About this file
This document contains a market research notice and cost breakdown exhibit for an underground electric lines construction project at Camp Buehring, Kuwait. The U.S. Army Corps of Engineers Transatlantic Middle East District intends to solicit fixed-price proposals to construct a new 11kV medium voltage electrical distribution ring to serve Ring 3 at Camp Buehring, with options to provide additional power lines to Rings 1 and 2. The cost breakdown exhibit provides pricing details for line items including mobilization, cable installation, packaged substations, site work, and optional additional scopes. Responses were due by May 6, 2019 for a project with an estimated value between $1-5 million and anticipated completion within 365 calendar days of award.
Amendment 0002 Cost Breakdown Camp Buehring
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP: W912ER19R0024 P2# 474411
PROJECT:
Underground Electric Lines
PROPOSER:
LOCATION: Camp Buehring, Kuwait DATE:
Mobilization and Demobilization in accordance with the contract documents
0001AA Mobilization
0001AB Demobilization
Total Price (Items 0001AA - AB)
Construct 11 KV Underground
Electric Lines in accordance with the contract documents
0002AA New 11 KV Cable
0002AB Cable Terminations
Total Price (Items 0002AA - AB)
Construct Packaged Substations in accordance with the Contract
Documents
0003AA Packaged Substation 14
0003AB Packaged Substation 15
0003AC Packaged Substation 16
0003AD Packaged Substation 17
Total Price (Items 0003AA - 0003AD)
DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
LABOR MAN-
HOURS
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
TOTAL
OVERHEAD/
INDIRECT COST
PROFIT
TOTAL PROPOSED
COST
COST BREAKDOWN
ITEM DESCRIPTION
EXHIBIT 1 Page 1 of 3
Underground Electric Lines
PROPOSER:
LOCATION: Camp Buehring, Kuwait DATE:
DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
LABOR MAN-
HOURS
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
TOTAL
OVERHEAD/
INDIRECT COST
PROFIT
TOTAL PROPOSED
COST
COST BREAKDOWN
ITEM DESCRIPTION
Site Work in accordance with the
Contract Documents
0004AA Demolition
0004AB Road Crossings
0004AC Site Earthwork
0004AD Site Improvements
Total Price (Items 0004AA - AD)
Option #1 Construct Packaged
Substation 18 in accordance with the
Contract Documents
0005AA Packaged Substation 18
0005AB
Site Civil Work associated with
Construction of Packaged Substation
Total Option #1 Price (Item(s) 0005AA -
0005AB)
TOTAL BASE BID PRICE (ITEMS 0001 - 0004)
Optional Bid Items
EXHIBIT 1 Page 2 of 3
Underground Electric Lines
PROPOSER:
LOCATION: Camp Buehring, Kuwait DATE:
DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
LABOR MAN-
HOURS
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
TOTAL
OVERHEAD/
INDIRECT COST
PROFIT
TOTAL PROPOSED
COST
COST BREAKDOWN
ITEM DESCRIPTION
Option #2 Construct Low Voltage
Cable Lines in accordance with the
Contract Documents
0006AA Low Voltage (415) Lines
0006AB
Site Civil Work associated with
Construction of Low Voltage (415)
Lines
Total Option #2 Price (Item(s) 0006AA -
0006AB)
TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0006)
TOTAL OPTIONS PRICE (ITEM(S) 0005-0006)
EXHIBIT 1 Page 3 of 3