Plans.pdf

PDF 2 MB Posted

Attached to
MISCELLANEOUS REPAIR
Solicitation number
W912EQ-17-B-0004
Issued by

About this file

Plans

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Arkansas

Missouri

Mississippi

Tennessee

Illinois

Kentucky

Texas

White

Lee

Dent

Drew

Iron

Clay

Howell

Bolivar

Butler

Desha

Izard

Shannon Wayne

Shelby

Dyer

Arkansas

Oregon

Lonoke

Ripley

Cross

Prairie

Panola

Sharp

Phillips

Jefferson

Fulton

Poinsett

Tate

Obion

Stoddard

Fayette

Perry

Reynolds

Monroe

Scott

Gibson

Mississippi

Carter

Marshall

Lincoln

Graves

Greene

Jackson

Carroll

Pope

Union

Lafayette

Stone

Bollinger

Dunklin

Tipton

Leflore

Craighead

Calhoun

Tunica

McNairy

Weakley

Tippah

Madison

DeSoto

Randolph

Woodruff

Alcorn

Cleburne

Hardeman

Lawrence

Crittenden

Coahoma

St. Francis

New Madrid

Haywood

Benton

Pemiscot

Saline

Pontotoc

Sunflower

Tallahatchie

Independence

Prentiss

Grenada

Henry

Webster

Pulaski

Phelps

Yalobusha

Quitman

Chickasaw

Lauderdale

Johnson

Williamson

Bradley

Lake

Cleveland

Cape Girardeau

Ballard

Chester

Itawamba

Henderson

Massac

Lowndes

Crockett

Hickman

St. Francois

Carlisle

Alexander

Ozark

Oktibbeha Montgomery

Livingston

Crawford

McCracken

Calloway

Chicot

Washington

Hardin

Douglas

Ste. Genevieve

Choctaw

Baxter

Faulkner

Gallatin

Grant

Tishomingo

Franklin

0 40 8020 Miles

MEMPHIS DISTRICT

Memphis District (Drawing No. 1)

Major Cities

State Boundary

District Boundary

FOR SOLICITATION

Illinois

Kentucky

Pulaski

Mississippi

Alexander

Ballard

Carlisle

Scott

I 5 7 S

I 5 7 N

U S

H W

Y

US HWY 60

STATE HW

Y 3

ST

AT

E

HW

Y

STATE HWY K

COUNTY HWY 2

S

TA

TE

H

W Y

COUNTY HWY 6

S

TA

TE

H

W Y

J

US HWY 62

COUNTY HWY 8

RAMP

M

AI

N

ST

US

HW

Y

R

AM

PRA

M

P

0 2.5 51.25 Miles

MEMPHIS DISTRICT

"ILLINOIS"

Memphis District (Drawing No. 2)

Major Cities

State Boundary

Illinois

Tennessee Arkansas

Illinois

Kentucky

Kentucky

Dyer

Stoddard

Scott

Clay

Dunklin

Obion

New Madrid

Butler

Pemiscot

Mississippi

Wayne

Lake

Bollinger

Fulton

Gibson

Lauderdale

Pulaski

Alexander

Crockett

Greene

Ballard

Cape Girardeau

Craighead

Hickman

Carlisle

Haywood

Johnson

0 7.5 153.75 Miles

MEMPHIS DISTRICT

"MISSOURI"

Memphis District (Drawing No. 3)

Major Cities

State Boundary

Missouri

Mississippi

Missouri

Tennessee White

Lee

Clay

Izard

Shelby

Arkansas

Lonoke

Cross

Prairie

Panola

Sharp

Phillips

Desha

Jefferson

Fulton

Poinsett

Tate

Bolivar

Mississippi

Lincoln

Monroe

Greene

Jackson

Stone

Dunklin

Craighead

Tunica

DeSoto

Randolph

Ripley

Woodruff

Cleburne

Lawrence

Crittenden

Coahoma

St. Francis

Oregon

Pemiscot

Tallahatchie

Tipton

Independence

Pulaski

ButlerHowell

Quitman

Cleveland

Drew

Grenada

Yalobusha

New Madrid

Baxter

Faulkner

Sunflower

Lauderdale

Marshall

Leflore

Ozark

Dyer

Stoddard

Grant

Lafayette

Fayette

Bradley

Van Buren

Lake

Saline

0 10 205 Miles

MEMPHIS DISTRICT

"ARKANSAS"

Memphis District (Drawing No. 4)

Major Cities

State Boundary

Arkansas

Kentucky

Illinois

Tennessee

Missouri

Obion

Graves

Weakley

Mississippi

Ballard

Fulton

Massac

Hickman

Pulaski

Carlisle

Pope

McCracken

Henry

Alexander

Marshall

Calloway

Lake

Livingston

Scott

Union Johnson

New Madrid

Dyer Gibson

0 4 82 Miles

MEMPHIS DISTRICT

"KENTUCKY"

Memphis District (Drawing No. 5)

Major Cities

State Boundary

Kentucky

Tennessee

Arkansas

Missouri

Kentucky

Shelby

Dyer

Tate

Obion

Fayette

Gibson

Mississippi

Panola

Carroll

Marshall

Clay

Lee

Union

Dunklin

Tipton

McNairy

Weakley

Tippah

Madison

DeSoto Alcorn

Hardeman

Lafayette

Henry

Haywood

Benton

Pemiscot

Crittenden

Tunica Prentiss

New Madrid

Lauderdale

Butler

Henderson

Lake

Graves

Chester

Fulton

Crockett

Hardin

Pontotoc

ItawambaQuitman

Calloway

Greene

Hickman

Poinsett

Stoddard

Craighead

Tishomingo

St. Francis

0 8 164 Miles

MEMPHIS DISTRICT

"TENNESSEE"

Memphis District (Drawing No. 6)

Major Cities

State Boundary

Tennessee

Tennessee

Louisiana

Lee

Attala

Bolivar

Shelby

Cross

Panola

Holmes

Phillips

Poinsett

Tate

Fayette

Carroll

Clay

Leflore

Marshall

Mississippi

Winston

Lafayette

Union

Monroe

Tipton

Calhoun

Tunica

Sunflower

Noxubee

McNairy

Tippah

Madison

Craighead

DeSoto

HardemanCrittenden

Alcorn

Coahoma

St. Francis

Haywood

Washington

Benton

Pontotoc

Tallahatchie

Grenada

Webster

Yalobusha

Quitman

Choctaw

Chickasaw

Lauderdale

Oktibbeha

Prentiss

Yazoo

Lowndes

Humphreys

Chester

Gibson

Montgomery

Sharkey

Crockett

Desha

Itawamba

Henderson

Leake Kemper

Dyer

Neshoba

Issaquena

Lawrence

Jackson

Woodruff

Arkansas

Chicot

Hardin

0 10 205 Miles

MEMPHIS DISTRICT

"MISSISSIPPI"

Memphis District (Drawing No. 7)

Major Cities

State Boundary

Mississippi

PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 00.00 11 - DEPARTMENT OF THE ARMY
00 00 00.00 11 - DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS
00 10 00.00 11 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS
00 10 00.00 11 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS
PART 1 GENERAL
1.1 Contract Information
00 41 00.00 11 - BIDDING SCHEDULE
00 41 00.00 11 - BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
00 70 00.00 11 - CONTRACT CLAUSE INSERTS
00 70 00.00 11 - CONTRACT CLAUSE INSERTS
PART 1 GENERAL
1.1 SUBMITTALS
1.2 UAI 31.105-101 Special Contract Requirements
1.3 FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT JUL 2013
1.4 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR
1.5 FAR 52.211-12 LIQUIDATED DAMAGES CONSTRUCTION SEP 2000
1.6 FAR 52.211-18 VARIATION IN ESTIMATED QUANTITIES APR 1984
1.7 FAR 52.216-18 ORDERING OCT 1995
1.8 FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT MAR 2000
1.9 FAR 52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION JAN 1997
1.10 FAR 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR APR 1984
1.11 FAR 52.236-5 MATERIAL AND WORKMANSHIP APR 1984
1.12 FAR 52.236-4 PHYSICAL DATA APR 1984
1.13 FAR 52.236-7 PERMITS AND RESPONSIBILITIES NOV 1991
1.14 FAR 52.236-16 QUANTITY SURVEYS - ALTERNATE I APR 1984
1.15 FAR 52.236-21 SPECIFICATION AND DRAWING FOR CONSTRUCTION FEB 1997
1.16 FAR 52.246-21 WARRANTY OF CONSTRUCTION MAR 1994
1.17 FAR 52.249-10 DEFAULT FIXED-PRICE CONSTRUCTIONAPR 1984
1.18 UAI 52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS MAR 2013
1.19 DFARS 252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS AUG 2000
1.20 DFARS 52.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION DEC
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
00 80 00.00 11 - SPECIAL CONTRACT REQUIREMENTS
00 80 00.00 11 - SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 EXCLUSION PERIODS IN COMPUTING COMPLETION SCHEDULES
1.4 EXCEPTION TO LIQUIDATED DAMAGES
1.5 RIGHTS-OF-WAY
1.6 LAYOUT OF WORK
1.7 PROGRESS CHART NOT USED
1.8 SAFETY RELATED SPECIAL REQUIREMENTS
1.9 CERTIFICATES OF COMPLIANCE
1.10 CONTRACTOR'S CERTIFICATE
1.11 SHOP DRAWINGS
1.12 AS-BUILT DRAWINGS
1.13 DAMAGE TO WORK
1.14 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK
1.15 RETESTING OF CONSTRUCTION MATERIALS
1.16 VEHICLE WEIGHT LIMITATIONS
1.17 OBSTRUCTIONS
1.18 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM NPDES
1.19 ACCEPTANCE SECTIONS
1.20 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER 31 OCT 1989
1.21 STONE SOURCES
1.22 FIELD OFFICE BUILDING NOT USED
1.23 HAUL ROADS
1.24 TEMPORARY PROJECT FENCING
1.25 MAINTENANCE OF TRAFFIC
1.26 COOPERATION WITH OTHERS
1.27 HOURS OF WORK
1.28 SUNDAY, HOLIDAY AND NIGHT WORK
1.29 SECURITY REQUIREMENTS
1.30 STORAGE OF EQUIPMENT AND MATERIALS
1.31 UTILITY SERVICES
1.32 COMMERCIAL WARRANTY NOT USED
1.33 PAYMENT FOR MATERIAL STORED OFF-SITE NOT USED
1.34 WORK IN QUARANTINED AREA NOT USED
1.35 WORK ON OR ADJACENT TO RAILROAD PROPERTY
1.36 INSURANCE REQUIREMENTS FOR WORK ON OR ADJACENT TO RAILROAD PROPERTY
1.37 CONTROL OF WATER LEVELS NOT USED
1.38 FLOOD EMERGENCY
1.39 PATENTS, PROPRIETARY RIGHTS
1.40 PROTECTION OF MATERIALS AND WORK
1.41 EXISTING FLOOD PROTECTION
1.42 FINAL ACCEPTANCE
1.43 INSPECTION
1.44 DESIGNATED BILLING OFFICE
1.45 REMOBILIZATION
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 11 - SUMMARY OF WORK
01 11 00.00 11 - SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
1.1.2 Location
1.2 EXISTING WORK
1.3 LOCATION OF UNDERGROUND FACILITIES
1.4 UAI SUBPART 22.13 - EQUAL OPPORTUNITY FOR VETERANS NOV 2014
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
01 22 00.00 11 - MEASUREMENT AND PAYMENT
01 22 00.00 11 - MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 Mobilization and Demobilization
1.1.2 Environmental Protection
1.2 Demolition
1.3 Write and/or Amend SWPPP, Obtain Permit If Necessary, Conduct
1.4 UNIT PRICE PAYMENT ITEMS
1.4.1 Remobilization
1.4.2 Storm Water Pollution Prevention
1.4.2.1 Silt Fence
1.4.2.2 Erosion Control Berm
1.4.2.3 Temporary Environmental Seeding
1.4.2.4 Construction Exit
1.4.3 Clearing
1.4.4 Grubbing
1.4.5 Stripping
1.4.6 Excavation
1.4.7 Geogrid
1.4.8 Geotextile
1.4.9 Corrugated Metal Pipe CMP
1.4.10 Polymer Coated CMP
1.4.11 Flared End Section
1.4.12 Flap Gate
1.4.13 Bedding Material
1.4.14 Aggregate Surfacing
1.4.15 Riprap
1.4.16 Transportation of Bedding Material, Aggregate Surfacing
1.4.17 Grout
1.4.18 Semi-compacted Backfill
1.4.19 Compacted Backfill
1.4.20 Establishment of Turf
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
01 33 00 - SUBMITTAL PROCEDURES
01 33 00 - SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal
1.1.2 Submittal Descriptions SD
1.1.3 Approving Authority
1.1.4 Work
1.2 SUBMITTALS
1.3 SUBMITTAL REGISTER
1.4 CONTRACTOR USE OF SUBMITTAL REGISTER
1.5 APPROVING AUTHORITY USE OF SUBMITTAL REGISTER
1.6 COPIES DELIVERED TO THE GOVERNMENT
1.7 PROCEDURES FOR SUBMITTALS
1.7.1 Reviewing, Certifying, Approving Authority
1.7.2 Constraints
1.7.3 Scheduling
1.7.4 Variations
1.7.4.1 Considering Variations
1.7.4.2 Proposing Variations
1.7.4.3 Warranting That Variations Are Compatible
1.7.4.4 Review Schedule Is Modified
1.8 CONTRACTOR'S RESPONSIBILITIES
1.9 GOVERNMENT'S RESPONSIBILITIES
1.10 FORMAT OF SUBMITTALS
1.10.1 Transmittal Sheet
1.10.2 Identifying Submittals
1.11 SUBMISSION AND CONTROL OF SUBMITTALS
1.11.1 Submittals Required from the Contractor
1.11.1.1 Submittal Procedures and Deviations
1.11.1.2 Control of Submittals
1.11.1.3 O&M Data
1.12 SUBMITTAL CLASSIFICATION
1.12.1 Government Approved
1.12.2 Information Only
1.13 APPROVED SUBMITTALS
1.14 DISAPPROVED SUBMITTALS
1.15 WITHHOLDING OF PAYMENT
1.16 GENERAL
1.17 SUBMITTAL REGISTER
1.18 SCHEDULING
1.19 TRANSMITTAL SHEET ENG FORM 4025
1.20 GOVERNMENT APPROVED SUBMITTALS
1.21 INFORMATION ONLY SUBMITTALS
1.22 STAMPS
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS
01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 ORDERING INFORMATION
01 45 00.15 10 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODERMS CM
01 45 00.15 10 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODERMS CM
PART 1 GENERAL
1.1 REFERENCES
1.2 Contract Administration
1.2.1 Correspondence and Electronic Communications
1.2.2 Other Factors
1.3 RMS SOFTWARE
1.3.1 RMS CONTRACTOR'S MODE CM
1.4 SYSTEM REQUIREMENTS
1.5 RELATED INFORMATION
1.5.1 RMS User Guide
1.6 CONTRACT DATABASE
1.7 DATABASE MAINTENANCE
1.7.1 Administration
1.7.1.1 Contractor Information
1.7.1.2 Subcontractor Information
1.7.1.3 Correspondence
1.7.1.4 Equipment
1.7.1.5 Management Reporting
1.7.1.6 Request For Information RFI
1.7.2 Finances
1.7.2.1 Pay Activity Data
1.7.2.2 Payment Requests
1.7.3 Quality Control QC
1.7.3.1 Daily Contractor Quality Control CQC Reports.
1.7.3.2 Deficiency Tracking.
1.7.3.3 QC Requirements
1.7.3.4 Three-Phase Control Meetings
1.7.3.5 Labor and Equipment Hours
1.7.3.6 Accident/Safety Reporting
1.7.3.7 Features of Work
1.7.3.8 Hazard Analysis
1.7.4 Submittal Management
1.7.5 Schedule
1.7.6 Import/Export of Data
1.8 IMPLEMENTATION
1.9 MONTHLY COORDINATION MEETING
1.10 NOTIFICATION OF NONCOMPLIANCE
PART 2 PRODUCTS
PART 3 EXECUTION
01 45 04.00 11 - CONTRACTOR QUALITY CONTROL
01 45 04.00 11 - CONTRACTOR QUALITY CONTROL
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 PAYMENT
PART 2 PRODUCTS Not Used
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.2 QUALITY CONTROL PLAN
3.2.1 Content of the CQC Plan
3.2.2 Acceptance of Plan
3.2.3 Notification of Changes
3.3 COORDINATION MEETING
3.4 QUALITY CONTROL ORGANIZATION
3.4.1 Personnel Requirements
3.4.2 CQC System Manager
3.4.3 Additional Requirement
3.4.4 Organizational Changes
3.5 SUBMITTALS AND DELIVERABLES
3.6 CONTROL
3.6.1 Preparatory Phase
3.6.2 Initial Phase
3.6.3 Follow-up Phase
3.6.4 Additional Preparatory and Initial Phases
3.7 TESTS
3.7.1 Testing Procedure
3.7.2 Testing Laboratories
3.7.2.1 Laboratory Validation
3.7.2.2 Capability Check
3.7.2.3 Capability Recheck
3.7.3 Onsite Laboratory
3.7.4 Furnishing or Transportation of Samples for Testing
3.8 COMPLETION INSPECTION
3.8.1 Punch-Out Inspection
3.8.2 Pre-Final Inspection
3.8.3 Final Acceptance Inspection
3.9 DOCUMENTATION
3.10 NOTIFICATION OF NONCOMPLIANCE
01 57 20.00 11 - ENVIRONMENTAL PROTECTION
01 57 20.00 11 - ENVIRONMENTAL PROTECTION
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DEFINITIONS
1.3.1 Environmental Pollution and Damage
1.3.2 Environmental Protection
1.3.3 Contractor Generated Hazardous Waste
1.3.4 Project Pesticide Coordinator
1.3.5 Land Application for Discharge Water
1.3.6 Pesticide
1.3.7 Pests
1.3.8 Surface Discharge
1.3.9 Waters of the United States
1.3.10 Wetlands
1.3.11 Spill or Hazardous Substance Release of "Reportable Quantity"
1.4 GENERAL REQUIREMENTS
1.5 SUBCONTRACTORS
1.6 ENVIRONMENTAL PROTECTION PLAN
1.6.1 Compliance
1.6.2 Contents
1.6.3 Appendix
1.7 PROTECTION FEATURES
1.8 SPECIAL ENVIRONMENTAL REQUIREMENTS
1.9 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS
1.10 NOTIFICATION
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION
3.1 ENVIRONMENTAL PERMITS AND COMMITMENTS
3.2 LAND RESOURCES
3.2.1 Work Area Limits
3.2.2 Landscape
3.2.3 Reduction of Exposure of Unprotected Erodible Soils
3.2.4 Temporary Protection of Disturbed Areas
3.2.5 Erosion and Sediment Controls
3.2.6 Contractor Facilities and Work Areas
3.2.7 Borrow Areas Provided by the Government
3.3 WATER RESOURCES
3.3.1 Cofferdams, Diversions, and Dewatering Operations
3.3.2 Stream Crossings
3.4 AIR RESOURCES
3.4.1 Particulates
3.4.2 Odors
3.4.3 Sound Intrusions
3.4.4 Burning
3.4.5 Hydrocarbons and Carbon Monoxide
3.4.6 Monitoring Air Quality
3.5 WASTE DISPOSAL
3.5.1 Disposal Areas
3.5.2 Temporary Excavation and Embankments
3.5.3 Solid Wastes
3.5.4 Chemicals and Chemical Wastes
3.5.5 Contractor Generated Hazardous Wastes/Excess Hazardous Materials
3.5.6 Fuel and Lubricants
3.5.7 Waste Water
3.6 REPORTING OF POLLUTION SPILLS
3.7 WASTE MINIMIZATION AND RECYCLING
3.8 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT
3.9 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES
3.10 BIOLOGICAL RESOURCES
3.11 INTEGRATED PEST MANAGEMENT - NOT USED
3.12 PREVIOUSLY USED EQUIPMENT
3.13 MAINTENANCE OF POLLUTION FACILITIES
3.14 MILITARY MUNITIONS - NOT USED
3.15 TRAINING OF CONTRACTOR PERSONNEL
3.16 INSPECTION
3.17 POST CONSTRUCTION CLEANUP
3.18 RESTORATION OF LANDSCAPE DAMAGE
01 57 25.00 11 - STORM WATER POLLUTION PREVENTION PLAN
01 57 25.00 11 - STORM WATER POLLUTION PREVENTION PLAN
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL
1.3 SUBMITTALS
1.4 EROSION AND SEDIMENT CONTROLS
1.4.1 Stabilization Practices
1.4.1.1 Unsuitable Conditions
1.4.1.2 No Activity for Less Than 14 Days
PART 2 STORMWATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITY
2.1 Site Description
2.2 Responsible Parties
2.3 Receiving Waters
2.4 Documentation of Permit Eligibility Related to the 303d list and
2.5 Attainment of Water Quality Standards After Authorization
2.6 Site Map Requirements See Site Map in Task Order drawings
2.7 Stormwater Controls
2.8 Other Controls
2.9 Non-Stormwater Discharges
2.10 Post-Construction Stormwater Management Establishment of Turf
2.11 Applicable State or Local Programs
2.12 INSPECTIONS
2.12.1 GENERAL INSPECTION GUIDELINES
2.12.2 DISTURBED AREAS AND AREAS USED FOR MATERIAL STORAGE
2.12.3 MODIFICATION OF POLLUTION PLAN
2.12.4 REPORTS
2.13 Maintenance
2.14 Employee Training
PART 3 CONTROL OF POLLUTANTS DURING CONSTRUCTION
3.1 NON-STRUCTURAL MEASURES
3.1.1 General
3.1.2 Reduction of Exposure of Unprotected Erodible Soils
3.1.3 General Buffer Zone
3.1.3.1 Improvement of the General Buffer
3.1.3.2 Maintenance of the General Buffer
3.1.4 Disturbed Area Stabilization with Mulch
3.1.4.1 Installation of Mulch
3.1.4.2 Maintenance of Mulch
3.1.5 Erosion Control Temporary Blankets and/or Permanent Matting
3.1.5.1 Installation of Erosion Control Blanket/Matting
3.1.5.2 Maintenance of Erosion Control Blanket/Matting
3.2 STRUCTURAL MEASURES
3.2.1 General
3.2.2 Silt Fences
3.2.2.1 Components for Silt Fences
3.2.2.2 Installation of Silt Fences
3.2.2.3 Maintenance of Silt Fences
3.2.3 Erosion Control Berms
3.2.3.1 Installation of Erosion Control Berms
3.2.3.2 Maintenance of Erosion Control Berms
3.2.4 Check Dams
3.2.4.1 Installation of Check Dams
3.2.4.2 Maintenance of Check Dams
3.2.5 Sediment Basins
3.2.6 Chemicals and Chemical Wastes
3.3 Contractor Generated Hazardous Wastes/Excess Hazardous Materials
3.4 Fuels and Lubricants
3.5 Solid Wastes
3.6 REPORTING OF POLLUTION SPILLS
3.7 WASTE MINIMIZATION AND RECYCLING
3.8 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT
3.9 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES
3.10 BIOLOGICAL RESOURCES
3.11 PREVIOUSLY USED EQUIPMENT
PART 4 OTHER CONSIDERATIONS
4.1 LOCATION OF CONSTRUCTION IN REGARD TO WATERS CLASSIFIED IN 10 CSR
4.2 PROXIMITY OF SITE TO MAJOR RESERVOIRS
PART 5 DEFINITIONS
5.1 BEST MANAGEMENT PRACTICES BMPs
5.2 COMMENCEMENT OF CONSTRUCTION
5.3 DRAINAGE SWALE
5.4 FINAL STABILIZATION

PART 6 CERTIFICATIONS, INSPECTION, AND MAINTENANCE REPORT FORMS

01 58 01.00 11 - PROJECT SIGN, BARRICADES, AND TRAFFIC CONTROL SIGNS
01 58 01.00 11 - PROJECT SIGN, BARRICADES, AND TRAFFIC CONTROL SIGNS
PART 1 GENERAL
1.1 SCOPE
1.2 PROJECT SIGN
1.3 BARRICADES AND TRAFFIC CONTROL SIGNS
1.4 PAYMENT
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED
01 78 00.00 11 - CLOSEOUT SUBMITTALS
01 78 00.00 11 - CLOSEOUT SUBMITTALS
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 As-Built Drawings
1.2.2 Record As-Built Drawings
1.2.3 For Construction Contract Documents
1.3 SOURCE DRAWING FILES
1.3.1 Terms and Conditions
1.4 SUBMITTALS
1.5 QUALITY CONTROL
PART 2 PRODUCTS
2.1 GOVERNMENT FURNISHED MATERIALS
2.2 SYSTEM DESCRIPTION
2.2.1 Additional Drawings
2.2.1.1 Sheet Numbers and File Names
PART 3 EXECUTION
3.1 AS-BUILT DRAWINGS
3.1.1 Markup Guidelines
3.1.2 As-Built Drawings Content
3.1.3 As-Built Drawing Submittals
3.1.3.1 35 Percent As-Built Drawings
3.1.3.2 100 Percent As-Built Drawings

3.1.4 Record As-Built Drawings

3.2 RECORD AS-BUILT DRAWING FILES
3.3 RECORD AS BUILT DRAWINGS
3.3.1 Record Drawing Package
3.4 FINAL APPROVED SHOP DRAWINGS
3.5 CONSTRUCTION CONTRACT SPECIFICATIONS
3.6 AS-BUILT RECORD OF EQUIPMENT AND MATERIALS
3.7 CLEANUP
3.8 WITHHOLDING OF PROGRESS AND FINAL PAYMENT
3.9 REAL PROPERTY RECORD
DIVISION 02 - EXISTING CONDITIONS
02 41 00 - DEMOLITION
02 41 00 - DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
1.2 PROJECT DESCRIPTION
1.2.1 Demolition Plan
1.2.2 General Requirements
1.3 ITEMS TO REMAIN IN PLACE
1.3.1 Existing Construction Limits and Protection
1.3.2 Weather Protection - NOT USED
1.3.3 Trees
1.3.4 Utility Service
1.3.5 Facilities - NOT USED
1.4 SAFETY REQUIREMENTS
1.5 BURNING
1.6 AVAILABILITY OF WORK AREAS
1.7 SUBMITTALS
1.8 QUALITY ASSURANCE
1.8.1 Dust and Debris Control
1.9 PROTECTION
1.9.1 Traffic Control Signs
1.9.2 Protection of Personnel
1.10 RELOCATIONS
1.11 EXISTING CONDITIONS
PART 2 PRODUCTS
2.1 FILL MATERIAL
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
3.1.1 Structures
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
3.1.2.2 Disconnecting Existing Utilities
3.1.3 Chain Link Fencing
3.1.4 Paving and Slabs
3.1.5 Roofing - NOT USED
3.1.6 Masonry - NOT USED
3.1.7 Concrete
3.1.8 Structural Steel
3.1.9 Miscellaneous Metal
3.1.10 Carpentry - NOT USED
3.1.11 Carpet - NOT USED
3.1.12 Acoustic Ceiling Tile - NOT USED
3.1.13 Airfield Lighting - NOT USED
3.1.14 Patching
3.1.15 Air Conditioning Equipment - NOT USED
3.1.16 Cylinders and Canisters - NOT USED
3.1.17 Locksets on Swinging Doors - NOT USED
3.1.18 Mechanical Equipment and Fixtures - NOT USED
3.1.19 Electrical Equipment and Fixtures - NOT USED
3.1.20 Elevators and Hoists - NOT USED
3.2 CONCURRENT EARTH-MOVING OPERATIONS
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
3.3.2 Reuse of Materials and Equipment - NOT USED
3.3.3 Salvaged Materials and Equipment - NOT USED
3.3.4 Disposal of Ozone Depleting Substance ODS - NOT USED
3.3.5 Unsalvageable and Non-Recyclable Material
3.4 CLEANUP
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
3.5.2 Burning on Government Property
3.5.3 Removal to Spoil Areas on Government Property - NOT USED
3.5.4 Removal from Government Property

3.6 REUSE OF SALVAGED ITEMS - NOT USED

DIVISION 31 - EARTHWORK
31 00 00 - EARTHWORK
31 00 00 - EARTHWORK
PART 1 GENERAL
1.1 SCOPE
1.2 QUALITY CONTROL
1.3 APPLICABLE PUBLICATION
1.4 SUBMITTALS
PART 2 MATERIALS NOT USED
PART 3 EXECUTION
3.1 EXCAVATION
3.1.1 General
3.1.2 Slide Excavation
3.1.3 Embedment of Stone Protection
3.2 DISPOSAL OF EXCAVATED MATERIAL
3.3 COMPACTED BACKFILL
3.3.1 General
3.3.2 Materials
3.3.3 Placement
3.3.4 Testing and Compaction
3.3.5 Additional Testing
3.4 SEMI-COMPACTED BACKFILL
3.4.1 General
3.4.2 Moisture Control
3.4.3 Compaction
3.4.3.1 Definition of Pass
3.4.3.2 Additional Compaction
3.5 LEVEE RESTORATION USING GEOGRID
3.5.1 Storage and Handling
3.5.2 Foundation Preparation
3.5.3 Installation
3.5.4 Placement of Geogrid
3.5.5 Testing and Compaction for Geogrid Restoration
3.6 SLIDES AND SHOALS
3.6.1 Excavated Material Disposal Areas
3.6.1.1 General
3.6.1.2 Slides Caused by Foundation Failure
3.6.1.3 Slides Not Caused by Foundation Failure
31 05 22 - GEOTEXTILES USED AS FILTERS
31 05 22 - GEOTEXTILES USED AS FILTERS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 General
2.1.2 Geotextile Fiber
2.1.3 Seams
2.1.4 Securing Pins
2.2 INSPECTIONS, VERIFICATIONS, AND TESTING
2.2.1 Manufacturing and Sampling
2.2.2 Site Verification and Testing
PART 3 EXECUTION
3.1 SURFACE PREPARATION
3.2 INSTALLATION OF THE GEOTEXTILE
3.2.1 General
3.2.2 Placement
3.3 PROTECTION
3.4 PLACEMENT OF CUSHIONING MATERIAL
3.5 OVERLAPPING AND SEAMING
3.5.1 Overlapping
3.5.2 Sewn Seams
31 11 00.00 11 - CLEARING, GRUBBING AND STRIPPING
31 11 00.00 11 - CLEARING, GRUBBING AND STRIPPING
PART 1 GENERAL
1.1 SCOPE
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.4 QUALITY CONTROL
PART 2 PRODUCTS
2.1 TREE WOUND PAINT
2.2 HERBICIDE
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Roads and Walks
3.1.2 Trees, Shrubs, and Existing Facilities
3.1.3 Utility and Telecommunication Lines
3.1.4 Cemeteries
3.2 CLEARING
3.3 GRUBBING
3.4 STRIPPING
3.5 TREE REMOVAL
3.6 PRUNING
3.7 DISPOSAL OF MATERIALS
3.7.1 General
3.7.2 Burning
3.7.3 Air Curtain Burning
3.7.4 Chipping
3.7.5 Removal from Site
3.7.6 Saleable Timber
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 15 00.00 11 - AGGREGATE SURFACE COURSE
32 15 00.00 11 - AGGREGATE SURFACE COURSE
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY CONTROL
1.4 EQUIPMENT
1.5 APPROVAL OF MATERIALS
1.6 SAMPLING AND TESTING
1.6.1 Sampling
1.6.2 Testing
1.6.2.1 Gradation
1.6.2.2 Liquid Limit and Plasticity Index
1.6.2.3 Wear Test
1.6.2.4 Smoothness Test
1.6.2.5 Government Testing
PART 2 PRODUCTS
2.1 AGGREGATES
2.1.1 Coarse Aggregates
2.1.2 Fine Aggregates
2.1.3 Gradation Requirements

2.2 LIQUID LIMIT AND PLASTICITY INDEX REQUIREMENTS

PART 3 EXECUTION
3.1 WEATHER LIMITATIONS
3.2 CLEARING AND DEBRIS REMOVAL
3.3 USE OF HAUL ROADS
3.4 STOCKPILING MATERIALS
3.5 PREPARATION OF UNDERLYING SUBGRADE
3.6 GRADE CONTROL
3.7 MIXING AND PLACING MATERIALS
3.8 PLACEMENT
3.9 LAYER THICKNESS
3.10 THICKNESS CONTROL
3.11 COMPACTION
3.12 EDGES OF AGGREGATE-SURFACED ROAD
3.13 MAINTENANCE
32 25 00.00 11 - CULVERT REMOVAL AND INSTALLATION
32 25 00.00 11 - CULVERT REMOVAL AND INSTALLATION
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 SUBMITTALS
1.4 QUALITY CONTROL
PART 2 PRODUCTS
2.1 PIPES
2.1.1 Corrugated Metal Pipe Culverts
2.1.2 Polymer Coated Corrugated Steel Pipe Culverts
2.2 FLARED END SECTIONS
2.3 FLAPGATES
PART 3 EXECUTION
3.1 REMOVAL OF EXISTING CULVERTS
3.2 FOUNDATION/BEDDING MATERIAL BENEATH CULVERTS
3.3 INSTALLATION OF CULVERT PIPE, FLARED END SECTIONS AND FLAPGATES
3.4 BACKFILL
3.4.1 General
3.4.2 Compacted Backfill
3.4.3 Semi-compacted Backfill

3.5 BEDDING MATERIAL AND RIPRAP AT THE CULVERTS

32 92 32.01 11 - ESTABLISHMENT OF TURF
32 92 32.01 11 - ESTABLISHMENT OF TURF
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 SUBMITTALS
1.4 QUALITY CONTROL
1.5 AREAS TO BE TURFED
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Fertilizer and Limestone
2.1.2 Seed
2.1.3 Mulch
2.1.4 Water
2.1.5 Spot Sod
2.1.6 Sprigs
2.1.7 Soil for Repairs
2.1.8 Soil Composition
2.2 SAMPLING, TESTING, AND CERTIFICATES
2.2.1 Seed
2.2.2 Soil Testing
2.2.3 Fertilizer and Limestone Testing
2.2.4 Mulch
PART 3 EXECUTION
3.1 COMMENCEMENT, PROSECUTION, AND COMPLETION
3.1.1 Sequence of Work
3.2 PREPARATION OF GROUND SURFACE
3.2.1 Clearing
3.2.2 Dressing
3.3 APPLICATION OF FERTILIZER AND/OR LIMESTONE
3.4 SPOT SODDING
3.5 SPRIGGING
3.6 SEEDING
3.6.1 Planting Dates
3.6.2 Seed Mixtures
3.6.3 Broadcast Seeding
3.6.4 Hydroseeding
3.6.5 Damage to Seeding
3.7 APPLICATION OF AN ANCHORING MULCH
3.8 HYDRAULIC SLURRY METHOD
3.9 COMPACTING
3.10 ESTABLISHMENT
3.10.1 General
3.10.2 Watering
3.10.3 Maintenance
3.10.4 Turf Establishment Period
3.11 INSPECTION AND ACCEPTANCE
3.11.1 Areas Requiring Returfing
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19.00 11 - STONE PROTECTION
35 31 19.00 11 - STONE PROTECTION
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SCOPE
1.4 QUALITY CONTROL
1.5 STONE SOURCES
1.6 Concrete Grout for Stone Protection
1.6.1 General
1.6.2 1.7.2 Concrete Grout Mixture Proportions
1.6.3 Evaluation and Acceptance of Grout
PART 2 PRODUCTS
2.1 BEDDING MATERIAL
2.1.1 General
2.1.2 Gradation
2.2 STONE
2.2.1 General
2.2.2 Sources and Evaluation Testing
2.2.3 Stone Gradation
2.2.4 Test Method
2.2.5 Gradation Test
2.2.6 Proportional Dimension Limitations
2.2.7 Stone Stockpile
2.3 CONCRETE GROUT
2.3.1 Cementitious Materials
2.3.1.1 Portland Cement
2.3.1.2 Pozzolan
2.3.2 Ground Granulated Blast-Furnace Slag Not Used
2.3.2.1 Silica Fume
2.3.3 Blended Hydraulic Cement
2.3.4 Aggregates for Concrete Grout
2.3.5 2.3.5 Admixtures
2.3.6 2.3.6 Curing Materials
2.3.7 Water
2.3.8 Non-Shrink Epoxy Grout
2.3.9 Equipment
PART 3 EXECUTION
3.1 STONE DELIVERY
3.2 BASE PREPARATION
3.3 PLACEMENT OF BEDDING LAYERS
3.3.1 General
3.3.2 Placement of Bedding Material on Prepared Base
3.4 PLACEMENT OF STONE
3.5 PLACEMENT CONTROL
3.5.1 Quality Control Measures
3.5.2 Check Surveys
3.6 GROUTING OF STONE PROTECTION
3.6.1 Producing, Conveying and Placing of Grout
3.6.1.1 Producing Grout
3.6.1.2 Preparation for Placing
3.6.1.3 3.2.1.3 Conveying and Placing
3.6.1.4 Cold-Weather Requirements
3.6.1.5 Hot Weather Requirements

3.6.2 Curing and Protection of Grouted Stone Protection

3.7 TESTS AND INSPECTIONS
3.7.1 Concrete Grout
3.7.1.1 General
3.7.1.2 Preparations for Placing
3.7.1.3 Air Content
3.7.1.4 Slump
3.7.1.5 Placing
3.7.2 Pre-Production
3.7.2.1 3.6.2.1 Bulk Specific Gravity
3.7.2.2 Material Quality
3.7.2.3 Borderline Material Quality
3.7.3 Bedding Layers
3.7.3.1 General
3.7.3.2 Reporting
District Maps.pdf
Drawings
District Maps.pdf
Drawings
MISSOURI BID SCHEDULE.pdf
00 41 00.00 11 - BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
ARKANSAS BID SCHEDULE.pdf
00 41 00.00 11 - BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
KENTUCKY.pdf
00 41 00.00 11 - BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
TENNESSEE.pdf
00 41 00.00 11 - BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
MISSISSIPPI.pdf
00 41 00.00 11 - BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
ILLINOIS.pdf
00 41 00.00 11 - BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
MISSOURI.pdf
00 41 00.00 11 - BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
ARKANSAS.pdf
00 41 00.00 11 - BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
KENTUCKY.pdf
00 41 00.00 11 - BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
TENNESSEE.pdf
00 41 00.00 11 - BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
MISSISSIPPI.pdf
00 41 00.00 11 - BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
M&P section.pdf
01 22 00.00 11 - MEASUREMENT AND PAYMENT
01 22 00.00 11 - MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 Mobilization and Demobilization
1.1.2 Environmental Protection
1.2 Demolition
1.3 Write and/or Amend SWPPP, Obtain Permit If Necessary, and Conduct
1.4 UNIT PRICE PAYMENT ITEMS
1.4.1 Remobilization
1.4.2 Storm Water Pollution Prevention
1.4.2.1 Silt Fence
1.4.2.2 Erosion Control Berm
1.4.2.3 Temporary Environmental Seeding
1.4.2.4 Construction Exit
1.4.2.5 Check Dam
1.4.2.6 Erosion Control Temporary Blankets and/or Permanent Matting
1.4.2.7 Straw Wattle, 12-inch
1.4.3 Clearing
1.4.4 Grubbing
1.4.5 Stripping
1.4.6 Excavation
1.4.7 Geogrid
1.4.8 Geotextile
1.4.9 Corrugated Metal Pipe CMP
1.4.10 Polymer Coated CMP
1.4.11 Flared End Section
1.4.12 Flap Gate
1.4.13 Bedding Material
1.4.14 Aggregate Surfacing
1.4.15 Riprap
1.4.16 Transportation of Bedding Material, Aggregate Surfacing
1.4.17 Grout
1.4.18 Semi-compacted Backfill
1.4.19 Compacted Backfill
1.4.20 Establishment of Turf
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used

File details come from the government source that posted it. Updated .