Plans.pdf
PDF 2 MB Posted
- Attached to
- MISCELLANEOUS REPAIR
- Solicitation number
- W912EQ-17-B-0004
About this file
Plans
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Arkansas
Missouri
Mississippi
Tennessee
Illinois
Kentucky
Texas
White
Lee
Dent
Drew
Iron
Clay
Howell
Bolivar
Butler
Desha
Izard
Shannon Wayne
Shelby
Dyer
Arkansas
Oregon
Lonoke
Ripley
Cross
Prairie
Panola
Sharp
Phillips
Jefferson
Fulton
Poinsett
Tate
Obion
Stoddard
Fayette
Perry
Reynolds
Monroe
Scott
Gibson
Mississippi
Carter
Marshall
Lincoln
Graves
Greene
Jackson
Carroll
Pope
Union
Lafayette
Stone
Bollinger
Dunklin
Tipton
Leflore
Craighead
Calhoun
Tunica
McNairy
Weakley
Tippah
Madison
DeSoto
Randolph
Woodruff
Alcorn
Cleburne
Hardeman
Lawrence
Crittenden
Coahoma
St. Francis
New Madrid
Haywood
Benton
Pemiscot
Saline
Pontotoc
Sunflower
Tallahatchie
Independence
Prentiss
Grenada
Henry
Webster
Pulaski
Phelps
Yalobusha
Quitman
Chickasaw
Lauderdale
Johnson
Williamson
Bradley
Lake
Cleveland
Cape Girardeau
Ballard
Chester
Itawamba
Henderson
Massac
Lowndes
Crockett
Hickman
St. Francois
Carlisle
Alexander
Ozark
Oktibbeha Montgomery
Livingston
Crawford
McCracken
Calloway
Chicot
Washington
Hardin
Douglas
Ste. Genevieve
Choctaw
Baxter
Faulkner
Gallatin
Grant
Tishomingo
Franklin
0 40 8020 Miles
MEMPHIS DISTRICT
Memphis District (Drawing No. 1)
Major Cities
State Boundary
District Boundary
FOR SOLICITATION
Illinois
Kentucky
Pulaski
Mississippi
Alexander
Ballard
Carlisle
Scott
I 5 7 S
I 5 7 N
U S
H W
Y
US HWY 60
STATE HW
Y 3
ST
AT
E
HW
Y
STATE HWY K
COUNTY HWY 2
S
TA
TE
H
W Y
COUNTY HWY 6
S
TA
TE
H
W Y
J
US HWY 62
COUNTY HWY 8
RAMP
M
AI
N
ST
US
HW
Y
R
AM
PRA
M
P
0 2.5 51.25 Miles
MEMPHIS DISTRICT
"ILLINOIS"
Memphis District (Drawing No. 2)
Major Cities
State Boundary
Illinois
Tennessee Arkansas
Illinois
Kentucky
Kentucky
Dyer
Stoddard
Scott
Clay
Dunklin
Obion
New Madrid
Butler
Pemiscot
Mississippi
Wayne
Lake
Bollinger
Fulton
Gibson
Lauderdale
Pulaski
Alexander
Crockett
Greene
Ballard
Cape Girardeau
Craighead
Hickman
Carlisle
Haywood
Johnson
0 7.5 153.75 Miles
MEMPHIS DISTRICT
"MISSOURI"
Memphis District (Drawing No. 3)
Major Cities
State Boundary
Missouri
Mississippi
Missouri
Tennessee White
Lee
Clay
Izard
Shelby
Arkansas
Lonoke
Cross
Prairie
Panola
Sharp
Phillips
Desha
Jefferson
Fulton
Poinsett
Tate
Bolivar
Mississippi
Lincoln
Monroe
Greene
Jackson
Stone
Dunklin
Craighead
Tunica
DeSoto
Randolph
Ripley
Woodruff
Cleburne
Lawrence
Crittenden
Coahoma
St. Francis
Oregon
Pemiscot
Tallahatchie
Tipton
Independence
Pulaski
ButlerHowell
Quitman
Cleveland
Drew
Grenada
Yalobusha
New Madrid
Baxter
Faulkner
Sunflower
Lauderdale
Marshall
Leflore
Ozark
Dyer
Stoddard
Grant
Lafayette
Fayette
Bradley
Van Buren
Lake
Saline
0 10 205 Miles
MEMPHIS DISTRICT
"ARKANSAS"
Memphis District (Drawing No. 4)
Major Cities
State Boundary
Arkansas
Kentucky
Illinois
Tennessee
Missouri
Obion
Graves
Weakley
Mississippi
Ballard
Fulton
Massac
Hickman
Pulaski
Carlisle
Pope
McCracken
Henry
Alexander
Marshall
Calloway
Lake
Livingston
Scott
Union Johnson
New Madrid
Dyer Gibson
0 4 82 Miles
MEMPHIS DISTRICT
"KENTUCKY"
Memphis District (Drawing No. 5)
Major Cities
State Boundary
Kentucky
Tennessee
Arkansas
Missouri
Kentucky
Shelby
Dyer
Tate
Obion
Fayette
Gibson
Mississippi
Panola
Carroll
Marshall
Clay
Lee
Union
Dunklin
Tipton
McNairy
Weakley
Tippah
Madison
DeSoto Alcorn
Hardeman
Lafayette
Henry
Haywood
Benton
Pemiscot
Crittenden
Tunica Prentiss
New Madrid
Lauderdale
Butler
Henderson
Lake
Graves
Chester
Fulton
Crockett
Hardin
Pontotoc
ItawambaQuitman
Calloway
Greene
Hickman
Poinsett
Stoddard
Craighead
Tishomingo
St. Francis
0 8 164 Miles
MEMPHIS DISTRICT
"TENNESSEE"
Memphis District (Drawing No. 6)
Major Cities
State Boundary
Tennessee
Tennessee
Louisiana
Lee
Attala
Bolivar
Shelby
Cross
Panola
Holmes
Phillips
Poinsett
Tate
Fayette
Carroll
Clay
Leflore
Marshall
Mississippi
Winston
Lafayette
Union
Monroe
Tipton
Calhoun
Tunica
Sunflower
Noxubee
McNairy
Tippah
Madison
Craighead
DeSoto
HardemanCrittenden
Alcorn
Coahoma
St. Francis
Haywood
Washington
Benton
Pontotoc
Tallahatchie
Grenada
Webster
Yalobusha
Quitman
Choctaw
Chickasaw
Lauderdale
Oktibbeha
Prentiss
Yazoo
Lowndes
Humphreys
Chester
Gibson
Montgomery
Sharkey
Crockett
Desha
Itawamba
Henderson
Leake Kemper
Dyer
Neshoba
Issaquena
Lawrence
Jackson
Woodruff
Arkansas
Chicot
Hardin
0 10 205 Miles
MEMPHIS DISTRICT
"MISSISSIPPI"
Memphis District (Drawing No. 7)
Major Cities
State Boundary
Mississippi
| PROJECT TABLE OF CONTENTS |
| DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS |
| 00 00 00.00 11 - DEPARTMENT OF THE ARMY |
| 00 00 00.00 11 - DEPARTMENT OF THE ARMY |
| U.S. ARMY CORPS OF ENGINEERS |
| 00 10 00.00 11 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS |
| 00 10 00.00 11 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS |
| PART 1 GENERAL |
| 1.1 Contract Information |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| 00 70 00.00 11 - CONTRACT CLAUSE INSERTS |
| 00 70 00.00 11 - CONTRACT CLAUSE INSERTS |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 UAI 31.105-101 Special Contract Requirements |
| 1.3 FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT JUL 2013 |
| 1.4 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR |
| 1.5 FAR 52.211-12 LIQUIDATED DAMAGES CONSTRUCTION SEP 2000 |
| 1.6 FAR 52.211-18 VARIATION IN ESTIMATED QUANTITIES APR 1984 |
| 1.7 FAR 52.216-18 ORDERING OCT 1995 |
| 1.8 FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT MAR 2000 |
| 1.9 FAR 52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION JAN 1997 |
| 1.10 FAR 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR APR 1984 |
| 1.11 FAR 52.236-5 MATERIAL AND WORKMANSHIP APR 1984 |
| 1.12 FAR 52.236-4 PHYSICAL DATA APR 1984 |
| 1.13 FAR 52.236-7 PERMITS AND RESPONSIBILITIES NOV 1991 |
| 1.14 FAR 52.236-16 QUANTITY SURVEYS - ALTERNATE I APR 1984 |
| 1.15 FAR 52.236-21 SPECIFICATION AND DRAWING FOR CONSTRUCTION FEB 1997 |
| 1.16 FAR 52.246-21 WARRANTY OF CONSTRUCTION MAR 1994 |
| 1.17 FAR 52.249-10 DEFAULT FIXED-PRICE CONSTRUCTIONAPR 1984 |
| 1.18 UAI 52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS MAR 2013 |
| 1.19 DFARS 252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS AUG 2000 |
| 1.20 DFARS 52.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION DEC |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| 00 80 00.00 11 - SPECIAL CONTRACT REQUIREMENTS |
| 00 80 00.00 11 - SPECIAL CONTRACT REQUIREMENTS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 EXCLUSION PERIODS IN COMPUTING COMPLETION SCHEDULES |
| 1.4 EXCEPTION TO LIQUIDATED DAMAGES |
| 1.5 RIGHTS-OF-WAY |
| 1.6 LAYOUT OF WORK |
| 1.7 PROGRESS CHART NOT USED |
| 1.8 SAFETY RELATED SPECIAL REQUIREMENTS |
| 1.9 CERTIFICATES OF COMPLIANCE |
| 1.10 CONTRACTOR'S CERTIFICATE |
| 1.11 SHOP DRAWINGS |
| 1.12 AS-BUILT DRAWINGS |
| 1.13 DAMAGE TO WORK |
| 1.14 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK |
| 1.15 RETESTING OF CONSTRUCTION MATERIALS |
| 1.16 VEHICLE WEIGHT LIMITATIONS |
| 1.17 OBSTRUCTIONS |
| 1.18 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM NPDES |
| 1.19 ACCEPTANCE SECTIONS |
| 1.20 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER 31 OCT 1989 |
| 1.21 STONE SOURCES |
| 1.22 FIELD OFFICE BUILDING NOT USED |
| 1.23 HAUL ROADS |
| 1.24 TEMPORARY PROJECT FENCING |
| 1.25 MAINTENANCE OF TRAFFIC |
| 1.26 COOPERATION WITH OTHERS |
| 1.27 HOURS OF WORK |
| 1.28 SUNDAY, HOLIDAY AND NIGHT WORK |
| 1.29 SECURITY REQUIREMENTS |
| 1.30 STORAGE OF EQUIPMENT AND MATERIALS |
| 1.31 UTILITY SERVICES |
| 1.32 COMMERCIAL WARRANTY NOT USED |
| 1.33 PAYMENT FOR MATERIAL STORED OFF-SITE NOT USED |
| 1.34 WORK IN QUARANTINED AREA NOT USED |
| 1.35 WORK ON OR ADJACENT TO RAILROAD PROPERTY |
| 1.36 INSURANCE REQUIREMENTS FOR WORK ON OR ADJACENT TO RAILROAD PROPERTY |
| 1.37 CONTROL OF WATER LEVELS NOT USED |
| 1.38 FLOOD EMERGENCY |
| 1.39 PATENTS, PROPRIETARY RIGHTS |
| 1.40 PROTECTION OF MATERIALS AND WORK |
| 1.41 EXISTING FLOOD PROTECTION |
| 1.42 FINAL ACCEPTANCE |
| 1.43 INSPECTION |
| 1.44 DESIGNATED BILLING OFFICE |
| 1.45 REMOBILIZATION |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00.00 11 - SUMMARY OF WORK |
| 01 11 00.00 11 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 WORK COVERED BY CONTRACT DOCUMENTS |
| 1.1.1 Project Description |
| 1.1.2 Location |
| 1.2 EXISTING WORK |
| 1.3 LOCATION OF UNDERGROUND FACILITIES |
| 1.4 UAI SUBPART 22.13 - EQUAL OPPORTUNITY FOR VETERANS NOV 2014 |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| 01 22 00.00 11 - MEASUREMENT AND PAYMENT |
| 01 22 00.00 11 - MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 JOB PAYMENT ITEMS |
| 1.1.1 Mobilization and Demobilization |
| 1.1.2 Environmental Protection |
| 1.2 Demolition |
| 1.3 Write and/or Amend SWPPP, Obtain Permit If Necessary, Conduct |
| 1.4 UNIT PRICE PAYMENT ITEMS |
| 1.4.1 Remobilization |
| 1.4.2 Storm Water Pollution Prevention |
| 1.4.2.1 Silt Fence |
| 1.4.2.2 Erosion Control Berm |
| 1.4.2.3 Temporary Environmental Seeding |
| 1.4.2.4 Construction Exit |
| 1.4.3 Clearing |
| 1.4.4 Grubbing |
| 1.4.5 Stripping |
| 1.4.6 Excavation |
| 1.4.7 Geogrid |
| 1.4.8 Geotextile |
| 1.4.9 Corrugated Metal Pipe CMP |
| 1.4.10 Polymer Coated CMP |
| 1.4.11 Flared End Section |
| 1.4.12 Flap Gate |
| 1.4.13 Bedding Material |
| 1.4.14 Aggregate Surfacing |
| 1.4.15 Riprap |
| 1.4.16 Transportation of Bedding Material, Aggregate Surfacing |
| 1.4.17 Grout |
| 1.4.18 Semi-compacted Backfill |
| 1.4.19 Compacted Backfill |
| 1.4.20 Establishment of Turf |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| 01 33 00 - SUBMITTAL PROCEDURES |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 DEFINITIONS |
| 1.1.1 Submittal |
| 1.1.2 Submittal Descriptions SD |
| 1.1.3 Approving Authority |
| 1.1.4 Work |
| 1.2 SUBMITTALS |
| 1.3 SUBMITTAL REGISTER |
| 1.4 CONTRACTOR USE OF SUBMITTAL REGISTER |
| 1.5 APPROVING AUTHORITY USE OF SUBMITTAL REGISTER |
| 1.6 COPIES DELIVERED TO THE GOVERNMENT |
| 1.7 PROCEDURES FOR SUBMITTALS |
| 1.7.1 Reviewing, Certifying, Approving Authority |
| 1.7.2 Constraints |
| 1.7.3 Scheduling |
| 1.7.4 Variations |
| 1.7.4.1 Considering Variations |
| 1.7.4.2 Proposing Variations |
| 1.7.4.3 Warranting That Variations Are Compatible |
| 1.7.4.4 Review Schedule Is Modified |
| 1.8 CONTRACTOR'S RESPONSIBILITIES |
| 1.9 GOVERNMENT'S RESPONSIBILITIES |
| 1.10 FORMAT OF SUBMITTALS |
| 1.10.1 Transmittal Sheet |
| 1.10.2 Identifying Submittals |
| 1.11 SUBMISSION AND CONTROL OF SUBMITTALS |
| 1.11.1 Submittals Required from the Contractor |
| 1.11.1.1 Submittal Procedures and Deviations |
| 1.11.1.2 Control of Submittals |
| 1.11.1.3 O&M Data |
| 1.12 SUBMITTAL CLASSIFICATION |
| 1.12.1 Government Approved |
| 1.12.2 Information Only |
| 1.13 APPROVED SUBMITTALS |
| 1.14 DISAPPROVED SUBMITTALS |
| 1.15 WITHHOLDING OF PAYMENT |
| 1.16 GENERAL |
| 1.17 SUBMITTAL REGISTER |
| 1.18 SCHEDULING |
| 1.19 TRANSMITTAL SHEET ENG FORM 4025 |
| 1.20 GOVERNMENT APPROVED SUBMITTALS |
| 1.21 INFORMATION ONLY SUBMITTALS |
| 1.22 STAMPS |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| 01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS |
| 01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 ORDERING INFORMATION |
| 01 45 00.15 10 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODERMS CM |
| 01 45 00.15 10 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODERMS CM |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 Contract Administration |
| 1.2.1 Correspondence and Electronic Communications |
| 1.2.2 Other Factors |
| 1.3 RMS SOFTWARE |
| 1.3.1 RMS CONTRACTOR'S MODE CM |
| 1.4 SYSTEM REQUIREMENTS |
| 1.5 RELATED INFORMATION |
| 1.5.1 RMS User Guide |
| 1.6 CONTRACT DATABASE |
| 1.7 DATABASE MAINTENANCE |
| 1.7.1 Administration |
| 1.7.1.1 Contractor Information |
| 1.7.1.2 Subcontractor Information |
| 1.7.1.3 Correspondence |
| 1.7.1.4 Equipment |
| 1.7.1.5 Management Reporting |
| 1.7.1.6 Request For Information RFI |
| 1.7.2 Finances |
| 1.7.2.1 Pay Activity Data |
| 1.7.2.2 Payment Requests |
| 1.7.3 Quality Control QC |
| 1.7.3.1 Daily Contractor Quality Control CQC Reports. |
| 1.7.3.2 Deficiency Tracking. |
| 1.7.3.3 QC Requirements |
| 1.7.3.4 Three-Phase Control Meetings |
| 1.7.3.5 Labor and Equipment Hours |
| 1.7.3.6 Accident/Safety Reporting |
| 1.7.3.7 Features of Work |
| 1.7.3.8 Hazard Analysis |
| 1.7.4 Submittal Management |
| 1.7.5 Schedule |
| 1.7.6 Import/Export of Data |
| 1.8 IMPLEMENTATION |
| 1.9 MONTHLY COORDINATION MEETING |
| 1.10 NOTIFICATION OF NONCOMPLIANCE |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 45 04.00 11 - CONTRACTOR QUALITY CONTROL |
| 01 45 04.00 11 - CONTRACTOR QUALITY CONTROL |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 PAYMENT |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 QUALITY CONTROL PLAN |
| 3.2.1 Content of the CQC Plan |
| 3.2.2 Acceptance of Plan |
| 3.2.3 Notification of Changes |
| 3.3 COORDINATION MEETING |
| 3.4 QUALITY CONTROL ORGANIZATION |
| 3.4.1 Personnel Requirements |
| 3.4.2 CQC System Manager |
| 3.4.3 Additional Requirement |
| 3.4.4 Organizational Changes |
| 3.5 SUBMITTALS AND DELIVERABLES |
| 3.6 CONTROL |
| 3.6.1 Preparatory Phase |
| 3.6.2 Initial Phase |
| 3.6.3 Follow-up Phase |
| 3.6.4 Additional Preparatory and Initial Phases |
| 3.7 TESTS |
| 3.7.1 Testing Procedure |
| 3.7.2 Testing Laboratories |
| 3.7.2.1 Laboratory Validation |
| 3.7.2.2 Capability Check |
| 3.7.2.3 Capability Recheck |
| 3.7.3 Onsite Laboratory |
| 3.7.4 Furnishing or Transportation of Samples for Testing |
| 3.8 COMPLETION INSPECTION |
| 3.8.1 Punch-Out Inspection |
| 3.8.2 Pre-Final Inspection |
| 3.8.3 Final Acceptance Inspection |
| 3.9 DOCUMENTATION |
| 3.10 NOTIFICATION OF NONCOMPLIANCE |
| 01 57 20.00 11 - ENVIRONMENTAL PROTECTION |
| 01 57 20.00 11 - ENVIRONMENTAL PROTECTION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DEFINITIONS |
| 1.3.1 Environmental Pollution and Damage |
| 1.3.2 Environmental Protection |
| 1.3.3 Contractor Generated Hazardous Waste |
| 1.3.4 Project Pesticide Coordinator |
| 1.3.5 Land Application for Discharge Water |
| 1.3.6 Pesticide |
| 1.3.7 Pests |
| 1.3.8 Surface Discharge |
| 1.3.9 Waters of the United States |
| 1.3.10 Wetlands |
| 1.3.11 Spill or Hazardous Substance Release of "Reportable Quantity" |
| 1.4 GENERAL REQUIREMENTS |
| 1.5 SUBCONTRACTORS |
| 1.6 ENVIRONMENTAL PROTECTION PLAN |
| 1.6.1 Compliance |
| 1.6.2 Contents |
| 1.6.3 Appendix |
| 1.7 PROTECTION FEATURES |
| 1.8 SPECIAL ENVIRONMENTAL REQUIREMENTS |
| 1.9 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS |
| 1.10 NOTIFICATION |
| PART 2 PRODUCTS NOT USED |
| PART 3 EXECUTION |
| 3.1 ENVIRONMENTAL PERMITS AND COMMITMENTS |
| 3.2 LAND RESOURCES |
| 3.2.1 Work Area Limits |
| 3.2.2 Landscape |
| 3.2.3 Reduction of Exposure of Unprotected Erodible Soils |
| 3.2.4 Temporary Protection of Disturbed Areas |
| 3.2.5 Erosion and Sediment Controls |
| 3.2.6 Contractor Facilities and Work Areas |
| 3.2.7 Borrow Areas Provided by the Government |
| 3.3 WATER RESOURCES |
| 3.3.1 Cofferdams, Diversions, and Dewatering Operations |
| 3.3.2 Stream Crossings |
| 3.4 AIR RESOURCES |
| 3.4.1 Particulates |
| 3.4.2 Odors |
| 3.4.3 Sound Intrusions |
| 3.4.4 Burning |
| 3.4.5 Hydrocarbons and Carbon Monoxide |
| 3.4.6 Monitoring Air Quality |
| 3.5 WASTE DISPOSAL |
| 3.5.1 Disposal Areas |
| 3.5.2 Temporary Excavation and Embankments |
| 3.5.3 Solid Wastes |
| 3.5.4 Chemicals and Chemical Wastes |
| 3.5.5 Contractor Generated Hazardous Wastes/Excess Hazardous Materials |
| 3.5.6 Fuel and Lubricants |
| 3.5.7 Waste Water |
| 3.6 REPORTING OF POLLUTION SPILLS |
| 3.7 WASTE MINIMIZATION AND RECYCLING |
| 3.8 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT |
| 3.9 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES |
| 3.10 BIOLOGICAL RESOURCES |
| 3.11 INTEGRATED PEST MANAGEMENT - NOT USED |
| 3.12 PREVIOUSLY USED EQUIPMENT |
| 3.13 MAINTENANCE OF POLLUTION FACILITIES |
| 3.14 MILITARY MUNITIONS - NOT USED |
| 3.15 TRAINING OF CONTRACTOR PERSONNEL |
| 3.16 INSPECTION |
| 3.17 POST CONSTRUCTION CLEANUP |
| 3.18 RESTORATION OF LANDSCAPE DAMAGE |
| 01 57 25.00 11 - STORM WATER POLLUTION PREVENTION PLAN |
| 01 57 25.00 11 - STORM WATER POLLUTION PREVENTION PLAN |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 GENERAL |
| 1.3 SUBMITTALS |
| 1.4 EROSION AND SEDIMENT CONTROLS |
| 1.4.1 Stabilization Practices |
| 1.4.1.1 Unsuitable Conditions |
| 1.4.1.2 No Activity for Less Than 14 Days |
| PART 2 STORMWATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITY |
| 2.1 Site Description |
| 2.2 Responsible Parties |
| 2.3 Receiving Waters |
| 2.4 Documentation of Permit Eligibility Related to the 303d list and |
| 2.5 Attainment of Water Quality Standards After Authorization |
| 2.6 Site Map Requirements See Site Map in Task Order drawings |
| 2.7 Stormwater Controls |
| 2.8 Other Controls |
| 2.9 Non-Stormwater Discharges |
| 2.10 Post-Construction Stormwater Management Establishment of Turf |
| 2.11 Applicable State or Local Programs |
| 2.12 INSPECTIONS |
| 2.12.1 GENERAL INSPECTION GUIDELINES |
| 2.12.2 DISTURBED AREAS AND AREAS USED FOR MATERIAL STORAGE |
| 2.12.3 MODIFICATION OF POLLUTION PLAN |
| 2.12.4 REPORTS |
| 2.13 Maintenance |
| 2.14 Employee Training |
| PART 3 CONTROL OF POLLUTANTS DURING CONSTRUCTION |
| 3.1 NON-STRUCTURAL MEASURES |
| 3.1.1 General |
| 3.1.2 Reduction of Exposure of Unprotected Erodible Soils |
| 3.1.3 General Buffer Zone |
| 3.1.3.1 Improvement of the General Buffer |
| 3.1.3.2 Maintenance of the General Buffer |
| 3.1.4 Disturbed Area Stabilization with Mulch |
| 3.1.4.1 Installation of Mulch |
| 3.1.4.2 Maintenance of Mulch |
| 3.1.5 Erosion Control Temporary Blankets and/or Permanent Matting |
| 3.1.5.1 Installation of Erosion Control Blanket/Matting |
| 3.1.5.2 Maintenance of Erosion Control Blanket/Matting |
| 3.2 STRUCTURAL MEASURES |
| 3.2.1 General |
| 3.2.2 Silt Fences |
| 3.2.2.1 Components for Silt Fences |
| 3.2.2.2 Installation of Silt Fences |
| 3.2.2.3 Maintenance of Silt Fences |
| 3.2.3 Erosion Control Berms |
| 3.2.3.1 Installation of Erosion Control Berms |
| 3.2.3.2 Maintenance of Erosion Control Berms |
| 3.2.4 Check Dams |
| 3.2.4.1 Installation of Check Dams |
| 3.2.4.2 Maintenance of Check Dams |
| 3.2.5 Sediment Basins |
| 3.2.6 Chemicals and Chemical Wastes |
| 3.3 Contractor Generated Hazardous Wastes/Excess Hazardous Materials |
| 3.4 Fuels and Lubricants |
| 3.5 Solid Wastes |
| 3.6 REPORTING OF POLLUTION SPILLS |
| 3.7 WASTE MINIMIZATION AND RECYCLING |
| 3.8 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT |
| 3.9 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES |
| 3.10 BIOLOGICAL RESOURCES |
| 3.11 PREVIOUSLY USED EQUIPMENT |
| PART 4 OTHER CONSIDERATIONS |
| 4.1 LOCATION OF CONSTRUCTION IN REGARD TO WATERS CLASSIFIED IN 10 CSR |
| 4.2 PROXIMITY OF SITE TO MAJOR RESERVOIRS |
| PART 5 DEFINITIONS |
| 5.1 BEST MANAGEMENT PRACTICES BMPs |
| 5.2 COMMENCEMENT OF CONSTRUCTION |
| 5.3 DRAINAGE SWALE |
| 5.4 FINAL STABILIZATION |
PART 6 CERTIFICATIONS, INSPECTION, AND MAINTENANCE REPORT FORMS
| 01 58 01.00 11 - PROJECT SIGN, BARRICADES, AND TRAFFIC CONTROL SIGNS |
| 01 58 01.00 11 - PROJECT SIGN, BARRICADES, AND TRAFFIC CONTROL SIGNS |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 PROJECT SIGN |
| 1.3 BARRICADES AND TRAFFIC CONTROL SIGNS |
| 1.4 PAYMENT |
| PART 2 PRODUCTS NOT USED |
| PART 3 EXECUTION NOT USED |
| 01 78 00.00 11 - CLOSEOUT SUBMITTALS |
| 01 78 00.00 11 - CLOSEOUT SUBMITTALS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 As-Built Drawings |
| 1.2.2 Record As-Built Drawings |
| 1.2.3 For Construction Contract Documents |
| 1.3 SOURCE DRAWING FILES |
| 1.3.1 Terms and Conditions |
| 1.4 SUBMITTALS |
| 1.5 QUALITY CONTROL |
| PART 2 PRODUCTS |
| 2.1 GOVERNMENT FURNISHED MATERIALS |
| 2.2 SYSTEM DESCRIPTION |
| 2.2.1 Additional Drawings |
| 2.2.1.1 Sheet Numbers and File Names |
| PART 3 EXECUTION |
| 3.1 AS-BUILT DRAWINGS |
| 3.1.1 Markup Guidelines |
| 3.1.2 As-Built Drawings Content |
| 3.1.3 As-Built Drawing Submittals |
| 3.1.3.1 35 Percent As-Built Drawings |
| 3.1.3.2 100 Percent As-Built Drawings |
3.1.4 Record As-Built Drawings
| 3.2 RECORD AS-BUILT DRAWING FILES |
| 3.3 RECORD AS BUILT DRAWINGS |
| 3.3.1 Record Drawing Package |
| 3.4 FINAL APPROVED SHOP DRAWINGS |
| 3.5 CONSTRUCTION CONTRACT SPECIFICATIONS |
| 3.6 AS-BUILT RECORD OF EQUIPMENT AND MATERIALS |
| 3.7 CLEANUP |
| 3.8 WITHHOLDING OF PROGRESS AND FINAL PAYMENT |
| 3.9 REAL PROPERTY RECORD |
| DIVISION 02 - EXISTING CONDITIONS |
| 02 41 00 - DEMOLITION |
| 02 41 00 - DEMOLITION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 PROJECT DESCRIPTION |
| 1.2.1 Demolition Plan |
| 1.2.2 General Requirements |
| 1.3 ITEMS TO REMAIN IN PLACE |
| 1.3.1 Existing Construction Limits and Protection |
| 1.3.2 Weather Protection - NOT USED |
| 1.3.3 Trees |
| 1.3.4 Utility Service |
| 1.3.5 Facilities - NOT USED |
| 1.4 SAFETY REQUIREMENTS |
| 1.5 BURNING |
| 1.6 AVAILABILITY OF WORK AREAS |
| 1.7 SUBMITTALS |
| 1.8 QUALITY ASSURANCE |
| 1.8.1 Dust and Debris Control |
| 1.9 PROTECTION |
| 1.9.1 Traffic Control Signs |
| 1.9.2 Protection of Personnel |
| 1.10 RELOCATIONS |
| 1.11 EXISTING CONDITIONS |
| PART 2 PRODUCTS |
| 2.1 FILL MATERIAL |
| PART 3 EXECUTION |
| 3.1 EXISTING FACILITIES TO BE REMOVED |
| 3.1.1 Structures |
| 3.1.2 Utilities and Related Equipment |
| 3.1.2.1 General Requirements |
| 3.1.2.2 Disconnecting Existing Utilities |
| 3.1.3 Chain Link Fencing |
| 3.1.4 Paving and Slabs |
| 3.1.5 Roofing - NOT USED |
| 3.1.6 Masonry - NOT USED |
| 3.1.7 Concrete |
| 3.1.8 Structural Steel |
| 3.1.9 Miscellaneous Metal |
| 3.1.10 Carpentry - NOT USED |
| 3.1.11 Carpet - NOT USED |
| 3.1.12 Acoustic Ceiling Tile - NOT USED |
| 3.1.13 Airfield Lighting - NOT USED |
| 3.1.14 Patching |
| 3.1.15 Air Conditioning Equipment - NOT USED |
| 3.1.16 Cylinders and Canisters - NOT USED |
| 3.1.17 Locksets on Swinging Doors - NOT USED |
| 3.1.18 Mechanical Equipment and Fixtures - NOT USED |
| 3.1.19 Electrical Equipment and Fixtures - NOT USED |
| 3.1.20 Elevators and Hoists - NOT USED |
| 3.2 CONCURRENT EARTH-MOVING OPERATIONS |
| 3.3 DISPOSITION OF MATERIAL |
| 3.3.1 Title to Materials |
| 3.3.2 Reuse of Materials and Equipment - NOT USED |
| 3.3.3 Salvaged Materials and Equipment - NOT USED |
| 3.3.4 Disposal of Ozone Depleting Substance ODS - NOT USED |
| 3.3.5 Unsalvageable and Non-Recyclable Material |
| 3.4 CLEANUP |
| 3.5 DISPOSAL OF REMOVED MATERIALS |
| 3.5.1 Regulation of Removed Materials |
| 3.5.2 Burning on Government Property |
| 3.5.3 Removal to Spoil Areas on Government Property - NOT USED |
| 3.5.4 Removal from Government Property |
3.6 REUSE OF SALVAGED ITEMS - NOT USED
| DIVISION 31 - EARTHWORK |
| 31 00 00 - EARTHWORK |
| 31 00 00 - EARTHWORK |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 QUALITY CONTROL |
| 1.3 APPLICABLE PUBLICATION |
| 1.4 SUBMITTALS |
| PART 2 MATERIALS NOT USED |
| PART 3 EXECUTION |
| 3.1 EXCAVATION |
| 3.1.1 General |
| 3.1.2 Slide Excavation |
| 3.1.3 Embedment of Stone Protection |
| 3.2 DISPOSAL OF EXCAVATED MATERIAL |
| 3.3 COMPACTED BACKFILL |
| 3.3.1 General |
| 3.3.2 Materials |
| 3.3.3 Placement |
| 3.3.4 Testing and Compaction |
| 3.3.5 Additional Testing |
| 3.4 SEMI-COMPACTED BACKFILL |
| 3.4.1 General |
| 3.4.2 Moisture Control |
| 3.4.3 Compaction |
| 3.4.3.1 Definition of Pass |
| 3.4.3.2 Additional Compaction |
| 3.5 LEVEE RESTORATION USING GEOGRID |
| 3.5.1 Storage and Handling |
| 3.5.2 Foundation Preparation |
| 3.5.3 Installation |
| 3.5.4 Placement of Geogrid |
| 3.5.5 Testing and Compaction for Geogrid Restoration |
| 3.6 SLIDES AND SHOALS |
| 3.6.1 Excavated Material Disposal Areas |
| 3.6.1.1 General |
| 3.6.1.2 Slides Caused by Foundation Failure |
| 3.6.1.3 Slides Not Caused by Foundation Failure |
| 31 05 22 - GEOTEXTILES USED AS FILTERS |
| 31 05 22 - GEOTEXTILES USED AS FILTERS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 General |
| 2.1.2 Geotextile Fiber |
| 2.1.3 Seams |
| 2.1.4 Securing Pins |
| 2.2 INSPECTIONS, VERIFICATIONS, AND TESTING |
| 2.2.1 Manufacturing and Sampling |
| 2.2.2 Site Verification and Testing |
| PART 3 EXECUTION |
| 3.1 SURFACE PREPARATION |
| 3.2 INSTALLATION OF THE GEOTEXTILE |
| 3.2.1 General |
| 3.2.2 Placement |
| 3.3 PROTECTION |
| 3.4 PLACEMENT OF CUSHIONING MATERIAL |
| 3.5 OVERLAPPING AND SEAMING |
| 3.5.1 Overlapping |
| 3.5.2 Sewn Seams |
| 31 11 00.00 11 - CLEARING, GRUBBING AND STRIPPING |
| 31 11 00.00 11 - CLEARING, GRUBBING AND STRIPPING |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| 1.4 QUALITY CONTROL |
| PART 2 PRODUCTS |
| 2.1 TREE WOUND PAINT |
| 2.2 HERBICIDE |
| PART 3 EXECUTION |
| 3.1 PROTECTION |
| 3.1.1 Roads and Walks |
| 3.1.2 Trees, Shrubs, and Existing Facilities |
| 3.1.3 Utility and Telecommunication Lines |
| 3.1.4 Cemeteries |
| 3.2 CLEARING |
| 3.3 GRUBBING |
| 3.4 STRIPPING |
| 3.5 TREE REMOVAL |
| 3.6 PRUNING |
| 3.7 DISPOSAL OF MATERIALS |
| 3.7.1 General |
| 3.7.2 Burning |
| 3.7.3 Air Curtain Burning |
| 3.7.4 Chipping |
| 3.7.5 Removal from Site |
| 3.7.6 Saleable Timber |
| DIVISION 32 - EXTERIOR IMPROVEMENTS |
| 32 15 00.00 11 - AGGREGATE SURFACE COURSE |
| 32 15 00.00 11 - AGGREGATE SURFACE COURSE |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY CONTROL |
| 1.4 EQUIPMENT |
| 1.5 APPROVAL OF MATERIALS |
| 1.6 SAMPLING AND TESTING |
| 1.6.1 Sampling |
| 1.6.2 Testing |
| 1.6.2.1 Gradation |
| 1.6.2.2 Liquid Limit and Plasticity Index |
| 1.6.2.3 Wear Test |
| 1.6.2.4 Smoothness Test |
| 1.6.2.5 Government Testing |
| PART 2 PRODUCTS |
| 2.1 AGGREGATES |
| 2.1.1 Coarse Aggregates |
| 2.1.2 Fine Aggregates |
| 2.1.3 Gradation Requirements |
2.2 LIQUID LIMIT AND PLASTICITY INDEX REQUIREMENTS
| PART 3 EXECUTION |
| 3.1 WEATHER LIMITATIONS |
| 3.2 CLEARING AND DEBRIS REMOVAL |
| 3.3 USE OF HAUL ROADS |
| 3.4 STOCKPILING MATERIALS |
| 3.5 PREPARATION OF UNDERLYING SUBGRADE |
| 3.6 GRADE CONTROL |
| 3.7 MIXING AND PLACING MATERIALS |
| 3.8 PLACEMENT |
| 3.9 LAYER THICKNESS |
| 3.10 THICKNESS CONTROL |
| 3.11 COMPACTION |
| 3.12 EDGES OF AGGREGATE-SURFACED ROAD |
| 3.13 MAINTENANCE |
| 32 25 00.00 11 - CULVERT REMOVAL AND INSTALLATION |
| 32 25 00.00 11 - CULVERT REMOVAL AND INSTALLATION |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 QUALITY CONTROL |
| PART 2 PRODUCTS |
| 2.1 PIPES |
| 2.1.1 Corrugated Metal Pipe Culverts |
| 2.1.2 Polymer Coated Corrugated Steel Pipe Culverts |
| 2.2 FLARED END SECTIONS |
| 2.3 FLAPGATES |
| PART 3 EXECUTION |
| 3.1 REMOVAL OF EXISTING CULVERTS |
| 3.2 FOUNDATION/BEDDING MATERIAL BENEATH CULVERTS |
| 3.3 INSTALLATION OF CULVERT PIPE, FLARED END SECTIONS AND FLAPGATES |
| 3.4 BACKFILL |
| 3.4.1 General |
| 3.4.2 Compacted Backfill |
| 3.4.3 Semi-compacted Backfill |
3.5 BEDDING MATERIAL AND RIPRAP AT THE CULVERTS
| 32 92 32.01 11 - ESTABLISHMENT OF TURF |
| 32 92 32.01 11 - ESTABLISHMENT OF TURF |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 QUALITY CONTROL |
| 1.5 AREAS TO BE TURFED |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 Fertilizer and Limestone |
| 2.1.2 Seed |
| 2.1.3 Mulch |
| 2.1.4 Water |
| 2.1.5 Spot Sod |
| 2.1.6 Sprigs |
| 2.1.7 Soil for Repairs |
| 2.1.8 Soil Composition |
| 2.2 SAMPLING, TESTING, AND CERTIFICATES |
| 2.2.1 Seed |
| 2.2.2 Soil Testing |
| 2.2.3 Fertilizer and Limestone Testing |
| 2.2.4 Mulch |
| PART 3 EXECUTION |
| 3.1 COMMENCEMENT, PROSECUTION, AND COMPLETION |
| 3.1.1 Sequence of Work |
| 3.2 PREPARATION OF GROUND SURFACE |
| 3.2.1 Clearing |
| 3.2.2 Dressing |
| 3.3 APPLICATION OF FERTILIZER AND/OR LIMESTONE |
| 3.4 SPOT SODDING |
| 3.5 SPRIGGING |
| 3.6 SEEDING |
| 3.6.1 Planting Dates |
| 3.6.2 Seed Mixtures |
| 3.6.3 Broadcast Seeding |
| 3.6.4 Hydroseeding |
| 3.6.5 Damage to Seeding |
| 3.7 APPLICATION OF AN ANCHORING MULCH |
| 3.8 HYDRAULIC SLURRY METHOD |
| 3.9 COMPACTING |
| 3.10 ESTABLISHMENT |
| 3.10.1 General |
| 3.10.2 Watering |
| 3.10.3 Maintenance |
| 3.10.4 Turf Establishment Period |
| 3.11 INSPECTION AND ACCEPTANCE |
| 3.11.1 Areas Requiring Returfing |
| DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION |
| 35 31 19.00 11 - STONE PROTECTION |
| 35 31 19.00 11 - STONE PROTECTION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 SCOPE |
| 1.4 QUALITY CONTROL |
| 1.5 STONE SOURCES |
| 1.6 Concrete Grout for Stone Protection |
| 1.6.1 General |
| 1.6.2 1.7.2 Concrete Grout Mixture Proportions |
| 1.6.3 Evaluation and Acceptance of Grout |
| PART 2 PRODUCTS |
| 2.1 BEDDING MATERIAL |
| 2.1.1 General |
| 2.1.2 Gradation |
| 2.2 STONE |
| 2.2.1 General |
| 2.2.2 Sources and Evaluation Testing |
| 2.2.3 Stone Gradation |
| 2.2.4 Test Method |
| 2.2.5 Gradation Test |
| 2.2.6 Proportional Dimension Limitations |
| 2.2.7 Stone Stockpile |
| 2.3 CONCRETE GROUT |
| 2.3.1 Cementitious Materials |
| 2.3.1.1 Portland Cement |
| 2.3.1.2 Pozzolan |
| 2.3.2 Ground Granulated Blast-Furnace Slag Not Used |
| 2.3.2.1 Silica Fume |
| 2.3.3 Blended Hydraulic Cement |
| 2.3.4 Aggregates for Concrete Grout |
| 2.3.5 2.3.5 Admixtures |
| 2.3.6 2.3.6 Curing Materials |
| 2.3.7 Water |
| 2.3.8 Non-Shrink Epoxy Grout |
| 2.3.9 Equipment |
| PART 3 EXECUTION |
| 3.1 STONE DELIVERY |
| 3.2 BASE PREPARATION |
| 3.3 PLACEMENT OF BEDDING LAYERS |
| 3.3.1 General |
| 3.3.2 Placement of Bedding Material on Prepared Base |
| 3.4 PLACEMENT OF STONE |
| 3.5 PLACEMENT CONTROL |
| 3.5.1 Quality Control Measures |
| 3.5.2 Check Surveys |
| 3.6 GROUTING OF STONE PROTECTION |
| 3.6.1 Producing, Conveying and Placing of Grout |
| 3.6.1.1 Producing Grout |
| 3.6.1.2 Preparation for Placing |
| 3.6.1.3 3.2.1.3 Conveying and Placing |
| 3.6.1.4 Cold-Weather Requirements |
| 3.6.1.5 Hot Weather Requirements |
3.6.2 Curing and Protection of Grouted Stone Protection
| 3.7 TESTS AND INSPECTIONS |
| 3.7.1 Concrete Grout |
| 3.7.1.1 General |
| 3.7.1.2 Preparations for Placing |
| 3.7.1.3 Air Content |
| 3.7.1.4 Slump |
| 3.7.1.5 Placing |
| 3.7.2 Pre-Production |
| 3.7.2.1 3.6.2.1 Bulk Specific Gravity |
| 3.7.2.2 Material Quality |
| 3.7.2.3 Borderline Material Quality |
| 3.7.3 Bedding Layers |
| 3.7.3.1 General |
| 3.7.3.2 Reporting |
| District Maps.pdf |
| Drawings |
| District Maps.pdf |
| Drawings |
| MISSOURI BID SCHEDULE.pdf |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| ARKANSAS BID SCHEDULE.pdf |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| KENTUCKY.pdf |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| TENNESSEE.pdf |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| MISSISSIPPI.pdf |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| ILLINOIS.pdf |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| MISSOURI.pdf |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| ARKANSAS.pdf |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| KENTUCKY.pdf |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| TENNESSEE.pdf |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| MISSISSIPPI.pdf |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| M&P section.pdf |
| 01 22 00.00 11 - MEASUREMENT AND PAYMENT |
| 01 22 00.00 11 - MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 JOB PAYMENT ITEMS |
| 1.1.1 Mobilization and Demobilization |
| 1.1.2 Environmental Protection |
| 1.2 Demolition |
| 1.3 Write and/or Amend SWPPP, Obtain Permit If Necessary, and Conduct |
| 1.4 UNIT PRICE PAYMENT ITEMS |
| 1.4.1 Remobilization |
| 1.4.2 Storm Water Pollution Prevention |
| 1.4.2.1 Silt Fence |
| 1.4.2.2 Erosion Control Berm |
| 1.4.2.3 Temporary Environmental Seeding |
| 1.4.2.4 Construction Exit |
| 1.4.2.5 Check Dam |
| 1.4.2.6 Erosion Control Temporary Blankets and/or Permanent Matting |
| 1.4.2.7 Straw Wattle, 12-inch |
| 1.4.3 Clearing |
| 1.4.4 Grubbing |
| 1.4.5 Stripping |
| 1.4.6 Excavation |
| 1.4.7 Geogrid |
| 1.4.8 Geotextile |
| 1.4.9 Corrugated Metal Pipe CMP |
| 1.4.10 Polymer Coated CMP |
| 1.4.11 Flared End Section |
| 1.4.12 Flap Gate |
| 1.4.13 Bedding Material |
| 1.4.14 Aggregate Surfacing |
| 1.4.15 Riprap |
| 1.4.16 Transportation of Bedding Material, Aggregate Surfacing |
| 1.4.17 Grout |
| 1.4.18 Semi-compacted Backfill |
| 1.4.19 Compacted Backfill |
| 1.4.20 Establishment of Turf |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
File details come from the government source that posted it. Updated .