Amendment_0003.pdf
PDF 259 KB Posted
- Attached to
- MISCELLANEOUS REPAIR
- Solicitation number
- W912EQ-17-B-0004
About this file
Amendment 0003
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XGR71716887
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0003 is being processed to reflect the following changes to the solicitation.
a.) Description of Changes b.) BID Schedule c.) SOW and Supplemental Specifcation d.) Please be advised there w as an error w ithin FBO and the previous amendment 0003 posted on 25 Aug 2017 w ill be superceded by this current amendment 0003.
e.) All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EQ17B0004
X 9B. DATED (SEE ITEM 11)
08-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
CODE
US ARMY ENGINEER DISTRICT, MEMPHIS
KIMBERLY DANIEL-RAY
167 N MAIN STREET
MEMPHIS TN 38103-1894
W912EQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
30-Aug-2017
W912EQ17B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
W912EQ-17-B-0004
AMENDMENT 0003
SATOC Task Order - Levee Slides Repair
DESCRIPTION OF CHANGES
PLAN CHANGES
NONE
SPECIFICATION CHANGES
The following changes were made to the project specifications. These updated spec sections are included with this amendment package.
1. SECTION 00 41 00.00 11 – BIDDING SCHEDULE:
a. The levee slides repair task order bid schedule provided with Amendment 1 shall be fully replaced with the levee slides repair task order bid schedule provided in Amendment 3.
b. Line item 0229 Additional Borrow has been removed from the levee slides repair task order bid schedule. The work required for the additional borrow for this project will be included under line items 0047 Excavation and 0075 Compacted Backfill. The estimated amount of additional borrow needed for this project is 955 cubic yards. This bid schedule change caused line item 0047 Excavation to increase from 6375 cubic yards to 7330 cubic yards. Line item 0075 Compacted Backfill quantity did not change because it already included the estimated borrow material quantity for the project.
c. Stripping of the borrow areas will now be included in the 0046 Stripping line item since the 0229 Additional Borrow line item was removed from the levee slides repair task order bid schedule. This change caused the 0046 Stripping line item quantity to increase from 0.6 acres to 3.9 acres.
W912EQ17B0004
2. SECTION 01 22 00.00 11 – MEASUREMENT AND PAYMENT:
a. The levee slides repair task order measurement and payment section provided with Amendment 1 shall be fully replaced with the levee slides repair task order measurement and payment section provided in Amendment 3.
b. Removed the following sentence from the levee slides repair task order Payment section for Stripping: “Stripping of the borrow areas will not be measured for payment under this line item, but will be included in “Additional Borrow.” ” Stripping of the borrow areas will now be included as part of the “Stripping” line item. The “Additional Borrow” line item has been removed from the levee slides repair task order bid schedule.
c. Removed the Measurement and Payment sections for “Additional Borrow”.
3. SECTION 31 00 00 – EARTHWORK:
a. The Earthwork supplemental specification provided in Amendment 1 will not be used on the levee slides repair task order. The Earthwork specification provided with the base project specifications will control on the levee slides repair task order.
4. SECTION 31 11 00.00 11 – CLEARING, GRUBBING AND STRIPPING:
a. The Clearing, Grubbing and Stripping supplemental specification provided in Amendment 1 will not be used on the levee slides repair task order. The Clearing, Grubbing and Stripping specification provided with the base project specifications will control on the levee slides repair task order.
SCOPE OF WORK CHANGES
1. The Scope of Work document provided in Amendment 1 shall be fully replaced with the Scope of Work document provided in Amendment 3.
2. The “OTHER INFORMATION” section in the Scope of Work document provided with Amendment 3 has been updated and now includes information regarding the additional borrow that will be needed for this project.