Text version
Lower Monumental Drainage & Unwatering Pumps System W912EF-18-B-0003 Replacement
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 28 GENERAL REQUIREMENTS
01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS
01 14 00.10 28 PROJECT SITE RESTRICTIONS
01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY
(OPSEC)
01 22 00.00 28 MEASUREMENT AND PAYMENT
01 32 01.00 28 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 10.00 28 DIVING
01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.00 28 CONTRACTOR QUALITY CONTROL
01 51 00.00 28 TEMPORARY UTILITIES
01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS
01 57 20.00 28 ENVIRONMENTAL PROTECTION
01 73 19.10 28 INSTALLATION AND COMMISSIONING
01 78 00.00 28 CLOSEOUT SUBMITTALS
01 78 23.00 28 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 24 10.10 28 DEWATERING
02 41 00.00 28 DEMOLITION
02 82 13.01 28 CLASS II ASBESTOS ABATEMENT
02 83 33.13 28 TOXIC METALS BASED PAINT REMOVAL AND DISPOSAL
DIVISION 03 - CONCRETE
03 30 50.00 28 MINOR CONCRETE
03 60 00.00 28 CONCRETE CORE DRILLING, DEMOLITION AND REPAIR OF CONCRETE
SURFACES
DIVISION 05 - METALS
05 50 03.00 28 MISCELLANEOUS PRODUCTS AND EQUIPMENT
05 50 14.00 28 METALWORK AND METAL FABRICATION
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.01 28 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 22 - PLUMBING
22 11 00.01 28 PIPING AND VALVES
DIVISION 26 - ELECTRICAL
26 05 00.00 28 GENERAL ELECTRICAL WORK
26 05 19.00 28 INSULATED WIRE AND CABLE
26 12 19.10 THREE-PHASE MEDIUM VOLTAGE FLOOR/PAD-MOUNTED TRANSFORMER
26 13 16.00 28 SWITCHGEAR - MEDIUM VOLTAGE
26 18 39.01 28 SOFT STARTER - MEDIUM VOLTAGE
26 24 19.00 28 MOTOR CONTROL CENTERS - LOW VOLTAGE
26 29 01.00 28 ELECTRIC MOTORS, 3-PHASE VERTICAL INDUCTION TYPE
PROJECT TABLE OF CONTENTS Page 1
26 29 23.10 28 VARIABLE FREQUENCY DRIVE SYSTEMS
DIVISION 40 - PROCESS INTERCONNECTIONS
40 94 43.01 28 PROCESS CONTROLLERS - PROGRAMMABLE LOGIC CONTROLLERS (PLC)
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
43 21 39.01 28 PUMPS: WATER, VERTICAL TURBINE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
SECTION 26 05 19.00 28
INSULATED WIRE AND CABLE
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 MEDIUM-VOLTAGE POWER CABLE
2.2 LOW-VOLTAGE POWER CABLE
2.3 MULTICONDUCTOR CONTROL CABLE
2.4 SINGLE-CONDUCTOR CONTROL CABLE
2.5 INSTRUMENTATION CABLE
2.6 GROUNDING CONDUCTOR
2.7 ETHERNET CABLE
2.8 MATERIALS
2.8.1 Wire Table
2.8.2 Rated Circuit Voltages
2.8.3 Conductors
2.8.3.1 Material for Conductors
2.8.3.2 Size
2.8.3.3 Stranding
2.8.3.4 Conductor Shielding
2.8.3.5 Separator Tape
2.8.4 Insulation
2.8.4.1 Insulation Material
2.8.4.2 Insulation Thickness
2.8.4.3 Insulation Shielding
2.8.5 Jackets
2.8.5.1 Jacket Material
2.8.5.2 Jacket Thickness
2.8.6 Metal-Clad Cable
2.8.6.1 General
2.8.6.2 Jackets
2.9 TERMINATIONS
2.10 CABLE IDENTIFICATION
2.10.1 Color-Coding
2.10.2 Shielded Cables Rated 2,001 Volts and Above
2.10.3 Cabling
2.10.4 Dimensional Tolerance
PART 3 EXECUTION
3.1 INSTALLATION INSTRUCTIONS
3.2 CABLE AND CONDUIT SCHEDULE
3.3 TESTS, INSPECTIONS, AND VERIFICATIONS
SECTION 26 05 19.00 28 Page 1
3.3.1 Cable Data
3.3.2 Inspection and Tests
3.3.2.1 High-Voltage Test Source
3.3.2.2 Shielded Cables Rated 2,001 Volts or Greater
3.3.2.3 Flame Tests
3.3.2.4 Field Testing
3.3.2.4.1 General
3.3.2.4.2 Insulation-Resistance Test
3.3.2.4.3 Continuity Test
3.3.2.4.4 Phase-Rotation Tests
3.3.2.4.5 Link Tests
3.3.2.4.6 Acceptance
3.3.2.5 Independent Tests
3.3.2.6 Reports
-- End of Section Table of Contents --
SECTION 26 05 19.00 28 Page 2
SECTION 26 05 19.00 28
INSULATED WIRE AND CABLE
PART 1 GENERAL
All wire and cable used for power, control, metering, and relaying systems shall be provided by the Contractor and shall conform to the requirements specified herein.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASSOCIATION OF EDISON ILLUMINATING COMPANIES (AEIC)
AEIC CS8 (2013) Specification for Extruded Dielectric Shielded Power Cables Rated 5 Through 46 kV
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 383 (2003; R 2008) Standard for Qualifying Class 1E Electric Cables and, Field Splices for Nuclear Power Generating Stations 2004
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA WC 63.1 (2005) Twisted Pair Premise Voice and Data Communications Cables
NEMA WC 70 (2009) Power Cable Rated 2000 V or Less for the Distribution of Electrical Energy--S95-658
NEMA WC 74/ICEA S-93-639 (2006) 5-46 kV Shielded Power Cable for Use in the Transmission and Distribution of Electric Energy
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014) National Electrical Code
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
TIA-568-C.1 (2009; Add 2 2011; Add 1 2012) Commercial Building Telecommunications Cabling Standard
SECTION 26 05 19.00 28 Page 3
TIA-568-C.2 (2009; Errata 2010) Balanced Twisted-Pair Telecommunications Cabling and Components Standards
UNDERWRITERS LABORATORIES (UL)
UL 13 (2015) Power-Limited Circuit Cables
UL 1072 (2006; R thru 2007) Medium-Voltage Power Cables
UL 1569 (1999; R 2000 thru 2009) Standard for Metal-Clad Cables
UL 2250 (2006; R 2014) Instrumentation Tray Cable
UL 44 (2005; R 2005) Thermoset-Insulated Wires and Cables
UL 486C (2013; Reprint Jan 2016) Splicing Wire Connectors
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Obtain approval of product data before fabrication and installation.
Installation Instructions; G, EL
Medium-voltage power cable; G, EL Low-voltage power cable; G, EL Multiconductor control cable; G, EL Single-conductor control cable; G, EL Instrumentation cable; G, EL Grounding conductor; G, EL Ethernet cable; G, EL
SD-05 Design Data
Obtain approval of design data before fabrication and installation.
Cable and conduit schedule; G, EL
SD-06 Test Reports
Tests, Inspections, and Verifications; G, EL
Continuity Tests; G, EL
SECTION 26 05 19.00 28 Page 4
Phase-Rotation Tests; G, EL
Insulation Resistance Tests; G, EL
Link Tests; G, EL
SD-10 Operation and Maintenance Data
Cable and conduit schedule; G, EL
1.3 DELIVERY, STORAGE, AND HANDLING
Furnish cables on reels or coils. Each cable and the outside of each reel or coil, shall be plainly marked or tagged to indicate the cable length, voltage rating, conductor size, and manufacturer's lot number and reel number. Each coil or reel of cable shall contain only one continuous cable without splices. Shielded cables rated 2,001 volts and above shall be reeled and marked in accordance with Section I of AEIC CS8 or NEMA WC 74/ICEA S-93-639, as applicable. Reels shall remain the property of the Contractor.
PART 2 PRODUCTS
2.1 MEDIUM-VOLTAGE POWER CABLE
Medium-voltage power cable shall be "C-L-X Type MV-105 or MC-HL" as manufactured by Okonite or equal. An equal product must meet the following salient physical, functional, and performance characteristics in addition to the other requirements in this specification.
a. Type MC with continuous corrugated metal sheath with jacket
b. Three symmetrical phase conductors
c. Three symmetrical ground conductors
d. Type MV-105
e. Rated for 5-kV
f. Rated for cable tray use
g. Copper conductors
h. NEMA WC 74/ICEA S-93-639 and UL 1072
i. Minimum size: 8 AWG
2.2 LOW-VOLTAGE POWER CABLE
Low-voltage power cable shall be "C-L-X Type MC" as manufactured by Okonite or equal. An equal product must meet the following salient physical, functional, and performance characteristics in addition to the other requirements in this specification.
a. Continuous corrugated metal sheath with jacket
b. Type MC
c. Rated for 600 volts
d. Rated for cable tray use
e. Copper conductors
f. UL 1569
g. Minimum size: 12 AWG
SECTION 26 05 19.00 28 Page 5
G4EDDMTJ
Line
2.3 MULTICONDUCTOR CONTROL CABLE
Multiconductor control cable shall be "C-L-X Type MC (XHHW-2)" as manufactured by Okonite or equal. An equal product must meet the following salient physical, functional, and performance characteristics in addition to the other requirements in this specification.
a. Continuous corrugated metal sheath with jacket
b. Type MC
c. Rated for 600 volts
d. Rated for cable tray use
e. Copper conductors
f. UL 1569, UL 44, NEMA WC 70
g. Minimum size: 12 AWG
2.4 SINGLE-CONDUCTOR CONTROL CABLE
Single-conductor control cable shall be "FMR-P" as manufactured by Okonite or equal. An equal product must meet the following salient physical, functional, and performance characteristics in addition to the other requirements in this specification.
a. Type XHHW-2
b. Rated for 600 volts
c. Rated for cable tray use
d. Copper conductors
e. NEMA WC 70 and UL 44
f. Minimum size: 12 AWG
2.5 INSTRUMENTATION CABLE
Instrumentation cable shall be "C-L-X Type P-OS" as manufactured by Okonite or equal. An equal product must meet the following salient physical, functional, and performance characteristics in addition to the other requirements in this specification.
a. Continuous corrugated metal sheath with jacket
b. Type PLTC
c. Rated for 300 volts
d. Rated for cable tray use and for exposed installation
e. Copper conductors
f. UL 2250 and UL 13
g. Minimum size: 16 AWG
2.6 GROUNDING CONDUCTOR
Grounding conductor shall be bare copper with ASTM B 8 Class B stranding, except grounding conductors in cable tray shall be insulated to prevent corrosion. Stranding shall be concentric and not bunched or rope. Size grounding conductor per NFPA 70 unless otherwise indicated. Insulation, if required, shall be XHHW-2.
2.7 ETHERNET CABLE
Ethernet cable shall be "7958A" as manufactured by Belden or equal. An equal product must meet the following salient physical, functional, and performance characteristics in addition to the other requirements in this specification.
SECTION 26 05 19.00 28 Page 6
a. NEMA WC 63.1 Category 5e or better
b. EtherNet/IP compliant
c. Documented to pass the UL 1666 vertical riser flame test
d. Documented to pass the IEEE 1202 flame test
e. UL Listed
f. 100% overall shield
2.8 MATERIALS
2.8.1 Wire Table
Furnish wire and cable in accordance with the requirements indicated on the drawings. Wire and cable shall conform to the detailed requirements specified herein.
2.8.2 Rated Circuit Voltages
All low-voltage wire and cable shall have minimum rated circuit voltages in accordance with NEMA WC 70.
2.8.3 Conductors
2.8.3.1 Material for Conductors
Conductors shall conform to all the applicable requirements of NEMA WC 70, as applicable, and shall be annealed copper. Copper conductors may be bare, or tin- or lead-alloy-coated, if required by the type of insulation used.
2.8.3.2 Size
Minimum wire size shall be No. 12 AWG for power circuits up to 600 volts.
Minimum wire sizes for rated circuit voltages of 2,001 volts and above shall not be less than those listed for the applicable voltage in NEMA WC 70, as applicable.
2.8.3.3 Stranding
Conductor stranding classes cited herein shall be as defined in NEMA WC 70, as applicable. Any conductors used between stationary and moving devices, such as hinged doors or panels, shall have Class H or K stranding. All other conductors shall have Class B or C stranding, except that No. 12 AWG may be 19 strands of No. 25 AWG, and No. 10 AWG may be 19 strands of No. 22
AWG.
2.8.3.4 Conductor Shielding
Use conductor shielding conforming to NEMA WC 70, as applicable, on power cables having a rated circuit voltage above 2,000 volts. In addition, conductor shielding for shielded cables shall also comply with Section C of AEIC CS8. Strict precautions shall be taken after application of the conductor shielding to prevent the inclusion of voids or contamination between the conductor shielding and the subsequently applied insulation.
2.8.3.5 Separator Tape
Where conductor shielding, strand filling, or other special conductor treatment is not required, a separator tape between conductor and
SECTION 26 05 19.00 28 Page 7 insulation is permitted.
2.8.4 Insulation
2.8.4.1 Insulation Material
Provide insulation which is a cross-linked thermosetting polyethylene (XLPE) type, meeting the requirements of NEMA WC 70, as applicable, or an ethylene-propylene rubber (EPR) type meeting the requirements of NEMA WC 70.
For shielded cables of rated circuit voltages above 2,000 volts, the following provisions shall also apply:
a. XLPE, if used, shall be tree-retardant.
b. The insulation material and its manufacturing, handling, extrusion and vulcanizing processes, shall all be subject to strict procedures to prevent the inclusion of voids, contamination, or other irregularities on or in the insulation. Insulation material shall be inspected for voids and contaminants. Inspection methods, and maximum allowable void and contaminant content shall be in accordance with Section B of AEIC CS8, as applicable.
c. Cables with repaired insulation defects discovered during factory testing, or with splices or insulation joints, are not acceptable.
2.8.4.2 Insulation Thickness
The insulation thickness for each conductor shall be based on its rated circuit voltage.
a. Power Cables/Single-Conductor Control Cables, 2,000 Volts and Below - The insulation thickness for single-conductor cables rated 2,000 volts and below shall be as required by NEMA WC 70, as applicable. Some thicknesses of NEMA WC 70 will be permitted only for single-conductor cross-linked thermosetting polyethylene insulated cables without a jacket.
b. Power Cables, Rated 2,001 Volts and Above - Thickness of insulation for power cables rated 2,001 volts and above shall be in accordance with the following:
(1) Non-shielded cables, 2,001 to 5,000 volts, shall comply with NEMA WC 70, as applicable.
(2) Shielded cables rated 2,001 volts and above shall comply with Column B of Table B1, of AEIC CS8, as applicable.
c. Multiple-Conductor Control Cables - The insulation thickness of multiple-conductor cables used for control and related purposes shall be as required by NEMA WC 70, as applicable.
2.8.4.3 Insulation Shielding
Unless otherwise specified, provide insulation shielding for conductors having rated circuit voltages of 2,001 volts and above. The voltage limits above which insulation shielding is required, and the material requirements, are given in NEMA WC 70, as applicable. The material, if thermosetting, shall meet the wafer boil test requirements as described in Section D of AEIC CS8, as applicable. The method of shielding shall be in
SECTION 26 05 19.00 28 Page 8 accordance with the current practice of the industry; however, the application process shall include strict precautions to prevent voids or contamination between the insulation and the nonmetallic component. Voids, protrusions, and indentations of the shield shall not exceed the maximum allowances specified in Section C of AEIC CS8, as applicable. The cable shall be capable of operating without damage or excessive temperature when the shield is grounded at both ends of each conductor. All components of the shielding system shall remain tightly applied to the components they enclose after handling and installation in accordance with the manufacturer's recommendations. Shielding systems which require heat to remove will not be permitted unless specifically approved.
2.8.5 Jackets
All cables shall have jackets meeting the requirements of NEMA WC 70, as applicable, and as specified herein. Individual conductors of multiple-conductor cables shall be required to have jackets only if they are necessary for the conductor to meet other specifications herein.
Jackets of single-conductor cables and of individual conductors of multiple-conductor cables, except for shielded cables, shall be in direct contact and adhere or be vulcanized to the conductor insulation.
Multiple-conductor cables and shielded single-conductor cables shall be provided with a common overall jacket, which shall be tightly and concentrically formed around the core. Repaired jacket defects found and corrected during manufacturing are permitted if the cable, including jacket, afterward fully meets these specifications and the requirements of the applicable standards.
2.8.5.1 Jacket Material
The jacket shall be one of the materials listed below.
a. General Use
(1) Heavy-duty black neoprene (NEMA WC 70).
(2) Heavy-duty chlorosulfonated polyethylene (NEMA WC 70).
(3) Heavy-duty cross-linked (thermoset) chlorinated polyethylene (
NEMA WC 70).
b. Accessible Use Only, 2,000 Volts or Less - Cables installed where they are entirely accessible, such as cable trays and raceways with removable covers, or where they pass through less than 10 feet of exposed conduit only, shall have jackets of one of the materials specified in above paragraph GENERAL USE, or the jackets may be of one of the following:
(1) General-purpose neoprene (NEMA WC 70).
(2) Black polyethylene (NEMA WC 70).
(3) Thermoplastic chlorinated polyethylene (NEMA WC 70).
2.8.5.2 Jacket Thickness
The minimum thickness of the jackets at any point shall be not less than 80 percent of the respective nominal thicknesses specified below.
SECTION 26 05 19.00 28 Page 9
a. Multiple-Conductor Cables - Thickness of the jackets of the individual conductors of multiple-conductor cables shall be as required by NEMA WC 70, and shall be in addition to the conductor insulation thickness required by Column B of Table 3-1 of the applicable NEMA publication for the insulation used. Thickness of the outer jackets or sheaths of the assembled multiple-conductor cables shall be as required by NEMA WC 70.
b. Single-Conductor Cables - Single-conductor cables, if nonshielded, shall have a jacket thickness as specified in NEMA WC 70. If shielded, the jacket thickness shall be in accordance with the requirements of
NEMA WC 70.
2.8.6 Metal-Clad Cable
2.8.6.1 General
The metallic covering shall be corrugated metal, conforming to the applicable requirements of NEMA WC 70. If the covering is of ferrous metal, it shall be galvanized. Copper grounding conductor(s) conforming to NEMA WC 70 shall be furnished for each multiple-conductor metal-clad cable. Assembly and cabling shall be as specified in paragraph CABLING.
The metallic covering shall be applied over an inner jacket or filler tape. The cable shall be assembled so that the metallic covering will be tightly bound over a firm core.
2.8.6.2 Jackets
Metal-clad cables may have a jacket under the armor, and shall have a jacket over the armor. Jackets shall comply with the requirements of NEMA WC 70. The outer jacket for the metal-clad cable may be of polyvinyl chloride.
2.9 TERMINATIONS
Indented nylon-coated ring-tongue terminals or spring-clamp terminals shall be used on all low-voltage power and control conductors No. 18 and larger.
2.10 CABLE IDENTIFICATION
2.10.1 Color-Coding
Insulation of individual conductors of multiple-conductor cables shall be color-coded in accordance with NEMA WC 70, except that colored braids will not be permitted. Only one color-code method shall be used for each cable construction type. Control cable color-coding shall be in accordance with NEMA WC 70. Power cable color-coding for circuits rated 120 to 240 volts shall be black for Phase A, red for Phase B, blue for Phase C, white for grounded neutral, and green for an insulated grounding conductor, if included.
2.10.2 Shielded Cables Rated 2,001 Volts and Above
Marking shall be in accordance with Section H of AEIC CS8, as applicable.
2.10.3 Cabling
Individual conductors of multiple-conductor cables shall be assembled with flame-and moisture-resistant fillers, binders, and a lay conforming to
SECTION 26 05 19.00 28 Page 10
NEMA WC 70, except that flat twin cables will not be permitted. Fillers shall be used in the interstices of multiple-conductor round cables with a common covering where necessary to give the completed cable a substantially circular cross section. Fillers shall be non-hygroscopic material, compatible with the cable insulation, jacket, and other components of the cable. The rubber-filled or other approved type of binding tape shall consist of a material that is compatible with the other components of the cable and shall be lapped at least 10 percent of its width.
2.10.4 Dimensional Tolerance
The outside diameters of single-conductor cables and of multiple-conductor cables shall not vary more than 5 percent and 10 percent, respectively, from the manufacturer's published catalog data.
PART 3 EXECUTION
3.1 INSTALLATION INSTRUCTIONS
Wire and cable shall not be pulled into conduit runs until the conduit has been checked and determined to be clean and dry by pulling a clean, dry, tight fitting rag through each run. Only approved lubricants may be used to facilitate pulling of conductors. Splices between the equipment termination point shall be the starting point to perform checking procedure.
Except for lighting conductors, splices will be permitted only where shown on the drawings, or with written approval from the Contracting Officer.
All splices shall be made in accessible cabinets, boxes, or outlets and shall comply with UL 486C. No splices will be allowed inside conduits.
Submit cable manufacturing data for each site. The following information shall be provided by the cable manufacturer for each size, conductor quantity, and type of cable furnished:
a. Minimum bending radius, in inches - For multiple-conductor cables, this information shall be provided for both the individual conductors and the multiple-conductor cable.
b. Pulling tension and sidewall pressure limits, in pounds.
c. Instructions for stripping semiconducting insulation shields, if furnished, with minimum effort without damaging the insulation.
Installation Instructions
3.2 CABLE AND CONDUIT SCHEDULE
Submit schedule of cable and conduit. Schedule shall include, at a minimum, cable designations, approximate cable length for the design data submittal, actual cable length for the as-built submittal, cable type and size, and conduit type and size. Cable shall be 10 times the diameter of the outer coverings.
SECTION 26 05 19.00 28 Page 11
3.3 TESTS, INSPECTIONS, AND VERIFICATIONS
3.3.1 Cable Data
Cable data shall be submitted for approval including dimensioned sketches showing cable construction, and sufficient additional data to show that these specifications will be satisfied.
Submit data for each site.
Tests, Inspections, and Verifications
3.3.2 Inspection and Tests
Inspection and tests of wire and cable furnished under these specifications may be performed by the manufacturer. The Government may perform further tests before or after installation. Testing in general shall comply with NEMA WC 70. Specific tests required for particular materials, components, and completed cables shall be as specified in the sections of the above standards applicable to those materials, components, and cable types.
Tests shall also be performed in accordance with the additional requirements specified below. Submit certified test reports.
3.3.2.1 High-Voltage Test Source
Where the applicable standards allow a choice, high-voltage tests for cables to be used exclusively on dc circuits shall be made with dc test voltages. Cables to be used exclusively on ac circuits shall be tested with ac test voltages. If both ac and dc will be present, on either the same or separate conductors of the cable, AC test voltages shall be used.
3.3.2.2 Shielded Cables Rated 2,001 Volts or Greater
Additionally, the following tests shall be performed. Section or paragraph references are to AEIC CS8 as applicable, unless otherwise stated.
a. High potential test voltages shall be as required by Table B1 of AEIC CS8 as applicable, rather than by NEMA WC 70.
b. If high potential testing is done with an ac test voltage as specified in paragraph HIGH-VOLTAGE TEST SOURCE, an additional test shall be made using a dc test voltage rated at 75 percent of the specified full dc test voltage, for 5 consecutive minutes.
c. Partial discharge tests shall be performed in accordance with ASTM D2275.
3.3.2.3 Flame Tests
All power and control cable assemblies shall pass IEEE 383 flame tests.
Single-conductor cables and individual conductors of multiple-conductor cables shall pass the flame test of NEMA WC 70. If such tests, however, have previously been made on identical cables, these tests need not be repeated. Instead, certified reports of the original qualifying tests shall be submitted. In this case the reports furnished under paragraph REPORTS, shall verify that all of each cable's materials, construction, and dimensions are the same as those in the qualifying tests.
SECTION 26 05 19.00 28 Page 12
3.3.2.4 Field Testing
3.3.2.4.1 General
After completion of the installation and splicing, and prior to energizing the conductors, perform wire and cable continuity and insulation tests as herein specified before the conductors are energized. Commercially available pre-terminated wire and cable systems are exempt from these tests.
Contractor must provide all necessary test equipment, labor, and personnel to perform the tests, as herein specified.
Isolate completely all wire and cable from all extraneous electrical connections at cable terminations and joints. Feeder breakers, disconnects in combination motor starters, circuit breakers in panel boards, and other disconnecting devices must be used to isolate the circuits under test.
3.3.2.4.2 Insulation-Resistance Test
Perform Insulation-Resistance Tests on each field-installed conductor with respect to ground and adjacent conductors. Applied potential must be 500 volts dc for 300 volt rated cable and 1000 volts dc for 600 volt rated cable. Take readings after 1 minute and until the reading is constant for 15 seconds. Minimum insulation-resistance values must not be less than 25 Megohms for 300 volt rated cable and 100 Megohms for 600 volt rated cable.
For circuits with conductor sizes 8AWG and smaller insulation resistance testing is not required.
3.3.2.4.3 Continuity Test
Perform Continuity Tests to insure correct cable connection (i.e correct phase conductor, grounded conductor, and grounding conductor wiring) end-to end. Any damages to existing or new electrical equipment resulting from contractor mis-wiring will be repaired and re-verified at contractor's expense. All repairs must be approved by the CO prior to acceptance of the repair.
3.3.2.4.4 Phase-Rotation Tests
Conduct Phase-Rotation Tests on all three-phase circuits using a phase-rotation indicating instrument. Perform phase rotation of electrical connections to connected equipment clockwise, facing the source.
3.3.2.4.5 Link Tests
For all Ethernet cable which is not pre-terminated by the manufacturer, perform Category 5e Link Tests in accordance with TIA-568-C.1 and TIA-568-C.2. Tests shall include wire map, length, insertion loss, NEXT, PSNEXT, ELFEXT, PSELFEXT, return loss, propagation delay, and delay skew.
3.3.2.4.6 Acceptance
Final acceptance will depend upon the successful performance of wire and cable under test. Do not energize any conductor until the final test reports are reviewed and approved by the Contracting Officer.
3.3.2.5 Independent Tests
The Government may at any time make visual inspections, continuity or
SECTION 26 05 19.00 28 Page 13 resistance checks, insulation resistance readings, power factor tests, or dc high-potential tests at field test values. A cable's failure to pass these tests and inspections, or failure to produce readings consistent with acceptable values for the application, will be grounds for rejection of the cable.
3.3.2.6 Reports
Furnish results of tests made. No wire or cable shall be shipped until authorized. Lot number and reel or coil number of wire and cable tested shall be indicated on the test reports.
SECTION 26 05 19.00 28 Page 14
-- End of Section --
SECTION 26 05 19.00 28 Page 15
SECTION TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
SECTION 26 12 19.10
THREE-PHASE MEDIUM VOLTAGE FLOOR/PAD-MOUNTED TRANSFORMER
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Pad-Mounted Transformer Drawings
1.4.2 Regulatory Requirements
1.4.3 Standard Products
1.4.3.1 Alternative Qualifications
1.4.3.2 Material and Equipment Manufacturing Date
1.5 MAINTENANCE
1.5.1 Transformer Data Package
1.6 WARRANTY
PART 2 PRODUCTS
2.1 WARNING SIGNS
2.2 Arc Flash Warning Label
2.3 GROUNDING AND BONDING
2.4 SOURCE QUALITY CONTROL
2.4.1 Transformer Test Schedule
2.4.2 Design Tests
2.4.3 Routine and Other Tests
PART 3 EXECUTION
3.1 INSTALLATION
3.2 GROUNDING
3.2.1 Pad-Mounted Transformer Grounding
3.2.2 Connections
3.2.3 Grounding and Bonding Equipment
3.3 INSTALLATION OF EQUIPMENT AND ASSEMBLIES
3.3.1 Meters and Current Transformers
3.4 FIELD APPLIED PAINTING
3.5 WARNING SIGN MOUNTING
3.6 FOUNDATION FOR EQUIPMENT AND ASSEMBLIES
3.6.1 Sealing
3.7 FIELD QUALITY CONTROL
3.7.1 Performance of Acceptance Checks and Tests
3.7.1.1 Pad-Mounted Transformers
3.7.1.2 Current Transformers
3.7.1.3 Watthour Meter
3.7.1.4 Grounding System
3.7.1.5 Surge Arresters, Medium- and High-Voltage
3.7.2 Follow-Up Verification
SECTION 26 12 19.10 Page 1
SECTION 26 12 19.10 Page 2
SECTION 26 12 19.10
THREE-PHASE MEDIUM VOLTAGE FLOOR/PAD-MOUNTED TRANSFORMER
PART 1 GENERAL
One medium voltage three phase 4160 volt to 480 volt 300 kVA transformer shall be provided and installed as indicated on the drawings.
Transformer specifics are:
The windings shall be 220 Celsius Insulation Type HT.
The transformer shall be a Air to Air (Class AA) transformer with a temperature rise of 150 Celsius. It shall have a sound level of 55 DB.
The Transformer shall have an efficiency of 90% or greater.
1.1 REFERENCES
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
IEEE C2 (2012; Errata 1 2012; INT 1-4 2012; Errata
2 2013; INT 5-7 2013; INT 8-10 2014; INT
11 2015) National Electrical Safety Code
IEEE C57.12.00 (2010) Standard General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers
IEEE C57.12.28 (2014) Standard for Pad-Mounted Equipment
- Enclosure Integrity
IEEE C57.12.34 (2009) Standard for Requirements for Pad-Mounted, Compartmental-Type, Self-Cooled, Three-Phase Distribution Transformers, 5 MVA and Smaller; High Voltage, 34.5 kV Nominal System Voltage and Below; Low Voltage, 15 kV Nominal System Voltage and Below
IEEE C57.12.90 (2010) Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers
IEEE C57.98 (2011) Guide for Transformer Impulse Tests
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2013) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
SECTION 26 12 19.10 Page 3
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI C12.1 (2008) Electric Meters Code for Electricity Metering
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014) National Electrical Code
UNDERWRITERS LABORATORIES (UL)
UL 467 (2007) Grounding and Bonding Equipment
1.2 DEFINITIONS
Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, shall be as defined in
IEEE 100.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. A designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Transformer(s); G EL SD-03 Product Data
Pad-Mounted Transformer Drawings; G EL
Submittal shall include manufacturer's information for each component, device, insulating medium (dry or liquid), and accessories provided with the 4160/480V transformer.
SD-06 Test Reports
Acceptance Checks and Tests; G EL
Routine and Other Tests; G EL
Submittal shall include acceptance criteria and limits for each test in accordance with NETA ATS "Test Values".
SD-09 Manufacturer's Field Reports
Design Tests; G EL
SD-10 Operation and Maintenance Data
Transformer Data Package; G EL
SECTION 26 12 19.10 Page 4
Submit operation and maintenance data in accordance with Section 01 78 23.00 28 OPERATION AND MAINTENANCE DATA and as specified herein.
SD-11 Closeout Submittals
Transformer Test Schedule; G EL
Submit report of test results as specified by paragraph entitled "Field Quality Control."
1.4 QUALITY ASSURANCE
1.4.1 Pad-Mounted Transformer Drawings
Drawings shall indicate, but not be limited to the following:
a. An outline drawing, with front, top, and side views.
b. ANSI nameplate data.
c. Elementary diagrams and wiring diagrams with terminals identified of watthour meter and current transformers.
d. One-line diagram, including switch(es), current transformers, meters, and fuses.
e. Manufacturer's published time-current curves (on full size logarithmic paper) of the transformer high side fuses.
1.4.2 Regulatory Requirements
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.
1.4.3 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.
1.4.3.1 Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than
SECTION 26 12 19.10 Page 5
6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
1.4.3.2 Material and Equipment Manufacturing Date
Products manufactured more than 3 years prior to date of delivery to site shall not be used, unless specified otherwise.
1.5 MAINTENANCE
1.5.1 Transformer Data Package
In addition to requirements of the Data Package, include the following on the actual Transformer(s) provided:
a. An instruction manual with pertinent items and information highlighted
b. An outline drawing, front, top, and side views
c. Prices for spare parts and supply list
d. Routine and field acceptance test reports
e. Fuse curves for primary fuses
f. Information on watthour demand meter, CT's, and fuse block
g. Actual nameplate diagram
h. Date of purchase
1.6 WARRANTY
The equipment items shall be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
PART 2 PRODUCTS
2.1 WARNING SIGNS
Provide warning signs for the enclosures of pad-mounted transformers having a nominal rating exceeding 600 volts.
a. When the enclosure integrity of such equipment is specified to be in accordance with IEEE C57.12.28, such as for pad-mounted transformers, provide self-adhesive warning signs on the outside of the high voltage compartment door(s). Sign shall be a decal and shall have nominal dimensions of 7 by 10 inches with the legend "DANGER HIGH VOLTAGE" printed in two lines of nominal 2 inch high letters. The word "DANGER" shall be in white letters on a red background and the words "HIGH VOLTAGE" shall be in black letters on a white background. Decal shall be Panduit No. PPSO710D72 or approved equal.
b. When such equipment is guarded by a fence, mount signs on the fence.
Provide metal signs having nominal dimensions of 14 by 10 inches with the legend "DANGER HIGH VOLTAGE KEEP OUT" printed in three lines of nominal 3 inch high white letters on a red and black field.
SECTION 26 12 19.10 Page 6
2.2 Arc Flash Warning Label
Provide warning label for the enclosure of pad-mounted transformers.
Locate this self-adhesive warning label on the outside of the high voltage compartment door warning of potential electrical arc flash hazards and appropriate PPE required. The label format shall be as indicated.
2.3 GROUNDING AND BONDING
UL 467. Provide grounding and bonding as specified in article 250 of NFPA 70.
2.4 SOURCE QUALITY CONTROL
2.4.1 Transformer Test Schedule
The Government reserves the right to witness tests. Provide transformer test schedule for tests to be performed at the manufacturer's test facility. Submit required test schedule and location, and notify the Contracting Officer 30 calendar days before scheduled test date. Notify Contracting Officer 15 calendar days in advance of changes to scheduled date.
a. Test Instrument Calibration
1. The manufacturer shall have a calibration program which assures that all applicable test instruments are maintained within rated accuracy.
2. The accuracy shall be directly traceable to the National Institute of Standards and Technology.
3. Instrument calibration frequency schedule shall not exceed 12 months for both test floor instruments and leased specialty equipment.
4. Dated calibration labels shall be visible on all test equipment.
5. Calibrating standard shall be of higher accuracy than that of the instrument tested.
6. Keep up-to-date records that indicate dates and test results of instruments calibrated or tested. For instruments calibrated by the manufacturer on a routine basis, in lieu of third party calibration, include the following:
(a) Maintain up-to-date instrument calibration instructions and procedures for each test instrument.
(b) Identify the third party/laboratory calibrated instrument to verify that calibrating standard is met.
2.4.2 Design Tests
IEEE C57.12.00 states that "design tests are made only on representative apparatus to substantiate the ratings assigned to all other apparatus of basically the same design." Submit design test reports (complete with test data, explanations, formulas, and results), in the same submittal package as the catalog data and drawings for each of the specified transformer(s).
SECTION 26 12 19.10 Page 7
Design tests shall have been performed in accordance with IEEE C57.12.90 prior to the award of this contract.
a. Tests shall be certified and signed by a registered professional engineer.
b. Temperature rise: "Basically the same design" for the temperature rise test means a pad-mounted transformer with the same coil construction (such as wire wound primary and sheet wound secondary), the same kVA, the same cooling type (ONAN), the same temperature rise rating, and the same insulating liquid as the transformer specified.
c. Lightning impulse: "Basically the same design" for the lightning impulse dielectric test means a pad-mounted transformer with the same BIL, the same coil construction (such as wire wound primary and sheet wound secondary), and a tap changer, if specified. Design lightning impulse tests shall include the primary windings only of that transformer.
1. IEEE C57.12.90, paragraph 10.3 entitled "Lightning Impulse Test Procedures," and IEEE C57.98.
2. State test voltage levels.
3. Provide photographs of oscilloscope display waveforms or plots of digitized waveforms with test report.
d. Lifting and moving devices: "Basically the same design" requirement for the lifting and moving devices test means a test report confirming that the lifting device being used is capable of handling the weight of the specified transformer in accordance with IEEE C57.12.34.
e. Pressure: "Basically the same design" for the pressure test means a pad-mounted transformer with a tank volume within 30 percent of the tank volume of the transformer specified.
f. Short circuit: "Basically the same design" for the short circuit test means a pad-mounted transformer with the same kVA as the transformer specified.
2.4.3 Routine and Other Tests
IEEE C57.12.00. Routine and other tests shall be performed in accordance with IEEE C57.12.90 by the manufacturer on each of the actual transformer(s) prepared for this project to ensure that the design performance is maintained in production. Submit test reports, by serial number and receive approval before delivery of equipment to the project site. Required tests and testing sequence shall be as follows:
a. Phase relation
b. Ratio
c. No-load losses (NLL) and excitation current
d. Load losses (LL) and impedance voltage
e. Dielectric
SECTION 26 12 19.10 Page 8
1. Impulse
2. Applied voltage
3. Induced voltage
f. Leak
PART 3 EXECUTION
3.1 INSTALLATION
Electrical installations shall conform to IEEE C2, NFPA 70, and to the requirements specified herein. Provide new equipment and materials unless indicated or specified otherwise.
3.2 GROUNDING
NFPA 70 and IEEE C2, except that grounding systems shall have a resistance to solid earth ground not exceeding 5 ohms.
3.2.1 Pad-Mounted Transformer Grounding
Provide separate copper grounding conductors and connect them to the ground loop as indicated. When work in addition to that indicated or specified is required to obtain the specified ground resistance, the provision of the contract covering "Changes" shall apply.
3.2.2 Connections
Make joints in grounding conductors and loops by exothermic weld or compression connector. Exothermic welds and compression connectors shall be installed as specified in article 250 of NFPA 70.
3.2.3 Grounding and Bonding Equipment
UL 467, except as indicated or specified otherwise.
3.3 INSTALLATION OF EQUIPMENT AND ASSEMBLIES
Install and connect pad-mounted transformers furnished under this section as indicated on project drawings, the approved shop drawings, and as specified herein.
3.3.1 Meters and Current Transformers
ANSI C12.1.
3.4 FIELD APPLIED PAINTING
Where field painting of enclosures is required to correct damage to the manufacturer's factory applied coatings, provide manufacturer's recommended coatings and apply in accordance with manufacturer's instructions.
3.5 WARNING SIGN MOUNTING
Provide the number of signs required to be readable from each accessible side, but space the signs a maximum of 30 feet apart.
SECTION 26 12 19.10 Page 9
3.6 FOUNDATION FOR EQUIPMENT AND ASSEMBLIES
Mount transformer on concrete slab. Unless otherwise indicated, the slab shall be at least 8 inches thick, reinforced with a 6 by 6 - W2.9 by W2.9 mesh, placed uniformly 4 inches from the top of the slab. Slab shall be placed on the powerhouse floor. Top of concrete slab shall be approximately 4 inches above finished grade with gradual slope for drainage. Edges above grade shall have 1/2 inch chamfer. Slab shall be of adequate size to project at least 8 inches beyond the equipment.
3.6.1 Sealing
When the installation is complete, the Contractor shall seal all entries into the equipment enclosure with an approved sealing method. Seals shall be of sufficient strength and durability to protect all energized live parts of the equipment from rodents, insects, or other foreign matter.
3.7 FIELD QUALITY CONTROL
3.7.1 Performance of Acceptance Checks and Tests
Perform in accordance with the manufacturer's recommendations and include the following visual and mechanical inspections and electrical tests, performed in accordance with NETA ATS.
3.7.1.1 Pad-Mounted Transformers
a. Visual and mechanical inspection
1. Compare equipment nameplate data with specifications and approved shop drawings.
2. Inspect physical and mechanical condition. Check for damaged or cracked insulators and leaks.
3. Inspect anchorage, alignment, and grounding.
4. Verify the presence of PCB content labeling.
5. Verify the bushings and transformer interiors are clean.
6. Inspect all bolted electrical connections for high resistance using low-resistance ohmmeter, verifying tightness of accessible bolted electrical connections by calibrated torque-wrench method, or performing thermographic survey.
7. Verify correct liquid level (if applicable)in tanks and bushings.
8. Perform specific inspections and mechanical tests as recommended by manufacturer.
9. Verify the presence of transformer surge arresters.
b. Electrical tests
1. Perform resistance measurements through all bolted connections with low-resistance ohmmeter.
SECTION 26 12 19.10 Page 10
2. Verify proper secondary voltage phase-to-phase and phase-to-neutral after energization and prior to loading.
3. Perform insulation-resistance tests, winding-to-winding and each winding-to-ground. Calculate polarization index.
4. Perform turns-ratio tests at all tap positions.
5. Perform insulation power-factor or dissipation-factor tests on all windings in accordance with test equipment manufacturer’s published data.
6. Perform power-factor or dissipation-factor tests on each bushing equipped with a power-factor/capacitance tap. In the absence of a power-factor/capacitance tap, perform hot-collar tests.
7. Measure the resistance of each medium-voltage winding in each de-energized tap-changer position, if applicable. Measure the resistance of each low-voltage winding in each de-energized tap-changer position, if applicable.
8. Remove and test a sample of insulating liquid for the following:
Dielectric breakdown voltage, Acid neutralization number, Specific gravity, Interfacial tension, Color, Visual Condition, Water in insulating liquids (Required on 25 kV or higher voltages and on all silicone-filled units.), and Power factor or dissipation factor, if applicable.
9. Perform dissolved-gas analysis (DGA) on a sample of insulating liquid if applicable.
3.7.1.2 Current Transformers
a. Visual and mechanical inspection
1. Compare equipment nameplate data with specifications and approved shop drawings.
2. Inspect physical and mechanical condition.
3. Verify correct connection.
4. Verify that adequate clearances exist between primary and secondary circuit wiring.
5. Verify the unit is clean.
6. Inspect all bolted electrical connections for high resistance using low-resistance ohmmeter, verifying tightness of accessible bolted electrical connections by calibrated torque-wrench method, or performing thermographic survey.
7. Verify that all required grounding and shorting connections provide good contact.
8. Verify correct operation of transformer withdrawal mechanism and grounding operation.
9. Verify appropriate lubrication on moving current-carrying parts
SECTION 26 12 19.10 Page 11 and on moving and sliding surfaces.
b. Electrical tests
1. Perform resistance measurements through all bolted connections with low-resistance ohmmeter, if applicable.
2. Perform insulation-resistance test of each current transformer and its secondary wiring.
3. Perform a polarity test of each current transformer.
4. Perform a ratio-verification test.
3.7.1.3 Watthour Meter
a. Visual and mechanical inspection
1. Compare equipment nameplate data with specifications and approved shop drawings.
2. Inspect physical and mechanical condition.
3. Verify tightness of electrical connections.
b. Electrical tests
1. Calibrate watthour meters according to manufacturer's published data.
2. Verify that correct multiplier has been placed on face of meter, where applicable.
3. Verify that current transformer secondary circuits are intact.
3.7.1.4 Grounding System
a. Visual and mechanical inspection
1. Inspect ground system for compliance with contract plans and specifications.
b. Electrical tests
1. Perform ground-impedance measurements utilizing the fall-of-potential method. On systems consisting of interconnected ground rods, perform tests after interconnections are complete.
On systems consisting of a single ground rod perform tests before any wire is connected. Use a portable ground testing megger in accordance with manufacturer's instructions to test each ground or group of grounds. The instrument shall be equipped with a meter reading directly in ohms or fractions thereof to indicate the ground value of the ground rod or grounding systems under test.
2. Submit the measured ground resistance of the grounding system, indicating the location of the grounding system. Include the test method and test setup (i.e., pin location) used to determine ground resistance.
SECTION 26 12 19.10 Page 12
3.7.1.5 Surge Arresters, Medium- and High-Voltage
a. Visual and mechanical inspection
1. Compare equipment nameplate data with specifications and approved shop drawings.
2. Inspect physical and mechanical condition.
3. Inspect anchorage, alignment, grounding, and clearances.
4. Verify the arresters are clean.
5. Inspect all bolted electrical connections for high resistance using low-resistance ohmmeter, verifying tightness of accessible bolted electrical connections by calibrated torque-wrench method, or performing thermographic survey.
6. Verify that the ground lead on each device is individually attached to a ground bus or ground electrode.
b. Electrical tests
1. Perform resistance measurements through all bolted connections with low-resistance ohmmeter, if applicable.
2. Perform an insulation-resistance test on each arrester, phase terminal-to-ground.
3. Test grounding connection.
3.7.2 Follow-Up Verification
Upon completion of acceptance checks and tests, the Contractor shall show by…