Control Number: 18-0007
SINGLE SOURCE DETERMINATION (including brand name)
1 CONTRACTING AGENCY: US Army Corps of Engineers (USACE), Walla Walla District (CENWW- CT) 201 North 3rd, Walla Walla, WA 99362.
2 DESCRIPTION OF ACTION: This action is for a firm fixed price brand name procurement of Allen- Brandley Programmable Logic Controller for use as part of the Lower Monumental drainage and unwatering pump systems.
These brand name components comprise only a portion of the acquisition. Accordingly, this justification and approval is limited to these components only. The estimated price of the components is $80,000.
3 DESCRIPTION OF ITEMS: Rockwell Automation Allen-Bradley PLC and terminal block equipment includes the items in the following table.
Product Description Qty
1756 series PLC with chassis and I/O modules 2 sets 1492 series Terminal blocks with pre-wired cables to PLC 2 sets
4 AUTHORITY CITED: FAR 13.106-1(b), Soliciting from a single source.
(1)For purchases not exceeding the simplified acquisition threshold, contracting officers may solicit from one source if the contracting officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand name, or industrial mobilization).
5 REASON FOR AUTHORITY CITED:
a. BACKGROUND: Integration of the PLC with terminal blocks is critical to the timely completion of the system upgrades. Other manufacturer’s products are not fully compatible with the current systems at Lower Monumental and introduce negative risks to the pumping systems’ operation if these components are not completely compatible. Additionally, if installed and found to be insufficient, adequate time to re-procure compatible PLC and terminal block components would not allow sufficient time to complete the work before the end of the outage.
Benefits for the use of a single brand will result in simplifying the training requirements for Government personnel, reduction of spare parts inventory required for system maintenance, and will allow parts to be exchanged between systems.
b. JUSTIFICATION: Rockwell Automation’s Allen-Bradley brand of PLC and terminal blocks is specified to meet compatibility and supportability requirements. Lower Monumental project personnel will be required to know how to maintain and troubleshoot the system after it is installed. Allen Bradley ControlLogix PLCs are already installed and are part of Lower Monumental’s maintenance repertoire. Personnel who already know how Allen Bradley Logic Controller PLCs work will have very little trouble learning how to maintain this system.
c. IMPACT: Substitution for the specified product would:
i. Increase the initial and recurring costs of programming software
ii. Increase the initial and recurring costs of spare parts inventory
iii. Increase labor time, travel, and expense to train District personnel who will support the system
iv. Decrease compatibility with existing systems and thus decrease the amount of information that can be conveyed throughout the system
v. Increase the complexity of the facility and thus decrease maintainability and reliability
d. ALTERNATIVES:
i. None
6 EFFORTS TO OBTAIN AND INCREASE COMPETITION: It is anticipated that multiple suppliers of the Rockwell Automation’s Allen-Bradley items are present.
7 FAIR AND REASONABLE COST DETERMINATION: Based on catalog pricing an anticipated cost of $80,000 for the items listed above is fair and reasonable.
8 MARKET RESEARCH: The items listed above are essential in order to maintain compatibility and supportability requirements for existing systems. Market research indicates other companies’ similar products, or products lacking the particular feature, do not meet or cannot be modified to meet the agency’s needs.
9 OTHER FACTS: None
10 INTERESTED SOURCES: None
11 CONTRACT SPECILAIST: I certify that this J&A is accurate and complete to the best of my knowledge and belief.
PREPARED BY: Valerie K. Reller TITLE: Contract Specialist
CAC SIGNATURE: _____________________________________
12 DETERMINATION: I hereby determine the above-stated circumstances of this contract action deem only one brand is available to meet the Government’s need.
APPROVED BY: Jani C. Long TITLE: Contracting Officer
13 DETERMINATION: In accordance with the requirements of UAI 5101.602-2-90, I have reviewed the
J&A and determined it is legally sufficient.
APPROVED BY:
TITLE: District Counsel
| 2017-11-15T14:10:03-0800 | |
| RELLER.VALERIE.K.1392455783 |
| 2017-11-15T14:58:06-0800 | |
| HAMPSON.THERESA.L.1374580937 |
| 2017-11-15T15:34:14-0800 | |
| LONG.JANI.C.1231624801 |
File details come from the government source that posted it.