W912EF-16-R-0039_Amend_0001-8-22-16.pdf

PDF 428 KB Posted

Attached to
Lower Granite Lock and Dam JFF Phase 1b Outfall Relocation Solicitation
Solicitation number
W912EF-16-R-0039
Issued by

About this file

W912EF-16-R-0039 Amendment 0001 Summary and Revised Specs

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV53624644

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

-Revise the specif ications (See summary of changes and revised specif ications) -Provide access to the Geotechnical Data Report as specif ied in SECTION 31 63 29.10 28 -Revise the Draw ings (See attached draw ings) -Revise the Information to Offerors sections C & D (See summary of changes) -Revise clauses 52.211-10 & 252.236-7001 (See summary of changes)

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 23

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-16-R-0039

X 9B. DATED (SEE ITEM 11)

02-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Aug-2016

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

CYNTHIA H JACOBSEN

201 N. THIRD AVE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-16-R-0039

This Page Intentionally Left Blank

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0001

Summary of changes for Amend -0001 Lower Granite JFF Phase 1b Outfall Relocation

1. Revised the following Specifications (See revised specification for details):

a. SECTION 01 33 00 SUBMITTAL PROCEDURES

• Revised Submittal Register

b. SECTION 01 45 04.00 28 CONTRACTOR QUALITY CONTROL

• Revised Paragraph 1.3 SUBMITTALS

• Revised Paragraph 3.4.2 CQC System Manager

• Deleted Paragraph 3.4.3 Concrete/Reinforcing Steel Inspector

• Revised and moved Paragraph 3.4.3 Drilled Pier Inspector

• Revised Paragraph 3.4.4 Additional Requirement

• Renumbered Paragraphs.

c. SECTION 09 97 02.00 28 PAINTING: HYDRAULIC STRUCTURES

• Revised Paragraph 1.3.5 Coating Thickness Gage Qualification

• Revised Paragraph 2.1 PRODUCT SAMPLES

• Revised Paragraph 3.1.2 Ferrous Surfaces Subject to Atmospheric Exposures

• Revised Paragraph 3.3.5 System No. 21-A-Z

d. SECTION 31 63 29.10 28 DRILLED CONCRETE PIERS

• Revised Paragraph 1.3 SUBSURFACE INVESTIGATIONS

2. Revised the following Drawings (See bracketed areas).

a. SHEET G-002

b. SHEET G-101

c. SHEET CD404

d. SHEET C-001

e. SHEET CP401

f. SHEET M-101

3. Revised Instruction to Bidders

a. Section C. Evaluation Approach, Factor 3-Past Performance

b. Section D. Proposal Submission (Revisions in red and deletions marked through)

4. Revised the following Clauses

a. 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

b. 252.236-7001Contract Drawings, Maps and Specifications (AUG 2000)

(See Yellow Highlights):

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

EVALUATION FACTORS

FACTOR 3 - PAST PERFORMANCE

The Government will evaluate the offeror’s record of current and past performance to ascertain the probability of successfully performing the required efforts of the scope of work.

a. Evaluation of past performance shall be in accordance with this plan utilizing the forms and questionnaires set forth in Appendix E. (a Government CPARS/CCASS evaluation is acceptable in place of the Past Performance Questionnaire)

b. The Government will focus its inquiries on the offeror’s (and major subcontractor’s) record of performance as it relates to all solicitation requirements, including price, schedule, performance and management of subcontractors. Major subcontractors are defined as members of an offeror’s overall team who are expected to perform ten (10) percent or more of the proposed effort. A significant achievement, problem, or lack of relevant data in any element of the work can become an important consideration in the evaluation process.

Therefore, offerors will be reminded to include the most current and relevant efforts (within the past six years) in their proposal. Absent any current and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be assigned an “unknown confidence rating” and its proposal will not be evaluated either favorably or unfavorably on past performance. The Government may use data provided by the offeror in its proposal and data obtained from other sources, including data in Government files or data obtained through interviews with personnel familiar with the contractor and their current and past performance under federal, State or Local government or commercial contracts for same or similar services. Data used in conducting performance risk assessments shall not extend past six years prior to the issue date of the RFP, but may include performance data generated during the past six years without regard to the contract award date.

c. Offerors shall submit all Government and/or commercial contracts for the prime offeror and each major subcontractor in performance or awarded during the past six years, from the issue date of this RFP, which are relevant to the efforts required by this RFP. The Government may consider a wide array of information from a variety of sources, but is not compelled to rely on all of the information available.

d. The past performance factor considers each offeror’s demonstrated record of current and relevant past performance in supplying products and services that meet the contract requirements. There are three two aspects to the past performance evaluation: recency and relevancy assessment.

e. RECENCY: The Government will conduct a performance assessment based on the recency of the Offeror’s relevant past performance, of which work shall be current and/or have been performed within the past six years from issue of the date of this RFP.

f. RELEVANCY: The Government will conduct a performance assessment based on the relevancy of the Offeror’s current and relevant past performance, as well as that of its major subcontractors, as it relates to the probability of successful accomplishment of the required effort. These efforts include all aspects of schedule, performance and customer support, including the Offeror’s submitted subcontracting plan for this project and the Offeror’s record of:

1. Conforming to specifications and standards of good workmanship;

2. Maintaining program execution within price;

3. Adherence to contract schedules, including the administrative aspects of performance;

4. Ability to resolve technical problems quickly and effectively;

5. Businesslike concern for the interest of its customers

6. Establishing and maintaining adequate management of subcontractors; and

7. Compliance with subcontracting plans submitted on previous projects.

Ratings: Ratings for this Factor will be either Acceptable or Unacceptable

Evaluation Standard

The methodology for assigning a rating for Factor 3 is noted below:

Rating Description Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below)

Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

Note: In accordance with FAR Part 15.305(a)(2)(iv), in the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available, the Offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable”.

Offeror Submission Instructions for Factor 3:

A PPQ is included in this solicitation at Attachment A. Submit one Attachment A for each project narrative submitted under Factor 2 (a Government CPARS/CCASS evaluation is acceptable in place of the Past Performance Questionnaire). When completing the PPQ, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal or have been received by the Government on the due date of your proposal. However, if the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal due date, the Offeror shall, at a minimum, submit with the proposal the first page of the PPQ with blocks 1 through 5 completed. This will allow the Government an opportunity to contact the client directly. Please contact the client to notify them of the Government’s intent to contact them regarding Past Performance on the project listed. Additionally, if the client requests, PPQs may be submitted directly from the client to the Government’s point of contact listed in Block 7 of Standard Form 1442.

Offerors shall not incorporate by reference into their proposal any PPQs previously submitted for other Solicitations/Requests for Proposals. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

All documentation for this factor shall be contained in Volume 1 “Technical Proposal.”

D. PROPOSAL SUBMISSION

1. Introduction The offerors’ proposal shall be submitted in hard copy, with accompanying digital copies, as set forth below. The RFP shall provide the Government address and receipt date for proposal submittal.

The offerors’ proposal shall consist of two (2) volumes. The Volumes are:

Volume I – Schedule, Experience and Past Performance Volume II - Price, Solicitation, Offer and Award Documents and Certifications/Representations.

Files shall not contain classified data. The use of hyperlinks in proposals is prohibited. Proposals shall be submitted in hard copy AND electronically. The electronic files shall contain identical information to the hard copy files.

Offerors are cautioned that “parroting” of the Technical requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal.

2. Proposal Submission Requirements

a. Each volume shall be submitted in a separate three-ring binder. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated. Each binder shall be clearly labeled with its Title and a copy number (e.g., copy 1 of 4).

b. Printing should be single spaced. Each paragraph shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or Times New Roman fonts are required.

Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.

c. The following volumes of material shall be submitted:

VOLUME TITLE PRINTED

COPIES

ELECTRONIC

COPIES

Volume I – Schedule, Experience and Past Performance Original +4 1 Volume II – Price & Administrative Original 1

3. Proposal Files

a. Format The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. A Table of Contents should be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:

Margins – Top, Bottom, Left, Right – 1” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”

NOTE: 11X17 folded pages are acceptable for tables/graphic representations

The following additional restrictions apply:

b. File Packaging. All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc., and provided on CDs or DVDs. Zip disks are not permitted. Files shall be in read-only format, using PDF files. All price breakdown information to aid in the Price evaluation shall be submitted in Microsoft Office Excel Read/Write format. Each disc shall be externally labeled with the volume number, date, and the offeror’s name. **Please note – Self extracting exe files are not acceptable. **Both electronic and hard copies shall be the same.

c. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked. The following shall be included in the Narrative discussion:

(i) Volume I: Technical Proposal. DO NOT SUBMIT PRICING INFORMATION IN VOLUME I.

The volume shall be organized into the following sections:

1) Section 1 – Factor 1: Schedule

2) Section 2 – Factor 2: Experience

• Sub-section 2: Sub-Factor 2A: Demolition of Existing Piles

• Sub-Section 2: Sub-Factor 2B: Construction of New Drilled Piers in a Riverine

Environment

• Sub-Section 2: Sub-Factor 2C – Constructing Elevated Flumes or Pipelines

3) Section 3 – Factor 3: Past Performance - This volume shall contain current and past performance information regarding similar contracts. This volume shall not exceed 25 pages plus five pages for each major subcontractor and fabricator, excluding Past Performance Questionnaire Forms. Offerors shall submit all Government and/or commercial contracts for the prime offeror and each major contract currently in performance or awarded during the past six years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation. Relevant efforts are defined as services/efforts that are the same as or similar to the effort required by the RFP. Data concerning the offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractor’s past performance information to the Offeror. In addition, letters of commitment shall be included for all major subcontractors for their past performance to be considered. This volume shall be organized into the following sections:

A. Section 1 – Contract Descriptions. This section shall include the following information in the following format. Ensure all information is current and accurate.

(a) Contractor/Subcontractor place of performance, CAGE Code and DUNS Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers).

(b) Government contracting activity, (or private firm) and current address, Procuring Contracting Officer’s name, e-mail address, telephone and fax numbers.

(c) Technical representative/COR and current email address, telephone and fax numbers.

(d) Government contract administration activity and the Administrative Contracting Officer’s name, current e-mail address, telephone and fax number.

(e) Government contract administration activity’s Pre-Award point of contact name, and current e-mail address, telephone and fax numbers.

(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Delivery Order Numbers.

(g) Contract Type (specific type such as Fixed-Price (FP), Cost Reimbursement (CR), Time & Material (T&M), etc.). In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).

(h) Awarded price.

(i) Final or projected final price.

(j) Original delivery schedule, including dates of start and completion or work.

(k) Final or projected final, delivery schedule, including dates of start and completion of work.

B. Section 2 – Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 2 - Contract Description, describing the objectives achieved and detailing how the effort is relevant to the requirement of this RFP.

(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The offerors shall also provide copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the offeror or proposed subcontractor. The offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

(b) For all contracts, the offeror shall provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to GFE component failures, and number and nature of failures attributable to the offeror’s delivered product.

C. Section 3 – Subcontracts. Offerors shall provide an outline of how the effort required by the RFP will be assigned for performance within the offeror’s corporate entity and among the proposed subcontractors. The information provided for the prime offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Government technical specification. This includes all subcontractors who will be providing critical hardware/services or whose subcontract is for more than 10% of the total proposed Price.

D. Section 4 – New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and employees. However, in addition to the other requirements in this section, the offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above. Letters of Commitment shall be included in the proposal for these employees in order to be considered.

E. Section 5-Past Performance Questionnaire. For all contracts identified in Section

2 - Contract Descriptions, a Past Performance Questionnaire, Appendix E, must be completed and submitted (a Government CPARS/CCASS evaluation is acceptable in place of the Past Performance Questionnaire). The offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the current and past contract. The Point of Contacts (POCs) shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to cynthia.h.jacobsen@usace army.mil. The offeror must submit, with its proposal, a list of all the POCs who were sent questionnaires.

The POC List shall be submitted in Word for Windows Table Format to include the following fields Solicitation Number; Company Name; Contract Number;

Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-mail Address; and Date E-Mail to POC (month/day). However, if the Offeror is unable to obtain a completed PPQ from a client for a project before the proposal due date, the Offeror shall, at a minimum, submit with the proposal the first page of the PPQ with blocks 1 through 5 completed. (See Offeror Submission Instructions for Factor 3 above.)

F. Section 6-Submissions Offerors are discouraged from providing points of contact with another contractors’ facility, i.e., in case an offeror (or one of his/her team members) is in a subcontract with another contractor who has submitted a proposal on the same requirement. Offerors shall provide and submit the prime contract number and all Governmental agency points of contact (POC) in lieu of subcontract numbers or prime contract POCs in situations as described above.

(ii) VOLUME II – Price Proposal. This volume shall consist of all information, required to support proposed prices. Certified pricing data is not currently required; however, the Government reserves the right to request such data prior to award. There are no page limitations for this volume.

1) The offeror shall ensure that the information submitted in this volume is consistent with and fully supports the amounts set forth in the SF1442 and continuation sheets.

2) Certifications and Representations – Each offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the RFP. An authorized official of the firm shall sign the SF 1442 and all certifications requiring original signature. An Acrobat PDF file shall be created to capture the signatures for submission.

Section 00010 – Standard Form 1442 Solicitation, Offer and Award (Construction, Alteration or Repair)

Section 00600 – Representations, Certification and Other Statements of Offerors

Solicitations, Offer and Award Documents, and Certifications/Representations shall not be submitted separately from that submitted in VOLUME II

i. Cover Letter containing: solicitation number; name, address, telephone number and email addresses of the Prime Offeror; DUNS number, CAGE code and Tax Identification Number (TIN) of the Primer Offeror.

ii. Joint Venture (JV) documentation/agreement, if applicable. See information below.

mailto:cynthia.h.jacobsen@usace

iii. Documentation for each factor, as described in the RFP, tabbed by the factor and sub-factor.

Joint Ventures (JV) A joint venture is defined as a legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements such as “teaming agreements” or “strategic alliance” which are not recognized as bona fide joint ventures for the purposes of this solicitation.

An offeror that is part of a JV shall submit a legally binding joint venture agreement. The Government will not evaluate the capability of any contractors that are not included in the JV agreement. JVs shall include a copy of the legal joint venture agreement signed by an authorized officer from each of the firms comprising the JV with the chief executive of each entity identified.

If submitting a proposal as a JV, the experience and past performance of each of the joint venture partners can be submitted for the JV entity. The experience for each joint venture partner will be considered the experience of the joint venture entity.

JVs shall submit, in Volume II, the following additional documentation regarding their business entities:

i. A copy of the JV agreement, translated into English if the original agreement is in a language other than English.

ii. A detailed statement outlining the following, in terms of percentages, where appropriate:

a. The relationship of the JV parties, in terms of business ownership, capital contribution and profit distribution or loss sharing.

b. The management approach of the JV in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the JV and perform the duties necessary to complete the work.

c. The structure of the JV and decision-making responsibilities of the JV parties, in terms of who will control the manner and method of performance of the work.

d. The bonding responsibilities of the JV parties.

e. Identification of the key personnel having authority to bind the JV to subcontracts and state who will provide or contract for the labor and materials for the JV.

f. Identification of party maintaining the JV bank accounts for payment of all expenses, deposits of all receipts, keeping the books and records, and payment for applicable taxes for the JV.

g. Identification of party furnishing the facilities, such as office supplies and telephone service.

h. Identification of the party having overall control of the JV.

i. Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual joint venture parties, identifying the party, or as hired employees of the JV.

j. If one of the JV parties possess relevant experience and/or past performance, the experience and/or past performance of that firm will be considered as experience and/or past performance of the Joint Venture.

k. A complete and legally binding document with all the information required under this section titled “Joint Ventures” shall be included.

l. All members of the Joint Venture shall sign the SF 1442.

m. Prospective JV Offerors that submit proposals may not change their firm or their Joint

Venture firms, if selected into the Competitive Range and requested to submit a Final Proposal Revision (FPR).

Credit for Subcontractor Experience. If an Offeror wishes to be credited with a subcontractor or supplier, i.e., a firm that is not the prime contractor or part of the joint venture, a letter of commitment signed by the subcontractor and the prime contractor shall be submitted. The letter of commitment shall be submitted even if the firm is in some way related to a joint venture partner (for example, the subcontractor is subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary). In regard to Experience, if an Offeror submits projects demonstrating experience in one of the factors, and that project was completed by a subcontractor, a subsidiary, or a supplier, as opposed to the prime or one of the joint venture partners, the Offeror SHALL submit a signed letter of commitment from the contractor who performed and completed the work. If a letter of commitment is not submitted, the experience will not be considered.

Past Performance Questionnaire. For all contracts identified in Factors 1 through 3 – Demolition;

In-Water Construction; Over-Water Construction, a Past Performance Questionnaire, Attachment A, shall be completed and submitted. The offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the current and past contract. The Point of Contacts (POCs) shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to cynthia.h.jacobsen@usace.army.mil. The offeror shall submit, with its proposal, a list of all the POCs who were sent questionnaires. The POC List shall be submitted in Word for Windows Table Format to include the following fields: Solicitation Number; Company Name; Contract Number;

Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-mail Address; and Date E-Mail to POC (month/day).

mailto:cynthia.h.jacobsen@usace.army.mil

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to

(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than the dates listed below.

• Anticipated Navigation Lock outages during this contract are as follows. Outages apply to ALL US Army Corps of Engineers Navigation locks on the Columbia/Snake River System:

o FY17 – Navigation Locks will be out of service for an extended outage between 6:00 A.M. on 12 December 2016, ending at 6:00 P.M. on 20 March 2017.

o FY18 – Navigation Locks are anticipated to be out of service between 6:00 A.M. on 3 March 2018, ending at 6:00 P.M. on 24 March 2018. Actual dates and length of outage may vary.

• Anticipated "Voluntary" Spill for Fish Passage during this contract:

o 1 April 2017 through 11:59 P.M. 15 December 2017.

o 1 April through 11:59 P.M. 31 August, typical, annually.

• Work Window outages are as follows. See Section 01 14 00.30 28 WORK RESTRICTIONS AND

SURFACE FINISH REQUIREMENTS – BIOLOGICAL, for more detailed information on work windows and restrictions:

i. In-Water Work Windows:

a. 15 November 2016 through 11:59 P.M. 28 February 2017.

b. 15 November 2017 through 11:59 P.M. 28 February 2018.

ii. Winter Maintenance Work Window – 15 November 2016 through 11:59 P.M. 24 March 2017.

iii. Extended Winter Maintenance Work Window – 1 August 2017 through 11:59 P.M. 24 March 2018.

(1) The Contractor shall complete all work related to operation of the Juvenile Fish Facility and bypass systems by not later than 11:59 P.M. 31 January 2018. The new Juvenile Fish Facility and Bypass Systems must be operational and in FULL BIOLOGICAL COMPLIANCE by this time. See Section 01 14 00.30 28 WORK RESTRICTIONS AND SURFACE FINISH REQUIREMENTS – BIOLOGICAL, paragraph DEFINITIONS. This includes all work related to the outfall pipe, kelt and research tanks, PIT tag items and equipment, water cannon, and all related fish passage features.

(2) Items NOT required for operation of the Juvenile Fish Facility and Bypass Systems must be completed No later than 15 February 2018. This includes items such as Navigation sign and lights, bird spikes, and walkway.

(3) All Drilled Piers must be completed during the 2016-2017 In-Water Work Window.

(4) The Contractor shall complete final cleanup and demobilization by not later than 15 calendar days after completion of work in (2) above.

(5) NOTE: All existing Juvenile Fish Facility facilities and components (including all outfall pipes) must be protected and remain in service until 1 November 2017. Contractor shall take special care to avoid damage of any fish facility related items.

(6) The Contractor will lose access to the work site for any In-water Work at the end of the In-Water Work Window. The following tasks are NOT allowed outside of the In-Water Work Window:

a. Any task that disturbs the river bed, including, but not limited to drilling, placing of caissons or formwork, spuds to anchor barges, etc..

b. Any task related to concrete placement in or over water. Includes placement of concrete in forms located in the water.

c. Any task that would increase turbidity in the river.

(7) The Contractor shall complete final submission of O&M manuals, working “as-built” contract drawings and final approved versions of Contractor prepared drawings (see SECTION 01 78 00.00 28) by not later than 30 calendar days after completion of work in (2) above.

(d) Other Contracts. Other Contractors will be working in the area. See FAR 52.236-8 .OTHER CONTRACTS

(APR 1984).

1. On Shore items labeled "By Others" in Contract drawings are scheduled to be completed (by another Contractor) no later than 11:59 P.M. 31 October 2017. On Shore work areas will not be available to the Contractor until work "By Others" is complete. On shore areas of contract work will be available no later than 1 November 2017, for this contract. See Section 01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS, paragraph COORDINATION WITH OTHER CONTRACTORS for additional information.

2. Drilled Pier 101 (see Sheet C-102 and others) shall be completed no later than 15 December 2016, to allow access for other contracts.

3. In-Water work for items labeled "By Others" will be during the In-Water Work windows. Anticipate work on in-water items by Other Contractors during these dates, unless noted otherwise on the drawings. See, also, Section 01 55 10.10 28 WORK, ACCESS AND STORAGE AREAS - BRZ AND TAILRACE, paragraph COORDINATION WITH OTHER CONTRACTORS.

4. "Emergency Bypass Outfall Pipe – By Others" will be constructed after 15 December 2016.

(End of Clause)

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(Yellow highlighted revision number and date on the index below are for this Amendment 0001)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Drawing Number

Sheet Number

Title

Revision Number

Date

LOWER GRANITE LOCK AND DAM

JFF PHASE 1B OUTFALL RELOCATION

GENERAL

GDG-1-0-1/654 G-001 COVER SHEET AND LOCATION MAPS

GDG-1-0-1/655 G-002 INDEX TO DRAWINGS A 8/17/2016

GDG-1-0-1/659 G-003 INDEX TO DRAWINGS - (FOR INFORMATION

ONLY)

GDG-1-0-1/656 G-008 GENERAL - ABBREVIATIONS AND LEGEND

GDG-1-0-1/657 G-009 GENERAL - STRUCTURAL NOTES AND - DESIGN

CRITERIA

GDG-1-0-1/658 G-101 GENERAL - OVERALL SITE PLAN A 8/18/2016

GDG-1-0-1/660 G-102 CONTRACTOR'S STAGING AREA

GDG-1-0-7/2 G-901

CONTRACTOR'S STAGING AND STORAGE AREA

PHOTOS - (CONTRACTOR DISPOSE OR -

REMOVAL BY GOVERNMENT)

GDG-1-0-7/3 G-902 CONTRACTOR'S STAGING AND STORAGE AREA

PHOTOS - (CONTRACTOR DISPOSE OR -

REMOVAL BY GOVERNMENT)

GDG-1-0-7/4 G-903 CONTRACTOR'S STAGING AND - STORAGE

AREA PHOTOS - (CONTRACTOR DISPOSE)

GDG-1-0-7/5 G-904

CONTRACTOR'S STAGING AND - STORAGE

AREA PHOTOS - (CONTRACTOR DISPOSE /

MOVE)

SURVEY

GDG-1-12-1/1 V-101 GENERAL SITE SURVEY CONTROL

GEOTECHNICAL

GDF-1-9-10/1 B-101 GEOTECHNICAL - EXISTING BORING

LOCATIONS

CIVIL

GDF-1-0-10/26 CD401 CIVIL - DEMOLITION PLAN - WEST

GDF-1-0-10/27 CD402 CIVIL - DEMOLITION PLAN - EAST

GDF-1-0-10/28 CD403 CIVIL - DEMOLITION - REFERENCE PHOTOS

GDF-1-0-10/29 CD404 CIVIL - DEMOLITION PLAN - NORTH A 8/18/2016

GDF-1-0-10/12 C-001 CIVIL - SITE PLAN A 8/18/2016

GDF-1-0-10/13 C-100 CIVIL - PIPING ALIGNMENTS

GDF-1-0-10/14 C-101 ALIGNMENT INFORMATION

GDF-1-0-10/15 C-102 CIVIL - PRIMARY BYPASS - PLAN AND PROFILE

- 1

GDF-1-0-10/16 C-103 CIVIL - PRIMARY BYPASS - PLAN AND PROFILE

- 2

GDF-1-0-10/17 C-104 CIVIL - PRIMARY BYPASS - PLAN AND PROFILE

- 3

GDF-1-0-10/18 C-105 CIVIL - DIRECT FACILITY BYPASS PIPE - PLAN

AND PROFILE

GDF-1-0-10/19 C-106 CIVIL - PIT TAG BYPASS PIPE - PLAN AND

PROFILE

GDF-1-0-10/20 C-107 CIVIL - NOAA AND SORT-BY-CODE TANK -

RELEASE PLAN AND PROFILES

GDF-1-0-10/21 C-401 CIVIL - WATER SUPPLY PIPING

GDF-1-0-10/22 C-501 CIVIL DETAILS

GDF-1-0-10/23 C-502 CIVIL - PIPE HANGER DETAILS - 1

GDF-1-0-10/24 C-503 CIVIL - PIPE HANGER DETAILS - 2

GDF-1-0-10/25 C-601 PIPE SUPPORT AND MERGER - SCHEDULES

GDF-1-0-10/30 CG101 CIVIL - GRADING PLAN

GDF-1-0-10/31 CP401 KELT TANK - TRUCK TRANSPORT RAMP - AND

ADJOINING SIDEWALK A 8/18/2016

GDF-1-0-10/32 CP402 CIVIL - PRIMARY BYPASS SIDEWALK

GDF-1-0-10/33 CP501 KELT TANK - TRUCK TRANSPORT RAMP -

DETAILS - 1

GDF-1-0-10/34 CP502 KELT TANK - TRUCK TRANSPORT RAMP -

DETAILS - 2

GDF-1-0-10/35 CP503 CIVIL - PRIMARY BYPASS - SIDEWALK DETAILS

STRUCTURAL

GDF-1-13-10/132 SB501 STRUCTURAL - PRIMARY BYPASS OUTFALL

PIERS - AND ACCESS HATCHES

GDF-1-13-10/133 SB502 STRUCTURAL - PIPE SUPPORT DETAILS

GDF-1-13-10/134 SB503 STRUCTURAL - PRIMARY BYPASS

OBSERVATION - HATCH AND MERGER DETAILS

GDF-1-13-10/135 SB504 STRUCTURAL - WALKWAY TRANSITION - AND

DRILLED PIER DETAILS

GDF-1-13-10/136 SB505 STRUCTURAL - BOAT RESTRICTED ZONE -

MAST AND DETAILS

GDF-1-13-10/137 SB506 STRUCTURAL - BOAT RESTRICTED ZONE -

WINCH ASSEMBLY AND DETAILS

MECHANICAL

GDF-1-3-10/140 M-101 MECHANICAL - PIPING PLAN A 8/17/2016

GDF-1-3-10/141 MP102 MECHANICAL - ENLARGED PIPING PLAN

GDF-1-3-10/142 MP301 MECHANICAL - WATER SUPPLY PIPING -

SECTIONS AND DETAILS - 1

GDF-1-3-10/143 MP302 MECHANICAL - WATER SUPPLY PIPING -

SECTIONS AND DETAILS - 2

GDF-1-3-10/144 MP303 MECHANICAL - SOUTH KELT TANK OUTLET -

RELOCATION PLAN AND SECTIONS

GDF-1-3-10/145 MP304 MECHANICAL - WATER CANNON DETAILS

GDF-1-3-10/146 MP501 MECHANICAL - SOUTH KELT TANK OUTLET -

RELOCATION PIPING DETAILS

GDF-1-3-10/147 MP502 MECHANICAL - WATER PIPING - DETAILS - 1

GDF-1-3-10/148 MP503 MECHANICAL - WATER PIPING - DETAILS - 2

GDF-1-3-10/149 MP504 MECHANICAL - PRIMARY BYPASS LINING -

DETAILS AND PIPE SUPPORTS

GDF-1-3-10/150 MP505 MECHANICAL - PRIMARY BYPASS - PIT TAG

SHIELD

GDF-1-3-10/151 MP601 MECHANICAL - ABBREVIATIONS AND

SCHEDULE

GDF-1-3-10/152 MP602 MECHANICAL - WATER SUPPLY PIPE DIAGRAM

ELECTRICAL

GDF-1-6-10/114 E-001 GENERAL - ELECTRICAL LEGEND

GDF-1-6-10/115 E-101 ELECTRICAL - ELECTRICAL SITE PLAN

GDF-1-6-10/116 E-102 ELECTRICAL - OUTFALL PIPE WALKWAY PLAN

GDF-1-6-10/117 E-501 ELECTRICAL - POWER AND LIGHTING -

DETAILS

GDF-1-6-10/118 E-502 JFF PHASE 1B OUTFALL - JUVENILE FISH

FACILITY - SEPARATOR CONDUIT ROUTING

GDF-1-6-10/119 E-601 ELECTRICAL - JFF POWER ONE-LINE DIAGRAM

GDF-1-6-10/120 E-602 ELECTRICAL - PANEL SCHEDULES

GDF-1-6-10/121 E-603 ELECTRICAL - MOTOR CONTROL - DIAGRAMS

GDF-1-6-10/122 E-604 JFF NAMEPLATE SCHEDULE

FOR INFORMATION ONLY (FIO)

The Government does not warrant the accuracy of the FIO drawings.

The Government recommends that the Contractor verify the accuracy of FIO drawings.

GDG-1-9-1/627 FIO-001

JUVENILE FISH FACILITY UPGRADE - GENERAL

SITE - EXISTING BORE - HOLE LOCATIONS -

KEY PLAN

GDG-1-9-1/629 FIO-002

JUVENILE FISH FACILITY UPGRADE - GEOTECH

BORING - PLAN AND - PROFILE - STA 15+00 TO

24+00

GDG-1-9-1/630 FIO-003

JUVENILE FISH FACILITY UPGRADE - GEOTECH

BORINGS - PLAN AND - PROFILE - STA 24+00 TO

27+17

GDG-1-9-1/631 FIO-004 JUVENILE FISH FACILITY UPGRADE - GEOTECH

BORINGS - PLAN AND PROFILE

GDG-1-9-1/632 FIO-005 JUVENILE FISH FACILITY UPGRADE - PIER

ELEVATION - TABLE

GDG-1-9-1/637 FIO-006 JUVENILE FISH FACILITY UPGRADE - BORING

LOGS - 13_DH-12 AND 13_DH-13

GDG-1-9-1/638 FIO-007 JUVENILE FISH FACILITY UPGRADE - BORING

LOGS - 13_DH-13 AND 13_DH-14

GDG-1-9-1/639 FIO-008 JUVENILE FISH FACILITY UPGRADE - BORING

LOGS - 13_DH-15 AND 13_DH-16

GDG-1-9-1/640 FIO-009 JUVENILE FISH FACILITY UPGRADE - BORING

LOGS - 13_DH-16, 13_DH-17, AND 13_DH-18

GDG-1-9-1/641 FIO-010 JUVENILE FISH FACILITY UPGRADE - BORING

LOGS - 14_DH-01 AND 14_DH-03

GDG-1-9-1/642 FIO-011 JUVENILE FISH FACILITY UPGRADE - BORING

LOGS - 14_DH-03 AND 14_DH-04

GDG-1-9-1/606 FIO-012 JUVENILE FISH FACILITY UPGRADE - CIVIL

SITE INDEX AND - STAGING AREAS

GDG-1-9-1/607 FIO-013 JUVENILE FISH FACILITY UPGRADE - CIVIL

DETAILS 1

GDG-1-9-1/608 FIO-014 JUVENILE FISH FACILITY UPGRADE - CHAIN

LINK - FENCE DETAILS

GDG-1-9-1/609 FIO-015 JUVENILE FISH FACILITY UPGRADE - DOUBLE

SWING GATE DETAILS

GDG-1-9-1/610 FIO-016 JUVENILE FISH FACILITY UPGRADE - CIVIL

DETAILS II

GDG-1-9-1/604 FIO-017 JUVENILE FISH FACILITY UPGRADE - BOAT

RESTRICTED ZONE - SITE PLAN

GDG-1-12-1/1 FIO-018 JUVENILE FISH FACILITY UPGRADE - SURVEY

CONTROL

GDG-1-9-1/649 FIO-019

JUVENILE FISH FACILITY UPGRADE -

TRANSPORTATION FLUME - STA 18+00 - TO

21+00 - PLAN AND PROFILE

GDG-1-9-1/652 FIO-020

JUVENILE FISH FACILITY UPGRADE - WATER

SUPPLY PIPE - STA 5+00 - TO 10+00 - PLAN AND

PROFILE

GDG-1-0-1/625 FIO-021 JUVENILE FISH FACILITY UPGRADE - CIVIL KEY

SHEET AND - ALIGNMENT INFORMATION

GDG-1-0-32/1 FIO-022

JUVENILE FISH FACILITY UPGRADE -

TRANSPORTATION FLUME - STA 21+00 - TO

27+17 - PLAN AND PROFILE

GDG-1-0-32/2 FIO-023 JUVENILE FISH FACILITY UPGRADE -

EMERGENCY BYPASS - PLAN AND PROFILE

GDG-1-0-32/3 FIO-024

JUVENILE FISH FACILITY UPGRADE - WATER

SUPPLY PIPE - STA 10+00 - TO 15+00 - PLAN AND

PROFILE

GDG-1-0-6/21 FIO-025 JUVENILE FISH FACILITY UPGRADE - TRAFFIC

AND UTILITY - PLAN 1

GDG-1-0-6/22 FIO-026 JUVENILE FISH FACILITY UPGRADE - TRAFFIC

AND UTILITY - PLAN 2

GDG-1-0-6/23 FIO-027 JUVENILE FISH FACILITY UPGRADE - VAULT

DETAILS

GDG-1-0-11/16 FIO-028 JUVENILE FISH FACILITY UPGRADE - CHAIN

LINK - FENCE DETAILS

GDG-1-0-1/624 FIO-029 JUVENILE FISH FACILITY UPGRADE - DRAWING

VOLUME WORK AREA - KEY PLAN

GDF-1-3-10/136 FIO-030 JUVENILE FISH FACILITY UPGRADE -

MECHANICAL - PIPING PLAN

GDF-1-3-10/137 FIO-031 JUVENILE FISH FACILITY UPGRADE -

MECHANICAL - ENLARGED PIPING PLAN

GDF-1-3-10/138 FIO-032

JUVENILE FISH FACILITY UPGRADE - PRIMARY

BYPASS ANCHOR BLOCK - MECHANICAL

DETAILS

GDF-1-3-10/139 FIO-033

JUVENILE FISH FACILITY UPGRADE -

MECHANICAL - PRIMARY BYPASS -

OBSERVATION - PORT DETAILS

GDG-1-0-1/603 FIO-034 JUVENILE FISH FACILITY UPGRADE - BOAT

RESTRICTED ZONE - SITE PLAN

GDF-1-0-1/302 FIO-035 JUVENILE FISH OUTFALL PIPE - GENERAL SITE

PLAN

GDF-1-0-1/303 FIO-036 JUVENILE FISH OUTFALL PIPE - KEY PLAN AND

PIPING LAYOUT

GDF-1-0-10/7 FIO-037 JUVENILE FISH SUPPORT FACILITIES - SITE

PLAN - PLAN AND DETAILS

GDF-1-0-14/3 FIO-038

LOWER GRANITE ADULT FISH TRAP -

MODIFICATIONS - CIVIL - SECTIONS AND

DETAILS 1

GDF-1-0-14/7 FIO-039

LOWER GRANITE ADULT FISH TRAP -

MODIFICATIONS - CIVIL - DRAIN - PIPELINE -

SECTIONS AND DETAILS 1

GDF-1-2-14/1 FIO-040

ADULT FISH TRAP MODIFICATIONS - PHASE I I

- OBSERVATION BUILDING - PLAN AND

ELEVATIONS

GDF-1-3-4/5 FIO-041 ADULT FISH TRAP - ATTRACTION WATER

PUMPS

GDF-1-3-4/28 FIO-042 FINGERLING FACILITIES - HOLDING AREA

PIPING - MECH. - PLAN, SECTION AND DETAILS

GDF-1-3-4/29 FIO-043 FINGERLING FACILITIES - HOLDING FACILITY -

MECH. - PIPING PLAN AND SECTIONS

GDF-1-3-4/31 FIO-044

HOLDING FACILITY - MECH. - FISH - SORTER

AND PROSITY CONTROL - UNITS - PLAN AND

ELEVATION

GDF-1-3-4/35 FIO-045 HOLDING FACILITY - MECH. - POROSITY

CONTROL UNIT - SECTIONS AND DETAILS

GDF-1-3-4/36 FIO-046 HOLDING FACILITY - MECH. - INCLINED

INTAKE SCREEN - PLAN SECTION AND DETAILS

GDF-1-3-4/48 FIO-047 FINGERLING ORIFICE VALVE - INSTALLATION -

PLAN

GDF-1-3-4/49 FIO-048 FINGERLING ORIFICE VALVE - INSTALLATION -

DETAILS AND SECTIONS I

GDF-1-3-4/50 FIO-049 FINGERLING ORIFICE VALVE - INSTALLATION -

DETAILS AND SECTIONS II

GDF-1-3-10/39 FIO-050

FINGERLING ORIFICE VALVE AUTOMATION -

LOWER GRANITE - SOLENOID VALVE - AND

LIMIT SWITCH INSTALLATION

GDF-1-3-10/26 FIO-051 JUVENILE FISH OUTFALL PIPE - PIPING -

PROFILES

GDF-1-3-10/37 FIO-052 JUVENILE FISH OUTFALL PIPE - PIT TAG TANK -

PIPING DETAILS

GDF-1-3-10/38 FIO-053 JUVENILE FISH OUTFALL PIPE -

MISCELLANEOUS PIPING DETAILS

GDF-1-4-10/1 FIO-054 FINGERLING FACILITIES - HOLDING FACILITY -

STRUCT. - PLAN

GDF-1-4-10/2 FIO-055 FINGERLING FACILITIES - HOLDING FACILITY -

STRUCT. - SECTIONS

GDF-1-5-10/22 FIO-056 JUVENILE FISH OUTFALL PIPE - IN-RIVER

SUPPORT - ELEVATION, SECTIONS AND DETAIL

GDF-1-5-10/23 FIO-057 JUVENILE FISH OUTFALL PIPE -

MISCELLANEOUS SUPPORTS

GDF-1-5-10/26 FIO-058 JUVENILE FISH OUTFALL PIPE - CABLE AND

ANCHOR RELOCATION - PLANS AND SECTIONS

GDF-1-6-10/34 FIO-059 JUVENILE FISH SUPPORT FACILITIES - PANEL

SCHEDULE

GDF-1-6-10/34.4 FIO-060 JUVENILE FISH SUPPORT FACILITIES - PANEL

SCHEDULES 2

GDG-9-12-38/22 FIO-061 MULTIBEAM BATHYMETRIC SURVEY -

TAILRACE AND FOREBAY

TO-10-

GRANITEV-101 FIO-062

ASBUILT AND TOPOGRAPHIC - SURVEYS -

JUVENILE FISH FACILITY - & LOWER GRANITE

DAM

TO-10-

GRANITEV-102 FIO-063

ASBUILT AND TOPOGRAPHIC - SURVEYS -

TO-10-

GRANITEV-103 FIO-064

ASBUILT AND TOPOGRAPHIC - SURVEYS -

GDB-1-0-3/1 FIO-065 WASTEWATER TREATMENT - OVERALL SITE

PLAN

GDB-1-0-3/6 FIO-066 WASTEWATER TREATMENT - PLAN STA 5+00

TO 9+50

GDB-1-0-3/7 FIO-067 WASTEWATER TREATMENT - PLAN STA 9+50

TO 14+00

GDB-1-0-3/8 FIO-068 WASTEWATER TREATMENT - PLAN STA 14+00

TO 17+75 - PLAN STA A0+03.80 TO A1+08.57

GDB-1-0-3/9 FIO-069 WASTEWATER TREATMENT - PLAN STA 17+75

TO 23+50

GDF-1-5-10/169 FIO-070

JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - COLUMN - LOCATION PLAN -

TOP LEVEL

GDF-1-5-10/170 FIO-071

JUVENILE FISH FACILITY - PHASE 1A - FLUME

MID LEVEL

GDF-1-5-10/171 FIO-072

BOTTOM LEVEL

GDF-1-5-10/172 FIO-073

LOOP SUPPORTS - INVERT ELEVATION

SCHEDULE

GDF-1-5-10/227 FIO-074

LOOP AND PRIMARY BYPASS - GROUND

SUPPORT LEVEL

GDF-1-5-10/173 FIO-075 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - ELEVATIONS 1

GDF-1-5-10/174 FIO-076 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - ELEVATIONS 2

GDF-1-5-10/175 FIO-077 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - ELEVATIONS 3

GDF-1-5-10/232 FIO-078 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - ELEVATIONS 4

GDF-1-5-10/233 FIO-079 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - ELEVATIONS 5

GDF-1-5-10/234 FIO-080 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - ELEVATIONS 6

GDF-1-5-10/235 FIO-081 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - ELEVATIONS 7

GDF-1-5-10/176 FIO-082 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - SECTIONS AND DETAILS 1

GDF-1-5-10/177 FIO-083 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - SECTIONS AND DETAILS 2

GDF-1-5-10/178 FIO-084 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - SECTIONS AND DETAILS 3

GDF-1-5-10/179 FIO-085 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - SECTIONS AND DETAILS 4

GDF-1-5-10/180 FIO-086 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - SECTIONS AND DETAILS 5

GDF-1-5-10/228 FIO-087 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - SECTIONS AND DETAILS 6

GDF-1-5-10/229 FIO-088 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - SECTIONS AND DETAILS 7

GDF-1-5-10/230 FIO-089 JUVENILE FISH FACILITY - PHASE 1A -

PARIMARY BYPASS - PIPE ANCHOR BLOCK

GDF-1-5-10/236 FIO-090 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - SECTIONS AND DETAILS 9

GDF-1-5-10/237 FIO-091 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - SECTIONS AND DETAILS 10

GDF-1-5-10/238 FIO-092 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - SECTIONS AND DETAILS 11

GDF-1-5-10/239 FIO-093 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - SECTIONS AND DETAILS 12

GDF-1-5-10/240 FIO-094 JUVENILE FISH FACILITY - PHASE 1A - FLUME

LOOP SUPPORTS - SECTIONS AND DETAILS 13

GDF-1-5-10/231 FIO-095 JUVENILE FISH FACILITY - PHASE 1A - RAILING

DETAILS

GDF-1-5-10/181 FIO-096 JUVENILE FISH FACILITY - PHASE 1A - LOOP TO

SEPARATOR SUPPORTS - PLAN

GDF-1-5-10/182 FIO-097

JUVENILE FISH FACILITY - PHASE 1A - LOOP TO

SEPARATOR SUPPORTS - SECONDARY

DEWATERER SUPPORTS

GDF-1-5-10/183 FIO-098

JUVENILE FISH FACILITY - PHASE 1A - LOOP TO

SEPARATOR SUPPORTS - SECONDARY

DEWATERER SUPPORTS

GDF-1-5-10/184 FIO-099

JUVENILE FISH FACILITY - PHASE 1A - LOOPS

TO SEPARATOR SUPPORTS - SEPARATOR

FRAMING

GDF-1-5-10/185 FIO-100 JUVENILE FISH FACILITY - PHASE 1A - LOOP TO

SEPARATOR SUPPORTS - ELEVATIONS 1

GDF-1-5-10/186 FIO-101 JUVENILE FISH FACILITY - PHASE 1A - LOOP TO

SEPARATOR SUPPORTS - ELEVATIONS 2

GDF-1-5-10/187 FIO-102 JUVENILE FISH FACILITY - PHASE 1A - LOOP TO

SEPARATOR SUPPORTS - ELEVATIONS 3

GD…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .