W912EF-16-R-0039_REGISTER_Amend_0002.pdf

PDF 210 KB Posted

Attached to
Lower Granite Lock and Dam JFF Phase 1b Outfall Relocation Solicitation Federal contract opportunity
Solicitation number
W912EF-16-R-0039
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

W912EF-16-R-0039 Amendment 0002 Revised Register

View the file

Other files for this federal contract opportunity

Other files attached to Lower Granite Lock and Dam JFF Phase 1b Outfall Relocation Solicitation, newest first.
File Type Posted
W912EF-16-R-0039_Amendment_0002.pdf PDF
W912EF-16-R-0039_TechSpec_Amend-0002.pdf PDF
Amend_0001_Plan_C-001-1B.pdf PDF
LLA_JFF_Upgrade_GDR_EntireDoc_20140716.pdf PDF
W912EF-16-R-0039_Amend_0001-8-22-16.pdf PDF
Amend_0001_Plan_CP401-1B.pdf PDF
Amend_0001_Plan_M-101-1B.pdf PDF
Amend_0001_Plan_CD404-1B.pdf PDF
Amend_0001_Plan_G-002-1B.pdf PDF
Amend_0001_Plan_G-101-1B.pdf PDF
FBO_Site_Visit_Attendee_List-16-R-0039.pdf PDF
W912EF-16-R-0039_Plans_FIOS.pdf PDF
W912EF-16-R-0039_Plans.pdf PDF
W912EF-16-R-0039-Experience_Form.pdf PDF
Past_Performance_Questionnaire.pdf PDF
W912EF-16-R-0039_TechSpec_Solicitation.pdf PDF
W912EF-16-R-0039_Site_Visit_Information.pdf PDF
W912EF-16-R-0039_LLA_JFF_Phase_1b_Outfall_Relocation.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 18 PAGES

W912EF-16-R-0039

Lower Granite JFF Phase 1b Outfall Relocation

01 11 01.00 28 SD-01 Preconstruction Submittals

1.5 G CList of Contact Personnel

1.8 I CEquipment List

1.12.1 I CPre-Work Survey

1.13 G CDust Control Plan

1.16 I CProject Superintendent

SD-07 Certificates

1.17 G CKey Personnel Substitution

SD-11 Closeout Submittals

1.12.1 I CPost-Work Survey

1.15 G CTraining Manuals

01 14 00.10 28 SD-01 Preconstruction Submittals

1.3 G CProject Security During

Construction

1.6 I CEmployee Training and

Identification Summary

01 14 00.90 28 SD-01 Preconstruction Submittals

1.3 I SLEAnti Terrorism (AT) Level 1

1.6 I SLEiWATCH, CORPS Watch, or See

Something, Say Something

1.7 I SLELevel 1 OPSEC training

1.8 I SLEPre-Screen Candidates Using

E-Verify Program

01 32 01.00 28 SD-01 Preconstruction Submittals

1.3 G CQualifications

3.4.2 G CInitial Project Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

01 32 01.00 28 3.4.4 G CPeriodic Schedule Updates

01 35 10.00 28 SD-01 Preconstruction Submittals

1.6 G DDCSafe Practices Manual

1.6 G DDCEmergency Management Plan

1.6 G DDCDive Personnel Qualifications

1.6 G DDCDive Station Equipment

Certifications and Certificates for

Air Quality

1.7 G DDCDive Plan

1.7 G DDCActivity Hazard Analysis (AHA)

1.8 G DDCSafe Clearance

SD-06 Test Reports

2.1 I CUnderwater Video

01 35 29.10 28 SD-01 Preconstruction Submittals

1.6 G CAccident Prevention Plan (APP)

1.6.1 G CFall Protection and Prevention

(FP&P) Plan

3.3.6 G CRescue and Evacuation Plan

1.7 G CActivity Hazard Analysis (AHA)

1.8 G CSafe Clearance

1.8 G CAuthorized Individuals

1.6.1 G CCrane Critical Lift Plan

1.5.1.3 I CCrane Operators

1.5.1.4 I CRiggers

1.6.2 G ECCLead Compliance Plan

1.6.3 G ECCAsbestos Hazard Abatement Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

01 35 29.10 28 1.6.1 G CConfined Space Entry Plan

1.12.4 I CCertificate of Compliance

1.13 I CThird Party Certification Of

Barge-Mounted Mobile Cranes

1.5.1.2 G SOFall Protection Competent Person

SD-06 Test Reports

1.12.1 I CAccident Reports

1.12.2 I CMonthly Exposure Reports

1.12.3 I CCrane Reports

SD-07 Certificates

1.9 I CConfined Space Entry Permit

1.9 I CHot work permit

01 45 04.00 28 SD-01 Preconstruction Submittals

3.2 G CContractor Quality Control (CQC)

Plan

3.4.3 G CDrilled Pier Inspector

01 55 10.00 28 SD-01 Preconstruction Submittals

1.8 G STTransport Loading Diagrams

1.9 I CDust Control Plan

01 55 10.10 28 SD-01 Preconstruction Submittals

1.10 I CFloating Plants

1.11 I CEvacuation Plan for In-Water

Work

01 57 20.00 28 SD-01 Preconstruction Submittals

1.8 G ECCEnvironmental Protection Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

01 57 20.00 28 1.8.2 G ECCPlan for Concrete On-Site Wash

Area

1.8.2 G ECCStorm Water Pollution and

Prevention Plan

3.6 G ECCSub-Surface and Construction

Water Disposal

3.1.1 G ECCStorm Water Pollution Prevention

Plan

3.1.2 G ECCNotice of Intent

3.10.4 G ECCWaste Determination

Documentation

3.10.3 G ECCHazardous Waste Handling Plan

3.2 G ECCAsbestos Abatement

3.1.3 I ECCInspection Reports

SD-03 Product Data

1.12 G ECCQuarry or Soil Source

SD-06 Test Reports

3.10.6 I ECCTCLP Testing

SD-07 Certificates

3.10.6 I ECCNotification To The Recycler

3.10.6 I ECCRecycling Facility

SD-11 Closeout Submittals

3.1.4 G ECCNotice of Termination

01 71 23.01 28 SD-01 Preconstruction Submittals

1.7.1 G GEQuality Control Plan

1.8 I GEProfessional Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

G4EDHCMP

Line

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

01 71 23.01 28 3.1.2.2 G GEPreliminary Survey

3.1.2.3 G GEConstruction Surveying Work

Plan and Schedule

SD-11 Closeout Submittals

1.5.2.4 I GEFinal Report

3.1.2.4 G GEAs-Built Surveys

01 78 00.00 28 SD-10 Operation and Maintenance

Data

3.1 G EOCDraft Operation and Maintenance

Manuals and Parts Catalogs

3.1 G CFinal Operation and Maintenance

Manuals and Parts Catalogs

SD-11 Closeout Submittals

3.2 G CPreliminary Versions Of The

Contractor Prepared Drawings

3.4 G CFinal Approved Versions of

Contractor Prepared Drawings

3.5 G CFinal Approved Versions of

Contractor Prepared Drawings

3.3 G CPreliminary As-Built Contract

Drawings

3.6 G CAs-Built Contract Drawings and

FIO Drawings

3.7 G CGovernment Issued Items

02 41 00.20 28 SD-07 Certificates

1.3.1 G AEDemolition Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

02 41 00.20 28 1.5 G AENotification

03 11 13.00 28 SD-03 Product Data

1.2 G STDesign

2.1 I STForm Materials

2.1.3 I GTForm Releasing Agents

SD-06 Test Reports

3.5 I CInspection

03 20 00.00 28 SD-02 Shop Drawings

3.1 G AEReinforcement

SD-03 Product Data

2.6 G AEMaterial

SD-06 Test Reports

2.6 G AEMaterial

SD-07 Certificates

2.2 I AEReinforcing Steel

2.4 I AEWelded Wire Fabric

2.6 G AETests, Inspections, and

Verifications

03 30 00.10 28 SD-01 Preconstruction Submittals

1.5.1 G AEQualifications

3.5 G AEPlacement Plan

3.2.3 G AEConstruction Joint Treatment

3.4.3 G AECold Weather Placing

3.4.4 G AEHot Weather Placing

SD-03 Product Data

2.1.1 G AECementitious Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

03 30 00.10 28 2.1.4 G AENon-Shrink Grout

2.1.5 G AEExpansion Joint Materials

2.1.5.1 G AEJoint Filler

2.1.5.2 G AESealants

2.1.3 G AEAdmixtures

SD-05 Design Data

1.5.2 G AEMaterials and Mix Design

3.1.6 G AEBatch Ticket Information

SD-06 Test Reports

2.1.2 G AEAggregates

3.8 G AETesting And Inspection For CQC

2.1.3.4 G AEAntiwashout Admixture

03 39 00.00 28 SD-03 Product Data

2.1.2 I AEMembrane-Forming Compound

SD-06 Test Reports

3.3 G CTesting and Inspection for CQC

05 05 23.00 28 SD-03 Product Data

1.4 G AEProcedure Qualifications Test

Records (PQR)

1.4 G AEWelding Procedure Specifications

(WPS)

3.2 G AEWelding Procedure Specifications

(WPS)

1.4.5 G AEWelder, Welding Operator, and

Tacker Performance Qualification

(WPQ)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

05 05 23.00 28 SD-06 Test Reports

3.3 G AEQuality Control

3.4.1 G AENondestructive Examination

SD-07 Certificates

1.4.6 G AEWelding Inspector Qualifications

and Certifications

1.4.6 G AECertifications for Nondestructive

Testing Personnel

05 50 00.00 28 SD-02 Shop Drawings

1.6 G AEContractor Designed Metal

Guardrails and Walkways

2.1.5 G AEKelt Tank Truck Ramp Sump

Grating

2.1.6 G AEKelt Tank Truck Ramp Ladder

SD-03 Product Data

1.6 G AEContractor Designed Metal

Guardrails and Walkways

2.1 G AEMiscellaneous Metals and

Standard Metal Articles

2.2.4 G AEAccess Hatch

SD-07 Certificates

1.4 G AEQualifications

05 50 13.00 28 SD-02 Shop Drawings

2.6 G AEBoat Restricted Zone Mast and

Cable

2.7 G AEPrimary Bypass Supports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

05 50 13.00 28 SD-03 Product Data

2.5 G AEPIT tag detector shield

2.1.9 G AEPost Installed Concrete Anchors

SD-07 Certificates

1.3 G AEQualification of Welders and

Welding Operators

2.3.2 G AEWelding of Aluminum

2.4.1.2 G AECertified Welding Inspector

05 50 13.10 28 SD-03 Product Data

2.1 I STBird Control Needle Strips

09 97 02.00 28 SD-01 Preconstruction Submittals

1.3.1.1 G GEQuality Control Manual (QCM)

SD-03 Product Data

2.1 G GEManufacturer's Product Data

Sheet

SD-04 Samples

2.1 G CERLProduct Samples

2.4.3 G GESolvent and Thinners

SD-06 Test Reports

1.3.4.3 G GECertification Test Results

3.4 I GEInspection Reports

SD-07 Certificates

1.3.1 G GEQualified Painting Contractor

1.3.3 G GEIndependent Third Party Test

Agency

1.3.4 G GEQualified Paint Applicator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

09 97 02.00 28 2.1 G GECurrent CERL Certification

1.3.2 G GEQuality Control Personnel

1.3.5 G GECoating Thickness Gage

Qualification

10 14 01.00 28 SD-02 Shop Drawings

3.1 G EASign Fabrication

SD-03 Product Data

3.2 I EAInstallation

1.4 G EAExterior Signage

1.4 I EAWind Load Requirements

SD-10 Operation and Maintenance

Data

3.3 I EAProtection and Cleaning

11 13 19.13 28 SD-02 Shop Drawings

1.4.1 G AEDetail Drawings

SD-03 Product Data

2.2.1.1 G AEDock Bumpers

SD-07 Certificates

1.4.1Fastening Materials

2.2.1.1.1Rubberized Fabric

2.2.1.1.1Steel Angles

22 11 12.10 28 SD-01 Preconstruction Submittals

3.11 G AEPipeline Tolerances

3.6 G AEFabrication and Installation Plan

and Procedure for Primary Bypass

Pipe with Corrugate Metal Liner

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

22 11 12.10 28 SD-06 Test Reports

3.11 G AEPipeline Tolerances

3.7.1 G AEContractor Pipe Weld Inspection

22 11 15.10 28 SD-01 Preconstruction Submittals

1.4.1.3 G CField Survey

1.8.1 G AEExisting Conditions

3.6.2 G AEHydrostatic Test Plan

1.3 G AECONTRACTOR DESIGN

3.3.1 G AEPipe Alignment Control Plan

SD-02 Shop Drawings

1.6 G AEShop Drawings And Material Lists

1.6.1 G AEPipe Layout Drawings

2.6.3 I AEFabricated Pipe Components

SD-03 Product Data

2.7.2 I AESleeve-Type Mechanical

Couplings

2.7.1 I AEFlanged Coupling Adapter

3.5 I AEThrust Restraint

2.8.2 I AEButterfly Valves

2.8.3 I AEAir Release Valves

2.11 G AEWater Cannon

2.5 G EAPVC Perforated Pipe

SD-06 Test Reports

3.6.2 I AEHydrostatic Test Reports

3.6.3 G AEPipe Leakage Tests

3.3.1 G AEAlignment Verification Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

22 11 15.10 28 SD-07 Certificates

1.6.2 I AEMill Certificates

26 05 00.00 28 SD-03 Product Data

1.7 G AESpare Parts

SD-06 Test Reports

3.3.3 I AEContinuity Test

3.3.4 I AEPhase-Rotation Tests

3.3.2 I AEInsulation Resistance Test

1.6 G AEARC FLASH ANALYSIS DATA

26 05 19.00 28 SD-03 Product Data

2.2.1 G AEWire and Cable

SD-06 Test Reports

1.4 G AETests, Inspections, and

Verifications

26 05 33.10 28 SD-03 Product Data

2.1.1 G AELiquid tight Flexible Steel Conduit

2.1.2 G AEPVC Coated Rigid Steel Conduit

3.1.15 G AEExpansion Fittings

26 20 00.00 28 SD-02 Shop Drawings

2.6 G AEPanelboards

2.8 G AETransformers

2.1 G AEEquipment Enclosures

1.4 G AEConnection Diagrams

SD-03 Product Data

2.6.3 G AECircuit breakers

2.3.2 E AEDisconnect Switches

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

26 20 00.00 28 2.4 I AEFuses

2.5 I AEReceptacles

2.8 G AETransformers

2.9.2Combination Motor Controllers

2.7 G AEMolded-Case Circuit Breakers

2.9 G AEManual motor starters

SD-06 Test Reports

3.3.3 I AEGrounding system test

3.3.1 I AETransformer tests

3.3.2 I AEGround-fault receptacle test

26 56 00.00 28 SD-01 Preconstruction Submittals

1.6.2 G AEPhotometric Plan

SD-02 Shop Drawings

1.6.1.1 G AELuminaire drawings

SD-03 Product Data

2.1 G AELED Luminaires

2.1.2 G AEExterior Light Fixture

2.1.3 G AELuminaire Light Sources

2.1.4 G AELuminaire Power Supply Units

(Drivers)

SD-05 Design Data

1.6.3 G AEDesign Data for luminaires

SD-06 Test Reports

3.2Operating test

26 60 13.00 28 SD-02 Shop Drawings

2.1.1 I AEInformational Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

26 60 13.00 28 SD-03 Product Data

2.1.1 G AEEquipment and Performance

Data

SD-06 Test Reports

3.3 I AEElectrical Tests

SD-08 Manufacturer’s Instructions

2.1.1 I AEManufacturer's Instructions

31 00 00.00 28 SD-01 Preconstruction Submittals

1.5.3 G AEExcavation and Shoring Plan

SD-03 Product Data

2.2.1 G AEPipe Bedding

2.2.3 G AEDrain Rock

2.2.4 G AEBase Course

2.2.2 G AEConduit Bedding Material

2.2.5 G AEDrain Sand

2.2.6 G AEHeavy Loose Riprap

2.2.7 G AEGeotextile

2.2.8 G AEControlled Density Fill

2.3 G AEBuried Warning And Identification

Tape

SD-06 Test Reports

3.10 G AETesting

3.10.2.1 G AEFill and Backfill

3.9.1 G AErevetment restoration plan

3.10.2.2 G AESelect Material

3.10.2.3 G AEDensity Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

31 00 00.00 28 SD-07 Certificates

1.4 I AEQualifications

3.10 G AETesting

31 63 29.10 28 SD-01 Preconstruction Submittals

1.6.2 G AEQualifications of Pier Excavation

Contractor

1.6.4 G AEQualifications Contractor's CSL

Testing Technician

1.6.5 G AEQualifications of Thermal Integrity

Profiling (TIP) Contractor

1.6.6 G AEQualifications for Concrete Coring

Contractor

1.8 G AEDrilled Pier Installation Plan

1.7 G AEExcavation and Drilling

Equipment

1.7 G AEExcavation and Drilling

Equipment

SD-02 Shop Drawings

2.5 G AESTEEL REINFORCING CAGE

1.6.3 G AEWelding Procedures

1.8 G AEDrilled Pier Diameters

1.8 G AETop and Bottom of Pier

Elevations

1.8 G AEAnchor Bolt Locations

1.8 G AEAccessories

2.4 G AETIP thermal sensor location plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

31 63 29.10 28 SD-03 Product Data

2.1.3 G AESteel casing

2.1.3 G AESteel casing

2.3 G AECSL Tubes

3.8 G AEembedded Thermal Wire®

sensors

2.4 G AETIP data acquisition system

SD-06 Test Reports

3.10.3 G AEConcrete Volume Measurement

during Placement

3.10.4 G AECrosshole Sonic Logging (CSL)

Tests

3.10.5 G AEThermal Integrity Profiling (TIP)

Tests

SD-07 Certificates

1.6.3 G AEAWS QC1 Certified Welding

Inspector Certificates

1.6.3 G AEWelding Certificates

2.1.3 G AESteel Casing

2.1.3 G AESteel Casing

2.3 G AECSL Tubes

3.6 G AETIP Thermal Wire®

1.7 G AEExcavation and Drilling

Equipment

1.7 G AEExcavation and Drilling

Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

32 16 13.90 28 SD-03 Product Data

2.1 G AEConcrete

SD-06 Test Reports

3.8 G AEField Quality Control

32 92 19.00 28 SD-03 Product Data

2.1.1 G GTSeed

2.2 I GTGranular Fertilizer

SD-07 Certificates

2.1.1 I GTState Seed Certification

33 70 02.00 28 SD-02 Shop Drawings

1.3.1 G AEDetail Drawings

SD-03 Product Data

2.3.2 G AEGrounding Conductors

2.3.1 G AEGround Rods

SD-06 Test Reports

3.8 I AEField Testing

3.8.7 I AEOperating Tests

3.3.1.2 I AECable Installation

SD-07 Certificates

2.1 I AECable Joints

43 21 13.00 28 SD-02 Shop Drawings

3.2 G AEInstallation

SD-03 Product Data

2.2 G AEMaterials and Equipment

3.2.2 G AEOperating Instructions

3.5.1 GTraining Period

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 18 PAGES

Lower Granite JFF Phase 1b Outfall Relocation

43 21 13.00 28 SD-06 Test Reports

3.3 G AEField Tests

SD-07 Certificates

1.3 IManufacturer's Representative

SD-10 Operation and Maintenance

Data

3.5.1 G AEOperation and Maintenance

Manuals

3.5.2 G AEOperation and Maintenance

Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

Amend-0002

File details come from the government source that posted it. Updated .