10_56_29.16_-_R0003.pdf

PDF 61 KB Posted

Attached to
Design-Bid-Build DLA Warehouse 9670 Construction Remodel
Solicitation number
W912DW-17-B-0008
Issued by

About this file

Revised tech spec Section 10 56 29.16

View the file

Other files

File Type Posted
B.01.02_-_17B008_ABSTRACT_-_PORTRAIT.pdf PDF
01_33_22_-_R0003.pdf PDF
ES102_-_R0003.pdf PDF
08_33_23_-_R0003.pdf PDF
TOC_-_R0003.pdf PDF
E-102_-_R0003.pdf PDF
S-501_-_R0003.pdf PDF
DLA_Arch_-_Interior_Drawings_-_R0003.pdf PDF
W912DW-17-B-0008_Amendment_R0003.pdf PDF
03_01_30.71_-_R0003.pdf PDF
00_73_00-A_-_R0003.pdf PDF
01_45_00.00_10_-_R0003.pdf PDF
01_50_00_-_R0003.pdf PDF
W912DW-17-B-0008-0002.pdf PDF
Amendment_0001_Pkg.pdf PDF
DRAWINGS_2_of_3.pdf PDF
DRAWINGS__3_of_3.pdf PDF
DRAWINGS_1_of_3.pdf PDF
Solicitation_W912DW-17-B-0008_Aug_23,_2017.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DLA Warehouse Bldg #9670 15013 Joint Base Lewis-McChord, WA W912DW-17-B-0008

SECTION TABLE OF CONTENTS

DIVISION 10 - SPECIALTIES

SECTION 10 56 29.16

PALLET RACK SYSTEM AND WAREHOUSE EQUIPMENT

09/16

PART 1 GENERAL

1.1 PALLET RACK SYSTEM

1.2 WAREHOUSE EQUIPMENT

1.3 REFERENCES

1.4 SUBMITTALS

1.5 SEISMIC ANCHORAGE FOR RACKS AND EQUIPMENT

1.6 DESIGN CRITERIA

1.7 DEMOLITION AND INSTALLATION

1.8 INSTALLATION PLAN

1.9 MAINTENANCE AND SPARE PARTS

1.10 COORDINATION

1.11 REPLACEMENT COMPONENTS

1.12 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 PALLET RACKS

2.1.1 Adjustability

2.1.2 Sizes and Configuration

2.1.3 Performance Requirements

2.1.4 Materials

2.1.5 Finishes

2.2 LIFT AND TILT SCISSOR TABLE

2.3 SHRINK WRAP MACHINE

2.4 STEEL PALLET CONVEYORS

2.5 COLUMN AND AISLE GUARDS

2.5.1 Column Guards

2.5.2 End of Aisle Guards

PART 3 EXECUTION

3.1 PREPARATION

3.2 INSTALLATION

3.3 FIELD QUALITY CONTROL

3.4 POST-INSTALLATION MEMORANDUM

3.5 RACK IDENTIFICATION MARKING

3.6 ADJUSTING, TOUCH-UP, AND CLEANING

-- End of Section Table of Contents --

SECTION 10 56 29.16 Page 1 R0003

SECTION 10 56 29.16

PALLET RACK SYSTEM AND WAREHOUSE EQUIPMENT

09/16

PART 1 GENERAL

1.1 PALLET RACK SYSTEM

Open style, prefinished, self supporting metal pallet racking consisting of uprights, load beams, shelf panels, skid channels, drum cradles, bracing, wall/row connectors, corner protectors, handling and conveying equipment, and other necessary components and accesories to construct a complete and operable system according to the drawings and this specification section.

1.2 WAREHOUSE EQUIPMENT

Warehouse equipment includes lift and tilt scissor table, shrink wrap machine, and steel pallet conveyors.

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A653/A653M (2015; E 2016) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

CSA GROUP (CSA)

CSA G40.20/G40.21 (2013; R 2014) General Requirements for Rolled or Welded Structural Quality Steel/Structural Quality Steel - Seventh Edition

CAN/CGSB 1.300 (2000) Applied Coating System of Semigloss Baked Finish for Office Furniture

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2015) International Building Code

MATERIAL HANDLING INDUSTRY OF AMERICA INC (MHIA)

MHI MH16.1 (2012) Specifications for Industrial Steel Storage Racks

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office

SECTION 10 56 29.16 Page 2 that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Installation Plan; G

SD-02 Shop Drawings

Shop Drawings; G

Shop Drawings and Product Data: Indicate shelving layout, components, assembly details including anchorage, types and thicknesses of materials, finishes, and maximum allowable design loads.

Seismic Calculations; G

SD-04 Samples

Anchor Samples

SD-11 Closeout Submittals

Post-Installation Memorandum; G

1.5 SEISMIC ANCHORAGE FOR RACKS AND EQUIPMENT

DLA Disposition Services - JBLM is in ICC IBC defined Seismic Zone 3.

Provide seismic calculations demonstrating that anchorages for pallet racks and warehouse equipment meet the requirements of ICC IBC for nonstructural components. Provide anchorage design details for each piece of equipment including concrete drilling sizes and depth, anchor bolts and washers, shims and spacers, setting bed materials, epoxy fillers, and all other materials and installation instructions necessary to insure a secure anchorage. Include directions for repair of improperly seated anchor bolts.

1.6 DESIGN CRITERIA

Provide manufacturer's standard components. All units shall be easily assembled and completely demountable and relocatable with total salvagability of all components.

1.7 DEMOLITION AND INSTALLATION

Disassemble existing rack system. Stack components on pallets, secure with metal banding, and store in designated area on site for salvage/disposal by owner.

DLA operations must continue during the demolition and installation process. Contractor may only occupy three warehouse bays concurrently. At least four warehouse bays must remain operational at all times. The Contractor must notify DLA at least 90 days prior to occupying or beginning work in any warehouse bay.

At least four forklift charging stations must be operational and accessible to DLA at all times during construction. Do not demolish emergency shower/eye wash stations prior to demolishing forklift charging stations that are intended to stay in use during construction.

SECTION 10 56 29.16 Page 3

1.8 INSTALLATION PLAN

Provide installation plan including layout of racks, types and sizes, anchorage points and method of attachment, dimensions, locations of column protectors, location tags, finishes and colors,

1.9 MAINTENANCE AND SPARE PARTS

Provide maintenance materials, special tools, and spare parts in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA. Provide an additional 5% of the total required shelves, end panels, and other standard components for maintenance use. Store where directed by DLA and provide identification labels on each box. Provide standard manufacturer tools for assembly and disassembly.

1.10 COORDINATION

Coordinate installation with DLA Disposition Services - JBLM, conduct a pre-installation meeting with the Site Manager, provide all labor, and deliver all material and equipment to: DLA Disposition Services - JBLM.

The contractor is to verify the shipping address and set up a pre-installation meeting date, time, and location with the Site Manager (information will be available after contract is awarded).

As part of the initial site visit, determine adequacy of pallet rack system design criteria and, if necessary, validate and redesign the quantity and width of load beam sections. Anticipate potential dimension and quantity changes after the initial site visit.

1.11 REPLACEMENT COMPONENTS

Any remaining racking system components not installed shall either be installed at the Site Manager's discretion or be turned over to the Site Manager to be used as replacement pieces for future use. Palletize, band, and label any components deemed unusable. Coordinate with the Site Manager to determine an appropriate location for these pallets.

1.12 DELIVERY, STORAGE, AND HANDLING

Protect finished surfaces from damage during delivery, storage, and handling. Deliver equipment and components to site in original unopened containers and packaging bearing manufacturer's seals and labels.

PART 2 PRODUCTS

2.1 PALLET RACKS

2.1.1 Adjustability

Provide pallet rack components that allow for vertical adjustment in six inch maximum increments.

2.1.2 Sizes and Configuration

Provide pallet rack components that allow for shelf depth of 42 inches, shelf width of 52 inches minimum, rack height of 11'-9", and five levels per unit with fixed top and bottom and three adjustable shelves.

SECTION 10 56 29.16 Page 4 R0003

G3ENDRDN

Polygon

2.1.3 Performance Requirements

Provide metal pallet rack to support uniform loads of 15,000 pounds per pair of load beams with maximum deflection of 1/180th of span.

Unless specifically noted otherwise on the drawings, provide 16 foot tall by 48 inch deep vertical columns with 108 inch long horizontal load beams.

All horizontal load beams shall have a combined minimum rated capacity between 5,500 and 6,000 lbs. Pallet supports will be used in addition to wire mesh decking (waterfall design).

Install the two levels of horizontal load beams at approximately 52 inches and between 108 and 110 inches above the floor. All 16 foot tall vertical columns shall have a minimum 23,000 lbs load capacity. Vertical column load capacity (design) will increase with increased height to properly meet or exceed the total capacity of all horizontal load beams to be installed (i.e. if four bays are to be installed at 6,000 lbs. capacity each, vertical column capacity must exceed 24,000 lbs.).

2.1.4 Materials

Sheet steel: commercial grade, stretcher leveled to ASTM A653/A653M.

Steel sections and plates: manufactured to meet provisions of

CSA G40.20/G40.21.

2.1.5 Finishes

Prepare and finish steel surfaces to meet provisions of CAN/CGSB 1.300.

Color selected from manufacturer's standard pallet of colors.

All horizontal load beams are to either receive solid coats of paint on every surface and then oven baked or galvanize dipped to support corrosion resistance.

Bolted frames are either electro-statically immersed in epoxy paint or galvanized to ensure that the coating saturates every surface and provides enhanced corrosion resistance in humid climates and chemical storage environments.

2.2 LIFT AND TILT SCISSOR TABLE

Provide lift and tilt scissor table that meets the following characteristics:

1. Hydraulic

2. Capable of lift and tilt separately/simultaneouly

3. 48 inch by 48 inch platform

4. 2,000 lb capacity

5. One-phase

6. 115 volt

7. Lift height between 11 and 48 inches

8. Tilt angle up to 45 degrees

9. Ten dual twin foot switch in lieu of 4-button control

Anchor each machine according to the seismic calculations for anchorage described in Paragraph SEISMIC ANCHORAGE FOR RACKS AND EQUIPMENT. Anchors shall be grade 5 or better bolts and have full 360-degree contact with the

SECTION 10 56 29.16 Page 5 R0003

G3ENDRDN

Polygon base material. Fasteners shall be manufactured from carbon steel and heat-treated.

Anchors are not to be reused after initial installation. If any improperly seated anchor bolts occur, fill and repair the hole with an epoxy based material designed for threaded applications.

The Contractor is not required to complete the electrical hook up.

2.3 SHRINK WRAP MACHINE

Provide shrink wrap machine that meets the following characteristics:

1. 4,000 lb capacity

2. 70 inch turntable diameter

3. variable speed carousel

4. 115 volt single-phase power with

5. Digital scale

6. Power mast

Anchor machine according to the seismic calculations for anchorage described in Paragraph SEISMIC ANCHORAGE FOR RACKS AND EQUIPMENT.

The Contractor is not required to complete the electrical hook up.

2.4 STEEL PALLET CONVEYORS

Provide steel pallet conveyors that meet the following characteristics:

1. Two inch diameter by 49-1/2 inch wide, 12-gauge, spring loaded rollers on three inch centers, 300 lbs capacity per roller

2. Rollers are set low on 7/16 inch hex axles, 50 inches wide between rails

3. All welded, 3-1/2 by 1 inch, 1 inch thick 10 gauge channel steel frame with butt couplers

4. Install on H-stands, 17 to 23 inches high, 1000 lb capacity

2.5 COLUMN AND AISLE GUARDS

All rack columns, column guards, and end of aisle guards will be anchored down to the concrete as described by the manufacturer's installation specifications. Unless otherwise specified by the rack system manufacturer, install 1/2 inch diameter wedge anchor bolts that are a minimum of 2-1/2 inches below the concrete surface. Bolts will be grade 5 or better.

Depending on the column guard design selected, additional anchors may be required to ensure each manufactured hole is utilized. Anchors with nuts shall have 360-degree contact with the base material. Oversized holes will not be required pending screw anchor type selected for installation.

Fasteners shall be manufactured from carbon steel, and are heat-treated.

Anchors are not to be reused after initial installation. An example of an acceptable screw anchor is Simpson's Strong-Bolt wedge anchors for cracked and uncracked concrete (provided installation follows Simpson's installation instructions) or equal. If inadequate anchor bolt binding

SECTION 10 56 29.16 Page 6 occurs the contractor will be required to fill the hole with an epoxy filler designed for threaded applications to ensure a solid contact with the concrete. Submit through the solicitation process, type of anchor to be used.

The number of anchor bolts will be determined by the number of manufactured holes in the selected aisle/column guard; an anchor bolt will be installed in each manufactured hole. Submit anchor samples of the type that will be used.

2.5.1 Column Guards

The racking system shall include sets of individual column protective devices that have a corrosion resistant coating applied to each to mitigate the environmental conditions (heat, humidity, and chemicals).

Provide 24 inch tall column guards that attach only to the floor, specifically designed to fit with the seismic compliant columns and base plates. Ensure that all vertical columns exposed to the aisles have a column protector installed and utilize all the manufacturer's bolt holes utilized to fasten to the concrete.

Each vertical column will have a protective device (i.e. corner or column guard); these are in addition to columns with end of aisles guards.

Install all column guards to the concrete floor using the manufacture's recommended bolts. Additional information on anchor bolts are listed in Part 3 EXECUTION below.

2.5.2 End of Aisle Guards

Provide a double-wide heavy-duty guard at the end of each row. Guards will be a minimum of six inches tall, extend the width of the columns, and fasten to the concrete floor. Each end of aisle guard shall be installed three to six inches from the racks. The Site Manager will have final approval for placement.

PART 3 EXECUTION

3.1 PREPARATION

Locations scheduled to receive racking shall be inspected for compliance with manufacturer's requirements. Dimensions shall be verified in accordance with approved shop drawings prior to starting the work.

Conditions which may adversely affect the racking and guard installations shall be corrected before installing.

3.2 INSTALLATION

Unpack components and assemble units in accordance with manufacturer's instructions. Install assembled units in areas indicated on manufacturer's approved shop drawings and schedule. Brace, secure and anchor units in place as indicated on shop drawings. Secure pallet racking to building structure as detailed on shop drawings.

All rack columns, column guards and end of aisle guards will be anchored down to the concrete as described by the manufacturer's installation specifications. Anticipate installing 1/2 inch diameter wedge anchor bolts (unless otherwise specified by the rack system/guard manufacturer) that are

SECTION 10 56 29.16 Page 7 a minimum of 2-1/2 inches below the concrete surface. Bolts will be grade 5 or better. Anchors with nuts shall have 360-degree contact with the base material. Oversized holes will not be required pending screw anchor type selected for installation. Fasteners shall be manufactured from carbon steel, and are heat-treated. Anchors are not to be reused after initial installation.

If inadequate anchor bolt binding occurs the contractor will be required to fill the hole with an epoxy filler designed for threaded applications to ensure a solid contact with the concrete.

Anticipate purchasing manufactured shims to ensure level installation in accordance with RMI standards as listed below. Shims may be used under the base plate to maintain plumb and/or level of the storage rack system. The shims shall be made of a material that meets or exceeds the design bearing strength (LRFD, Load and Resistance Factor Design) or allowable bearing strength (ASD, Allowable Strength Design) of the floor. The shim size and location under the base plate shall be equal to or greater than the required base plate size and location.

In no case shall the total thickness of a shim stack under a base plate exceed six times the diameter of the largest anchor bolt used in that base. Shims stacks having a total thickness greater than two and less than or equal to six times the anchor bolt diameter under bases with only one anchor bolt shall be interlocked or welded together in a fashion that is capable of transferring all the shear forces at the base. Shims stacks having a total thickness of less than or equal to two times the anchor bolt diameter need not be interlocked or welded together. Bending in the anchor associated with shims or grout under the base plate shall be taken into account in the design of anchor bolts.

All work will be accomplished in accordance with MHI MH16.1.

3.3 FIELD QUALITY CONTROL

The manufacturer's technical representative shall visit the site as necessary during installation of racking. Inspections shall be conducted in the presence of the Contracting Officer. An inspection report shall be submitted to the Contracting Officer within two working days. The inspection report shall note compliance with manufacturer's instructions and requirements, work quality, deficiencies, and recommended corrective actions.

3.4 POST-INSTALLATION MEMORANDUM

The structural integrity of the racks in accordance with the local seismic zone requirements is critical to the satisfactory installation of the system. This includes, but is not limited to, racks, anchor plates and shims, anchor bolt size, grade, and depths in accordance with seismic zone requirements. Provide a Post-installation Memorandum, sealed and signed by the design engineer, that clearly describes the work performed and attests that this racking project complies with and/or exceeds all applicable local, UFC, ASTM, ASME, AISC, and IBC codes and standards. Perform any and all corrections to the rack system, particularly if determined seismically insufficient.

3.5 RACK IDENTIFICATION MARKING

Each individual vertical column and horizontal load beams must be

SECTION 10 56 29.16 Page 8 permanently marked, preferably stamped, a welded, bolted, or riveted metal data plate or an industrial strength sticker is also acceptable. The key information to be marked on each component is the manufacture's brand name, replacement part number recognized by the manufacturer, and horizontal beam's load capacity. This identification will support ease in component replacement (vs. entire rack replacement). An acceptable sticker will be a 2 inch by 4 inch label using two permanent enamel based inks (white and black) subsurface printed on 10 mil industrial Lexan, backed with permanent adhesive.

3.6 ADJUSTING, TOUCH-UP, AND CLEANING

Touch-up damaged paint surfaces with matching paint, on completion of installation. Promptly remove debris, surplus materials and tools as work progresses. Repair damage caused by work of this Section to existing structures and finishes.

-- End of Section --