W912DS21B0015-Amendment 0003.pdf
PDF 179 KB Posted
- Solicitation number
- W912DS21B0015
About this file
This amendment modifies a solicitation for beach erosion control services along the New Jersey coastline between Sandy Hook and Barnegat Inlet. The U.S. Army Corps of Engineers seeks to award a firm fixed-price construction contract to place approximately 1-2.3 million cubic yards of beachfill along 9 miles of coastline from Asbury Park to Manasquan Inlet between July 2021 and March 2023. The contractor must complete all base work by March 1, 2022 and have the option to perform additional fill work, construct scour holes or install marker piles valued between $25-100 million by specified dates if exercised within 120 days of the notice to proceed. The amendment revises bidding instructions, answers questions, and clarifies specifications for the beach nourishment and restoration work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract W912DS21B0015.xlsx | XLSX spreadsheet | |
| 5035_SeaBright-to-Manasquan_15ft_thinned_30ft_sorted_navd88_elev.txt | TXT text file | |
| 01 11 00.pdf | ||
| 01 57 19.pdf | ||
| W912DS21B0015-0002.pdf | ||
| W912DS21B0015Amendment0001.pdf | ||
| SEABRIGHTMANRENO_100PCNT-20210729_RTA.pdf | ||
| SB-M-21_PLANS_072821.pdf | ||
| W912DS21B0015.pdf | ||
| Draft USACE annual NOx calculator ACNJ (27 Jul 21).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise and Reissue bid schedule specifically line item 12 to state option 8
2. Answ er Question from prospective bidders for informational purposes only
3. Revise notes section
Off eror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS21B0015
X 9B. DATED (SEE ITEM 11)
30-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Aug-2021
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS21B0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
P00003 Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Mobilization & Demobilization
FFP
for Hydraulic Beach Fill FOB: Destination
PSC CD: Y1KF
NET AMT
0002 1,083,353 Cubic
Yard
Hydraulic Beach Fill
FFP
(Estimated Quantity)
0003 1 Job Final Record Drawings
FFP
0004 1 Job Vibration Monitoring
FFP
0005 205,856 Cubic
OPTION Option 1
Hydraulic Beach Fill (STA508+00 to STA522+00) (Estimated Quantity)
0006 210,654 Cubic
OPTION Option 2
Hydraulic Beach Fill (STA498+00 to STA508+00) (Estimated Quantity)
0007 195,135 Cubic
OPTION Option 3
Hydraulic Beach Fill (STA489+00 to STA498+00) (Estimated Quantity)
0008 402,000 Cubic
OPTION Option 4
Hydraulic Beach Fill (STA1005+00 to STA1060+50) (Estimated Quantity)
0009 1 Job OPTION Option 5
FFP
Re-mobilization & Demobilization for Hydraulic Beach Fill
0010 1 Job OPTION Option 6
FFP
Scour Hole Construction
0011 1 Job OPTION Option 7
FFP
Marker Pile #34
0012 1 Job OPTION Option 8
FFP
Marker Pile #40
TOTALS
TOTALS
BASE (CLINS 0001- 0004) $______________________________
OPTIONS (CLINS 0005-0012) $_______________________________
BASE PLUS OPTIONS (CLINS 0001 – 0012) $_________________________________
NOTES:
1. Materially unbalanced bids will be rejected. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
2. The bidders are required to bid on all items or their bid will be rejected.
3. The low bidder for the purpose of award will be the conforming responsible bidder offering the lowest amount for the Total Base Bid and Optional Bid items.
4. Line item 0003 is pre-priced at $100,000 and this price shown may not be changed. See Section 01 78 00 for Final Record Drawing definition and requirement.
5. The Bid Acceptance Period is as stated on Standard Form 1442.
6. Tapering are included in the items and exact locations are on the plan sheets.
7. All base work must be completed by March 1, 2022 due to environmental restrictions. No work will occur between March 1, 2022, and October 15, 2022. No work will be allowed after March 1, 2023.
8. The government may exercise options within 120 days of NTP. Option work for Bid Item Numbers 0010-0012 (options 6, 7 & 8), if exercised, must be completed by March 1, 2022. Option work for Item Numbers 0005-0008 (options 1, 2, 3 & 4), if exercised, must be completed by March 1, 2023 at the latest.
The USACE will coordinate with the contractor to maximize the placement area next to adjacent base or option sections.
9. Optional line items may be independently awarded in accordance with the above timeline. Bid item number 0009 (option 5) may be exercised if option work (bid item numbers 0005-0008) exceeds the March 1, 2022 restriction.
10. The Government is under no obligation to exercise/award any option.
To Bidders The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED and REISSUED:
-None
2. The following DRAWINGS have been ADDED:
-None
3. The following DRAWINGS have been REVISED but NOT REISSUED:
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED in their entirety:
-None
4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:
REVISED SPECIFICATIONS:
CLARIFICATION ON SPECIFICATIONS:
The following specification titles differed on the Specifications table of contents and the Solicitation. The table below is for clarification.
Table of Contents in Specifications Solicitation Section 00 21 16 – INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
Section 00 21 13 – INSTRUCTIONS TO
BIDDERS
Section 00 72 00 – CONTRACT CLAUSES Section 00 70 00 – CONDITIONS OF THE
CONTRACT
Section 00 90 00 – WAGE RATES Section 00 73 00 – SUPPLEMENTARY
CONDITIONS
Questions and Answers:
The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.
This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents.
Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted in the sam.gov.
RFI SET #1:
Question 1. Section 01 57 19, 3.1.4.2 Seabeach Amaranth, states During each construction cycle, the Contractor will provide a qualitied biologist or botanist to survey the work sites for the Federally threatened plan species, seabeach amaranth on a weekly basis form 15 June to 15 July (in the event work takes place at this time) and from 15 September to 15 October to determine the presence of any plants. Please confirm that the contractor may also work during 15 September to 15 October as long as a biologist or botanist surveys the work area on a weekly basis.
Response: Contractor may not work during 15 Sept – 15 Oct, refer to new Note 8 on bidding schedule, “All base work must be completed by March 1, 2022 due to environmental restrictions. No work will occur between March 1, 2022, and October 15, 2022. No work will be allowed after March 1, 2023. “ Question 2. Does the Corps understand the Challenges and costs associated with placing the marker piles successfully? The water beyond the template gets deep quickly and erosion is fast in this area. To install using crane and conventional equipment in the current design location requires the need to install cofferdams. IF costs for them are to be included in pricing could the corps allow;
a. Would the Corps entertain the installation of two marker piles at each locations installed inshore of the designed location installed on either side of the outfall, so they can be reached from the newly installed berm to eliminate the need for cofferdams?
b. Does the corps want us to include the cost of cofferdams in the price to install the marker piles?
c. The sand erodes too quickly from the template in this area. Will the corps pay for design and installation of cofferdams or Causeways as needed to install the markers?
Response:
a. Contractor to install the marker pile so they can be reached from newly constructed berm (as far seaward as possible during low water) to eliminate the need for cofferdams.
b. Do not include cost of cofferdams in the price to install the marker piles.
c. No.
Question 3. The contact language regarding award of Options, as it is currently written, does not provide clear schedule requirements. It is currently unknown whether contractors will be required to dredge 1 million cubic yards (base) or 2 million cubic yards (base + options) by March 1, 2022. This is a significant quantity to leave without a clear required completion date, and poses the risk of deterring bidders due to the undefined schedule within a work window where Industry resources are already stretched to accomplish critical projects elsewhere in the country. Please reference the Corps / Industry Hopper Dredge Status Report below when developing this project to ensure it’s constructible within the required schedule. This status report is broadcast weekly by Corps HQ and supports our above award/performance schedule request.
In order for contractors to provide competitive pricing, schedule requirements must be clear. Under previous phases of this work (ref: Sea Bright to Manasquan,W912DS19C0025), this identical language was appropriately amended by USACE to provide a second season should options be awarded, regardless of the timeframe they were awarded. We strongly encourage the Government to revise the schedule requirements to Base completion by March 1, 2022 and Base + Options completion by March 1, 2023.
Response: Notes were revised to the following –
Note 8 – All base work must be completed by March 1, 2022 due to environmental restrictions. No work will occur between March 1, 2022, and October 15, 2022. No work will be allowed after March 1, 2023.
Note 9 - The government may exercise options within 120 days of NTP. Option work for Bid Item Numbers 0010-0012 (options 6, 7 & 8), if exercised, must be completed by March 1, 2022. Option work for Item Numbers 0005-0008 (options 1, 2, 3 & 4), if exercised, must be completed by March 1, 2023 at the latest.
The USACE will coordinate with the contractor to maximize the placement area next to adjacent base or option sections.
Note 10 - Optional line items may be independently awarded in accordance with the above timeline. Bid item number 0009 (option 5) may be exercised if option work (bid item numbers 0005-0008) exceeds the March 1, 2022 restriction.
Note 11 - The Government is under no obligation to exercise/award any option.
(End of Summary of Changes)