This document provides details for a federal construction contract solicitation for beach erosion control projects along the New Jersey coastline. The U.S. Army Corps of Engineers, New York District intends to issue a solicitation seeking a firm fixed-price construction contract through sealed bidding for beach nourishment and berm construction between Elberon and Manasquan, New Jersey. The project includes placement of approximately 1 to 2.3 million cubic yards of beachfill material to a berm elevation of +9.3 feet NAVD88, as well as optional items for marker pile installation and scour hole reconstruction. The estimated contract value ranges from $25 million to $100 million, with a performance period of 450 calendar days. Questions regarding the solicitation are due by a specified date, with bids to be submitted to the Corps of Engineers New York District office. Interested offerors must register in the System for Award Management to access solicitation documents on the Federal Business Opportunities website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract W912DS21B0015.xlsx | XLSX spreadsheet | |
| W912DS21B0015-Amendment 0003.pdf | ||
| 5035_SeaBright-to-Manasquan_15ft_thinned_30ft_sorted_navd88_elev.txt | TXT text file | |
| 01 57 19.pdf | ||
| W912DS21B0015-0002.pdf | ||
| W912DS21B0015Amendment0001.pdf | ||
| SEABRIGHTMANRENO_100PCNT-20210729_RTA.pdf | ||
| SB-M-21_PLANS_072821.pdf | ||
| W912DS21B0015.pdf | ||
| Draft USACE annual NOx calculator ACNJ (27 Jul 21).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Elberon To Manasquan Reaches SEABRIGHTMANRENO
100% SPECIFICATIONS - RTA AMENDMENT 2
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
a. The Contractor must be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use, and remove all equipment from the contract area no later than March 1, 2022. The time stated for completion must include the final cleanup of the premises. (FAR 52.212-3). If options are exercised within 150 days 120 days from NTP, the Contractor shall be required to complete these options, and remove all equipment from the contract area no later than March 1, 2023. Construction activities are prohibited between March 1, 2022 and October 15, 2022, and after March 1, 2023.
b. The Contractor must furnish all labor, materials, equipment, and services for the following work: construction for dredging and beachfill placement, installation of marker piles, and construction for scour hole as described in the solicitation package.
s c. All work must be in accordance with the drawings and specifications or instructions attached hereto and made a part thereof, or to be furnished hereafter by the Contracting Officer and subject, in every detail, to his supervision, direction, and instructions.
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes placement of the beach fill material and incidental related work, including advanced nourishment along the length of the design berm, and feeder beaches, as well as installation of marker piles and construction of a scour hole.
1.2.2 Location
The work is located from Elberon to Manasquan in New Jersey, approximately as indicated. The exact location is shown in the bid documents.
1.3 DFARS 236.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS
This project is estimated between $25,000,000 and $100,000,000.
1.4 AUTHORIZED CONSTRUCTION AREA AND TRESPASSING
Do not inflict damage upon land and properties outside the authorized construction area by unwarranted entry upon, passage through, damage to, or disposal of, material on such land or property. The Contractor may make a separate agreement with any other party, regarding the use of, or right to, land or facilities outside the contract area. If such an agreement is made, it must be in writing and a copy must be provided to
SECTION 01 11 00 Page 1
Elberon To Manasquan Reaches SEABRIGHTMANRENO
100% SPECIFICATIONS - RTA AMENDMENT 2
the Contracting Officer. The Contractor must hold and save the Government, its officers, and agents free from liability arising from trespassing or damage occasioned by his operations.
1.5 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
c. The responsibility for damage to the permanent work must be as set forth in the article of the contract clause entitled "PERMITS AND RESPONSIBILITIES". However, if in the judgment of the Contracting Officer, the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, severe coastal storm or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor must make the repairs as ordered by the Contracting Officer and full compensation for repairs will be made at the applicable Contract unit or lump-sum prices as fixed and established in the Contract. If, in the opinion of the Contracting Officer, there are no Contract unit or lump sum prices applicable to the work, an equitable adjustment, pursuant to Contract Clause entitled CHANGES, will be made as full compensation for the repairs of that part of the permanent work for which there are not applicable Contract unit or lump-sum prices. Except as herein provided, damage to all work, utilities, materials, equipment, and plant, including temporary construction and utilities, pavements, and other property along the routes used by the Contractor's pipelines and/or land vehicles, must be repaired to the satisfaction of the Contracting Officer, the State of New Jersey, and the utilities companies, at the Contractor's expense regardless of the cause of such damage.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK |
| 1.2 WORK COVERED BY CONTRACT DOCUMENTS |
| 1.2.1 Project Description |
| 1.2.2 Location |
| 1.3 DFARS 236.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS |
| 1.4 AUTHORIZED CONSTRUCTION AREA AND TRESPASSING |
| 1.5 EXISTING WORK |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
File details come from the government source that posted it. Updated .