W912DS19B0010-Amendment_0007.pdf

PDF 336 KB Posted

Attached to
Building 135 Renovation at Watervliet, NY
Solicitation number
W912DS-19-B-0010
Issued by

About this file

Amendment 0007

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
photos.pdf PDF
amd_005_drawings.pdf PDF
building_135_site_walkthrough_sign_in_sheet_(11Jul19).pdf PDF
amd_005_specifications.pdf PDF
W912DS19B0010-_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Combined_RTA_Sealed_rev_2_(corrected_size_v3).pdf PDF
Amendment_0003.pdf PDF
Amendment_0001.pdf PDF
Amendment_0001_-B135_RTA_Specs_Vol_I.pdf PDF
Amendment_0001_Combined_RTA_Sealed_rev_2.pdf PDF
B135_RTA_Specs_Vol_II.pdf PDF
B135_RTA_Specs_Vol_I.pdf PDF
Solicitation_W912DS-19-B-0010.pdf PDF
B135_RTA_Specs_Vol_IV.pdf PDF
Combined_RTA_Sealed_Vol_I.pdf PDF
Combined_RTA_Sealed_Vol_II.pdf PDF
B135_RTA_Specs_Vol_III.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Respond to RFIs for informational purposes only.

2. Update clause 52.211-10 and Revise period of performance to 540 days after NTP

3. Bid opening date remains 31July 2019 at 2:00 P.M. EST NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing Methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS19B0010

X 9B. DATED (SEE ITEM 11)

17-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jul-2019

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS19B0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0007

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

None

3. The following SPECIFICATION SECTIONS have been REVISED but REISSUED (revisions are shown in red text):

• In Section 00 72 00, clause 52.211-10: Change 365 to 540.

4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:

None

OFFERER’S QUESTIONS AND GOVERNMENT REPLY

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors for information only and do not revise the solicitation, plans, or specifications.)

1. Regarding Option 1, specifically in terms of maintaining operation of the building while this is performed.

In order to safely perform this work would require setting up a scaffold work platform, which would prevent crane operation. Moreover, erection of this scaffolding, in and of itself would take an entire work shift. With that being said, not even the span of a weekend would allow for setup, platform demolition, replacement with metal platform, and dismantling of scaffolding. Does the facility have scheduled downtimes wherein major services like this can be performed? This is easily a weeks’ worth of work, start to finish, and we want to make sure we are in alignment with the needs of the facility.

Response: See the first paragraph under GENERAL PHASING AND COORDINATION NOTES on Sheet AG002. Work can be done on the 2nd and 3rd shifts or on weekends. The Government acknowledges

W912DS19B0010

that there will be crane interference and this is covered in the above note. Coordination between the contractor and the building occupant will be necessary throughout.

2. Electrical / Tel-Data After review of drawings and details as well as a close visual inspection at the site visit, we have concerns regarding the relocation of existing cables from the existing wooden tray to the newly installed solid bottom tray. These cables appear to have very little if any slack and are also quite old. What provisions for possible shutdowns have been made? Also, due to the age and visible deterioration there is a possibility of these cables being unfit to be re-energized. Please advise.

Response: Shutdowns are possible. Coordination with the user is required and shutdowns will need to be made on weekends. The contractor is responsible for any damage to the electrical or communications cabling and must restore the cabling operable conditions.

3. Is the 365 day requirement based on the needs of the facility? If not, I would ask that this requirement be increased to a minimum of 630 days; if not a full 730 days (2 years).

Response: The specifications have been revised with this amendment to change the contract duration from 365 days to 540 days.

4. It appears that this job has been specified for a Garaventa Genesis lift. Unfortunately we do not have access to this manufacturer as they only work with exclusive distributors of which there may not be locally.

The unit I would like to propose would be the Savaria V1504 vertical platform lift Manufactured in Canada, which we believe to be a superior alternative.

Response: The Garaventa Genesis lift is not sole sourced. The Government will accept equivalent lifts.

SECTION 00 10 00 - SOLICITATION

The contractor period of performance end date has increased by 175 days from 365 days to 540 days.

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 540 days after NTP. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
OFFERER’S QUESTIONS AND GOVERNMENT REPLY