Building 135 Renovation at Watervliet, NY
Solicitation number
W912DS-19-B-0010
Issued by

About this file

Amendment 0006

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
W912DS19B0010-Amendment_0007.pdf PDF
amd_005_specifications.pdf PDF
photos.pdf PDF
amd_005_drawings.pdf PDF
building_135_site_walkthrough_sign_in_sheet_(11Jul19).pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Combined_RTA_Sealed_rev_2_(corrected_size_v3).pdf PDF
Amendment_0001_-B135_RTA_Specs_Vol_I.pdf PDF
Amendment_0001_Combined_RTA_Sealed_rev_2.pdf PDF
Amendment_0001.pdf PDF
B135_RTA_Specs_Vol_II.pdf PDF
Combined_RTA_Sealed_Vol_II.pdf PDF
B135_RTA_Specs_Vol_III.pdf PDF
B135_RTA_Specs_Vol_I.pdf PDF
Solicitation_W912DS-19-B-0010.pdf PDF
B135_RTA_Specs_Vol_IV.pdf PDF
Combined_RTA_Sealed_Vol_I.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Answ er questions to prospective bidders for informational purposes only.

2. Revise the Bid schedule

3. Revise the Specif ications and Draw ing

4. Extend Bid Opening date to 31 July 2019 at 2:00 P.M. EST

NOTE: Bidders must acknow lledge receipt of this amendement of date specif iied in the bid (or as amended ) by one of the follow ing methods:

In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATEWITHDRAWAL OF

BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 18

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS19B0010

X 9B. DATED (SEE ITEM 11)

17-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jul-2019

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS19B0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

Repair Facility

FFP

Repair work shall be completed as shown on drawings and specified on the Contract Documents, but exclusive of work covered under Items 0002, 0003, 0004, 0005, 0006.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

Repair Facility

FFP

New work shall be completed as shown on drawings and specified on the Contract Document, but exclusive of work covered under Items 0001, 0003, 0004, 0005, 0006. New Exterior Stairs included foundations, pavement and etc. Accessible Lift including foundation, utilities, pavement and etc.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Job

Roof Replacement

FFP

Roof Replacemnet shall include all work required for replacement of the roof for sections R2, R4, R6, R8, R10, R12, R14, R16, R19 and R20 as shown on Drawing A-021. This includes demolition, new flashing, new roof system, roof drains etc. as shown on the drawings and specifications.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004 1 Job

Stair Case

FFP

Replacement of wood stair case and includes all work required to remove the existing wood stairs and install the new metal stairs. This includes all incidentals for completing the stair replacement. See drawings and A-401 and further drawings and specification for further definition.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005 1 Job

As-built and Operation and Maintenance

FFP

As-built and Operation and Maintenance Manuals FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0006 1 Job

Lockers

FFP

Lockers, disposal off-site of the existing lockers and include purchase and installation of new lockers. See drawings and specification for further definition.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0007 1 Job OPTION Optional Item 1

FFP

Replacement of wood platforms/ Catwalks and includes all work required to remove the existing wood platforms and install new metal platforms. This include all incidentals for completing the platfom replacements. See drawings AD-010, A- 052, SD-130, S-130 and further drawings and specification for further definition.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0008 1 Job OPTION Optional Item 2

FFP

For Roof Replacement (SECTIONS R1,R3,R5,R7,R9,R11,R13,R15 and R17) and includes to all the work required for replacement of the roof. This includes demolition, new flashing, new roof system, roof drains etc. as shown on the drawings and specifications. See Drawing A-021 for Roof Section Designations.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0009 1 Job OPTION Optional Item 3

FFP

Roof Replacement (Section R18) and includes all work required for replacement of the roof. This includes demolition, new flashing, new roof system, roof drains etc.

as shown on the drawing and specifications. See Drawing A-021 for Roof Section Designations.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0010 30 Cubic

Yard OPTION Optional Item 4

FFP

Contaminated Soil Removal and Disposal shall include removal and disposal of contaminated soil associated with construction on this project. Costs for this item shall include excavation, laboratory analytical testing, characterization, manifesting, confirmation sampling, containerization, transportation, and off-site disposal. For estimating purposes any waste encountered would be classified as industrial waste and not Hazardous waste. (Estimated Quantities)

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0011 9,500 Square

Foot OPTION Optional Item 5

FFP

Wood Roof Deck Replacement - shall involve replacement of wood decking as the reroofing is being performed. The Contractor will notify the Government of wood decking that is recommended to be replaced. The Government will then provide direction and approval for the amount of roof deck to replace. Further information is described within the request for Proposal. (Estimated Quantities)

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0012 400 Square

Foot OPTION Optional Item 6

FFP

Parapet Plywood Replacement - shall involve replacement of plywood within the parapet as the reroofing is being performed. The Contractor will notify the Government of plywood that is recommended to be replaced. The Government will then provide direction and approval for the amount of roof deck to replace.

Further information is described within the request for Proposal. (Estimated Quantities)

FOB: Destination

NET AMT

TOTALS SECTION

BASE TOTAL AMOUNT (CLIN 0001-0006) $________________

OPTIONAL ITEM 1 TOTAL AMOUNT (CLIN 0007) $________________

OPTIONAL ITEM 2 TOTAL AMOUNT (CLIN 0008) $________________

OPTIONAL ITEM 3 TOTAL AMOUNT (CLIN 0009) $ ________________

OPTIONAL ITEM 4 TOTAL AMOUNT (CLIN 0010) $________________

OPTIONAL ITEM 5 TOTAL AMOUNT (CLIN 0011) $________________

OPTIONAL ITEM 6 TOTAL AMOUNT (CLIN 0012) $________________

GRAND TOTAL - BASE AMOUNT PLUS OPTIONAL ITEMS 1 – 6 AMOUNTS (CLIN 0001-

0012)

NOTES

1. Bidders must bid on all items including Optional Items. Failure to bid on all items may be cause for rejection of the proposal. The basis of award shall be based upon the sum total of CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011 and 0012.

2. Optional Items CLINs 0007, 0008, 0009, 0010, 0011 and 0012 may be exercised at any time within 90 calendar days after contract award. The Contracting Officer may exercise the Optional Items by written notice to the Contractor, postmarked within the period specified above.

3. No Additional time will be added to the contract performance period. The Government is under no obligation to award any option and will not be awarded after the contract expires.

4. Low bidder for the purpose of award will be the conforming responsible bidder offering the lowest amount for the Total Bid Items.

5. Any bid which is materially unbalanced as to prices for the bid items may be rejected. An unbalanced bid is one which is based on prices significantly less than cost for some work, and prices which are significantly overstated for other work.

6. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions, or attachments made by the bidders thereto may render the bid non-responsive and may be cause for its rejection.

Building 135 Renovation, Watervliet, NY

W912DS-19-B-0010

Amendment No. 0004

1. Please confirm the glass makeup listed on the architectural drawing #A-651 is the required glass for the aluminum storefront frames.

Response: Glass type1 as indicated on A-651 is correct, Specification 08 81 00 will be revised in AM 0005

2. Do the existing lockers have concrete bases that will require removal?

Response: We do not believe there are Concrete Bases

3. Have the new toilets been verified to work with existing drain piping and mounts?

Response: Yes toilets are floor mount with proper sized pipe connections.

4. Have the new urinals verified to work with existing drain piping and carriers?

Response: Yes urinals are wall mount and will be compatible with existing carriers.

5. D1/AD101 contains errant D03 note for wall demo (should be D09) – top corner. Please revise for clarity to bidders.

Response: Wall running east /west is label D03 and will be revised to D09 per AM 0005

6. D1/AD101 does not call for flooring removal (D11) in small room in SE corner. Is this intentional?

Response: Flooring in space is to be removed and will be labeled D11. Will be revised in

AM 0005

7. A1/AD101 does not call for flooring to be removed in Locker Room. What is existing floor and will it be an acceptable substrate for RF/EF called out in Finish Schedule?

Response: Locker room floor and restroom floor 100 shall have existing floor tile removed in entirety. Plan A5/AD101 rooms 115, 115a, 118 & 118a are also to have existing floor tile removed in entirety. Will be revised in AM 0005

8. Specification Section 01 35 26 does not specify whether, or not, the SSHO must be without other responsibilities. Please advise, as this has a direct implication on cost.

Response: Per specification section 01 35 26 paragraph 1.6.1.2, "The Contractor Quality Control Manager cannot be the SSHO." If the SSHO has other duties outside of paragraph 1.6.1.1 and 1.6.2.1, then "SSHO are subject to dismissal if the above duties are not being effectively carried out."

9. Detail B4/A511 indicates a bond beam directly beneath the underside of deck. This is not Industry standard and will not allow for typical MEP penetrations just below deck level (and thus above finish ceiling elevation. Additionally, it is very difficult to visually verify QAQC under these conditions. Would it be acceptable to place the bond beam one or 2 courses lower and then complete elevation with a solid CMU?

Response: Locations of M1CA & M1CB wall types are limited to door infill. Will revise door infill system with gypsum wall types due to unknown older construction at doors for proper masonry toothing required. Will revise wall types and specifications as required in AM 0005. Please see revised specifications.

Plans have been verified to be true to the full size drawing scale. Provide an example of the issue for better understanding of the concern.

14. In amendment 2, new drawings are issued with the new scale. But its still printing on 11x17 pages. Can you please check the scale once again and issue the perfect scale drawings ?

Response: Please see the revised drawings

15. Spec 051200 – Can the AISC fabricator and erector requirement be waived? There are very few in this geographic area and this project doesn’t have the size requirement that they tend to look at.

Response: Requirement to be removed in AM 0005.

10. Specification Section 09 06 00 calls for ACT-1 to be Armstrong Fine Fissured #1749. However, per our conversations with Armstrong, this product is no longer available (discontinued in 2011). This product was a vinyl polypropylene, sprayed, washable tile (2ft X 4ft X 5/8). The closest currently available tile is fine fissured # 1729, however it is not washable. Please advise.

Response: ACT 1 Basis of design will be revised in AM 0005 to Armstrong Fine Fissured #1732

11. Specification Section 09 06 00 calls for ACT 2 to be Armstrong Fine Fissured #932. However, per our conversations with Armstrong, this is a residential-grade tile; and, as such, appears to not be a correct designation. The commercial equivalent is Fine Fissured #1732. Please advise.

Response: ACT 2 Basis of design will be revised in AM 005 to Armstrong CERAMAGUARD Fine Fissured #607. Room Schedule will be revised for restroom and locker ceiling in AM 0005.

12. Section 00 21 13 of the solicitation asks for a CD of the proposal in addition to the hard copies. Typically, essential vendor and subcontracting pricing for a GC’s proposal comes in last minute and would be prohibitive to make a CD in time for the proposal deadline with our pricing on it. Please confirm a CD is desired.

Response: CD’s are not longer required

13. Will a bid date extension be possible in light of a pre-bid visit announced for 7/11/19 and plans large enough to perform take-off on made available by the amendment dated 7/9/19?

Response: Bid opening is scheduled for 31-Jul-2019

16. Drawing A-201 a note on the drawing for the east elevation says to replace 12 courses of brick on the exterior wythe of brick. This elevation only. Pictures of the elevation point out individual brick areas, repairs, and repointing at various areas. They are conflicting each other. Please advise.

Response: Per specification 04 03 00 photos label East and West are incorrect and will be revised in AM 0005. Notes to East elevations will be revised. The East elevation of the building has extensive amount of face brick damage and shall be Bid to replaced as indicated per drawing A-201. Final decision if existing brick can remain during construction shall be by Historic Masonry Consultant evaluation and approved by contracting officer.

17. General Floor Plan Demolition Notes: 3-Clean all interior brick of old paint where peeling or other signs show needing repair prior to covering with work. Repair per specification 04 03 00. Then paint. There are no quantities or pictures that we have found for this. Please provide an exact SF of surface for bidding purposes to ensure all bidders are looking at the same quantities and not putting in excessive amount of contingency on this item as this note is very vague.

Response: Specification 04 03 00 attachment Interior Brick Restoration / Repair", Doors 124, 125, 140 & 141 will require paint removal, brick repair and repainting at base as indicted. Note will be revised and limit will be added to AD101 & AD102 plans for walls requiring cleaned and repainted prior to new work covering.

18. The scales for the drawings provided are wrong. Could you please provide the drawings with the correct scale.

Response: scale has been checked. Please provide sheets and details/plans/section that there is an issue with.

19. Drawing AD-021 shows that Monitor Roof is 43’ wide where as the detail A1 in sheet A-312 shows its 20’ wide. Please clarify the exact width.

Response: E1/A-312 is upper monitor roof (43') 40' to gridlines centers for odd number roofs from R3 to R15.

A1/A-312 Is Lower Monitor well roof (17') 20' to gridline centers for even number roof from R2 thru R16.

Section cover typical conditions on roof as shown on Sheet A-021. R1 & R17 differ in size. Will revise roof numbering on A-021 and Bar Scale for Detail E1/A-312 to match drawing scale in AM 0005

20. Sheet AD-021 states the existing wood tongue and grove decking is to be inspected & repaired in kind were deficient. How should we assume what area of the deck will be deficient. Are we to assume a percentage, is so what percentage must be assumed. Kindly Clarify.

Response: CLIN Option will be added as a unit cost item incase this is discovered during construction.

21. Drawings indicate new ceilings throughout NE and SE corner areas, but the demo only shows limited removal of the ceilings in this area. Please clarify.

Response: NE - First floor existing ceilings shall be removed in rooms 110A, 115, 115A, 118,& 118A.

NE - Second floor entire ceiling for floor shall be removed.

SE - First Floor all ceiling except for Janitor closet shall be removed.

22. Please include the allowances of the number of units of brick needed.

Response: Means and methods for contractor to estimate quantity of brick required for project

23. Looking further into the logistics planning for this project, I wanted to ask if the existing low roof areas (R19 and R20) will support scaffold stair systems. Do you know if a loading analysis has been performed on the existing roof structure? The stair systems will be quintessential in providing safe access to our employees and tradesmen (as opposed to 30’ extension ladders) and will provide a means of material transportation for the same.

Response: Means and methods for contractor to review existing low roof for imposed scaffold stair systems. There are opportunities to place scaffold stair systems from grade up to high roof sections as an alternative.

24. Per drawing P-105 note 2 & 3 alternates, what is the extent of the piping to the roof drains? Are we to disconnect the old drains, furnish and install the new drains? Or are adding new pipe as well within the new drains?

Response: Provide and install new roof drains and below roof line some additional horizontal storm piping will be installed to connect to the new roof drain's new centralized location on the roof.

25. The bid schedule, bid item 0004 states - Replacement of wood stair case and includes all work required to remove the existing wood stairs and install the new metal stairs, does this include the staircase on the Southwest corner and the interior staircase on the Southeast corner? Kindly Clarify.

Response: This Option is associates with the staircase shown on A-401 and other related sheets and details.

26. It is clear that the superintendent cannot fill the role of QC Manager; however, can the superintendent fil the role of site safety offices?

Response: Per specification section 01 30 00 paragraph 1.7.4, "The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the Contract and for failure to manage the Project to insure timely completion." It is at the risk of the contractor to assign added responsibilities to the SUP.

27. Can the bid proposal be emailed?

Response: No

28. Per drawing P-105 note 2 & 3 alternates, what is the extent of the piping to the roof drains? Are we to disconnect the old drains, furnish and install the new drains? Or are adding new pipe as well within the new drains?

Response: Provide and install new roof drains and below roof line some additional horizontal storm piping will be installed to connect to the new roof drain's new centralized location on the roof.

29. can the lightning protection wire aluminum?

Response: Conductors selected to be installed shall comply with NFPA 780, UL-96, and UFC 3-575-01, and shall comply with existing lightning protection system.

30. Did the original installation have a UL master label Certification. To get a master label all low roofs will need lightning protection. . Is the intent of this job to upgrade the existing system to get a UL master label?

Response: The completed lightning protection system, after roof modification, shall be certified with UL Master label. Any additional modifications to the lightning protection system, other than reconnection of existing, are unknown.

31. Per Specification section 23 00 00, 2.7 Duct Systems, 2.7.1 Metal Ductwork, it says to “Construct ductwork meeting the requirements for the duct system static pressure specified in APPENDIX D of Section 23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC.” There is no APPENDIX D in that section, please provide APPENDIX D or confirm that General Note #10 on M-001 is what we are supposed to follow for duct construction.

Response: Duct construction shall comply with requirements shown on Duct Construction and Leakage Testing Table shown on sheet M-501

32. Confirm the glass makeup listed on the architectural drawing #A-651 is the required glass for the aluminum storefront frames.

Response: Same as #1 Glass type1 as indicated on A-651 is correct, Specification 08 81 00 will be revised in

AM 0005

33. Warranties - Typical glass warranty for insulated glass is 10 years from date of manufacture. Is this acceptable?

Response: Per 08 81 00 paragraph 1.5.1 states 10 year warranty.

34. Warranties – Typical materials warranties – 2 years on materials; 5 year finish for anodized finishes and 10 year for painted finishes mfg. standard. Is this acceptable?

Response: Warranty requirements are listed within the specifications for each item.

35. The plans call out to replace the roof drains on building 135. The roof in one area is approximately 100' or more taller. There is equipment in this area that i am told can not be moved. To access this area would require a boom lift that will not fit with this equipment where it currently is.

Response: Per the original scope of work, roof drains are to be replaced. Access to roof drains for execution on work falls on the contractor. Roof drains on the "high" roof and "high high" roof are bid options. Further discussion with COE, building owner may be required to find solution. Means and Methods

36. Piping in the bathrooms currently is not to code. Plans show to replace fixtures only and to reuse this piping. This piping will not pass a plumbing inspection.

Response: Existing piping connecting to new fixtures is adequate size, and new piping connecting to new fixtures and existing piping is adequately sized.

37. Who will be conducting the plumbing inspections? City of Watervliet or does the arsenal have its own inspector?

Response: Per specification section 22 00 00 paragraph 3.8.4 (operation test) the contractor will perform tests and report adequacy of the system. Per paragraph 1.2 (submittals) the contractor shall provide test reports on the plumbing system.

38. Keyed note 1 says reinstall light fixture removed and cleaned from demo. The Fixture type is shown at the fixture L2 and L2E. Existing fixtures were fluorescent not LED. What do the want? New or reinstall old?

Response: Light fixtures noted to be ‘salvaged and reinstalled in space’ shall be salvaged and reinstalled. Existing fixtures in noted spaces are fluorescent fixtures with T8 LED Nanotubes. These shall be reinstalled as noted on plans.

39. For estimating purposes, is there a square foot area of plywood/decking on the roof to be replaced?”

Response: CLIN Option will be added as a unit cost item incase this is discovered during construction.

40. On the bid form, Item No. 0007 – Option – Replacement of Wood Platforms – do the wood platforms refer to the catwalks? Or is this to replace the miscellaneous wood platforms as shown on the demo plan?

Response: These are the catwalks located at the roof level. See drawings AD-010, A- 052, SD-130, and S-130

41. For estimating purposes, is there any asbestos remediation?

Response: See attachment to specification 01 57 19 for the Lead and Asbestos report for the Building.

42. On page A-573 detail E9, there is a note that says to “remove ladder and reattach after fascia board replacement… etc.” Is this work to be done only if the alternate is accepted? is this only if the alternate is accepted?

Response: Ladder will need to be disconnected at base to install 1/2" sheathing per Detail C1/A-571 for base bid and base connection detail will need to be coordinated with insulation thickness if only base option is awarded. Ladder will need to be completely removed and repositioned if upper monitor roof option is awarded to meet OSHA requirements for top rung to match roof surface due to height increase in insulation and to re-attach new fascia.

43. Is there any information on the current roof, so we may know what is made up of, and how thick? The current roof height is looking to be appx. 9” thick on the low monitor roofs and roughly 10” thick on the upper monitor roof. We would need to know how much wood blocking we will need, and also if it is going to be too high. Looking at the picture on A-574 detail A1, it looks like the wood blocking will be up to the metal corner. Would it be possible for us and our subcontractor to go back and do a test cut quickly?

Response: Based on drawing A1/A-312 the low monitor roof thickness at high point at 5" this slope will be constant along curb. Existing Roof insulation was a constant thickness ranged from roof to roof from 2" to 2 1/2" thickness.

Preliminary Roof test report can be provided as "reference only" to Specification 07 22

00. Contractor is reponsible to perform roof fastener pull out test on Drawing A-021 Roofing Notes. Sheets AD021 & A-021 will be revised to clarify required fastener testing.

44. Existing to remain EFs (VF-1 thru 6) have new gravity dampers on them. I believe VF-7 thru 9 have existing gravity dampers as well. The control drawings show new 2 position damper actuators with end switches on each exhaust fan (1-9). There is no mention of these actuators in the sequence. Is this a typo?

Actuators cannot be added to the existing gravity dampers. There are no new dampers shown for each of these EFs either.

Response: The existing gravity dampers are to remain. The actuated control dampers serving the existing ventilation fans will be removed from the controls drawings and controls points shall be removed from the points list for each VF.

45. On A-573 E9 they are saying to….remove ladder and reattach after fascia board replacement ect… I am assuming that that would be only if they accept the alternate but I am not 100%. They also show replacing bad fascia boards in the pictures too. Can you confirm please. Is there any information on the current roof so we know what is made up of and how thick. The current roof height is looking to be 9” thick on the low monitor roofs and roughly 10” thick on the upper monitor roof. I need to know how much wood blocking we will need and also if it is going to be too high, looking at the picture on A-574 A1 it looks like the wood blocking will be up too the metal corner.

Response: Ladder will need to be disconnected at base to install 1/2" sheathing per Detail C1/A-571 for base bid and base connection detail will need to be coordinated with insulation thickness if only base option is awarded. Ladder will need to be completely removed and repositioned if upper monitor roof option is awarded to meet OSHA requirements for top rung to match roof surface due to heigh increase in insulation and to re-attach new fascia.

Based on drawing A1/A-312 the low monitor roof thickness at high point at 5" this slope will be constant along curb. Existing Roof insulation was a constant thickness ranged form roof to roof from 2" to 2 1/2" thickness.

Preliminary Roof test report can be provided as "reference only" to Specification 07 22

00. Contractor is reponsible to perform roof fastener pull out test on Drawing A-021 Roofing Notes. Sheets AD021 & A-021 will be revised to clarify required fastener testing.

46. The insulated glass specified in spec section 0881002 calls for 1” thick insulated glass. The window framing system specified in spec section 08 51 13 will only accept 1 5/16” thick insulated glass. Please advise framing or glass makeup.

Response: Glass type1 as indicated on A-651 is correct, Specification 08 81 00 will be revised in AM 0005

47. RTUs: Would it be acceptable to use Belt Drive Fans with adjustable shiv in lieu of the specified Direct Drive Supply Fans?

Response: No

48. The outside Condensing Units are called to be on support steel and we are to reference the structural for details (e.g. M-101, Keyed Note 4&6). The specifications (230000-2.9.1.6 Remote Air-Cooled Condenser) say the same thing: "Heat pump condensing unit shall be elevated off of concrete equipment pad via structural steel support frame. See Structural Drawings for support frame information." Please provide the referenced structural steel detail.

Response: Information to the equipment foundation typical detail on S-011 to be provided in AM 005. Please see revised Specifications

The following have been modified:

AMENDMENT 0001

1. Will there be a site visit, and if so when and where? The site visit will be conducted 11-JULY at 9:00am.

At 07:30 am report to WVA security office at North Main gate 09:00 am site walk with begin Link up Location: North West Corner of B135 POC: Scott Kosnick Scott.M.Kosnick@usace.army.mil

2. The bid form in the solicitation is different than the bid form in Vol 1 of the specifications. Which is the correct one to use?

Response: The bid scheldule in the solicitation is the correct version. Section 00 10 00 Vol 1 of the specifications has been revised and corrected.

3. Can you provide new drawings that will print to the correct scale? When I go to print the only size that these will print to is 8.5 x 11.

Response: Yes, please see the revised drawing- combined RTA Sealed rev 2.

4. The above subject solicitation listed several roof’s that are to be replaced. Would you please provide answers to the questions below?

* Are the roofs sloped or flat?

* Are they metal?

* Are they metal with a roofing membrane on top?

* If not metal what material is currently on the roof?

Response: See drawing sheet A-021, roofing notes, for existing roof slope. See drawing sheet AD-021 for existing roof materials and components.

5. Additional follow up questions concerning the building commissioning:

a. Section 1.8.1 – Can a PE with 5+ years of Cx experience be substituted, in lieu of SCA, CxA, CCP, CBCP, QCxP, or CPMP?

b. Section 1.9.2b – Can a PE with 5+ years of electrical testing experience be substituted for NETA certification?

Response: No to both

6. Can you please provide the Bidder Inquiry Key so we can access ProjNet?

Response: ProjNet will no longer be utilized for this project.

7. We want to confirm that all of that masonry work is required for this project and request quantities of the restoration which needs to be included in the bid.

Response: Please see photos after specification section 04 03 00.

8. Can an alternative lift can be approved.

Response: See specifications section 14 24 24 for lift information regarding lift requirements.

9. The BOD is Stonhard, please confirm that other manufacturers will be considered if they can meet the performance specifications.

Response: Yes, as long as performance specifications in 09 67 23.13 are met and subsequently approved.

10. Is it required that the engineers be onsite for the 365 day duration of the project? Please see comment from that company:

Response: See Specification section 01 91 00.15 paragraph 1.8 c. Commissioning firms must assist General or Prime contractor with the work specified herein.