B135_RTA_Specs_Vol_IV.pdf

PDF 1016 KB Posted

Attached to
Building 135 Renovation at Watervliet, NY
Solicitation number
W912DS-19-B-0010
Issued by

About this file

Specs Vol IV

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
W912DS19B0010-Amendment_0007.pdf PDF
photos.pdf PDF
amd_005_drawings.pdf PDF
building_135_site_walkthrough_sign_in_sheet_(11Jul19).pdf PDF
amd_005_specifications.pdf PDF
W912DS19B0010-_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Combined_RTA_Sealed_rev_2_(corrected_size_v3).pdf PDF
Amendment_0003.pdf PDF
Amendment_0001.pdf PDF
Amendment_0001_-B135_RTA_Specs_Vol_I.pdf PDF
Amendment_0001_Combined_RTA_Sealed_rev_2.pdf PDF
B135_RTA_Specs_Vol_II.pdf PDF
Combined_RTA_Sealed_Vol_II.pdf PDF
B135_RTA_Specs_Vol_III.pdf PDF
B135_RTA_Specs_Vol_I.pdf PDF
Solicitation_W912DS-19-B-0010.pdf PDF
Combined_RTA_Sealed_Vol_I.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New York District

Repair Facility Deficiencies (B135)

FY 18

Watervliet Arsenal New York

Specifications RTA Design Submittal Volume I

May 2019

Repair Facility Deficiencies (B135) 110688 Watervliet Arsenal, NY

SECTION 13 48 00

SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT

05/18

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this Specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)

ACI 355.2 (2007) Qualification of Post-Installed Mechanical Anchors in Concrete and Commentary

ACI 355.4 (2011) Qualification of Post-Installed Adhesive Anchors in Concrete (ACI 355.4) and Commentary

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 325 (2010) Steel Construction Manual

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

ASCE 7 (2010) Minimum Design Loads for Buildings and Other Structures

ASTM INTERNATIONAL (ASTM)

ASTM A153/A153M (2016) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A307 (2014; E 2017) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength

ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel

ASTM A449 (2014) Standard Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use

ASTM A500/A500M (2018) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, SECTION 13 48 00 Page 1

Welded and Seamless

ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts

ASTM A603 (1998; R 2014) Standard Specification for Zinc-Coated Steel Structural Wire Rope

ASTM A653/A653M (2017) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM E488/E488M (2015) Standard Test Methods for Strength of Anchors in Concrete and Masonry Elements

ASTM F1554 (2018) Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength

ICC EVALUATION SERVICE, INC. (ICC-ES)

ICC ES AC156 (2012) Acceptable Criteria for Seismic Certification by Shake-Table Testing of Nonstructural Components

ICC-ES AC23 (2012; R 2016) Acceptance Criteria for Sprayed Fire-resistant Materials (SFRMs), Intumescent Fire-resistant Coatings and Mastic Fire-resistant Coatings Used to Protect Structural Steel Members

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2015) International Building Code

METAL FRAMING MANUFACTURERS ASSOCIATION (MFMA)

MFMA-4 (2004) Metal Framing Standards Publication

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-301-01 (2013; with Change 4) Structural Engineering

UFC 3-310-04 (2013; with Change 1) Seismic Design of Buildings

UFC 4-010-01 (2012; with Change 1) DoD Minimum Antiterrorism Standards for Buildings

VIBRATION ISOLATION AND SEISMIC CONTROL MANUFACTURERS ASSOCIATION

(VISCMA)

VISCMA 412 (2014) Installing Seismic Restraints for Mechanical Equipment

SECTION 13 48 00 Page 2

1.2 SYSTEM DESCRIPTION

1.2.1 General Requirements

Apply the requirements for seismic protection measures, described in this Section and on the Drawings, of the miscellaneous equipment and systems listed below, in accordance with UFC 3-310-04 and additional data furnished by the Contracting Officer. Provide seismic protection measures in addition to any other requirements called for in other Sections of these Specifications. Where there is a conflict between the Specifications and the Drawings, the Specifications will take precedence.

Accomplish resistance to lateral forces induced by earthquakes without consideration of friction resulting from gravity loads.

1.2.2 Miscellaneous Equipment and Systems

Provide bracing and attachment for the following miscellaneous equipment and components developed by the Contractor in accordance with the requirements of this Specification:

a. Equipment/Components with Ip = 1.0.

b. Storage cabinets.

c. Ornamentations.

d. Storage Racks.

e. Signs and Billboards.

f. Shelving.

g. Furnishings.

h. Partitions.

i. Stacks.

j. Pole or frame supported equipment.

k. Storage tanks for water and oil.

Equipment/Components with Ip = 1.5 (Designated Seismic Systems) Insert edited list here similar to one above for Ip = 1.0 Non-Mission Critical (NMC) Equipment/Components in Risk Category V

1.2.3 Contractor Designed Bracing

Submit copies of the design calculations with the Drawings. Calculations must be approved, certified, stamped and signed by a registered Professional Structural Engineer. Calculations must verify the capability of structural members to which bracing is attached for carrying the load from the brace. Design the bracing in accordance with UFC 3-310-04, UFC 4-010-01 and additional data furnished by the Contracting Officer.

Resistance to lateral forces induced by earthquakes must be accomplished without consideration of friction resulting from gravity loads.

UFC 3-310-04 uses parameters for the building, not for the equipment in the building; therefore, corresponding adjustments to the formulas must be required. Loadings determined using UFC 3-310-04 are based on strength

SECTION 13 48 00 Page 3 design; therefore, AISC 325 Specifications must be used for the design of structural and miscellaneous steel members and connections. The bracing for the equipment designated in Paragraph 1.2.2 must be developed by the Contractor.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. When shown in this Specification, detailed Shop Drawings for all required equipment, piping and ductwork with calculations certified by a Registered Structural Engineer will be provided. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Bracing; G, RO

Resilient Vibration Isolation Devices; G, RO

Equipment Requirements; G, RO

SD-03 Product Data

Bracing; G, RO

Equipment Requirements; G, RO

Anchor Bolts; G, RO

Vibration Isolators; G, RO

Snubbers; G, RO

SD-05 Design Data

Design Calculations; G, RO

SD-06 Test Reports

Anchor Bolts; G, RO

SD-07 Certificates

ICC ES AC156 Shake Table Test; G, RO

PART 2 PRODUCTS

2.1 EQUIPMENT REQUIREMENTS

Submit Detail Drawings of bracing along with calculations, catalog cuts, templates, and erection and installation details, as appropriate, for the items listed in Paragraph 1.2.2. Indicate thickness, type, grade, class of metal, and dimensions; and show construction details, reinforcement, anchorage, and installation with relation to the building construction.

Provide calculations and Drawings that are stamped by a Registered Structural Engineer, and that verify the capability of structural members

SECTION 13 48 00 Page 4 to which bracing is attached for carrying the load from the brace. Design must be based on actual equipment and system layout. Design must include calculated dead loads, static seismic loads and capacity of materials utilized for the connection of the equipment or system to the structure.

Analysis must detail anchoring methods.

Include Drawing for Designated Seismic System Equipment indicating the equipment location in the facility sufficient to be used for the installation. Equipment must be rigidly or flexibly mounted as indicated in the Specifications and/or Drawings depending on vibration isolation requirements as follows below. Roof mounted equipment both vibration isolated and non-isolated, must have support members designed and anchored to building structural steel or concrete as required for seismic restraint and wind loads.

2.1.1 Rigidly (Base and Suspended) Mounted Equipment

Equipment furnished under this Contract must be rigidly mounted or rigidly mounted using cast-in-place anchor bolts to anchor them or post-installed anchors that are qualified for earthquake loading in accordance with ACI 355.2 and ACI 355.4. Anchor bolts must conform to ASTM F1554-07ae1.

For any rigid equipment which is rigidly anchored, provide flexible joints for piping, electrical conduit, etc., that are capable of accommodating displacements equal to the full width of the joint in both orthogonal directions. Suspended equipment bracing attachments should be located just above the center of gravity to minimize swinging. Designated Seismic Systems (DSS) RC IV buildings assigned to Seismic Design Category Coefficient (SDC) C, D, E, or F and Risk Category IV components needed for continued operation after an earthquake must have two nuts provided on each anchor bolt.

2.1.2 Non-Rigid or Flexibly-Mounted Equipment

Select vibration isolation devices so that the maximum movement of equipment from the static deflection point is 1/4 inch. Equipment flexibly mounted on vibration isolators must have a bumper restraint or snubber in each horizontal direction and vertical restraints must be provided where require to resist overturning. Isolator housing and restraints must be constructed of ductile materials. A viscoelastic pad or similar material of appropriate thickness must be used between the bumper and components to limit the impact load. Restraints must be designed to resist the calculated horizontal lateral and vertical forces.

Spring vibration isolators must be seismically rated, restrained isolators for equipment subject to load variations and large external forces. The seismically rated housing must be sized to meet or exceed the force requirements applicable to the Project and meet the required isolation criteria. Spring vibration isolator manufacturer's will be a member of VISCMA. Design force, Fp, must be doubled for vibration isolators with an air gap greater than 0.25 inches as specified in ASCE 7, Chapter 13.

2.2 BOLTS AND NUTS

Hex head bolts, and heavy hexagon nuts must be ASTM A307 Grade A bolts or ASTM A449 high strength bolts and ASTM A563 nuts. Provide bolts and nuts galvanized in accordance with ASTM A153/A153M when used underground and/or exposed to weather.

SECTION 13 48 00 Page 5

2.3 SWAY BRACING

Material used for members listed in this Section and on the Drawings, must be structural steel conforming with the following, as a minimum:

a. Plates, rods, and rolled shapes, ASTM A36/A36M.

b. Wire rope, ASTM A603.

c. Hollow structural sections, ASTM A500/A500M, Grade C.

d. Pipes, ASTM A53/A53M, Type E, Grade B.

e. Light gauge angles, less than 1/4 inch thickness, ASTM A653/A653M.

f. Channels (Strut) with in-turned lips and associated hardware for fastening to channels at random points conforming to MFMA-4.

PART 3 EXECUTION

3.1 BRACING

Provide bracing conforming to the arrangements shown. Install cables at a 45-degree slope. Where interference is present, the slope may be minimum of 30 degrees or a maximum of 60 degrees per VISCMA 412.

3.2 BUILDING DRIFT

Do not attach sway braces for equipment to two dissimilar structural elements of a building that may respond differentially during an earthquake unless a flexible joint is provided. Bracing must be capable of accommodating building drift due to seismic displacements.

3.3 ANCHOR BOLTS

3.3.1 General

Submit copies of test results to verify the adequacy of the specific anchor and application, as specified.

Ensure housekeeping pads have adequate space to mount equipment and seismic restraint devices allowing adequate edge distance and embedment depth for restraint anchor bolts. Identify position of reinforcing steel and other embedded items prior to drilling holes for anchors. Do not drill holes in concrete or masonry until concrete, mortar, or grout has achieved full design strength. Install neoprene grommet washers or till the gap with epoxy on equipment anchor bolts where clearance between anchor and equipment support hole exceeds 0.125 inches.

3.3.2 Cast-In-Place

Use templates to locate cast-in-place bolts accurately and securely in formwork. Provide anchor bolts with an embedded straight length equal to at least 12 times nominal diameter of the bolt. Anchor bolts that exceed the normal depth of equipment foundation piers or pads must either extend into concrete floor or the foundation or be increased in depth to accommodate bolt lengths. Use templates to locate cast-in-place bolts accurately and securely in formwork.

SECTION 13 48 00 Page 6

3.3.3 Drilled-In Anchor Bolts

Drill holes with rotary impact hammer drills. Drill bits must be of diameters as specified by the anchor manufacturer. Unless otherwise shown on the Drawings, all holes must be drilled perpendicular to the concrete surface. Where anchors are permitted to be installed in cored holes, use core bits with matched tolerances as specified by the manufacturer.

Properly clean cored hole per manufacturer's instructions. Identify position of reinforcing steel and other embedded items prior to drilling holes for anchors. Exercise care in coring or drilling to avoid damaging existing reinforcing or embedded items. Notify the COR if reinforcing steel or other embedded items are encountered during drilling. Take precautions as necessary to avoid damaging prestressing tendons, electrical and telecommunications conduit, and gas lines. Unless otherwise specified, do not drill holes in concrete or masonry until concrete, mortar, or grout has achieved full design strength. Perform anchor installation in accordance with manufacturer instructions.

3.3.3.1 Wedge Anchors, Heavy-Duty Sleeve Anchors, and Undercut Anchors

Protect threads from damage during anchor installation. Heavy-duty sleeve anchors must be installed with sleeve fully engaged in part to be fastened. Set anchors to manufacturer's recommended torque, using a torque wrench. Following attainment of 10 percent of the specified torque, 100 percent of the specified torque must be reached within 7 or fewer complete turns of the nut. If the specified torque is not achieved within the required number of turns, the anchor must be removed and replaced unless otherwise directed by the Engineer.

3.3.3.2 Cartridge Injection Adhesive Anchors

Where approved for seismic application, clean all holes per manufacturer instructions to remove loose material and drilling dust prior to installation of adhesive. Inject adhesive into holes proceeding from the bottom of the hole and progressing toward the surface in such a manner as to avoid introduction of air pockets in the adhesive. Follow manufacturer recommendations to ensure proper mixing of adhesive components.

Sufficient adhesive must be injected in the hole to ensure that the annular gap is filled to the surface. Remove excess adhesive from the surface. Shim anchors with suitable device to center the anchor in the hole. Do not disturb or load anchors before manufacturer specified cure time has elapsed.

3.3.3.3 Capsule Anchors

Where approved for seismic application, perform drilling and setting operations in accordance with manufacturer instructions. Clean all holes to remove loose material and drilling dust prior to installation of adhesive. Remove water from drilled holes in such a manner as to achieve a surface dry condition. Capsule anchors must be installed with equipment conforming to manufacturer recommendations. Do not disturb or load anchors before manufacturer specified cure time has elapsed. Observe manufacturer recommendations with respect to installation temperatures for cartridge injection adhesive anchors and capsule anchors.

3.3.4 Anchor Bolt Testing

Test in place expansion and chemically bonded anchors not more than 24 hours after installation of the anchor, conducted by an independent

SECTION 13 48 00 Page 7 testing agency; testing must be performed on random anchor bolts as described below.

3.3.4.1 Torque Wrench Testing

Perform torque wrench testing on not less than 50 percent of the total installed expansion anchors and at least one anchor for every piece of equipment containing more than two anchors. The test torque must equal the minimum required installation torque as required by the bolt manufacturer. Calibrate torque wrenches at the beginning of each day the torque tests are performed. Recalibrate torque wrenches for each bolt diameter whenever tests are run on bolts of various diameters. Apply torque between 20 and 100 percent of wrench capacity. Reach the test torque within one half turn of the nut, except for 3/8 inch sleeve anchors which must reach their torque by one quarter turn of the nut. If any anchor fails the test, test similar anchors not previously tested until 20 consecutive anchors pass. Failed anchors must be retightened and retested to the specified torque; if the anchor still fails the test it must be replaced.

3.3.4.2 Pullout Testing

Test expansion and chemically bonded anchors by applying a pullout load using a hydraulic ram attached to the anchor bolt. Testing must be done in accordance with ASTM E488/E488M or ICC-ES AC23. At least 5 percent of the anchors, but not less than 3 per day must be tested. Apply the load to the anchor without removing the nut; when that is not possible, the nut must be removed and a threaded coupler must be installed of the same tightness as the original nut. Check the test setup to verify that the anchor is not restrained from withdrawing by the baseplate, the test fixture, or any other fixtures. The support for the testing apparatus must be at least 1.5 times the embedment length away from the bolt being tested. Load each tested anchor to the design tension value for the anchor. The anchor must have no observable movement at the test load. If any anchor fails the test, similar anchors not previously tested must be tested until 10 consecutive anchors pass. Failed anchors must be retightened and retested to the specified load; if the anchor still fails the test it must be replaced.

3.4 RESILIENT VIBRATION ISOLATION DEVICES

Where the need for these devices is determined, based on the magnitude of the design seismic forces, select anchor bolts for vibration isolation devices and/or snubbers for equipment base and foundations that follow the same procedure as in Paragraph "Anchor Bolts", except use an equipment weight equal to five times the actual equipment weight.

3.4.1 Spring-Type Vibration Devices

Select vibration isolation devices so that the maximum movement of equipment from the static deflection point is 1/2 inch. Equipment flexibly mounted on vibration isolators must have a bumper restraint or snubber in each horizontal direction and vertical restraints must be provided where required to resist overturning. Isolator housing and restraints must be constructed of ductile materials. A viscoelastic pad or similar material of appropriate thickness must be used between the bumper and components to limit the impact load. Restraints must be designed to resist the calculated horizontal lateral and vertical forces.

SECTION 13 48 00 Page 8

Spring vibration isolators must be seismically rated, restrained isolators for equipment subject to load variations and large external forces. The seismically rated housing must be sized to meet or exceed the force requirements applicable to the Project and meet the required isolation criteria. Spring vibration isolator manufacturers will be a member of

VISCMA.

3.4.2 Multidirectional Seismic Snubbers

Install multidirectional seismic snubbers employing elastomeric pads on floor- or slab-mounted equipment. Use snubbers that provide 1/4 inch free vertical and horizontal movement from the static deflection point.

Provide snubber medium consisting of multiple pads of cotton duct and neoprene or other suitable materials arranged around a flanged steel trunnion so both horizontal and vertical forces are resisted by the snubber medium.

3.5 EQUIPMENT SWAY BRACING

3.5.1 Suspended Equipment

Provide equipment sway bracing for items supported from floor, overhead floor or roof structural systems. Provide braces that consist of angles, rods, wire rope, bars, channels (struts) or pipes arranged as shown in bracing submittals and secured at both ends with not less than 1/2 inch bolts. Provide sufficient braces for equipment to resist a horizontal force as specified in UFC 3-310-04 without exceeding safe working stress of bracing components. Provide, for approval, specific force calculations in accordance with UFC 3-310-04 for the equipment in the Project. Submit details of equipment bracing for acceptance. In lieu of bracing with vertical supports, these items may be supported with hangers inclined at 45 degrees directed up and radially away from equipment and oriented symmetrically in 90-degree intervals on the horizontal plane, bisecting the angles of each corner of the equipment, provided that supporting members are properly sized to support operating weight of equipment when hangers are inclined at a 45-degree angle.

3.5.2 Floor or Pad Mounted Equipment

3.5.2.1 Shear Resistance

Bolt to the floor, floor mounted equipment. Provide the number and installation of bolts to resist shear forces in accordance with Paragraph "Anchor Bolts".

3.5.2.2 Overturning Resistance

Use the ratio of the overturning moment from seismic forces to the resisting moment due to gravity loads to determine if overturning forces need to be considered in the sizing of anchor bolts. Provide calculations to verify the adequacy of the anchor bolts for combined shear and overturning.

3.6 SPECIAL TESTING FOR SEISMIC-RESISTING EQUIPMENT

Equipment and components designated as Designated Seismic Systems required to remain operational after an earthquake will be seismic qualified by shake table testing conforming to ICC ES AC156 Shake Table Test procedures. The manufacturer is to provide a certification by a fully

SECTION 13 48 00 Page 9 qualified testing agency for the specific equipment and/or components.

Prequalified certifications are acceptable unless noted otherwise.

Seismic component qualification documentation for each piece of equipment must contain the information required in UFC 3-310-04, Section 4-13.2.2.1 Component Qualification Documentation.

Miscellaneous components that are required to be certified must bear permanent marking or nameplates constructed of a durable heat and water resistant material. Nameplates must be mechanically attached to such nonstructural components and placed on each component for clear identification. The nameplate must not be less than 5 inches by 7 inches with red letters 1 inch in height on a white background stating "Certified Equipment." The following statement must be on the nameplate: "This equipment/component is certified. No modifications are allowed unless authorized in advance and documented in the Equipment Certification Documentation file." The nameplate must also contain the component identification number in accordance with the Drawings/Specifications and the O&M manuals.

3.7 SPECIAL INSPECTION FOR SEISMIC-RESISTING SYSTEMS AND EQUIPMENT

Perform special inspections for seismic-resisting systems, equipment and components designated seismic systems and equipment per ICC IBC 1705.12.4;

and storage racks per ICC IBC 1705.12.7. Periodic special inspections will be conducted on miscellaneous equipment as required by Section

1705.12 of the International Building Code and paragraph 2-2.4.3 of UFC 3-301-01. Provide a Statement of Special Inspections and Final Report in accordance with paragraph 2-2.4.3 of UFC 3-301-01.

-- End of Section --

SECTION 13 48 00 Page 10

SECTION 14 24 24

VERTICAL PLATFORM LIFTS

05/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this Specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASME INTERNATIONAL (ASME)

ASME A17.1/CSA B44 (2016) Safety Code for Elevators and Escalators

ASME A17.5 (2014) Elevator and Escalator Electrical Equipment

ASME A18.1 (2017) Safety Standard for Platform Lifts and Stairway Chairlifts

CSA AMERICA, INC.

CSA B355 (2015) Lifts For Persons With Physical Disabilities

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14; TIA 17-15; TIA 17-16; TIA 17-17 )

National Electrical Code

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Vertical Platform Lift System; G RO AE

Vertical Platform Lift Components; G, RO

Vertical Platform Lift Controller; G, RO

Wiring Diagrams; G, RO

SD-03 Product Data

SECTION 14 24 24 Page 1

Vertical Platform Lift and Accessories; G RO AE

Vertical Platform Lift Components; G, RO

Data Sheets; G, RO

Vertical Platform Lift Controller; G, RO

SD-05 Design Data

Emergency Power Systems

SD-07 Certificates

Vertical Platform Lift Parts and Components Price Lists; G, RO

Warranty; G RO

SD-10 Operation and Maintenance Data

Maintenance Control Program (MCP); G, RO

Submit in accordance with Section 01 78 23 OPERATION AND

MAINTENANCE DATA.

1.3 PRODUCT DATA

Manufacturer's data sheets on each product to be used, including:

a. Submit manufacturer's installation instructions, including preparation, storage and handling requirements.

b. Include complete description of performance and operating characteristics.

c. Show maximum and average power demands.

1.4 SHOP DRAWINGS

a. Shop Drawings:

(1) Show typical details of assembly, erection and anchorage.

(2) Include wiring diagrams for power, control, and signal systems.

(3) Show complete layout and location of equipment, including required clearances and coordination with shaftway.

b. Selection Samples: For each finished product specified, provide two complete sets of color chips representing manufacturer's full range of available colors and patterns.

c. Verification Samples: For each finished product specified, two samples, minimum size 1-3/4 inch by 2-1/4 inches, representing actual product, color, and patterns.

1.5 QUALITY ASSURANCE

Manufacturer Qualifications: Firm with minimum 10 years experience in

SECTION 14 24 24 Page 2 manufacturing of vertical platform lifts, with evidence of experience with similar installations of type specified.

Installer Qualifications: Licensed to install equipment of this scope, with evidence of experience with specified equipment. Installer shall maintain an adequate stock of replacement parts, have qualified people available to ensure fulfillment of maintenance and callback service without unreasonable loss of time in reaching Project Site.

1.6 REGULATORY REQUIREMENTS

a. Provide platform lifts in compliance with:

(1) ASME A18.1 - Safety Standard for Platform Lifts and Stairway Chairlifts.

(2) ASME A17.1/CSA B44 - Safety Code for Elevators and Escalators.

(3) ASME A17.5 - Elevator and Escalator Electrical Equipment.

(4) NFPA 70 - National Electric Code.

b. Provide platform lifts in compliance with:

(1) CSA B355 - Lifts for Persons with Physical Disabilities.

(2) ASME A17.5 - Elevator and Escalator Electrical Equipment.

(3) CSA - National Electric Code.

1.7 DELIVERY, STORAGE, AND HANDLING

a. Store products in manufacturer's unopened packaging until ready for installation.

b. Store components off the ground in a dry covered area, protected from adverse weather conditions.

1.8 PROJECT CONDITIONS

Do not use wheelchair lift for hoisting materials or personnel during construction period.

1.9 WARRANTY

a. Warranty: Manufacturer shall warrant the wheelchair lift materials and factory workmanship for two years following completion of installation.

b. Extended Warranty: Provide an extended manufacturer's warranty for the entire warranty period covering the wheelchair lift materials and factory workmanship for the following additional extended period beyond the initial two-year warranty. Preventive Maintenance agreement required.

(1) Five additional years.

SECTION 14 24 24 Page 3

PART 2 PRODUCTS

2.1 ENCLOSED VERTICAL WHEELCHAIR LIFT

a. Capacity: 750 pounds rated capacity.

b. Mast Height:

(1) 171 inches maximum lifting height.

c. Nominal Clear Platform Dimensions:

(1) Standard: 37-1/4 inches by 54 inches.

d. Platform Configuration:

(1) Straight Through Entry/Exit: Front and rear openings.

e. Landing Openings:

(1) Lower Landing: Door.

(2) Upper Landing: Gate.

f. Doors and Gates: Doors and gates shall be self closing type:

(1) Door Height: Flush mount, 80 inches.

(2) Gate Height: Flush mount, 42-1/8 inches.

(3) Door Construction: Aluminum frame with:

(a) Panels of 16 gauge painted galvanized steel.

(b) D-Handle Pull: 12 inch offset D-Handle.

(4) Power Door/Gate Operator: Automatically opens the door/gate when platform arrives at a landing. Will also open at landing by pressing call button.

(a) ADA Compliant and obstruction sensitive.

(b) Low voltage, 24 VDC with all wiring concealed.

(c) Location:

1. Lower Landing: Door.

2. Upper landing: Gate.

g. Lift Components:

(1) Machine Tower: Custom aluminum extrusion.

(2) Base Frame: Structural steel.

(3) Platform Side Wall Panels: 42-1/8 inches high. 16 gauge galvanized steel sheet. Custom aluminum extrusion tubing frame.

SECTION 14 24 24 Page 4

(4) Enclosure Panels:

(a) 16 gauge painted galvanized steel sheet.

h. Enclosure Height Above Upper landing:

(1) Enclosure shall extend 42-1/8 inches above the upper landing level

i. Infill Panel Kit: Provide 16 gauge galvanized panels and mounting hardware to cover void between side of enclosure, drive mast and adjacent wall at the following locations:

(1) Lower landing.

(2) Upper landing.

j. Base Mounting and Access to Lift at Lower Landing:

(1) Floor Mount: Base of lift shall be mounted on the floor surface of the lower landing. For access onto the platform provide a ramp of 16 gauge galvanized steel sheet with a slip resistant surface.

k. Leadscrew Drive:

(1) Drive Type: Self-lubricating ACME screw drive.

(2) Emergency Operation: Manual handwheel device to raise or lower platform.

(3) Battery Powered Emergency Lowering: Battery powered platform lowering device that automatically activates in the event of power failure. Allows passenger to drive platform downward to lower landing. Does not operate lift in up direction.

(4) Safety Devices:

(a) Integral safety nut assembly with safety switch.

(5) Travel Speed: 10 fpm (3.0 m/minute).

(6) Motor: 2.0 hp (560 W).

(7) Power Supply:

(a) 120 VAC single phase; 60 Hz on a dedicated 20 amp circuit.

l. Platform Controls: 24 VDC control circuit with the following features.

(1) Direction Control: Illuminated tactile and constant pressure push buttons with dual platform courtesy lights and safety light.

(2) Illuminated and audible emergency stop switch shuts off power to lift and activates audio alarm equipped with battery backup.

(3) Keyless operation.

(4) Emergency Telephone: Platform shall be equipped with ADA compliant autodialer telephone with a stainless-steel faceplate.

Telephone shall operate in the event of power failure. A

SECTION 14 24 24 Page 5 telephone line shall be supplied to the lift site.

m. Call Station Controls: 24 VDC control circuit with the following features.

(1) Direction Control: Illuminated tactile and constant pressure push buttons with illuminated "In Use" indicator.

(2) Keyless operation.

(3) Call Station Mounting:

(a) Lower:

1. Frame mounted.

(b) Upper:

1. Frame mounted.

n. Safety Devices and Features:

(1) Grounded electrical system with upper, lower, and final limit switches.

(2) Tamper resistant interlock to electrically monitor that the door is in the closed position and the lock is engaged before lift can move from landing.

(3) Electrical disconnect shall shut off power to the lift.

o. Finishes:

(1) Aluminum Extrusions: Anodized finish.

(2) Ferrous Components: Electrostatically applied baked powder finish, fine textured.

(a) Color: Satin Grey, RAL 7030.

(3) Lift Finish: Baked powder coat finish, color as selected from manufacturers optional RAL color chart.

PART 3 EXECUTION

3.1 EXAMINATION

a. Do not begin installation until substrates have been properly prepared.

b. Verify shaft and machine space are of correct size and within tolerances.

c. Verify required landings and openings are of correct size and within tolerances.

d. Verify electrical rough-in is at correct location.

e. If substrate preparation is the responsibility of another installer, notify C unsatisfactory preparation before proceeding.

SECTION 14 24 24 Page 6

3.2 PREPARATION

a. Clean surfaces thoroughly prior to installation.

b. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the Project Conditions.

3.3 INSTALLATION

a. Install platform lifts in accordance with applicable regulatory requirements including ASME A17.1/CSA B44, ASME A18.1, and the manufacturer's instructions.

b. Install platform lifts in accordance with applicable regulatory requirements including CSA B355, and manufacturer's instructions.

c. Install system components and connect to building utilities.

d. Accommodate equipment in space indicated.

e. Startup equipment in accordance with manufacturer's instructions.

f. Adjust for smooth operation.

SECTION 14 24 24 Page 7

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 14 24 24 Page 8

SECTION 21 13 13.00 10

WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

05/09

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this Specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASME INTERNATIONAL (ASME)

ASME B16.1 (2015) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250

ASME B16.11 (2016) Forged Fittings, Socket-Welding and Threaded

ASME B16.21 (2016) Nonmetallic Flat Gaskets for Pipe Flanges

ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300

ASME B16.4 (2011) Standard for Gray Iron Threaded Fittings; Classes 125 and 250

ASME B16.9 (2012) Standard for Factory-Made Wrought Steel Buttwelding Fittings

ASME B18.2.2 (2015) Nuts for General Applications:

Machine Screw Nuts, Hex, Square, Hex Flange, and Coupling Nuts (Inch Series)

ASTM INTERNATIONAL (ASTM)

ASTM A135/A135M (2009; R2014) Standard Specification for Electric-Resistance-Welded Steel Pipe

ASTM A183 (2014) Standard Specification for Carbon Steel Track Bolts and Nuts

ASTM A193/A193M (2017) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications

ASTM A449 (2014) Standard Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use

ASTM A47/A47M (1999; R 2014) Standard Specification for Ferritic Malleable Iron Castings

SECTION 21 13 13.00 10 Page 1

ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A536 (1984; R 2014) Standard Specification for Ductile Iron Castings

ASTM A795/A795M (2013) Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use

ASTM F436 (2011) Hardened Steel Washers

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 13 (2016; TIA 16-1; TIA 16-2; TIA 16-3 2016;

Errata 17-1; Errata 17-2) Standard for the Installation of Sprinkler Systems

NFPA 24 (2016; ERTA 2016) Standard for the Installation of Private Fire Service Mains and Their Appurtenances

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES

(NICET)

NICET 1014-7 (2012) Program Detail Manual for Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout

UNDERWRITERS LABORATORIES (UL)

UL Fire Prot Dir (2012) Fire Protection Equipment Directory

1.2 SYSTEM DESCRIPTION

Furnish piping offsets, fittings, and any other accessories as required to provide a complete installation and to eliminate interference with other construction. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively effect or disrupt the sprinkler discharge pattern and coverage. Provide wet pipe sprinkler system in areas indicated on the Drawings. Except as modified herein, the system shall be designed and installed in accordance with NFPA 13. Pipe sizes which are not indicated on Drawings shall be determined by hydraulic calculation. Design any portions of the sprinkler system that are not indicated on the Drawings including locating sprinklers, piping and equipment, and size piping and equipment when this information is not indicated on the Drawings or is not specified herein. The design of the sprinkler system shall be based on hydraulic calculations, and the other provisions specified herein.

SECTION 21 13 13.00 10 Page 2

1.2.1 Hydraulic Design

Hydraulically design the system as indicated on Drawings. The minimum pipe size for branch lines in gridded systems shall be 1-1/4 inch.

Hydraulic calculations shall be in accordance with the Area/Density Method of NFPA 13. Water velocity in the piping shall not exceed 20 ft/s.

1.2.1.1 Hose Demand

Add an allowance for exterior hose streams as indicated on Drawings to the sprinkler system demand at the point of connection to the existing system.

1.2.1.2 Basis for Calculations

Perform a hydrant flow test and utilize the information to provide a hydraulically designed sprinkler system. Flow test information provided on Drawings is for bid purposes only. Hydraulic calculations shall be based upon the Hazen-Williams formula with a "C" value of 120 for steel piping, 150 for copper tubing, 140 for new cement-lined ductile-iron piping, and 100 for existing underground piping.

1.2.1.3 Hydraulic Calculations

Submit hydraulic calculations, including a drawing showing hydraulic reference points and pipe segments and as outlined in NFPA 13, except that calculations shall be performed by computer using software intended specifically for fire protection system design using the design data shown on the Drawings. Software that uses k-factors for typical branch lines is not acceptable. Calculations shall be based on the water supply data shown on the Drawings to substantiate that the design area used in the calculations is the most demanding hydraulically. Water supply curves and system requirements shall be plotted on semi-logarithmic graph paper so as to present a summary of the complete hydraulic calculation. Provide a summary sheet listing sprinklers in the design area and their respective hydraulic reference points, elevations, actual discharge pressures and actual flows. Elevations of hydraulic reference points (nodes) shall be indicated. Documentation shall identify each pipe individually and the nodes connected thereto. Indicate the diameter, length, flow, velocity, friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe. For gridded systems, calculations shall show peaking of demand area friction loss to verify that the hydraulically most demanding area is being used.

Also for gridded systems, a flow diagram indicating the quantity and direction of flows shall be included. A drawing showing hydraulic reference points (nodes) and pipe designations used in the calculations shall be included and shall be independent of Shop Drawings.

1.2.2 Sprinkler Coverage

Sprinklers shall be uniformly spaced on branch lines. Sprinklers shall provide coverage throughout 100 percent of the area of renovation. This includes, but is not limited to, electrical and mechanical spaces.

Coverage per sprinkler shall be in accordance with NFPA 13, but shall not exceed 100 square feet for extra hazard occupancies, 130 square feet for ordinary hazard occupancies, and 225 square feet for light hazard occupancies.

SECTION 21 13 13.00 10 Page 3

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Shop Drawings; G As-Built Drawings

SD-03 Product Data

Fire Protection Related Submittals Materials and Equipment; G Spare Parts Preliminary Tests; G Final Acceptance Test; G Onsite Training; G Fire Protection Specialist; G Sprinkler System Installer; G

SD-05 Design Data

Sway Bracing; G

SD-06 Test Reports

Preliminary Test Report Final Acceptance Test Report

SD-07 Certificates

Inspection by Fire Protection Specialist

SD-10 Operation and Maintenance Data

Operating and Maintenance Manuals; G

1.4 QUALITY ASSURANCE

Compliance with referenced NFPA standards is mandatory. In the event of a conflict between specific provisions of this Specification and applicable NFPA standards, this Specification governs. Interpret reference to "authority having jurisdiction" to mean the Contracting Officer.

1.4.1 Fire Protection Specialist

Perform work specified in this Section under the supervision of and certified by the Fire Protection Specialist who is an individual registered professional engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES) or who is certified as a Level III Technician by National Institute for Certification in Engineering Technologies (NICET) in the Automatic Sprinkler System Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7. Submit the name and documentation of certification of the proposed Fire Protection Specialists, no later than 14 days after the

SECTION 21 13 13.00 10 Page 4

Notice to Proceed and prior to the submittal of the sprinkler system drawings and hydraulic calculations. The Fire Protection Specialist shall prepare and submit a list of the fire protection related submittals, no later than 7 days after the approval of the Fire Protection Specialist, from the Contract Submittal Register that relate to the successful installation of the sprinkler systems(s). The submittals identified on this list shall be accompanied by a letter of approval signed and dated by the Fire Protection Specialist when submitted to the Government. The Fire Protection Specialist shall be regularly engaged in the design and installation of the type and complexity of system specified in the Contract Documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.

1.4.2 Sprinkler System Installer

Work specified in this Section shall be performed by the Sprinkler System Installer who is regularly engaged in the installation of the type and complexity of system specified in the Contract Documents, and who has served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.

Submit the name and documentation of certification of the proposed Sprinkler System Installer, concurrent with submittal of the Fire Protection Specialist Qualifications.

1.4.3 Shop Drawings

Shop Drawings shall conform to the requirements established for working plans as prescribed in NFPA 13. Submit 3 copies of the Sprinkler System Shop Drawings, no later than 21 days prior to the start of sprinkler system installation. Drawings shall include plan and elevation views demonstrating that the equipment will fit the allotted spaces with clearance for installation and maintenance. Each set of Drawings shall include the following:

a. Descriptive index of Drawings in the submittal with Drawings listed in sequence by Drawing number. A legend identifying device symbols, nomenclature, and conventions used.

b. Floor plans drawn to a scale not less than 1/8 inch = 1 foot-0 inches which clearly show locations of sprinklers, risers, pipe hangers, seismic separation assemblies, sway bracing, inspector's test connections, drains, and other applicable details necessary to clearly describe the proposed arrangement. Each type of fitting used and the locations of bushings, reducing couplings, and welded joints shall be indicated.

c. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross-mains and branch lines to finished floor and roof or ceiling. A detail shall show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.

d. Longitudinal and transverse building sections showing typical branch line and cross-main pipe routing as well as elevation of each typical sprinkler above finished floor.

e. Details of each type of riser assembly; pipe hanger; and restraint of

SECTION 21 13 13.00 10 Page 5 underground water main at point-of-entry into the building, and electrical devices and interconnecting wiring. Submit load calculations for sizing of sway bracing, for systems that are required to be protected against damage from earthquakes.

1.5 DELIVERY, STORAGE, AND HANDLING

All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Additionally, all pipes shall either be capped or plugged until installed.

1.6 EXTRA MATERIALS

Submit spare parts data for each different item of material and equipment specified. The data shall include a complete list of parts and supplies, with current unit prices and source of supply, and a list of parts recommended by the manufacturer to be replaced after 1 year and 3 years of service. Include a list of special tools and test equipment required for maintenance and testing of the products supplied.

PART 2 PRODUCTS

2.1 STANDARD PRODUCTS

Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.

2.2 NAMEPLATES

All equipment shall have a nameplate that identifies the manufacturer's name, address, type or style, model or serial number, and catalog number.

2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE

Provide Materials and Equipment that have been tested by Underwriters Laboratories, Inc. and are listed in UL Fire Prot Dir or approved by Factory Mutual and listed in FM APP GUIDE. Where the terms "listed" or "approved" appear in this Specification, such shall mean listed in UL Fire Prot Dir or FM APP GUIDE. Submit manufacturer's catalog data included with the Sprinkler System Drawings for all items specified herein. The data shall be highlighted to show model, size, options, etc., that are intended for consideration. Data shall be adequate to demonstrate compliance with all Contract requirements. In addition, provide a complete equipment list that includes equipment description, model number and quantity.

2.4 ABOVEGROUND PIPING COMPONENTS

Aboveground piping shall be steel.

2.4.1 Steel Piping Components

2.4.1.1 Steel Pipe

Except as modified herein, steel pipe shall be black as permitted by NFPA 13 and shall conform to applicable provisions of ASTM A795/A795M, SECTION 21 13 13.00 10 Page 6

ASTM A53/A53M, or ASTM A135/A135M. Pipe in which threads or grooves are cut or rolled formed shall be Schedule 40 or shall be listed by Underwriters' Laboratories to have a corrosion resistance ratio (CRR) of

1.0 or greater after threads or grooves are cut or rolled formed. Pipe shall be marked with the name of the manufacturer, kind of pipe, and ASTM designation.

2.4.1.2 Fittings for Non-Grooved Steel Pipe

Fittings shall be cast iron conforming to ASME B16.4, steel conforming to ASME B16.9 or ASME B16.11, or malleable iron conforming to ASME B16.3.

Steel press fittings shall be approved for fire protection systems.

Fittings into which sprinklers, drop nipples or riser nipples (sprigs) are screwed shall be threaded type. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe and segmented welded fittings shall not be used.

2.4.1.3 Grooved Mechanical Joints and Fittings

Joints and fittings shall be designed for not less than 175 psi service and shall be the product of the same manufacturer;segmented welded fittings shall not be used. Fitting and coupling houses shall be malleable iron conforming to ASTM A47/A47M, Grade 32510; ductile iron conforming to ASTM A536, Grade 65-45-12. Gasket shall be the flush type that fills the entire cavity between the fitting and the pipe. Nuts and bolts shall be heat-treated steel conforming to ASTM A183 and shall be cadmium plated or zinc electroplated.

2.4.1.4 Flanges

Flanges shall conform to NFPA 13 and ASME B16.1. Gaskets shall be non-asbestos compressed material in accordance with ASME B16.21, 1/16 inch thick, and full face or self-centering flat ring type.

2.4.1.5 Bolts, Nut, and Washers

Bolts shall be conform to ASTM A449, Type 1 and shall extend no less than three full threads beyond the nut with bolts tightened to the required torque. Nuts shall be hexagon type conforming to ASME B18.2.2 or ASTM A193/A193M, Grade 5. Washers shall meet the requirements of ASTM F436.

Flat circular washers shall be provided under all bolt heads and nuts.

2.5 SPRINKLERS

Sprinklers with internal O-rings shall not be used. Sprinklers shall be used in accordance with their listed coverage limitations. Temperature classification shall be ordinary. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters shall have temperature classification in accordance with NFPA 13. Extended coverage sprinklers shall not be used.

2.5.1 Recessed Sprinkler

Recessed sprinkler shall be white polyester quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.

2.5.2 Pendent Sprinkler

Pendent sprinkler shall be of the fusible strut or glass bulb type, SECTION 21 13 13.00 10 Page 7 recessed quick-response type…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.