75906_WVA_Warehs_S-001.pdf
PDF 4 MB Posted
- Attached to
- General Purpose Storage Building, Watervliet, NY Federal contract opportunity
- Solicitation number
- W912DS-18-B-0014
About this file
S-001
View the file
Other files for this federal contract opportunity
Show all 50
General Purpose Storage Building, Watervliet, NY has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
A N
S I
D
W
D S -1
-B -0
W X
X X
X X -X
X -X -X
A
T E
R V
L
IE
T A
R S
E N
A L
W A
T E
R V
L
IE
T
N Y
G E
N E
R A
L P
U R
P O
S E W
A R
E H
O U
S E
P N
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K
N Y
W X
X X
X X -X
X -X -X
M
Y
RTA
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
A N
S I
D
W
D S -1
-B -0
X X
X X -X
X -X -X
T E
R V
L
IE
T A
R S
E N
A L
W A
T E
R V
L
IE
T
N Y
G E
N E
R A
L P
U R
P O
S E W
A R
E H
O U
S E
P N
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K
N Y
W X
X X
X X -X
X -X -X
M
Y
RTADS: S:\Projects\TS_WORKSPACES\AEC_WS_001\Workspace\Extensions\LocalExtension\pltcfg\AEC_Screen.dscript.dscript 2:24:26 PM 7/24/2018
S:\Projects\Watervilet_Arsenal\New_Warehouse\Drawings\ProjectData\CAD_BIM\_Sheets\75906_WVA_Warehs_S-001.dgn
J S
U B
M
IT
T E
R
S-001
J
C H
E C
K E
R
E
C S h e e tS e e d .d g n
S T
R U
C T
U R
A L G
E N
E R
A L N
O T
E S
DESIGN CRITERIA
UNBALANCED SNOW LOAD
7.56 PSF
25.2 PSF
13.2 PSF
22.4'
UNBALANCED SNOW LOAD SEE DIAGRAM
Ps = 25.2 psf
SLOPED ROOF SNOW LOAD
Pf = 25.2 psf
FLAT ROOF SNOW LOAD
Cs = 1
Ct = 1
Ce = .9
SNOW IMPORTANCE FACTOR = 1
ACCORDING TO ASCE 7-10 SNOW PARAMETERS
PER ARCHITECTURAL DESIGN ROOF SLOPE IS 1 ON 12 (WARM ROOF)
GROUND SNOW LOAD = 40 PSF
ACCORDING TO UFC 3-301-01 TABLE E-2
SNOW:
SEISMIC DESIGN CATEGORY = B
Sd1 = .08
Sds = .154
Sm1 = .12
Sms = .23
Fv = 1.7
Fa = 1.2
SEISMIC IMPORTANCE FACTOR = 1
ACCORDING TO ASCE 7-10 SEISMIC PARAMETERS
PER GEOTECHNICAL REPORT "SITE CLASS C"
S1 = .07g
Ss = .19g
ACCORDING TO UFC 3-301-01 TABLE E-3
SEISMIC:
GCPi = +.55 and -.55
G = .85
Kzt = 1
Kd = .85
PARTIALLY ENCLOSED
EXPOSURE CATEGORY B
ACCORDING TO ASCE 7-10 WIND LOAD PARAMETERS
BASIC WIND SPEED = 115 MPH
ACCORDING TO UFC 3-301-01 TABLE E-1
WIND:
LOADS:
RISK CATEGORY II
ACCORDING TO UFC 3-301-01 TABLE 2-2
CODES AND MANUALS
UFC 3-320-06A CONCRETE FLOOR SLABS ON GRADE SUBJECTED TO HEAVY LOADS
UFC 3-310-04 SEISMIC DESIGN FOR BUILDINGS
UFC 3-301-01 STRUCTURAL ENGINEERING
UFC 1-200-01 GENERAL BUILDING REQUIREMENTS
UNIFIED FACILITIES CRITERIA (UFC)
PORTLAND CEMENT ASSOCIATION - CONCRETE FLOORS ON GROUND
DESIGN LOADS ON STRUCTURES DURING CONSTRUCTION - ASCE 37
MEMBERS AND COMMENTARY AND STANDARD FOR COLD-FORMED STEEL FRAMING (AISI)
NORTH AMERICAN SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL STRUCTURAL
BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES - ACI 530
METAL BUILDING SYSTEMS MANUAL AND METAL ROOFING SYSTEMS DESIGN MANUAL (MBMA)
STRUCTURAL WELDING CODE - STEEL, AWS D1
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE - ACI 318
STEEL CONSTRUCTION MANUAL, FOURTEENTH EDITION (AISC 325-11)
MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES - ASCE 7-10
INTERNATIONAL BUILDING CODE, IBC 2015, AS MODIFIED BY UFC 1-200-01
METAL BUILDING SYSTEM
STRUCTURAL FOUNDATION/SLAB SYSTEMS
CONCRETE SLAB/FOUNDATION
J .L
A U
L E
T T
A -W
E
IN
M A
N N
J .L
A U
L E
T T
A -W
E
IN
M A
N N
DOCK LEVELER
SEE MANUFACTURER'S INSTALLATION PROCEDURE.
FACE OF DOCK LEVELER SHOULD BE SQUARE WITH BUILDING FOUNDATION.
3. LEVEL THE DOCK LEVELER AT THE FINISHED FLOOR HEIGHT. FRONT
MANUFACTURER'S LOADING FORCE DIAGRAM.
AND THE LOADS TO BE APPLIED TO THE DOCK LEVELER PER
2. A CONCRETE PAD IS TO BE POURED TO SUPPORT THE DOCK LEVELER
ACCOMMODATE THE DOCK LEVELER.
DIMENSIONS ARE TO BE PROVIDED BY THE MANUFACTURER TO
1. A CUT OUT IS TO BE PROVIDED IN THE FOUNDATION WALL. CUT OUT
METAL FRAME AND PAN ENCLOSES THE DOCK LEVELER.
"POUR IN PLACE" HYDRAULIC DOCK LEVELER (OR EQUAL).
BASIS OF DESIGN PENTALIFT HD SERIES 100,000 LB CAPACITY
LOADING DOCK
DESIGN DEPTH = 48" BELOW FINISHED GRADE.
GEOTECHNICAL REPORT RECOMMENDS 48" BELOW FINISHED GRADE.
BOTTOM OF EXTERIOR WALL FOOTING DEPTHS 44" BELOW EXTERIOR GRADE (HEATED BUILDING)
5. ACCORDING TO UFC 3-301-01 TABLE E-2 AND FIGURE B-1 THE FROST DEPTH = 82"
PIPE BRIDGE
CONSTRUCTION OF THE PROJECT.
ADDITIONAL GEOTECHNICAL INVESTIGATIONS THAT MAY BE NEEDED FOR THE DESIGN AND
HIS/HER DESIGN, HE/SHE SHOULD ACQUIRE ADDITIONAL DATA. THE CONTRACTOR IS RESONSIBLE FOR ANY
4. IF THE FOUNDATION ENGINEER DETERMINES THAT EXISTING SUBSURFACE DATA IS INADEQUATE FOR
3. GEOTECHNICAL REPORT RECOMMENDS A SUBGRADE MODULUS OF K = 150 PCI FOR SLAB DESIGN.
FOUNDATION/SLAB ENGINEER TO VERIFY.
OF THE MAXIMUM MODIFIED PROCTOR DENSITY AS DETERMINED BY ASTM D1557. CONTRACTOR'S
(NYSDOT 733-04 TYPE 2) BE PLACED UNDER THE SLAB ON GRADE AND COMPACTED TO AT LEAST 95%
2. GEOTECHNICAL REPORT RECOMMENDS AT LEAST 6 INCHES OF IMPORTED GRANULAR MATERIAL
SLABS-ON-GRADE SUBJECT TO FORKLIFT TRAFFIC. 5,000 PSI CONCRETE IS SPECIFIED FOR THIS PROJECT.
1. ACCORDING TO UFC 3-301-01 A MINIMUM OF 4,000 PSI CONCRETE STRENGTH IS RECOMMENDED FOR
BASIS OF DESIGN FOR CRANE: AMERICAN CRANE & EQUIPMENT CORPORATION "ACECO" OR EQUAL.
BASIS OF DESIGN FOR METAL BUILDING SYSTEM: NUCOR BUILDING SYSTEMS OR EQUAL.
TO DESIGN THE SITE SPECIFIC FOUNDATION/SLAB FOR THE STRUCTURE.
SHALL PROVIDE ALL COLUMN REACTIONS TO THE PROFESSIONAL ENGINEER SELECTED BY THE CONTRACTOR
SHALL BE SUBMITTED TO THE NEW YORK DISTRICT FOR REVIEW. THE METAL BUILDING MANUFACTURER
ALL CALCULATIONS, SPECIFICATIONS AND DRAWINGS. CALCULATIONS, SPECIFICATIONS AND DRAWINGS
MANUFACTURER'S PROFESSIONAL ENGINEER REGISTERED IN NEW YORK STATE WHO WILL CHECK/SIGN/SEAL
THE STRUCTURAL DESIGN OF THE METAL BUILDING WILL BE PERFORMED BY THE METAL BUILDING
EQUIPMENT AND LIGHTING PLACEMENT CLEARANCES, ETC.
DESIGN INCORPORATING THE FINAL CRANE SELECTION, THE 25 FOOT HOOK HEIGHT, MECHANICAL
PURPOSES. THE BUILDING HEIGHT IS TO BE FINALIZED BY THE METAL BUILDING SYSTEM MANUFACTURER'S
PRELIMINARY RIGID FRAME AND CRANE PROVIDED IN THE DRAWINGS ARE FOR COST ESTIMATING
THE STRUCTURE. A BRACKET SUPPORT FROM THE TAPERED RIGID FRAMES IS TO BE UTILIZED. THE
CAPACITY AND A MINIMUM 25 FOOT HOOK HEIGHT. THE CRANE WILL SPAN NEARLY THE FULL WIDTH OF
THE STRUCTURE WILL INCORPORATE A DOUBLE GIRDER TOP RUNNING, OVERHEAD CRANE, WITH A 5.5 TON
ADEQUATE ROOM FOR STORAGE RACKS, FORKLIFT MANUEUVERABILITY AND A VEHICLE DRIVE THRU.
THE BUILDING SHALL BE A CLEAR SPAN OPEN STRUCTURE WITHOUT INTERIOR COLUMNS PROVIDING
WILL BE PROVIDED WITHIN THE ROOF AND SIDE WALLS AS REQUIRED BY THE MANUFACTURER'S DESIGN.
MANUFACTURER FOR LATERAL STABILITY AGAINST WIND AND SEISMIC LOADS. LONGITUDINAL BRACING
FRAMING SYSTEM IS A RIGID FRAMED METAL BUILDING SYSTEM TO BE DESIGNED BY A METAL BUILDING
STRUCTURE WITH A HIGH BAY AREA AND EQUIPMENT PLATFORM. THE PRIMARY STRUCTURAL
THE GENERAL PURPOSE WAREHOUSE IS A ONE STORY RECTANGULAR SHAPED RISK CATEGORY II
DRAWINGS TO BE SUBMITTED TO THE NEW YORK DISTRICT FOR REVIEW.
ALL SLAB AND RETAINING WALL CALCULATIONS, SPECIFICATIONS AND
6. CONTRACTOR'S FOUNDATION/SLAB ENGINEER WILL CHECK/SIGN/SEAL
SHOWN ON CIVIL AND ARCHITECTURAL DRAWINGS AND AS NOTED ON S-404.
CONCRETE PAVEMENT DETAILS, TURNING RADIUS (IF MODIFIED) OR AS
LOADING DOCK WIDTH, ELEVATIONS, TRENCH DRAIN, HEAVY DUTY
TRUCK TYPE/SIZE SPECIFIED BY THE USER, SITE SOIL CONDITIONS AND FINAL
DUTY SLAB AND RETAINING WALLS PER LOADING REQUIREMENTS OF THE
4. CONTRACTOR'S FOUNDATION/SLAB ENGINEER IS TO DESIGN THE HEAVY
THE METAL BUILDING'S FOUNDATION/SLAB AND DOCK LEVELER PLACEMENT.
DUTY SLAB AND RETAINING WALLS IN COORDINATION WITH THE DESIGN OF
3. CONTRACTOR'S FOUNDATION/SLAB ENGINEER IS TO DESIGN THE HEAVY
TO THE NEW YORK DISTRICT FOR REVIEW.
CALCULATIONS, SPECIFICATIONS AND DRAWINGS TO BE SUBMITTED
REGISTERED IN NEW YORK STATE WHO WILL CHECK/SIGN/SEAL ALL
DESIGNED BY THE CONTRACTOR'S PROFESSIONAL ENGINEER
MODIFICATIONS (IF REQUIRED) TO THE BASIS OF DESIGN ARE TO BE
DOCK BASIS OF DESIGN REQUIREMENTS ARE TO BE REEVALUATED.
2. USER TO PROVIDE FINAL DESIGN TRUCK/SIZE FROM WHICH LOADING
AS NOTED ON S-404.
TURNING RADIUS, ETC. SEE CIVIL AND ARCHITECTURAL DRAWINGS AND
TRENCH DRAIN AND HEAVY DUTY CONCRETE PAVEMENT DETAILS,
1. FOR BASIS OF DESIGN INCLUDING LOADING DOCK WIDTH, ELEVATIONS,
SUPPORT AT LOCATION A BETWEEN DOORS, 18' CLEARANCE, ETC.
NOTES WITH RESPECT TO ELEVATIONS, COLUMN HEIGHTS, BRIDGE
6. SEE DRAWING S-408 FOR COORDINATION, VERIFICATION, INSPECTION
AS BUILTS AT THESE LOCATIONS.
THROUGH S-408 FOR LOADING DOCK AND GANTRY CRANE FOUNDATION
WITH PIPE BRIDGE SUPPORT DESIGNS AT THESE LOCATIONS. SEE S-406
CONDITION REPORTS, CLEAR AND PROVIDE CONCRETE REPAIR
AT GANTRY CRANE FOUNDATION AND EXISTING LOADING DOCK, PROVIDE
5. CONTRACTOR'S FOUNDATION ENGINEER IS TO INSPECT CONCRETE
THE METAL BUILDING.
INCORPORATION INTO METAL BUILDING DESIGN IF TO BE SUPPORTED BY
REQUIREMENTS TO THE METAL BUILDING'S PROFESSIONAL ENGINEER FOR
4. THE CONTRACTOR'S STRUCTURAL ENGINEER IS TO PROVIDE LOADING
INDEPENDENTLY FROM THE METAL BUILDING.
INCORPORATION INTO THE PIPE BRIDGE'S SUPPORT SYSTEM IF SUPPORTED
REQUIREMENTS TO THE CONTRACTOR'S FOUNDATION ENGINEER FOR
3. THE CONTRACTOR'S STRUCTURAL ENGINEER IS TO PROVIDE LOADING
A AND B AS SHOWN ON S-405.
INCORPORATION INTO THE PIPE BRIDGE'S SUPPORT SYSTEM AT SECTIONS
REQUIREMENTS TO THE CONTRACTOR'S FOUNDATION ENGINEER FOR
2. THE CONTRACTOR'S STRUCTURAL ENGINEER IS TO PROVIDE LOADING
TO THE NEW YORK DISTRICT FOR REVIEW.
CALCULATIONS, SPECIFICATIONS AND DRAWINGS TO BE SUBMITTED
REGISTERED IN NEW YORK STATE WHO WILL CHECK/SIGN/SEAL ALL
PERFORMED BY THE CONTRACTOR'S PROFESSIONAL ENGINEER
STRUCTURAL ENGINEER. FINAL DESIGN OF THE PIPE BRIDGE WILL BE
LOADING AND SITE CONDITIONS BY THE CONTRACTOR'S REGISTERED
SHALL BE VERIFIED AND ADJUSTMENTS MADE AS REQUIRED PER FINAL
STRUCTURAL STEEL MEMBER SIZES, ETC. AS SHOWN ON S-302 AND S-405
1. ALL ASSUMED LOADS, ELEVATIONS, DIMENSIONS, JOIST SELECTION,
3. PIPE BRIDGE REQUIREMENTS AS SHOWN ON S-302, S-405 THROUGH S-408.
2. LOADING DOCK REQUIREMENTS AS SHOWN ON RELATED CIVIL AND ARCHITECTURAL DRAWINGS AND AS NOTED ON S-404.
WHICH ELIMINATES THE NEED TO PREFORM A DOCK LEVELER PIT PRIOR TO DOCK LEVELER INSTALLATION.
DOCK LEVELER AND LOADS INCORPORATING A 2.5 DYNAMIC LOAD MULTIPLIER. A POUR IN PLACE OPTION IS SPECIFIED
1. DOCK LEVELER REQUIREMENTS INCLUDING CUT IN FOUNDATION WALL AND A CONCRETE PAD TO SUPPORT THE
COORDINATION AND DESIGN IS ALSO REQUIRED BY THE CONTRACTOR'S FOUNDATION/SLAB ENGINEER WITH RESPECT TO:
ARE TO BE SUBMITTED TO THE NEW YORK DISTRICT FOR REVIEW AND APPROVAL BEFORE ADVANCING TO FULL DESIGN.
LOADS OBTAINED FROM ALL LOADING SOURCES. PRELIMINARY DESIGNS OF ALTERNATE FOUNDATION /SLAB SYSTEMS
ANY PRELIMINARY DESIGNS OF ALTERNATE FOUNDATION/SLAB SYSTEMS ARE TO BE BASED ON ALL APPLICABLE FINAL
AND SPECIFICATION BY ALEXANDER NEWMAN WHO CAUTIONS AGAINST HAIRPINS WITH SLAB TIES.
ARE ALSO TO BE INCORPORATED INTO THE FOUNDATION/SLAB DESIGN. REFER TO METAL BUILDING SYSTEM DESIGN
WIRE INVINCIBLE RACK OR EQUAL. GABLE BENT THRUST FORCES PROVIDED BY THE METAL BUILDING MANUFACTURER
AND SUBMITTED TO THE NEW YORK DISTRICT FOR REVIEW. BASIS OF DESIGN FOR RACKING SYSTEM: HUSKY RACK AND
SHALL BE PERFORMED/CHECKED/SIGNED/SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF NEW YORK
SEISMIC STABILITY AGAINST OVERTURNING. THE RACKING SYSTEM CALCULATIONS, SPECIFICATIONS AND DRAWINGS
THE RACKING SYSTEM MANUFACTURER'S PROFESSIONAL ENGINEER WHO WILL VERIFY THE RACKING SYSTEM LOADS AND
THE RACKING SYSTEM WHICH IS TO BE VERIFIED WITH FINAL RACKING LOADS AND SEISMIC REACTIONS OBTAINED FROM
FOR COST ESTIMATING PURPOSES. THE THICKNESS OF THE PRELIMINARY MAT WAS BASED ON THE POST LOADING FROM
A PRELIMINARY MAT FOUNDATION WITH HAUNCH FOR FROST PROTECTION HAS BEEN INCLUDED WITH THE DRAWINGS
BY THE METAL BUILDING MANUFACTURER'S PROFESSIONAL ENGINEER AND ALL VERIFIED SLAB LOADINGS.
WITH CALCULATIONS DEMONSTRATING ADEQUACY TO SUSTAIN THE METAL BUILDING REACTIONS PROVIDED
SPECIFICATIONS AND DRAWINGS INCLUDING NARRATIVE, REFERENCES, ALL PERTINENT DATA AND DETAILS, THE CONTRACTOR'S FOUNDATION/SLAB ENGINEER IS TO PROVIDE A FOUNDATION/SLAB DESIGN ANALYSIS, CALCULATIONS, SPECIFICATIONS AND DRAWINGS TO BE SUBMITTED TO THE NEW YORK DISTRICT FOR REVIEW.
PROFESSIONAL ENGINEER REGISTERED IN NEW YORK STATE WHO WILL CHECK, SIGN AND SEAL ALL
THE FOUNDATION/SLAB DESIGN FOR THE METAL BUILDING WILL BE PERFORMED BY THE CONTRACTOR'S
IN
S T
R U
C T
IO
N S C
O N
T R
A C
T O
R 'S P
R O
F E
S S
IO
N A
L E
N G
IN
E E
R S
J U
L Y
THE STRUCTURAL APPENDIX.
BY THE CRANE MANUFACTURER. AN EXAMPLE IS INCLUDED IN
SERVICEABILITY, DEFLECTION AND TOLERANCES AS SPECIFIED
METAL BUILDING AND FOUNDATION DESIGN SHALL ADDRESS
SERVICEABILITY AND DEFLECTION:
EQUIPMENT PLATFORM 125 PSF
MECHANICAL EQUIPMENT LOADS
AND COORDINATED WITH FOUNDATION ENGINEER.
AND RACKING LOADS PROVIDED BY RACKING SYSTEM MANUFACTURER
6" APART TOTALING 36,000 POUNDS) SEISMIC HORIZONTAL FORCES
SHELVING RACKS (WORSE CASE 2 POST LOADS 18,000 POUNDS EACH
VEHICLE FLATBED TRUCKS (34,000 LBS THREE AXLES)
FORKLIFT (MAXIMUM DRIVE AXLE LADEN CONDITION 32,912 LBS)
CONCRETE SLAB ON GRADE FLOOR LOADS:
WITH METAL BUILDING MANUFACTURER AND FOUNDATION ENGINEER.
DOCK LEVELER, ETC. PROVIDED BY MANUFACTURERS FOR COORDINATION
DYNAMIC LIVE LOADS, SUCH AS THOSE GENERATED BY CRANE,
AUXILIARY LOADS:
IN METAL BUILDING DESIGN
COORDINATED AND PROVIDED BY METAL BUILDING MANUFACTURER
SYSTEMS, ELECTRICAL SYSTEMS, ETC.
BULDING SYSTEM FOR PERMANENT ITEMS SUCH AS MECHANICAL
ADDITIONAL DEAD LOADS OTHER THAN THE WEIGHT OF THE METAL
COLLATERAL LOADS:
MANUFACTURER
ROOF DEAD LOAD = PROVIDED BY METAL BUILDING
ROOF LIVE LOAD = 20 PSF
ROOF LOADS:
WITH ASCE 7-10.
BUILDING LIVE AND DEAD LOADS SHALL BE IN ACCORDANCE
MINIMUM DESIGN LIVE AND DEAD LOAD REQUIREMENTS:
Revision 1 , 18JU L 18
File details come from the government source that posted it.