Q&A MDC 3339 Gelberman Overhaul

W912BU21Q0015

April 30, 2021

1- Is the protective wooden platform on stern of the vessel being removed as spec. calls out for blasting main deck (cap rail to cap rail), if so will ACOE or Contractor be responsible for removal & re-installation?

It shall be the contractor’s responsibility to remove and reinstall the platform if it needs to be removed for blasting.

2- Please confirm that it is only the interior of ballast tank, Fr. 49 – Fr. 54 that is being blasted and not the void spaces outboard of this tank within the same frames?

Only the tank shall be blasted, not the void spaces outboard the tank.

3- Is there any reason for not a call out for [Wartsila Defense Inc] inspecting/changing the shaft seals?

The vessel no longer uses Wartsila seals

4- Please re-confirm that a wage determination is for required for repair and maintenance contract? please provide WD for New London County, Connecticut.

Yes, it is required. Wage determination for requested location is not available in beta.sam.gov. A request will be submitted to Department of Labor once information is received it will be included in solicitation or prior to contract award if awardee is from the requested region.