QA Amendment 0003.pdf

PDF 72 KB Posted

Attached to
MDC 3339 Gelberman Overhaul
Solicitation number
W912BU21Q0015
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A MDC 3339 Gelberman Overhaul

W912BU21Q0015

April 29, 2021

1. Will the deck plate for the hinges that need replaced, also require replacement under Work Item

1.15? If the deck plate also requires replacement, will the plate be GFE, or will this plate be CFE?

The deckplate will need to be replaced and will be provided as GFE.

2. Will the Lines Plan in the drawing package be available in a CAD file? These lines are needed to develop the block offsets in the for the blocking plan.

No. The Lines Plan drawing is unavailable as a CAD file.

3. Are the reduction gears’ bell housings mounted to the engines or is the flex coupling independent of the gears?

The reduction gears’ bell housings are mounted to the engines.

4. Are the reduction gears and engines on any shims or epoxy?

There are no apparent shims or epoxy.

5. Are the engines currently hard mounted or on resilient mounts?

The main engines are hard mounted.

File details come from the government source that posted it. Updated .