ATTACHMENT 2- Quote Form and Price Schedule.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
MDC 3339 Gelberman Overhaul
Solicitation number
W912BU21Q0015
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quote Form

MDC 3339 Gelberman Overhaul
W912BU21Q0015
Date:
Company Name:
Company POC:
Address:
Telephone No.:
Cage Code:
DUNS:
FAR 52.212-3 or FAR 52.212-3(b) Included:
The contractor shall provide the place of contract performance (Shipyard name and address):
*Master Agreement For Repair and Alteration of Vessels Contract Number:
Additional Requirements:
a) FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (OCT 2020)
b)FAR 52.204-26 Covered Telecommunications Equipment or Services--Representation (OCT

2020)

c) Clause FAR 52.209-7(b) Fill-In:
*Price Schedule Sheet Completed:
Quote Valid:*90 Days
*(1)- OR shall be capable of entering into such agreement in accordance with DFARS SUBPART 217.71--MASTER AGREEMENT FOR REPAIR AND ALTERATION OF VESSELS. DFARS 217.71 clauses are hereby incorporated in full force and effect.
*(2) The offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.
Pre-quote vessel inspection available. SOW pages 2-3

**Worksheets are protected. Contractors shall input data in unlocked cells**

Price Schedule

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 General Contract Requirements (SW-1 to SW-6 & SC-1 to SC-17) Sub-Total XXXXX $ - 0

0002Hull RepairsSub-TotalXXXXX$ - 0
0002AHull Repairs - Definite ItemsSub-TotalXXXXX$ - 0
0002AADry Docking (TP 1.01)1Lump Sum$ - 0$ - 0
0002ABGas Freeing Compartments (TP 1.02)1Lump Sum$ - 0$ - 0
0002ACHull Plugs (TP 1.03)1Lump Sum$ - 0$ - 0
0002ADExterior Cleaning and Painting (TP 1.04)1Lump Sum$ - 0$ - 0
0002AEInterior Cleaning and Painting (TP 1.05)1Lump Sum$ - 0$ - 0
0002AFKeel Cooler (TP 1.06)1Lump Sum$ - 0$ - 0
0002AGReplace Crane Power Unit Keel Cooler (TP 1.07)1Lump Sum$ - 0$ - 0
0002AHSea Chest (TP 1.08)1Lump Sum$ - 0$ - 0
0002AIZinc Anodes (TP 1.09)1Lump Sum$ - 0$ - 0
0002AJCleaning of Fuel Tanks (TP 1.10)1Lump Sum$ - 0$ - 0
0002AKFresh Water Tank Cleaning (TP 1.11)1Lump Sum$ - 0$ - 0
0002ALCompanion Way Epoxy Floor (TP 1.12)1Lump Sum$ - 0$ - 0
0002AMCompanion Way Fire Stations (TP 1.13)1Lump Sum$ - 0$ - 0
0002ANPilout House Window Removal1Lump Sum$ - 0$ - 0
0002AODeck Plate Hinge Replacement1Lump Sum$ - 0$ - 0
0002APFuruno Upgrade1Lump Sum$ - 0$ - 0
0002AQElectronic Charting System1Lump Sum$ - 0$ - 0
0002BHull Repairs - Indefinite ItemsSub-TotalXXXXX$ - 0
0002BASteelwork (TP 1.18)10,000Lbs$ - 0$ - 0
0002BBWelding Seams (TP 1.19)1,000Lin - Ft$ - 0$ - 0
0002BDBilge Water Disposal (TP 1.20)1,000Gal.$ - 0$ - 0
0002BEGas-Freeing Compartments (TP 1.21)6Compartments$ - 0$ - 0
0002BGAdditional Audio-Gauging Requirements (TP 1.22)500Shots$ - 0$ - 0
0002BHReplacement of Docking Plugs (TP 1.23)6Plugs$ - 0$ - 0
0002BIBolted Manole Replacement (TP 1.24)1Lump Sum$ - 0$ - 0
0002BJFabricate 2 Rudders (TP 1.25)2Rudders$ - 0$ - 0
0002BKCO2 Bottle Removal (TP 1.35)1Lump Sum$ - 0$ - 0
0002BLPaint and Blast #6 (TP 1.27)1Lump Sum$ - 0$ - 0
0002BMEngine Room Painting (TP 1.28)1Lump Sum$ - 0$ - 0
0002BNAdditional Hull Anode Remove (TP 1.29)50Anode$ - 0$ - 0
CLINDESCRIPTIONQUANTITYUNITUNIT PRICEAMOUNT
0003Machinery RepairsSub-TotalXXXXX$ - 0
0003AMachinery Repairs - Definite ItemsSub-TotalXXXXX$ - 0
0003AARudders (TP 2.01)1Lump Sum$ - 0$ - 0
0003ABRudder Stock Bearings (TP 2.02)1Lump Sum$ - 0$ - 0
0003ACPropellers and Propellor Shafts (TP 2.03)1Lump Sum$ - 0$ - 0
0003ADSea Valves (TP 2.04)1Lump Sum$ - 0$ - 0
0003AEDeck Vents (TP 2.05)1Lump Sum$ - 0$ - 0
0003AFPropellers (TP 2.06)1Lump Sum$ - 0$ - 0
0003AGReplace Aft Capstan (TP 2.07)1Lump Sum$ - 0$ - 0
0003AHBearing Ring Guards (TP 2.08)1Lump Sum$ - 0$ - 0
0003AIHydraulic Power Unit Removal (TP 2.09)1Lump Sum$ - 0$ - 0
0003AJHydraulic Power Unit Install (TP 2.10)1Lump Sum$ - 0$ - 0
0003AKCrane HPU Exhaust Piping (TP 2.11)1Lump Sum$ - 0$ - 0
0003ALReplace Sink Drain Piping (TP 2.12)1Lump Sum$ - 0$ - 0
0003AMReplace Potable Water Piping (TP 2.13)1Lump Sum$ - 0$ - 0
0003ANRemove AC Pump Lines (TP 2.14)1Lump Sum$ - 0$ - 0
0003AOReduction Gear Overhaul (TP 2.15)1Lump Sum$ - 0$ - 0
0003APPort Steering Gear Ram (TP 2.16)1Lump Sum$ - 0$ - 0
0003AQConvert Lights in the Engine Room (TP 2.17)1Lump Sum$ - 0$ - 0
0003BMachinery Repairs - Indefinite ItemsSub-TotalXXXXX$ - 0
0003BAPropellers (TP 2.18)2Propellers$ - 0$ - 0
0003BBPropeller Shafts (2.19)2Shafts$ - 0$ - 0
0003BCPropeller Shaft Bearings (TP 2.20)4Bearings$ - 0$ - 0
0003BDEpoxy Shaft Bearing Liners (TP 2.21)2Liners$ - 0$ - 0
0003BEPropulsion System Alignment (TP 2.22)2Alignments$ - 0$ - 0
0003BFRenewal of Deck Vent Stems3Stems$ - 0$ - 0
0003BGRenewal of Deck Vents3Vents$ - 0$ - 0
0003BHRudder Stocks (TP 2.25)2Rudder Stocks$ - 0$ - 0
0003BIRudder Stock Bearings (TP 2.26)2Bearings$ - 0$ - 0
0003BJAdditional Sea Valves8Valves$ - 0$ - 0
0003BKSea Valves Replacement2Valves$ - 0$ - 0
0003BKFuel2500Gal.$ - 0$ - 0
CLINDESCRIPTIONQUANTITYUNITUNIT PRICEAMOUNT
0004Miscellaneous RepairsSub-TotalXXXXX$ 25,000.00
0004AMiscellaneous Repairs - Indefinite ItemsSub-TotalXXXXX$ - 0
0004AAMiscellaneous Work (TP 3.01)*1Lump Sum$ 25,000.00$ 25,000.00

TOTAL (CLINs 0001 - 0004) Total XXXXX $ 25,000.00

* Not to Exceed $25,000.00

The Government may reject a quote as non-responsive if it is materially and mathematically unbalanced as to price for any item or combination of items. Unbalanced means when prices are significantly less than cost for some work and prices, which are significantly overstated for other work.

**Worksheets are protected. Contractors shall input data in unlocked cells**

File details come from the government source that posted it. Updated .