ATT0053 CDRL TS25 EIP.pdf

PDF 109 KB Posted

Attached to
TOTAL ENGINEERING and INTEGRATION SERVICES-TEIS IV Federal contract opportunity
Solicitation number
W9128Z-20-R-0001
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This document package includes a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity.

The CDRL outlines technical requirements for an Engineering Installation Package (EIP) to be delivered under the contract. It specifies that EIPs shall include sections on general project information, installation team responsibilities, points of contact, and appendices with details such as installation steps, materials lists, drawings, and additional site-specific documentation. Requirements include page headers, formatting in Microsoft Word, and delivery of draft and final versions according to the project notification form.

The federal contract opportunity is for Total Engineering and Integration Services to support the United States Army Information Systems Engineering Command. Services will cover all aspects of information and communication systems from planning through retirement, including engineering, implementation, logistics, testing, and sustainment worldwide. Support may be required in challenging and sometimes hostile locations with infrastructure limitations. Work involving high-level security clearances and within highly secure facilities may also be included.

View the file

Other files for this federal contract opportunity

Other files attached to TOTAL ENGINEERING and INTEGRATION SERVICES-TEIS IV, newest first.
File Type Posted
W9128Z20R0001-0003.pdf PDF
W9128Z20R0001-0002.pdf PDF
ATT0064 REVISED 2 CONUS High CONUS OCONUS Labor Rates.xlsx XLSX spreadsheet
ATT0064 REVISED CONUS High CONUS OCONUS Labor Rates.xlsx XLSX spreadsheet
ATT0063 REVISED Past Performance Questionnaire.pdf PDF
ATT0010 REVISED 2.5 item f USAISEC CyberSecurity Assessment and CE Eng Manual V2.1.1.pdf PDF
W9128Z20R0001-0001.pdf PDF
ATT0037 REVISED ST-1 CDRL SE008 Post Deployment Meeting.pdf PDF
ATT0019 TEIS IV - REVISED Labor Category Descriptions.pdf PDF
All final Q and A.xlsx XLSX spreadsheet
ATT0036 CDRL SE007 Out-Brief.pdf PDF
ATT0058 CDRL TS30 System Design Plan (SDP).pdf PDF
ATT0003 2.5 item b 18-035 USAISEC Drafting Guide Final 24 Apr 18.pdf PDF
FINAL SOLICITATION W9128Z20R0001.pdf PDF
ATT0065 Small Business Participation Commitment Document (SBPCD).pdf PDF
ATT0002 2.5 item a ISEC OPSEC Plan 2017.pdf PDF
ATT001 TEIS IV PWS.pdf PDF
ATT0046 CDRL SE018 POAM.pdf PDF
ATT0039 CDRL SE011 eMASS upload-download.pdf PDF
ATT0006 2.5 item e 13-033-1 Instructional Guide for Developing EIPs-Final_4JUN13.pdf PDF
ATT0041 CDRL SE013 Data Analysis Work Products.pdf PDF
ATT0055 CDRL TS27 Systems Acceptance Test Plan.pdf PDF
ATT0034 CDRL SE005 In-Brief.pdf PDF
ATT0032 CDRL SE003 Pre Deployment Meeting.pdf PDF
ATT0022 1.6.1A_ESS Network HW-SW List.xlsx XLSX spreadsheet
ATT0074 DD254 Appendix B- Army Handbook for SCI Contracts.pdf PDF
ATT0059 Sample Task-Technologies.pdf PDF
ATT0070 DD254 Appendix B- ICD-503.pdf PDF
ATT0071 DD254 Appendix B- ICD-704.pdf PDF
ATT0063 Past Performance Questionnaire.pdf PDF
ATT0030 1.6.3C_NC Ports and Protocols List.xls XLS spreadsheet
ATT0017 CDRL A007.pdf PDF
ATT0016 CDRL A006.pdf PDF
ATT0049 CDRL SE022 SCAR.pdf PDF
ATT0023 1.6.1B_ESS Network Diagram.pdf PDF
ATT0073 DD254 Appendix B- DoDM 5105 Vol 1.pdf PDF
ATT0072 DD254 Appendix B- IC Tech Spec-for ICD_ICS 705.pdf PDF
ATT0011 CDRL A001.pdf PDF
ATT0008 2.5 item j I3A Technical Criteria (for OSP Only) November 2017.pdf PDF
ATT0037 CDRL SE008 Post Deployment Meeting.pdf PDF
ATT0052 CDRL TS24 Site Survey Report.pdf PDF
ATT0048 CDRL SE021 Risk Calculator.pdf PDF
ATT0062 Past Performance Information Summary (PART B).pdf PDF
ATT0061 Past Performance Reference List (PART A).pdf PDF
ATT0056 CDRL TS28 Installation Schedule.pdf PDF
ATT0068 Cochise County AZ WD 2015-5719 rev8.pdf PDF
ATT0024 1.6.1C_ESS Ports and Protocols List.xls XLS spreadsheet
ATT0057 CDRL TS29 Trip Report.pdf PDF
ATT0025 1.6.2A_ITV HW-SW List.xlsx XLSX spreadsheet
ATT0060 CDRL TS08 Facility Wiring Design Criteria (FWDC).pdf PDF
Show all 50

TOTAL ENGINEERING and INTEGRATION SERVICES-TEIS IV has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: TS25
title: Engineering Installation Package (EIP)
sub:
auth: N/A
ref: Sample Task 2 para 3.1.1.2, 3.2.3
req_ofc: HQUSAISEC ELIE-ISE-TS
dd250:
appcode:
dist:
freq:
asof:
firstsub:
subsub:
addressee1: TM
draft1: 1
reg1: 1
repro1:
addressee2: COR
draft2: 1
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 2
total_reg: 2
total_repro: 0
remarks: Date of first and subsequent submissions: As specified in the Government issued Project Notification (PN) Form.

Engineering Installation Packages (EIP) shall be developed in accordance with this CDRL. EIPs (draft and final) shall be delivered as specified in the Project Notification (PN) form. Delivery of the FINAL EIP shall be 5 days after receipt of comments from the Governent. If comments are not provided within 10 business days following delivey of the DRAFT EIP, the DRAFT will become the FINAL deliverable. Note that depending on the scope of the project, more than one draft may be required.

All EIPs shall be developed in Microsoft Word using 12 pt. Arial font. Each page of the EIP shall have a header that shows the EIP number and the date of the EIP. The EIP shall contain the following information:

Cover sheet: The cover sheet shall contain the following:

- Project title

- Date of EIP

- Disclaimer

- Directorate and command supported

- Signature block of the of the designated signing official Disclaimer, Changes, and Disposition Instructions Page Section 1: General Information. Identifies what information is contained in the EIP, the project to be supported, and a brief listing of the equipment to be installed.

Section 2: Installation Team Responsibilities. Identifies the installation team responsibilites.

Section 3: Points of Contact. Provides POC information for the following:

- Government point of contact

- O&M command point of contact Section 4: List of Appendices. Provides a list of appendices incuded in the EIP. The appendices include information required in order to complete the implementation. Typical appendices are as follows:

Appendix A: Installation Steps and Instructions. This appendix provides specific information on where the equipment will be installed and provides a recommended sequence to be followed in order to minimimize operational impact to the site. If specific installation tasks need to be completed in support of a scheduled Authorized Systems Interruption (ASI), these tasks shall be clearly identified along with the date by which they must be compleded.

Appendix B: Major Item Bill of Materials (MIBOM) Packing List. This appendix shall include a complete listing (per the project managers packing list) of what equipment will be installed.

group:
total_price:
prep_name: GOVERNMENT
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat:
system:
ctr_no:
contr:
remarksb: Appendix C: List of Materials (LOM). This appendix shall include a complete listing of the materials required to install the MIBOM.

Appendix D: Project Concurrence Memorandum (PCM). This appendix shall contain the PCM that was distributed in support of this installation effort.

Appendix E: Cable Running List (Intra-Rack): This appendix shall contain the cable running list for all intra-system cables Appendix F: Cable Running List (Inter-Rack): This appendix shall contain the cable running list for all inter-system cables Appendix G: Rack Elevations: Includes the rack elevations of all racks to be installed.

Appendix H: Standard drawings: Includes all standard drawings required to support the installation. This may include the following:

- Rack installation drawings

- Cable fabrication drawings

- Cable ladder installation drawings

- Unistrut installation drawings

- Other standard drawings, as required Appendix I: Site Specific Drawings: This appendix shall include site specific drawings which shall aid in the installation and may include the following:

- Floor plans

- System diagrams

- Power diagrams

- Ground system diagrams Appendix J: Additional Appendidices as required to aid in completion of the installation.

NOTE: If one of the listed appendices is not required, it will be skipped and all subsequent appendices renumbered accordingly.

Method of delivery: One (1) soft copy of the report shall be submitted to the Technical Monitor (TM) and Contracting Officer’s Representative (COR) via e-mail. The report shall be fully identified and referenced in the subject line of the email message. The document shall not be locked or protected in any fashion that would prevent text to be copied or edited by the Government after delivery.

Page2: 2
Reset:
prep_date:
app_by:
app_date:
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .