This document is a solicitation for the "Joint Recruiting Facilities Program Bullet-Resisting Panels" issued by the U.S. Army Corps of Engineers, Omaha District. The solicitation is a small business set-aside for the manufacturing, shipping, delivery, and installation of bullet-resisting panels certified to UL-RF-H or Legacy UL Level 8 for approximately 170 recruiting facilities located both in the Continental United States (CONUS) and Outside the Continental United States (OCONUS). The contractor will be responsible for coordinating with the facilities and executing the shipping, delivery, and full installation as prescribed. The solicitation closes on September 6, 2024, and the period of performance is 1.5 years from the date of contract award. The North American Industry Classification System (NAICS) code is 337215 - Showcase, Partition, Shelving, and Locker Manufacturing, with a size standard for Small Business of 500 employees.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F24Q0070 Amd001.pdf | ||
| Attachment 2 - Ballistic Panels_MASTER LIST 2024_priorities_2 July 24.xlsx | XLSX spreadsheet | |
| Attachment 6 - Past Performance PPQ.pdf | ||
| W9128F24Q0070 Questions and Answers.docx | DOCX document | |
| Attachment 2 - Ballistic Panels_MASTER LIST 2024.xlsx | XLSX spreadsheet | |
| Attachment 2 - Revised Ballistic Panels_MASTER LIST 2024.xlsx | XLSX spreadsheet | |
| Attachment 4 - Example Floorplan of a Recruiting Office.pdf | ||
| Attachment 6 - Past Performance PPQ.pdf | ||
| Attachment 1 - Example Pictures of Panels.pdf | ||
| Attachment 2 - Revised Ballistic Panels_MASTER LIST 2024_priorities_current pricing.xlsx | XLSX spreadsheet | |
| Attachment 5 - Bullet-Resistant Panel Feet Examples.pdf | ||
| Attachment 3 - UL Ratings for Bullet-Resisting Materials.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9128F24Q0070 05-Aug-2024
b. TELEPHONE NUMBER
402-995-2668
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 06 Sep 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9128F9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
BRIANNA WOHLERS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
337215
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF41
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9128F24Q0070
Section SF 1449 - CONTINUATION SHEET
STATEMENT OF WORK (FY24)
United States Army Corps of Engineers Jo int Recruiting Facilities Program
Bullet-Resisting Panels Solicitation W9128F-24-Q-0070
1.1 Introduction. The Joint Recruiting Facilities Program (JRFP) has a requirement to provide bullet-resisting capability for the work spaces inside all identified Military Services (Services) recruiting offices or other government specified locations. Bullet-resisting capability signifies that protection is provided against complete penetration, passage of fragments of projectiles, or spalling [fragmentation] of the protective material, to the degree that injury would not occur to a person standing on the opposite side of the bullet-resisting barrier (from either side of the barrier). The Services are comprised of the following: 1) Air Force; 2) Air Force Reserve; 3) Air National Guard; 4) Army; and 5) Marines. The bullet-resisting capability required shall be met with the procurement of bullet-resisting panels certified as UL-RF-H or Legacy UL Level 8, under standard 752 of the American National Standards Institute (ANSI)/Underwriters Laboratories (UL), “Bullet-Resisting Equipment,” to be installed up against existing cubicles, walls or in open areas. To establish uniformity and continuity of appearance and maximize the use of space for all recruiting Services facilities, the required bullet-resisting panels shall have fabric (on both sides), trim, and design features complementary of the existing cubicles. Note: Each Service has identified the appropriate fabric/trim colors to match their internal office colors.
Definitions:
Panel: For the purposes of this document, the term “panel” refers to the bullet-resisting panels certified as UL-RF- H or Legacy UL Level 8, under standard 752 of the ANSI/UL. No reference to the term “panel” in this statement of work is intended to be defined as anything other than a bullet-resisting panel. Each panel type/unit will be comprised of individual “panel sections”.
Location: For the purposes of this document, the term “location” refers to a leased location with an address.
Facility: For the purposes of this document, the term “facility” refers to an individual Services space at a location.
The number of facilities at a location will vary from 1 to potentially 7 and may not be in contiguous space at the location.
1.2 Background. The JRFP has initiated steps to improve security of recruiting facilities. The JRFP intends to utilize freestanding ballistic panel cubicle wall partitions to go around the exterior of the current cubicle workstations, desks or open areas in order to provide increased protection to recruiters within most off-military installation recruiting facilities. It is necessary to have a means of providing the Services facilities protection within the workplace from the outside or entering threat (from the front or rear). It is also necessary that, the panels are to have a standardized appearance within all Services facilities. The panel’s colors for each Service has been identified to match their existing color scheme in order to maintain the current office branding. The intent is to establish uniformity and continuity of appearance between all Services, maximize the use of space for all Services recruiting facilities, and provide a seamless appearance of the panels. Each Service’s recruiting facility refers to a single Service space at a given location. Most locations will have several Service facilities at a location.
For example: A location might have 4 Services present (Army, Air Force, Navy, and Air Force Reserve). Each Service (Army, Air Force, Navy, and Air Force Reserve) at this location has their own exclusive use space facility.
2.0 Objectives. The objective of this contract is to provide panels to all identified Services off-military installation recruiting offices, located throughout the United States and its territories, which are UL-RF-H or Legacy UL Level 8 certified, approved, and produced. The contractor will be responsible for coordinating with all of the Services facility locations, to execute shipping, delivery, and full installation as prescribed. The contractor shall complete these tasks while meeting the standards of safety, durability, dimensions, ergonomics, and structural adequacy of the new panels.
3.0 Scope. The JRFP identified a need for the manufacturing, shipping, delivery, and installation of panels for all identified Services off-installation recruiting offices, located throughout the United States and its territories. These facilities are in CONUS & OCONUS locations. This requirement entails approximately 170 facilities, with the potential for minor additions and deletions throughout the term of the contract. The Government will provide the estimated quantities that are required at each location. An initial “master facilities” listing with locations and estimated quantities are included in Attachment 2. In accordance with FAR 52.211-16, Variation in Quantity, the amount of ballistic panels may change with the prescribed tolerance located in the referenced clause. Every effort will be made to identify the exact number of panels and minimize any deviation, but the winning bidder should expect some variation and plan accordingly. Some variation in delivery locations is anticipated in terms of delivery address within a location, however, locations will not change without amendment/modification.
4.0 Contractual Method. The Government expects an award of a stand-alone SB set-aside commercial RFQ with evaluation factors. Metropolitan Statistical Area (MSA) priority ranking order is provided as part of Attachment 2 (master Facility List). Delivery dates in MSA priority order to be proposed by the by the contractor, and approved by the Government following MSA priority Ranking identified in column F of the Master Facility List. However, the 100% completion date is no later than 1.5 years from contract award. Government reserves the right to modify the MSA priority ranking on an individual facility/location basis due to emerging threats/conditions.
5.0 Requirements. The contractor shall produce panels that are UL-RF-H or Legacy UL Level 8 certified. To include shipping, delivery, installation, and warranty, as prescribed below.
5.1 Individual Panel Sections & Overall Panel Sizes within Separate CLIN Structures. The contractor is responsible for the production of UL Level 8 panels. Panels are defined within one of the ‘Types’ listed below. The “L” shaped or straight panel systems will be comprised of different overall sizes as listed below. Multiple panel sections or sizes is suggested to keep the weight of each section so that it can moved by an average individual.
Target weight of each section should be less than 175 pounds. There may be situations where a freestanding panel will be needed that is NOT in an “L” shape, but a straight overall panel only. The panels are broken down into Structure Types and by “L” shaped or straight panels. The Structure Type quantities are also listed in the master facilities list in Attachment 2. However, within each of the overall “L” shaped panel unit sizes, there are individual panel section sizes that fit together to create the required overall panel unit sizes. The fewest number of individual cubicle panel sections are to be used to minimize the number of panel connections and maximize ballistic protection. An example floorplan for a recruiting office is provided as Attachment 4 (EACH location will be unique). Attachment 1 shows an example diagram and pictures of the expected matching look and design of the cubicle panels. The diagram provided in Attachment 1 also shows an example of the individual cubicle panel section dimensions along with example pictures. These dimensions are listed as follows:
5.2 Individual Panel Sections Structure:
i. Suggested Individual Panel Section Sizes for 48” High Solution:
a) 48 inches high x 36 inches wide
b) 48 inches high x 30 inches wide
c) 48 inches high x 28 inches wide
d) 48 inches high x 36 inches wide (return)
ii. Length may have a variance of plus or minus two (2) inches, and width a variance of ½ an inch.
Overall Panel Unit Size Structure as follows:
Type 1:
Bullet-resisting Freestanding Panels – Type 1 (Straight Cubicle Wall and Side Return) Overall Dimensions: Front Panel = 100 inches wide x 48 inches high Return Panel = 36 inches wide x 48 inches high Panel Structure i = a, a, c & d Panels shall be installed freestanding up against the exterior of existing cubicle walls, against permanent walls or stand alone to provide 100% UL-RF-H or Legacy UL Level 8 coverage. Panel units (100 inches wide x 48 inches high) not to exceed three panels across the front along with a side return panel (36 inches wide x 48 inches high).
Length may have a variance of plus or minus two (2) inches, and width a variance of ½ an inch. For cubicles wider than 100 inches, panels shall only cover up to 100 inches in length measured from the corner joints.
Type 2:
Bullet-resisting Freestanding Panels – Type 2 (Straight Cubicle Wall and Side Return) Overall Dimensions: Front Panel = 84 inches wide x 48 inches high Return Panel = 36 inches wide x 48 inches high Panel Structure i = c, c, c & d Panels shall be installed freestanding up against the exterior of existing cubicle walls, against permanent walls or stand alone to provide 100% UL-RF-H or Legacy UL Level 8 coverage. Panel units (84 inches wide x 48 inches high) not to exceed three panels across the front along with a side return panel (36 inches wide x 48 inches high).
Length may have a variance of plus or minus two (2) inches, and width a variance of ½ an inch.
Type 3:
Bullet-resisting Freestanding Panels – Type 3 (Straight Cubicle Wall and Side Return) Overall Dimensions: Front Panel = 72 inches wide x 48 inches high Return Panel = 36 inches wide x 48 inches high Panel Structure i = a, a & d Panels shall be installed freestanding up against the exterior of existing cubicle walls, against permanent walls or stand alone to provide 100% UL-RF-H or Legacy UL Level 8 coverage. Panel units (72 inches wide x 48 inches high) not to exceed two panels across the front along with a side return panel (36 inches wide x 48 inches high).
Length may have a variance of plus or minus two (2) inches, and width a variance of ½ an inch.
Type 4:
Bullet-resisting Freestanding Panels – Type 4 (Straight Cubicle Wall and Side Return) Overall Dimensions: Front Panel = 60 inches wide x 48 inches high Return Panel = 36 inches wide x 48 inches high Panel Structure i = b, b & d Panels shall be installed freestanding up against the exterior of existing cubicle walls, against permanent walls or stand alone to provide 100% UL-RF-H or Legacy UL Level 8 coverage. Panel units (60 inches wide x 48 inches high) not to exceed two panels across the front along with a side return panel (36 inches wide x 48 inches high).
Length may have a variance of plus or minus two (2) inches, and width a variance of ½ an inch.
Type 5:
Bullet-resisting Freestanding Panels – Type 5 (Straight Cubicle Wall Only) Overall Dimensions: Front Panel = 100 inches wide x 48 inches high Panel Structure i = a, c & a Panels shall be installed freestanding up against the exterior of existing cubicle walls, against permanent walls or stand alone to provide 100% UL-RF-H or Legacy UL Level 8 coverage. Panel units (100 inches wide x 48 inches high) not to exceed three panels across. Length may have a variance of plus or minus two (2) inches, and width a variance of ½ an inch.
Type 6:
Bullet-resisting Freestanding Panels – Type 6 (Straight Cubicle Wall Only) Overall Dimensions: Front Panel = 84 inches wide x 48 inches high Panel Structure i = c, c & c Panels shall be installed freestanding up against the exterior of existing cubicle walls, against permanent walls or stand alone to provide 100% UL-RF-H or Legacy UL Level 8 coverage. Panel units (84 inches wide x 48 inches high) not to exceed three panels across. Length may have a variance of plus or minus two (2) inches, and width a variance of ½ an inch.
Type 7:
Bullet-resisting Freestanding Panels – Type 7 (Straight Cubicle Wall Only) Overall Dimensions: Front Panel = 72 inches wide x 48 inches high Panel Structure i = a & a Panels shall be installed freestanding up against the exterior of existing cubicle walls, against permanent walls or stand alone to provide 100% UL-RF-H or Legacy UL Level 8 coverage. Panel units (72 inches wide x 48 inches high) not to exceed two panels across. Length may have a variance of plus or minus two (2) inches, and width a variance of ½ an inch.
Type 8:
Bullet-resisting Freestanding Panels – Type 8 (Straight Cubicle Wall Only) Overall Dimensions: Front Panel = 60 inches wide x 48 inches high Panel Structure i = b & b Panels shall be installed freestanding up against the exterior of existing cubicle walls, against permanent walls or stand alone to provide 100% UL-RF-H or Legacy UL Level 8 coverage. Panel units (60 inches wide x 48 inches high) not to exceed two panels across. Length may have a variance of plus or minus two (2) inches, and width a variance of ½ an inch.
5.3 Design. ALL required panels are to include (but not limited to): fabric on both sides of the panels, connection joints, feet, trim, caps, rails, clamps, tracking, joints, and/or connectors with panel variations of 2.5 inches in thickness/width, plus or minus 0.5 inches.
5.3.1 Ultra Violet (UV) Light. The panels shall be protected from degradation due to UV light or other environmental factors. In the case of the bullet-resistant panels being degraded by UV light, the panels shall have a UV inhibitor applied/inserted into the overall panel. The UV inhibitor may be a completely opaque material applied on all sides of the panels, or may be comprised of a thin solid material sheets (sealed if necessary) that does NOT allow light transfer / penetration of UV rays to reach the bullet-resistant panels. This inhibitor shall deny any exposure of the panels to UV light that will allow the panels to remain 100% effective into the future. The panels shall remain 100% effective as long as they are being used in the future without degradation from environmental factors. The contractor shall provide a panel unit that provides continuous 100% UL-RF-H or Legacy UL Level 8 coverage for ALL panel sections/panel units. It is the contractor’s responsibility to develop a design that provides the level of coverage required.
5.3.2 Length. Length may have a variance of plus or minus two (2) inches, and width a variance of ½ an inch. The height of the panel units must equal 48 inches, with a variance of plus or minus ½ an inch.
5.3.3 Multiple Panel Sections. The finished product shall have a seamless appearance within the workplace as if it were a standard office cubicle wall. If comprised of multiple panel sections (not to exceed specified panel sections across the front/straight side – see CLIN 0001 thru 0008 for additional information), panels shall be joined together prior to installation. The contractor shall provide a panel unit that provides continuous 100% UL-RF-H or Legacy UL Level 8 coverage for ALL panel sections / panel units. It is the contractor’s responsibility to develop a design that provides the level of coverage required. If applicable, contractor shall also provide ALL necessary special tools for panel unit assembly to EACH Service facility along with the panels for future flexibility and office relocations.
5.3.3.1 Panel Units. The panel units, when installed, shall sit flush to the floor, and as level as is practicable considering environmental factors at the location. Trim shall be covering any gaps between the panel and the floor to present a seamless appearance. The panel shall be self-supportive, secure and plumb, and shall resist a range of 80 to 100 pounds of force applied laterally at the top of the panel without tipping or falling over. They shall be capable of absorbing the impact of munitions up to their ballistic rating without collapse not withstanding acts of God.
5.3.3.2 Panel Feet. If feet are necessary for panels, they shall be as minimal as possible, have an ergonomic appearance, and not obstruct the walkway. Wheels or casters will not be acceptable as feet. Feet shall not extend more than twelve (12) inches from the panel to ensure safety within the workplace. Feet shall be as unobtrusive as possible, minimizing trip hazards. They should be flat on one side, not to exceed ¼ of an inch in thickness [to meet Americans with Disabilities Act (ADA) standards] and shall extend no more than 12 inches from the panel giving the capability to slide the panel under a desk or possibly another existing cubicle wall.
Feet shall be as thin as practicable while still providing adequate stability and support. Feet shall be independently removable to allow maximum mobility and installation options in the event the panels need to be installed up against a wall or in an open area in the office as a stand-alone. See Attachment 5 for examples of feet envisioned, but not required, by the Government. The contractor may suggest other panel feet alternatives that will meet the criteria, flexibility and stability characteristics described above.
5.3.3.3 Panel Unit Walls. Contractor shall design the front of the cubicle and side return to ensure full coverage.
If the bullet-resisting coverage of the panel unit is comprised of multiple panel sections, the design for 100% coverage shall not exceed the specified number of panel sections. Specifics on maximum number of panel sections is contained within each CLIN. For ALL panel unit walls, there shall be no gap in bullet-resisting coverage;
therefore, as addressed in 5.1.3, split panels shall be connected with full UL-RF-H or Legacy UL Level 8 material and certified in accordance with ANSI/UL 752, “Bullet-Resisting Equipment”.
CLIN 0001 through 0004 shall have panel sections across the front which connect to another panel section that will serve as a return, forming an “L shape” panel unit. The corner connection to form the “L” shaped panel unit and front straight wall shall not leave a gap in UL Level 8 coverage. The panel unit design shall be compatible with an “L” shaped cubicle workspace with a return wall that is oriented on the left or right. Installation by contractor will attach on the left or right based on the office layout. For panel Types 5 through 8, the connections between panel sections shall not leave a gap in UL-RF-H or Legacy UL Level 8 coverage. The design shall enable easy installation/connection for the L shape and front/straight panel sections. Every effort should be used to conceal bolts or other fasteners if they are used to connect corner sections.
5.3.3.4 All panel units shall provide UL-RF-H or Legacy UL Level 8 coverage from the front and back. The direction of fire is not always from the front or from the back. The threat could come from either or both directions.
5.3.3.5 All panel system sections that comprises the larger panel unit system shall NOT exceed the weight of 180 pounds (representative of a standard two-person lift plus 10% upward adjustment). The overall panel unit design shall have the capability to be easily uninstalled, moved, and reinstalled without the use of a certified/professional installer.
5.4 Bullet-Resisting Material. The bullet-resisting material component of the panels shall be a certified fiberglass material and equal to UL-RF-H or Legacy UL Level 8 protection level. This will maintain consistency with existing panels. In addition, the contractor shall provide a panel that mitigates ricocheting, spalling, and splattering (when attacked from either or both sides) in order to prevent secondary injuries in a confined workspace.
5.4.1 Panel Frames. Panel Frames are to be made of metal. All other connections/trim/feet/other pieces being made of metal, plastic or fabric materials as necessary to meet the 100% UL-RF-H or Legacy UL Level 8 coverage. Exterior panel colors for each Military Service are listed below. The panel unit materials shall be protected from UV or other types of degradation (see paragraph 5.1.1 for specifics). All panel component materials shall not pose any health risks to the workspace. If the panel materials are comprised of fibers or chemicals that vent, the materials and/or panels shall be coated to prevent venting. Avoid the use of harmful Volatile Organic Compound (VOC’s) in the production of the panels. Any material that is susceptible to moisture retention shall be coated to prevent mold or mildew. Entire panel assemblies shall be one hour fire rated to American Society for Testing & Materials (ASTM) E84 or UL 723 and the fabric to National Fire Protection Association (NFPA) 265.
5.5 Fabric & Other Exposed Panel Materials. In order to maintain seamless appearance and maintain the Services office branding, the panels shall have fabric, any necessary trim, caps, rails, clamps, tracking, joints, connectors, etc. in accordance with fabric and trim colors listed in the table below. Manufacturer, style and color information is provided to maintain consistency with existing panels, establish design intent or basis of design, and is not intended to limit the selection of equal products from other manufacturers. Equivalent manufacturer's product may be submitted for consideration/ approval.
The table below provides color selections for each Service to the contractor for use in the production of the panels once the final manufacturer is identified. The colors identified in the table are placeholders until the actual manufacturer is identified by the contractor, and colors are selected / approved by the Government. Panel fabric shall be Design Tex, Gamut or equal. Fabric shall cover both sides of the panel units and include the capability to use push pins (with a minimum of ¼ inch pin insertion depth) on both sides, with a tackable core under the fabric that is completely opaque to light. Trim shall be equal in color to Sherwin Williams, Mega Greige, SW 7031 for all panels.
Construct panel so finished product looks like a standard workstation panel. Panel system fabric, trim / connections, glues or adhesion methods used on the fabric or otherwise, shall meet warranty requirements.
Service
Fabric Color
Trim/Connections Color
Manufactur er
Style Name
Number
Manufacturer
Name
Number
Air Force
Equal to:
Design
Tex
Gamut
3468-407
Sherwin Williams
Mega Greige
SW 7031
Air Force Reserve
3468-407
Air National Guard
3468-407 Equal to:
Army
3468-803 Equal to:
Marine Corps
T
3468-408 Equal to:
5.6 100% UL-RF-H or Legacy UL Level 8 Coverage. All necessary trim, caps, rails, clamps, tracking, joints, and/or connectors shall not interfere with the bullet-resisting capabilities of the panels and 100% UL- RF-H or Legacy UL Level 8 coverage required. The entire cubicle panel unit (each CLIN) dimensions provided above require 100% UL-RF-H or Legacy UL Level 8 bullet-resisting coverage; therefore, any trim, caps, rails, clamps, tracking, joints, and/or connectors that fall within the stated panel dimensions need to be made of bullet-resisting materials that provide 100% UL-RF-H or Legacy UL Level 8 protection. All butt joints between panels shall be reinforced by a back-up strip (batten) of UL-RF-H or Legacy UL Level 8bullet-resisting material. Minimum width of the reinforcing batten strip at joints shall be 4 inches placed so there is a minimum 2 inch overlap on each panel. Method of panel application shall be in conjunction with Attachment 4 (panels will be installed adjacent to surfaces, junctures, walls or in open areas). Every effort should be used to conceal bolts or other fasteners if they are used to connect sections.
5.6.1 100% UL-RF-H or Legacy UL Level 8 Certification. All bullet-resisting materials must be tested and certified in accordance with ANSI/UL 752, “Bullet-Resisting Equipment” standard. All bullet-resisting material and components with bullet-resisting properties shall be tested, certified, and marked in accordance with ANSI/UL 752 standard. All bullet-resisting material and component markings shall be in accordance with the UL Security Listing Mark guidelines. Reference Attachment 3 for the Legacy UL ratings of bullet-resisting materials. Only UL-RF-H or Legacy UL Level 8 will be accepted.
5.6.2 Certification. Prior to general production the contractor must provide proof of certification (from UL) stating that all bullet-resisting materials and applicable bullet-resisting components have been tested and certified to meet bullet- resisting requirements of UL-RF-H or Legacy UL Level 8. No other certification or endorsement will be accepted. Prior to beginning production, the contractor shall submit this documentation to the Contracting Officer Representative (COR) for approval. Contractor shall construct a mock-up of the proposed panels for Government review/approval prior to general production (see paragraph 5.11 for more details on the mock-up to be provided).
Note, if the contractor does not have bullet-resisting UL certification for their proposed materials at the time of bidding they must arrange for the testing described in SOW paragraph 5.12 below prior to general production.
Shipping, Delivery, and Installation. The panels are to be shipped F.O.B. Destination. The contractor is responsible for the coordination, execution of all shipping, delivery, and installation required to satisfy the requirements of the contract (including all necessary payments). Panels shall not be delivered to delivery locations until they are assembled and ready for installation. N o t e : Delivery locations do NOT have storage space available prior to installation. Contractor shall be responsible to remove and dispose of all crating and packaging material utilized during shipping. Every effort should be made by the contractor to recycle or reuse materials utilized for packaging and shipping of panel components. Locations listed in Attachment 2 are found within CONUS & OCONUS.
5.6.3 Installation of panel units are required to start as early as practicable in accordance with the contractor’s proposed delivery schedule and 100% installation of all panel units no later than 1.5 years of contract issuance.
The priority installation ranking for each of the Services facilities can be found in Attachment 2. The contractor shall be able to complete the necessary installations within the specified installation timeframes and clearly articulate how this will be accomplished in their quote(to include at a minimum: production; shipment; delivery;
coordination; planned dates; installation and warranty repairs / replacements; etc.)
5.6.4 The contractor shall notify and coordinate with the designated COR and Military Service location receiving delivery/installation at least ten (10) working days in advance as to date and time of delivery and installation. A follow up notice shall be required forty-eight (48) hours in advance of delivery and installation as well. Product panels shall be delivered on the whole-location concept. If there are multiple Services at a given location, ALL Services will have their panels installed on the same day. If multiple days are required for installation, coordination shall be at least 10 days in advance to the delivery date, and are subject to approval from the COR.
Additional costs incurred for the second day of installation will be at the contractor’s own expense and risk. The Government requires the delivery to each location, all materials needed (no split deliveries for individual locations) so that each location is visited only once (unless warranty work is necessary). Delivery and installation is limited to Monday through Friday, except Federal Holidays. Installation shall not start prior to 0800 and shall not continue beyond 1700 local time on any given day. If installation cannot be completed in one day, approval must be sought from the COR for the second day of work, and will be at the contractor’s own expense and risk.
5.6.5 Installation of individual panel unit systems should be accomplished as quickly as possible. All installation and positioning within each Services facility / office shall be within one working day per installation location (all Services facilities) to minimize workplace disruption. If installation cannot be completed in one day, approval must be sought from the COR for the second day of work, and will be at the contractor’s own expense and risk.
5.6.6 Locations of Delivery and Installation. A complete list of facilities is located within Attachment 2 and includes CONUS & OCONUS facilities / locations. This listing will provide potential bidders better accuracy in proposing shipping, delivery, and installation prices. A price for EACH panel unit described in the first 8 CLIN’s shall include ALL costs associated with (but not limited to) manufacturing, assembly and installation, etc.
Contractor shall also provide shipping and delivery costs in accordance with the pricing bid schedule.
CONUS Locations: Consists of the 48 continental States, including the District of Columbia.
OCONUS Locations: Consists of the Alaska, Hawaii, Guam, American Samoa, Saipan, Virgin Islands, Puerto Rico, and other potential US Territories outside the 48 continental States.
5.6.7 Inventory & Reporting. For each of the identified Services facilities, the contractor shall use Attachment 2 (MASTER Facility listing) for reporting and tracking purposes. To include, but not limited to a “Look Ahead” schedule using the master facility listing. Contractor shall track panel unit quantities that are: 1) ready/scheduled for shipping; 2) shipped; 3) installation start; 4) installation completed; 5) installation issues; and 6) warranty issues by individual Service facility locations and other items determined to be applicable by the Government. Said report will be at a minimum each week to all of the USACE points of contact (listed in paragraph 7.0 below) until the contract is 100% complete. Other reporting items may be required as the contract progresses. Timetable for periodic reporting will be each week on a specified day of the week or as otherwise specified by the Government.
Other ad hoc reporting will be required as necessary to the Government, along with bi-weekly status conference calls and periodic conference calls and in person meetings to address specific issue that may arise during the execution of this contract. All information regarding this contract, schedules, look ahead schedules, master facility listings, testing data/video, databases created by the contractor, etc. shall be stored on CDs, as well as an external hard drive. Two sets of CDs and the external hard drive shall be provided to the Government upon completion of the panel installations.
5.8 Warranty. The contractor shall provide the standard manufacturer's warranty for the panels and their peripherals and shall provide the Government with details regarding the duration and breadth of coverage included in the standard warranty. Upon award, the warranty becomes enforceable as proposed by the contractor.
5.9 Government-Furnished Property (GFP). The Government will not provide services or equipment to the Contractor for this requirement.
5.10 Mock-up: One full sized mock-up of Panel Type 1 unit shall be provided within 45 days of issuance of the initial contract and prior to general production. Mock-up shall exemplify all aspects of the requirements specified throughout this statement of work. Mock-up of this panel unit shall include the ballistic material, corner brackets, fabric, trim, feet or any other piece / material necessary to be installed as if it were part of general production and to be installed at a facility. Mock-up shall include the Navy color (for fabric & trim), as identified in the award. This mock-up can be used to fulfill project requirements if it meets the standards of the statement of work and is approved by the COR. The mock-up must be delivered, fully assembled and installed by the contractor at a specified location (by the COR for evaluation by the Government. The mock-up installation shall also include the 10 day and 48 hour scheduling / coordination notices. This will allow the government to inspect, review & approve (or disapprove) the designed/constructed product prior to general production and have the contractor make any necessary adjustments. In doing so the contractor will be able to experience the entire process of the contract requirements. Contractor can glean lessons learned from this process, and implement changes for general production, shipping, delivery and installation. IMPORTANT: This mock-up review will need to be conducted within the first 45 days of the contract, with dates to be specified upon award by the COR.
5.11 Government Ballistic Testing. The Government will review the certification and testing submittals of the contractor for sufficiency (see paragraph 5.6.2). Government testing is required under this contract within 30 days of issuance of the initial contract to validate level of protection provided by the selected bidder’s panels. The panel units to be tested shall have all appropriate fabric, trim, feet, battens, connectors, etc. to provide a complete assessment of the panels within the test results. The Contractor will provide a Type 1 panel unit for testing as directed by the Government. Contractor shall also provide for testing to be performed by an independent third-party testing facility / agent. The Government reserves the right to modify the requirements of the testing up until the date testing takes place. The following contains specific requirements of the panel testing.
5.11.1 The contractor shall comply with the testing requirements listed below:
1) The contractor shall perform ballistic testing of one L shaped ballistic panel assembly representative of Panel Type 1.
2) Testing Required:
5.11.2 Requirement Compliance:
5.11.2.1 Physical Characteristics prior to test:
i. Each Ballistic Panel will be measured
ii. Each Ballistic Panel will be weighed
iii. Each Ballistic Panel will be inspected for signs of pre-existing
Ballistic material damage/delamination.
5.11.2.2. Direct Fire Compliance
i. In accordance with UL 752 protocol and UL-RF-H or Legacy UL Level 8 shot pattern
ii. Repeat UL-RF-H or Legacy UL Level 8 shot pattern three times on designated single panel
iii. Shoot into both sides of panel
5.11.2.3. Direct Fire Seam Compliance/Exploitation (all at 4 inch (+ ½ inch) shot spacing).
i. 7 shots on vertical seam – Inside – out
ii. 7 shots on vertical seam – Outside- in
iii. 4 shots on corner seam – Inside – out
iv. 4 shots on corner seam – Outside – in
v. For seams, impact at center of steel or aluminum batten (+ ½ inch).
vi. 6-8 exploitation shots on panel edges (Top and Side(s) to characterize edge effects). Impact at 1 inch (+ ½ inch) from edge.
5.11.2.4. Direct Fire Skip Angle (4 inch (+ ½ inch) shot spacing)
i. Shoot outside-in only on panel
ii. 5-8 shots starting at 30 degree obliquity. Angle measured from face of panel with 0 degrees being parallel to panel face.
iii. Obliquity incrementally reduced/increased until skip angle is characterized.
iv. Panel will have finished material/tackable surfaces in place for all shots.
5.11.3 Testing Documentation:
A written test report shall be presented to the Government contact below. Also, the Government requires a video recording of the ballistic testing performed. The video shall be sent to the Government contact below:
USACE
Attention: Andrew Winslow 1616 Capitol Avenue
Omaha NE 68102-4901 andrew.l.winslow@usace.army.mil
6.0. Security Requirements. Contractor personnel working under this contract shall abide by Title 18, United States Code, Section 930 (c) which prohibits possession of firearms or other dangerous weapons aboard / within DOD installations, leased facilities and property. The contractor and all contracted personnel are prohibited from providing any technical information (i.e., level of protection, details of the design, etc.) on this contract to any non-government personnel associated with this contract.
7.0 Contractor Representative. The contractor shall have one designated primary point of contact (POC) to handle communications between the government and the contractor. This POC adequately handles all administrative, managerial, warranty issues, financial and all other aspects of the contract. The contractor POC shall report any issues through the USACE PM, and meet virtually with the USACE PM & COR on a quarterly basis to deliver project status until the delivery order is 100% complete. The POC will also provide weekly status (and other) reports as identified in this statement of work to the Government. Once the contract is awarded, the Government POC’s for this contract are below. Do not contact them during the solicitation or evaluation process:
USACE Project Manager:
Name: Andrew Winslow Phone: 402/995-2767 Mobile: 402/216-4250 Email address: andrew.l.winslow@usace.army.mil
8.0 Funding. Contractor will be required to submit invoices through the USACE Project Manager as specified.
Invoice review and process will be initiated by the PM for all orders that are fulfilled and accepted.
9.0 AT/OPSEC
9.1 All contractor and all associated sub-contractors employees shall comply with applicable facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet access requirements. Contractor workforce must comply with all personal identity verification requirements as directed by the facility local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at facility change, the Government may require changes in contractor security matters or processes.
9.2 All contract employees, including subcontractor employees will be escorted by a Military Service Representative at the facility locations.
9.3 The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e- verify) website to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
Statement of Work Attachments:
Attachment 1:
Example diagram and picture (expected matching look and design of the bullet resisting panels)
Attachment 2:
Master Facilities Listing (facilities, locations, quantities)
Attachment 3:
UL ratings table for bullet-resisting materials
Attachment 4:
Example floorplan of a Recruiting Office (EACH location will be unique)
Attachment 5:
Examples styles of stability / support feet envisioned by the Government
Attachment 6:
Past Performance Questionnaire (PPQ)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Ballistic Panel Supply
FFP
All ballistic panel supply, delivery and installation, and costs associated with providing mock-up and Government ballistic testing in accordance with the Statement of Work.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination MFR PART NR: UL-RF-H or Legacy UL Level 8 certified
PSC CD: 7195
See Price Schedule Below
See Price Schedule Below
NET AMT
SOLICITATION NO. W9128F24Q0070
PRICE SCHEDULE
Panel Type PANEL SYSTEM STRUCTURE QUANTITY
UNIT
PRICE
TOTAL
NO. AMOUNT
1 Front: 100"X48" Return: 36"X48" 54
2 Front: 84"X48" Return: 36"X48" 65
3 Front: 72"X48" Return: 36"X48" 56
4 Front: 60"X48" Return: 36"X48" 34
5 Front: 100"X48" (Straight cubicle wall only) 22
6 Front: 84"X48" (Straight cubicle wall only) 69
7 Front: 72"X48" (Straight cubicle wall only) 44
8 Front: 60"X48" (Straight cubicle wall only) 52
CONUS Delivery and Installation per panel 388
OCONUS Delivery and Installation per panel 8
All cost associated with providing Mock-up 1
All cost associated with Government Ballistic Testing 1
TOTAL CONTRACT COST
CLAUSES INCORPORATED BY FULL TEXT
52.212-1 Addendum; Instructions to Offerors - Commercial Items
Please provide the following information with your proposal:
Company’s Name as it appears on SAM:
Company’s Address as it appears on SAM:
UNIQUE ENTITY ID:
CAGE CODE:
TIN:
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF1449, letterhead stationery, or as otherwise specified in the solicitation. Offers must be submitted electronically, unless other arrangements have been made. Send completed offers to Brianna Wohlers, Contract Specialist at Brianna.N.Wohlers@usace.army.mil. The proposal shall consist of one (1) pdf document not to the maximum page limits set in paragraph 1.0 of 52.212-2, Evaluation – Commercial Products and Commercial Services. As a minimum, offers must include with their proposal:
(1) The solicitation number;
(2) The name, address, federal tax identification, email, and telephone number of the offeror;
(3) Names, title, email, and telephone number of persons authorize to negotiate and sign the proposal;
(4) All required technical, past performance, and price factor information stated in FAR 52.212-2, Evaluation –
Commercial Products and Commercial Services;
(5) A statement specifying agreement will all terms, conditions and provisions included in the solicitation.
Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration;
(6) Acknowledgement of Solicitation Amendments, if applicable; and
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.
(d) Questions. All questions pertaining to this combined synopsis and solicitation shall be in writing, directed to the attention of Brianna Wohlers, Contract Specialist at Brianna.N.Wohlers@usace.army.mil. All questions shall be submitted not later than seven (7) calendar days prior to the proposal due date, in order to ensure adequate time is allotted for form an appropriate response and if needed, amend the solicitation.
Offerors are requested to review the solicitation in its entirety for answers to questions, prior to submitting a new question.
(e) Insurance Required (FAR 52.228-5): In accordance with FAR 28.307-2, “Liability,” the contractor shall procure the following minimum insurance:
Type Amount Workman’s Compensation and Employer’s Liability Insurance
$100,000
General Liability Insurance $1,000,000 per occurrence
And, when automobiles are used in connection with performing the contract:
Automobile Liability Insurance $200,000 per person Bodily Injury $500,000 per occurrence Property Damage $20,000 per occurrence
And, when aircraft is used in connection with performing the contract:
Aircraft Public and Passenger Liability Insurance $200,000 per person Bodily Injury (other than passenger injury) $500,000 per occurrence Property Damage $200,000 per occurrence Passenger Liability Bodily Injury $200,000 multiplied by the number of seats or passengers, whichever is greater
And, when contract performance involves use of vessels, the Contracting Officer shall require, as determined by the agency, vessel collision liability and protection and indemnity insurance. The contractor is responsible for contacting the state for compliance with its workman’s compensation laws.
(f) State and Local Taxes. The U.S. Army Corps of Engineers is exempt from paying state and local taxes per
Title 4 United States Code 104-107. The U.S. Army Corps of Engineers Tax ID Number is 62-1642142.
Contractors performing services for the U.S. Army Corps of Engineers are not exempt from state and local taxes in transactions with vendors, suppliers, or subcontractors.
52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
1.0 EVALUATION SUMMARY
Quotes will be evaluated using the following Factors. The requirements specified in the solicitation are considered to be minimum requirements. NOTE: Factors 1-3 when combined, are significantly more important than Factor
4 PRICE.
Factor 1 –Technical Aspects
Subfactor A - Ballistic material, design & product features such as trim & connectors.
Maximum Number of Pages: 10 Subfactor B - Color and Aesthetics Submittal Color Pallet and Fabric Type Maximum Number of Pages: 2 Most Important
Factor 2: Schedule – Production, delivery & installation
Maximum Number of Pages: 6 Second Most Important
Factor 3: Past Performance Maximum Number of Pages: N/A
Third Most Important
Factor 4: Price Complete Pricing Schedule Least Important Factor
Note: An “Unacceptable” evaluation rating for any factor, or combination of different factors, may cause the overall offer to be evaluated as “Unacceptable”.
2.0 OFFER REQUIREMENTS AND SUBMISSION FORMAT
a. Offerors shall submit quotes electronically.
b. Any pages in excess of the assigned page limitation will be removed by the Government and will not be evaluated. Incomplete information on the remaining pages will be evaluated as is. A quote that attempts to circumvent the page restriction purpose or unnecessarily burden the government evaluation may be rejected in its entirety.
c. Font on any page shall be either Arial, Calibri, or Times New Roman, and will not be less than 10 point.
Unreadable quotes due to font or reduction, will not be returned, and will be evaluated as is or rejected.
3.0 FACTOR 1: TECHNICAL ASPECTS
3.1 Subfactor A: Ballistic material, design & product features such as trim & connectors.
a. Submission Requirements
Quotes shall clearly articulate:
(a) The ballistic material that the offeror proposes
(b) The method…