W91218F23Q0040 AM0001pdf.pdf
PDF 381 KB Posted
- Attached to
- Fort Peck Station Battery Replacement Federal contract opportunity
- Solicitation number
- W9128F23Q0040
About this file
This document contains a federal contract opportunity solicitation and an amendment to the solicitation.
The solicitation seeks replacement of the station service battery systems at the Fort Peck Project located in Fort Peck, Montana. The scope of work includes supplying and installing replacement battery banks and testing existing batteries at two power plants. Optional items include procurement of an inverter/charger, battery chargers, and a new battery rack if needed. The contractor must commence work upon award and complete within 210 days of the notice to proceed. A site visit is scheduled for June 20, 2023. The estimated construction cost is between $250,000 to $500,000.
The amendment updates language in section 2.0 general requirements regarding contractor personnel and subcontracting. It adds requirements for contractors to submit subcontractor information with proposals and obtain written approval before subcontracting work after award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W91218F23Q0040 A0003pdf.pdf | ||
| Appendix C - Existing PP2 Station Battery Information.pdf | ||
| BATTERY ROOM ACCESS.pdf | ||
| MFP-OPN83E1650_008.pdf | ||
| FP Station Battery Replacement Bidder Inquiries.pdf | ||
| Appendix A - Existing PPCS Battery_Inverter Information.pdf | ||
| Appendix B - Existing PP1 Station Battery Information.pdf | ||
| MFP-OPN83E1602_017.pdf | ||
| IMG_2987.JPG | JPG image | |
| W9128F23Q0040 FP STATION BATTERY - AM0002.pdf | ||
| MFP-OPN83E1601_003.pdf | ||
| IMG_2986.JPG | JPG image | |
| W9128F23Q0040 Site Visit Sign-In Sheet.pdf | ||
| Attachments from FP Powerhouse 1 Battery Replacement SOW.pdf | ||
| W91218F23Q0040 Solicitation.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W59XQG31100400
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the language under the 2.0 General Requirements sections; paragraph 2.2.1 and 2.2.2. See SF 30 Block 14 Continuation Page for full details. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jun-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F23Q0040
X 9B. DATED (SEE ITEM 11)
01-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2023
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F23Q0040
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SUMMARY OF CHANGES
The following changes have been added by full text:
2.0 General
2.2 Contractor Personnel
2.2.1 The contractor shall perform all work under this contract using his or her own forces except as provided in Paragraph 1.4.2 Subcontracting. Employees who perform this work shall be qualified persons on the contractor’s own payroll.
2.2.2 Subcontracting. The contractor shall not subcontract any work without written approval of the Contracting Officer. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the contractor.
Changed to:
2.0 General Requirements
2.2 Contractor Personnel
2.2.1 The contractor shall perform all work under this contract using his or her own forces except as provided in Paragraph 2.2.2 Subcontracting. Employees who perform this work shall be qualified persons on the contractor’s own payroll. Contractor shall submit the subcontractors information when submitting with the quote.
2.2.2 Subcontracting. Once the contract is awarded, the contractor shall not subcontract any work to a new subcontractor without written approval of the Contracting Officer. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the contractor.
//End of Changes//ldr
(End of Summary of Changes)