This document contains bidder inquiries and responses regarding a federal solicitation for the Fort Peck Station Battery Replacement project. The solicitation involves replacing and testing station service battery systems at two power plants located in Fort Peck, Montana. Services required include procuring new flooded cell lead acid battery banks for plant 1's UPS and station service systems, capacity testing an existing battery bank at plant 2, and optional procurement of inverters, chargers, and a new battery rack. Bidders had questions about battery room access details like distances, floor locations, and elevator capacities. Drawings of plant electrical systems and specifications for battery parts were provided. The site visit is scheduled for June 20, 2023 and work must be completed within 210 days of notice to proceed. The estimated construction cost is between $250,000 and $500,000. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Omaha.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W91218F23Q0040 A0003pdf.pdf | ||
| W9128F23Q0040 FP STATION BATTERY - AM0002.pdf | ||
| MFP-OPN83E1601_003.pdf | ||
| IMG_2986.JPG | JPG image | |
| Appendix A - Existing PPCS Battery_Inverter Information.pdf | ||
| Appendix B - Existing PP1 Station Battery Information.pdf | ||
| MFP-OPN83E1602_017.pdf | ||
| IMG_2987.JPG | JPG image | |
| Appendix C - Existing PP2 Station Battery Information.pdf | ||
| BATTERY ROOM ACCESS.pdf | ||
| MFP-OPN83E1650_008.pdf | ||
| W9128F23Q0040 Site Visit Sign-In Sheet.pdf | ||
| W91218F23Q0040 AM0001pdf.pdf | ||
| W91218F23Q0040 Solicitation.pdf | ||
| Attachments from FP Powerhouse 1 Battery Replacement SOW.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FP Station Battery Replacement Bidder Inquiries
1. Q: What is the distance from loading dock to battery room/s?
A: The distance from the Power Plant 1 (PP1) north personnel entrance to the battery room is approximately sixty-four (64) feet. A file titled “Battery Room Access.pdf” has been provided to offer additional information.
Amendment to follow.
2. Q: Is battery room on the same floor as loading dock?
A: PP1: A file titled “Battery Room Access.pdf” has been provided to offer additional information. Amendment to follow.
PP2: No, the Battery Room is located one floor elevation below the Erection Bay and
Transformer Service Bay. Access will be through the Freight Elevator or floor hatches. A file titled “Battery Room Access.pdf” has been provided to offer additional information.
3. Q: What is the weight capacity of the elevator within the Powerhouse?
A: The weight capacity of the Power Plant Elevators is as follows:
- PP1 freight elevator: 12,000 lbs
- PP1 passenger elevator: 1800 lbs
- PP2 freight elevator: 3000 lbs
A file titled “Battery Room Access.pdf” has been provided to offer additional information.
Amendment to Follow
4. Q: Please provide PID electrical one lines for the plant 1 and plant 2 125V DC system and 480V related to the chargers.
A: The attached drawings MFP-OPN83E1601, MFP-OPN83E1602 and MFP-OPN83E1650 contain the PID electrical one lines for PP1 and PP2.
Amendment to Follow
5. Q: Does any special Indian taxes or fees apply?
A: FEDERAL, STATE AND LOCAL TAXES
It is the Contractor's responsibility to investigate applicable federal, state, and local taxes as well as any specific exemptions that may exist. This includes any applicable Value-Added Taxes (VAT), sales, use, and excise taxes. See General Conditions (Contract Clause) 52.229-3 FEDERAL, STATE, AND LOCAL TAXES.
Amendment to Follow
6. Q: Can Capacity Testing of existing cell in Powerhouse #2 (CLIN 0003) be conducted before or at a separate time ahead of the Install and Replacement of the two cells in Powerhouse #1 (CLIN 0001 and 0002) upon award and Notice to Proceed? Or is capacity testing scope required to be done in conjunction with install replacement?
A: The PP2 station service battery capacity test can be completed at the contractors convenience (before, after or similar time as PP1 work).
7. Q: For 9170+ unit, the battery pack part number is ASY-0529, one pair per slot. The requirement doesn’t specify how many battery slots are currently being used and Eaton can’t confirm based on the pictures provided. Is there any way you can check and let us know? So that we can share the same information to Eaton guys.
A: Files titled IMG_2986 and IMG_2987 have been provided for reference.
Amendment to Follow
8. Q: What are the door dimensions to the Battery Charging Room in PP1?
A: The door to the battery charging room in PP1 measures 30” in width. The existing battery chargers measure 25” in width.
A file titled “Battery Room Access.pdf” has been provided to offer additional information.