About this file

This document outlines a federal contract opportunity for battery replacement services at Fort Peck Station in Montana. The solicitation involves replacing the station service battery systems in Power Plant 1 and Power Plant 2, including procuring new flooded lead acid battery banks and optional inverter chargers and battery chargers. Site visits are scheduled for June 2023 and offerors must be able to complete the work within 210 days of receiving the notice to proceed. The estimated construction cost is between $250,000 and $500,000. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Omaha. Responses to the solicitation are due by the date specified in the final solicitation document.

View the file

Other files for this federal contract opportunity

Other files attached to Fort Peck Station Battery Replacement, newest first.
File Type Posted
W91218F23Q0040 A0003pdf.pdf PDF
Appendix C - Existing PP2 Station Battery Information.pdf PDF
BATTERY ROOM ACCESS.pdf PDF
MFP-OPN83E1650_008.pdf PDF
FP Station Battery Replacement Bidder Inquiries.pdf PDF
Appendix A - Existing PPCS Battery_Inverter Information.pdf PDF
Appendix B - Existing PP1 Station Battery Information.pdf PDF
MFP-OPN83E1602_017.pdf PDF
IMG_2987.JPG JPG image
W9128F23Q0040 FP STATION BATTERY - AM0002.pdf PDF
MFP-OPN83E1601_003.pdf PDF
IMG_2986.JPG JPG image
W9128F23Q0040 Site Visit Sign-In Sheet.pdf PDF
W91218F23Q0040 AM0001pdf.pdf PDF
W91218F23Q0040 Solicitation.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-1

Appendix A UPS/PPCS Battery Bank and Inverter Charger Information

UPS/PPCS Battery Bank

1. Existing are C&D Technologies product 4XTJ9 for our UPS system. There are 15 jars, 4 cells/jar, and battery voltage is 134.4V.

2. Existing rack dimensions are 170” in length and 19” in width. The containment dimensions are 172” in length and 20.5” in width. Containment width to remain the same to maintain walking space between PPCS battery and PP1 Station Service Battery.

IMG_7325: Batteries and rack on the left side of the image closest to the wall.

IMG_2125: Battery nameplate, XT4J9 (IMG_2127)

PPCS Battery Bank

PP1 Station Service Battery Bank

A-2

Inverter Charger

1. Existing PPCS battery inverter charger is a Powerware 9170 with a max rating of 9kVA.

2. Powerware chassis can hold 6 modules, currently 4 power modules are ASY-0673 split-phase, and 1 charger module ASY-0675 (see images below).

(IMG_0614) Powerware 9170 nameplate

(IMG_2985) 1 charger module ASY-0675 (IMG_2987) 4 power modules, ASY-0673 split-phase

A-3

3. System Data from Powerware 9170:

B-1

Appendix B Power Plant 1 Station Battery Information

Power Plant 1 Station Battery

1. Existing are C&D Technologies product LCR 19.

2. Sixty (60) cell stationary flooded lead acid battery bank

3. Reuse existing tiered rack.

IMG_4350: PP1 Station Service Battery and rack centered in image, elev. 2071

IMG_3538: PP1 Station Service battery nameplate, C&D LCR 19

PP1 Station Service

B-2

Power Plant 1 Station Battery Chargers

IMG_3560: PP1 Battery Charger

C-1

Appendix C Power Plant 2 Station Battery Information

Power Plant 2 Station Battery

1. Existing are C&D Technologies product LCR 17 SAN.

2. Sixty (60) cell stationary flooded lead acid battery bank

IMG_1802: PP2 Station Service Battery, elev. 2049

IMG_3539: PP2 Station Service battery nameplate, C&D LCR 17 SAN

PP2 Station Service

C-2

Power Plant 2 Station Battery Chargers

IMG_3569: PP2 Station Battery Charger nameplate