Am-0002_W9128F-17-R-0078.pdf
PDF 2 MB Posted
- Solicitation number
- W9128F17R0078
About this file
Amendment 0002
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0002
AUTOMATED INFANTRY PLATOON BATTLE COURSE (AIPBC), PN72176, FORT CARSON, COLORADO
See attached documentation for content of the amendment changes to RFP
Date for receipt of proposals is 16 NOV 2017 at 1400 hours
Government Point of Contact: MSG Glenda Canty, Contract Specialist (402) 995-2059
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F-17-R-0078
10/27/2017
10/16/2017
10/27/2017
Am #0002 - 1
Am #0002 - 2 (Continuation of SF30)
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers
1616 Capitol Avenue Omaha, Nebraska 68102-4901
:NOTICE: Failure to acknowledge : Solicitation No. W9128F-17-R-0078 :all amendments may cause rejec-:
:tion of the offer. See FAR : Date of Issue: 16 OCT 2017 :52.215-1 of Section 00 21 00. : Date of Receiving Proposals:
16 NOV 2017
Amendment No. 0002
27 OCT 2017
SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Construction of Automated Infantry Platoon Battle Course (AIPBC).
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes). NONE
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages as noted below. The substituted pages are revised and reissued with this Amendment. For convenience, on the revised specification pages, changes have been identified by highlighting text. (All portions of reissued specification pages shall apply whether or not changes thereon have been indicated.)
Pages Deleted Pages Substituted or Added
00 10 00-3 CLIN 00 10 00-3 CLIN
c. Drawings (Not Reissued). The following drawing(s) are revised as indicated below with a revision date of 26 OCT 2017. These drawing(s) are not reissued with this amendment.
(1) Sheet B-131, SOIL BORING LOCATION PLAN – AREA 131,Drawing deleted
d. Drawings (Reissued). The following drawing(s) are revised with a revision date as indicated in the title block, and reissued with this amendment.
(1) Sheet G-010, DRAWING COORDINATION AND AREA PLAN
(2) Sheet B-110, SOIL BORING LOCATION PLAN – AREA 110
(3) Sheet B-111, SOIL BORING LOCATION PLAN – AREA 111
(4) Sheet B-115, SOIL BORING LOCATION PLAN – AREA 115
(5) Sheet B-118, SOIL BORING LOCATION PLAN – AREA 118
Am #0002 - 3
(6) Sheet B-122, SOIL BORING LOCATION PLAN – AREA 122
(7) Sheet B-130, SOIL BORING LOCATION PLAN – AREA 130
(8) Sheet B-132, SOIL BORING LOCATION PLAN – AREA 132
(9) Sheet B-150, SOIL BORING LOCATION PLAN – DRILL HOLES FC16-
37 THROUGH FC16-39
(10) Sheet B-306, SOIL BORING LOCATION PLAN – DRILL HOLES FC16-
36 & 16-37
(11) Sheet CD109, CLEARING & GRUBBING PLAN - OBJECTIVE B - AREA
(12) Sheet CD110, CLEARING & GRUBBING PLAN - OBJECTIVE B - AREA
(13) Sheet CD111, CLEARING & GRUBBING PLAN - OBJECTIVE B - AREA
(14) Sheet CS104, RANGE OPERATIONS AND CONTROL AREA SITE PLAN -
AREA 104
(15) Sheet CS109, DOWNRANGE SITE PLAN - OBJECTIVE B - AREA 109
(16) Sheet CS110, DOWNRANGE SITE PLAN - OBJECTIVE B - AREA 110
(17) Sheet CS111, DOWNRANGE SITE PLAN - OBJECTIVE B - AREA 111
(18) Sheet CS512, TARGET DETAILS - DOWNRANGE POWER CENTER
(19) Sheet CS601, TARGET DETAILS - HORIZONTAL AND VERTICAL
CONTROL POINT DATA
(20) Sheet CG104, RANGE OPERATIONS AND CONTROL AREA GRADING
PLAN - AREA 104
(21) Sheet CG109, DOWNRANGE GRADING PLAN - OBJECTIVE B - AREA
(22) Sheet CG110, DOWNRANGE GRADING PLAN - OBJECTIVE B - AREA
(23) Sheet CG111, DOWNRANGE GRADING PLAN - OBJECTIVE B - AREA
(24) Sheet CG118, DOWNRANGE GRADING PLAN - OBJECTIVE D - AREA
(25) Sheet CG201, RANGE OPERATIONS AND CONTROL AREA GRADING
SECTIONS - SECTIONS A, B
(26) Sheet CG202, RANGE OPERATIONS AND CONTROL AREA GRADING
SECTIONS - SECTIONS C, D
Am #0002 - 4
(27) Sheet CG203, RANGE OPERATIONS AND CONTROL AREA GRADING
SECTIONS - SECTIONS E, F
(28) Sheet CE109, DOWNRANGE EROSION CONTROL PLAN - OBJECTIVE B
- AREA 109
(29) Sheet CE110, DOWNRANGE EROSION CONTROL PLAN - OBJECTIVE B
- AREA 110
(30) Sheet CE111, DOWNRANGE EROSION CONTROL PLAN - OBJECTIVE B
- AREA 111
(31) Sheet ES106, ELECTRICAL SITE PLAN
(32) Sheet ES404, ROCA ELECTRICAL SITE PLAN
(33) Sheet A-101AB, AMMO BREAKDOWN FLOOR, CEILING, & ROOF PLAN
(OPTION)
(34) Sheet A-200AB, BUILDING ELEVATIONS - OPTION
(35) Sheet A-300AB, BUILDING SECTIONS - OPTION
(36) Sheet A-400AB, WALL SECTIONS - OPTION
(37) Sheet E-101AB, AMMO BREAKDOWN PLANS – OPTION
(38) Sheet A-101BE, BLEACHER ENCLOSURE FLOOR, CEILING, & ROOF
PLAN – OPTION
(39) Sheet A-200BE, BUILDING ELEVATIONS – OPTION
(40) Sheet A-300BE, BLEACHER SECTIONS – OPTION
(41) Sheet A-400BE, WALL SECTION – OPTION
(42) Sheet E-101BE, BLEACHER ENCLOSURE PLANS – OPTION
(43) Sheet A-101CM, COVERED MESS FLOOR, CEILING, & ROOF PLAN –
OPTION
(44) Sheet A-200CM, BUILDING ELEVATIONS & SECTIONS – OPTION
(45) Sheet E-101CM, COVERED MESS PLANS- OPTION
(46) Sheet A-600, ROOM FINISH SCHEDULE & DOOR/WINDOW/LOUVER
SCHEDULE
(47) Sheet EL501, LIGHTING SCHEDULE AND DETAILS
(48) Sheet EL502, LIGHTING DETAILS – OPTION
(49) Sheet EP601, ROCA ONE-LINE
(50) Sheet EP602, PANEL SCHEDULES
Am #0002 - 5
e. Drawings (New). The following new drawing(s) dated 26 OCT 2017 are hereby added to the request for proposal drawings and are issued with this amendment.
(1) Sheet B-125, SOIL BORING LOCATION PLAN – AREA 125
(2) Sheet CS104A, RANGE OPERATIONS AND CONTROL AREA SITE PLAN
(OPTION) - AREA 104
(3) Sheet CG104A, RANGE OPERATIONS AND CONTROL AREA GRADING
PLAN (OPTION) - AREA 104A
(4) Sheet CG201A, RANGE OPERATIONS AND CONTROL AREA GRADING
SECTIONS (OPTION) - SECTIONS A, B
(5) Sheet CG202A, RANGE OPERATIONS AND CONTROL AREA GRADING
SECTIONS (OPTION) - SECTIONS C, D
(6) Sheet CG203A, RANGE OPERATIONS AND CONTROL AREA GRADING
SECTIONS (OPTION) - SECTIONS E, F
(7) Sheet ES404A, ROCA ELECTRICAL SITE PLAN – OPTION
(8) Sheet EP601A, ROCA ONE-LINE – OPTION
(9) Sheet EP602A, PANEL SCHEDULES - OPTION
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal thereby occasioned.
a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.
b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00 10 00-1 of Standard Form 1442.
3. Offers will be received until 2:00 p.m, local time at place of receiving proposals, 16 NOV 2017.
Attachments:
Site Visit Sign-In Sheet (For Information Only) Specification Page(s) listed in 1.b., above Drawings listed in 1.d. and 1.e., above (Under Separate Cover)
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
27 OCT 2017
NEP/2160
This page was intentionally left blank for duplex printing.
Am #0002 Page 1 of 2
Am #0002 Page 2 of 2
CLIN SCHEDULE 00 10 00 - 3 W9128F-17-R-0078
Am #0002
CONTRACT LINE ITEM PRICING SCHEDULE
ITEM
NO.
DESCRIPTION
QTY
UNIT
UNIT
PRICE
AMOUNT
BASIC ITEMS
Entire work complete for Construction of Automated Infantry Platoon Battle Course, PN72176 at Fort Carson, CO excluding Option Items listed below
Job
XXX
TOTAL BASIC AMOUNT $_____________________________
OPTION ITEMS
[Option 1]
Entire work complete for construction of Bleacher Enclosure, Covered Mess and Ammo Breakdown buildings, including underground power from EHH at the Range Flagpole to the buildings in this option.
[Option 2]
Entire work complete for Procurement and Installation of Furnishing, Fixtures, and Equipment (FF&E).
TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________
OFFEROR'S NAME:____________________________
Performance Duration in Calendar Days After the Notice to Proceed is Received Should Not Exceed 540 Days.
(See Note No. 4) ____________ DAYS
NOTES:
1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS (RFP) for evaluation of options. The
Government reserves the right to exercise options within 180 days of Notice To Proceed. The evaluation of options does not obligate the Government to make award of options.
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of
CLIN SCHEDULE 00 10 00 - 4 W9128F-17-R-0078
Am #0002 variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.
3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected.
4. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to
Proceed (NTP) is received by the Contractor. The total number of proposed calendar days for design and construction through completion, ready for turnover should not exceed 540 calendar days. The proposed duration shall become the required contract. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP. See Section 00 73 00, paragraph 1.1: COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK.
| Standard_Form_30 |
| Am_0002_Narrative |
| Attachments |
| Automated Infantry Platoon Battlecourse Site Visit 26 Oct 2017 - FIO |
| 00 10 00-3 CLIN SCHEDULE |
File details come from the government source that posted it. Updated .