About this file
This document provides the solicitation requirements for a $300 million Small Business Design-Bid-Build Construction Services Multiple Award Task Order Contract for the U.S. Army Corps of Engineers Honolulu District. The solicitation seeks proposals for a target of five firm fixed-price indefinite delivery contracts for construction services. Key requirements include submitting separate technical and price proposals in PDF format by 8 October 2019. The technical proposal shall address the offeror's construction experience on at least three but no more than five relevant projects, past performance information, organization and management plan, and technical approach. Price factors include daily labor rates, escalation rates, and pricing for a sample project. Evaluation will be based on construction experience, past performance, organization and management, and technical approach as the most important non-price factors, with price being less important. Awards will be made based on best overall value as determined by the source selection authority.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
FOR
$300M Small Business
State of Hawaii
Design-Bid-Build Construction Services
Multiple Award Task Order Contract
(MATOC)
U.S. Army Corps of Engineers
HONOLULU DISTRICT
REQUEST FOR PROPOSAL W9128A-19-R-0002
$300M Small Business (SB) Multiple Award Task Order Contract (MATOC) for Design-Bid-Build Construction Services for the State of Hawaii
The North American Industry Classification System (NAICS) code for this acquisition is 236220, with a size standard of $36,500,000.
This requirement is a total small business set-aside.
* See Individual Task Orders
** See Section 00 22 16
DAYNA MATSUMURA 808-835-4379
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
23-Aug-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______ calendar days and complete it within ________ calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ 52.211.10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ 4 copies to perform the work required are due at the place specified in Item 8 by ___________ local time __0_8__Oc_t_ 2_0_1_9_ ___ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CECT - CONTRACTING DIVISION
USACE, HONOLULU DISTRICT
BLDG 252 (CECT-POH)
FT. SHAFTER HI 96858-5440
W9128A
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX: TEL: TEL: FAX:
W9128A19R0002 115
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W9128A-19-R-0002
Section 00 10 00
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 300,000,000 Job
Base Period (3-Years)
FFP
The duration of this MATOC will be a maximum of seven (7) years – a base ordering period of three (3) years and two (2) option ordering periods of two (2) years. The MATOC will not exceed a cumulative total of $300,000,000.00 for all task orders awarded under this solicitation.
The MATOC will not exceed a cumulative total of $300M shared amongst all awardees.
FOB: Destination
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0002 UNDEFINED Job OPTION Option Period 1 (2-Years)
FFP
FOB: Destination
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0003 UNDEFINED Job OPTION Option Period 2 (2-Years)
FFP
FOB: Destination
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0004 UNDEFINED Job OPTION Option if 52.217-8 is exercised
FFP
FOB: Destination
MAX
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 30-DEC-2022 300,000,000 N/A
FOB: Destination
0002 30-DEC-2024 N/A
FOB: Destination
0003 30-DEC-2026 N/A
FOB: Destination
SOLICITATION NO. W9182A-19-R-0002
SOLICITATION
PROPOSAL SCHEDULE
CLIN DESCRIPTION DAILY RATES
0001 Project Manager $____________
0002 Project Superintendent $____________
0003 Contractor Quality Control (CQC) System Manager $____________
0004 Quality Control Representative (QCR) $____________
0005 Site Safety and Health Officer (SSHO) $____________
DEFINITION:
“Daily Rate” is the rate for an 8 hour work period.
For Daily Rates:
Escalation Rate for Year 2 of the Base Period _________ %
Escalation Rate for Year 3 of the Base Period _________ %
Escalation Rate for Year 1 of the 1st Option Period _________ %
Escalation Rate for Year 2 of the 1st Option Period _________ %
Escalation Rate for Year 1 of the 2nd Option Period _________ %
Escalation Rate for Year 2 of the 2nd Option Period _________ %
Escalation Rate for the Additional Months if option to extend services is exercised (FAR clause 52.217-8) (maximum 6 months) _________ %
Home Office Overhead Rate _________ %
General and Administrative (G&A) Rate _________ %
NOTES:
1. The Offeror agrees that the rates included in Section 00 10 00 shall be used in the pricing of all task orders and modifications issued for the life of the contract. At the end of an ordering period, the Offeror may request an equitable adjustment to the Home Office Overhead and/or G&A rates in Section 00 10 00. The Offeror must submit back-up documentation substantiating for the adjusted rate(s). Approval of the adjusted rate(s) is subject to the approval of the Contracting Officer.
2. MEASUREMENT AND PAYMENT. Compensation for all work to be performed under this contract will be made under the payment item(s) listed in the task order. Prices(s) and payment(s) for the item(s) shall cover all work, complete and finished in accordance with the specifications, schedules, and drawings, and shall be full compensation for all work in connection therewith, including quality control and the cost of performance-and payment-bond premiums as specified in the CONTRACT CLAUSES. Price(s) and payment(s) shall constitute full and final compensation for furnishing all materials, equipment, management, supervision, labor, transportation, fuel, power, water, and all incidental items necessary to complete the work, except as otherwise specified to be furnished by the Government. For the purpose of CONTRACT CLAUSE entitled "PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS", the term "designated billing office" and "designated payment office" are as follows:
a. Billing Office
U.S. Army Corps of Engineers, Honolulu District Area Office to be determined with award of each task order
b. Payment Office
USACE Finance Center Attn: CEFC-FP 5722 Integrity Drive Millington, TN 380554-5005
3. (a) For CLINS 0001 through 0005, the daily rates includes labor, labor burden, and fringe benefits.
(b) For the Home Office Overhead and/or the G&A rates, the rates should NOT include bond premiums and State of Hawaii general excise tax.
4. The minimum guarantee for the pool of contractors is $2,000 per contractor for the base period only. A minimum guarantee will not be applicable to the optional periods of performance.
SECTION 00 10 00
SAMPLE PROJECT PROPOSAL SCHEDULE
REPAIR BY REPLACEMENT VARIOUS BUILDINGS NEIGHBORHOOD,
POHAKULOA TRAINING AREA (PTA), ISLAND OF HAWAII, HAWAII
UNIT
CLIN DESCRIPTION QUANTITY UNIT PRICE AMOUNT
0001 Repair by Replacement Various Buildings 1 JOB LS $_______________
TOTAL $_______________
NOTES:
1. Work to be self-performed by the prime contractor: 15%
2. Complete the entire work ready for use not later than three-hundred sixty-five (365) calendar days after the date the Contractor receives the notice to proceed.
PAYMENT
Compensation for all work to be performed under this contract will be made under the payment items(s) listed herein. The principal features of the work to be included under the payment item(s) are noted.
Work required by the drawings and specifications and not particularly mentioned shall be included in and be paid for under the contract price for the item to which the work pertains. Price(s) and payment(s) for the item(s) shall cover all work, complete and finished in accordance with the specifications, schedules, and drawings, and shall be full compensation for all work in connection therewith, including quality control and cost of performance-and payment-bond premiums as specified in the CONTRACT
CLAUSES. Price(s) and payment(s) shall constitute full and final compensation for furnishing all materials, equipment, management, supervision, labor, transportation, fuel, power, water, and all incidental items necessary to complete the work, except as otherwise specified to be furnished by the
Government. For the purpose of CONTRACT CLAUSE entitled “PROMPT PAYMENT FOR
CONSTRUCTION CONTRACTS”, the term “designated billing office” and “designated payment office” are as follows:
a. Billing Office
U.S. Army Corps of Engineers, Honolulu District
Fort Shafter Area Office
Bldg 230, Otake Street
Fort Shafter, Hawaii 96858-5440
b. Payment Office
USACE Finance Center
Attn: CEFC-FP
5722 Integrity Drive Millington, TN 38054-5005
The item number mentioned below corresponds to the item number in the PROPOSAL SCHEDULE.
a. CLIN 0001. Repair by Replacement - Five (5) ea. Barracks (Large Buildings), will be paid for at the contract price, complete in place and ready for use, including new building structure, natural ventilation with sliding windows, fire sprinkler system, building electrical work, cleanup, demolition and removal of existing building structure, sitework, exterior electrical work located outside of the 5 foot building line, cleanup, and all incidental items necessary to complete the work. One (1) Shower/Latrine duplex will be paid for at the contract price, complete in place and ready for use, including new building structure, building electrical work, cleanup, demolition and removal of existing building structure, sitework, water, sewer, plumbing, exterior electrical work located outside of the 5 foot building line, cleanup, and all incidental items necessary to complete the work. One (1). GP Admin – Small Building, will be paid for at the contract price, complete in place and ready for use, including new building structure, natural ventilation with sliding windows, fire sprinkler, building electrical and telecommunication work, cleanup, demolition and removal of existing building structure, sitework, exterior electrical and telecommunication work located outside of the 5 foot building line, cleanup, and all incidental items necessary to complete the work. One (1) ea. Latrine Only, will be paid for at the contract price, complete in place and ready for use, new building structure, building electrical work, cleanup, demolition and removal of existing building structure, sitework, water, sewer, plumbing, exterior electrical work located outside of the 5 foot building line, cleanup, and all incidental items necessary to complete the work. One (1) ea. Laundry, will be paid for at the contract price, complete in place and ready for use, including new building structure, building electrical work, cleanup, demolition and removal of existing building structure, sitework, water, sewer, plumbing, exterior electrical work located outside of the 5 foot building line, cleanup, and all incidental items necessary to complete the work.
--End of Section--
Section 00 21 16
Section 00 21 16 - Instructions to Proposers
PROVISIONS INCORPORATED BY REFERENCE
52.203-18 Prohibition on Contracting With Entities That Require Certain Internal
Confidentiality Agreements or Statements--Representation
JAN 2017
52.204-7 System for Award Management OCT 2018
52.204-16 Commercial and Government Entity Code Reporting JUL 2016
52.204-22 Alternative Line Item Proposal JAN 2017
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017
52.216-27 Single or Multiple Awards OCT 1995
52.223-4 Recovered Material Certification MAY 2008
52.232-13 Notice Of Progress Payments APR 1984
PROVISIONS INCORPORATED BY FULL TEXT
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
* (To be provided as applicable, in accordance with individual task order(s))
Any contract awarded as a result of this solicitation will be DX rated order; DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations
System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.
(End of provision)
52.215-5 FACSIMILE PROPOSALS (OCT 1997)
* (To be provided as applicable, in accordance with individual task order(s))
(a) Definition. Facsimile proposal, as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via facsimile machine.
(b) Offerors may submit facsimile proposals as responses to this solicitation. Facsimile proposals are subject to the same rules as paper proposals.
(c) The telephone number of receiving facsimile equipment is: (808)835-4396.
(d) If any portion of a facsimile proposal received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document--
(1) The Contracting Officer immediately shall notify the offeror and permit the offeror to resubmit the proposal;
(2) The method and time for resubmission shall be prescribed by the Contracting Officer after consultation with the offeror; and
(3) The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness, provided the offeror complies with the time and format requirements for resubmission prescribed by the Contracting Officer.
The Government reserves the right to make award solely on the facsimile proposal. However, if requested to do so by the Contracting Officer, the apparently successful offeror promptly shall submit the complete original signed proposal.
(End of provision)
52.215-20 REQUIREMENTS FOR COST OR PRICING DATA OR INFORMATION OTHER THAN COST
OR PRICING DATA (OCT 2010)—ALTERNATE III (OCT 1997)
* (To be provided as applicable, in accordance with individual task order(s))
(a) Exceptions from cost or pricing data. (1) In lieu of submitting cost or pricing data, offerors may submit a written request for exception by submitting the information described in the following subparagraphs. The Contracting
Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Commercial item exception. For a commercial item exception, the offeror shall submit, at a minimum, information on prices at which the same item or similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include--
(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities;
(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market;
(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(2) The offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the offeror's determination of the prices to be offered in the catalog or marketplace.
(b) Requirements for cost or pricing data. If the offeror is not granted an exception from the requirement to submit cost or pricing data, the following applies:
(1) The offeror shall prepare and submit cost or pricing data and supporting attachments in accordance with Table
15-2 of FAR 15.408.
(c) Submit the cost portion of the proposal via the following electronic media: [Insert media format, e.g., electronic spreadsheet format, electronic mail, etc.]
As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.
(End of provision)
52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR INFORMATION OTHER
THAN CERTIFIED COST OR PRICING DATA (OCT 2010)—ALTERNATE IV (OCT 2010)
* (To be provided as applicable, in accordance with individual task order(s))
(a) Submission of certified cost or pricing data is not required.
(b) Provide data described below: [Insert description of the data and the format that are required, including the access to records necessary to permit an adequate evaluation of the proposed price in accordance with 15.403-3.]
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed-price construction contract resulting from this solicitation.
(End of provision)
52.217-3 EVALUATION EXCLUSIVE OF OPTIONS (APR 1984)
* (To be provided as applicable, in accordance with individual task order(s))
The Government will evaluate offers for award purposes by including only the price for the basic requirement; i.e., options will not be included in the evaluation for award purposes.
(End of provision)
52.217-4 EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD (JUN 1988)
* (To be provided as applicable, in accordance with individual task order(s))
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the
Government will evaluate the total price for the basic requirement together with any option(s) exercised at the time of award.
(End of provision)
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
* (To be provided as applicable, in accordance with individual task order(s))
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the
Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting
Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance
Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
69.1% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract
Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from
Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract
Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is the State of
Hawaii.
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under
Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the
Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph
(b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause
52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
DEPARTMENT OF THE ARMY
Contracting Division (CEPOH-CT)
U.S. Army Corps of Engineers, Honolulu District
Attn: Contracting Officer
Bldg 252
Fort Shafter, Hawaii 96858-5440
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
[Insert date and time]
(c) Participants will meet at--
[Insert location]
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/ http://farsite.hill.af.mil/vfdfara.htm
252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS
(OCT 2016)
(a) Definitions. As used in this provision--
Controlled technical information, covered contractor information system, covered defense information, cyber incident, information system, and technical information are defined in clause 252.204-7012, Safeguarding Covered
Defense Information and Cyber Incident Reporting.
(b) The security requirements required by contract clause 252.204-7012 shall be implemented for all covered defense information on all covered contractor information systems that support the performance of this contract.
(c) For covered contractor information systems that are not part of an information technology service or system operated on behalf of the Government (see 252.204-7012(b)(2))--
(1) By submission of this offer, the Offeror represents that it will implement the security requirements specified by
National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, ``Protecting Controlled
Unclassified Information in Nonfederal Information Systems and Organizations'' (see http://dx.doi.org/10.6028/NIST.SP.800-171) that are in effect at the time the solicitation is issued or as authorized by the contracting officer not later than December 31, 2017.
(2)(i) If the Offeror proposes to vary from any of the security requirements specified by NIST SP 800-171 that are in effect at the time the solicitation is issued or as authorized by the Contracting Officer, the Offeror shall submit to the
Contracting Officer, for consideration by the DoD Chief Information Officer (CIO), a written explanation of—
(A) Why a particular security requirement is not applicable; or
(B) How an alternative but equally effective, security measure is used to compensate for the inability to satisfy a particular requirement and achieve equivalent protection.
(ii) An authorized representative of the DoD CIO will adjudicate offeror requests to vary from NIST SP 800-171 requirements in writing prior to contract award. Any accepted variance from NIST SP 800-171 shall be incorporated into the resulting contract.
252.215-7010 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN
CERTIFIED COST OR PRICING DATA--BASIC (JAN 2018)
(a) Definitions. As used in this provision--
Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from sources independent of the offerors.
Non-Government sales means sales of the supplies or services to non-Governmental entities for purposes other than governmental purposes.
Relevant sales data means information provided by an offeror on sales of the same or similar items that can be used to establish price reasonableness taking into consideration the age, volume, and nature of the transactions (including any related discounts, refunds, rebates, offsets, or other adjustments).
Sufficient non-Government sales means relevant sales data that reflects market pricing and contains enough information to make adjustments covered by FAR 15.404-1(b)(2)(ii)(B).
Uncertified cost data means the subset of ``data other than certified cost or pricing data'' (see FAR 2.101) that relates to cost.
(b) Exceptions from certified cost or pricing data.
(1) In lieu of submitting certified cost or pricing data, the Offeror may submit a written request for exception by submitting the information described in paragraphs (b)(1)(i) and (ii) of this provision. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted and whether the price is fair and reasonable.
(i) Exception for prices set by law or regulation--Identification of the law or regulation establishing the prices offered. If the prices are controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Commercial item exception. For a commercial item exception, the Offeror shall submit, at a minimum, information that is adequate for evaluating the reasonableness of the price for this acquisition, including prices at which the same item or similar items have been sold in the commercial market. Such information shall include--
(A) For items previously determined to be commercial, the contract number and military department, defense agency, or other DoD component that rendered such determination, and if available, a Government point of contact;
(B) For items priced based on a catalog--
(1) A copy of or identification of the Offeror's current catalog showing the price for that item; and
(2) If the catalog pricing provided with this proposal is not consistent with all relevant sales data, a detailed description of differences or inconsistencies between or among the relevant sales data, the proposed price, and the catalog price (including any related discounts, refunds, rebates, offsets, or other adjustments);
(C) For items priced based on market pricing, a description of the nature of the commercial market, the methodology used to establish a market price, and all relevant sales data. The description shall be adequate to permit the DoD to verify the accuracy of the description;
(D) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item; or http://farsite.hill.af.mil/ http://farsite.hill.af.mil/vfdfara.htm
(E) For items provided by nontraditional defense contractors, a statement that the entity is not currently performing and has not performed, for at least the 1-year period preceding the solicitation of sources by DoD for the procurement or transaction, any contract or subcontract for DoD that is subject to full coverage under the cost accounting standards prescribed pursuant to 41 U.S.C. 1502 and the regulations implementing such section.
(2) The Offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and to determine the reasonableness of price.
(c) Requirements for certified cost or pricing data. If the Offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:
(1) The Offeror shall prepare and submit certified cost or pricing data and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used in any resultant contract, unless the Contracting Officer and the Offeror agree to a different format and change this provision to use Alternate I.
(2) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the Offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR
15.406-2.
(d) Requirements for data other than certified cost or pricing data. (1) Data other than certified cost or pricing data submitted in accordance with this provision shall include the minimum information necessary to permit a determination that the proposed price is fair and reasonable, to include the requirements in DFARS 215.402(a)(i) and 215.404-1(b).
(2) In cases in which uncertified cost data is required, the information shall be provided in the form in which it is regularly maintained by the Offeror or prospective subcontractor in its business operations.
(3) Within 10 days of a written request from the Contracting Officer for additional information to permit an adequate evaluation of the proposed price in accordance with FAR 15.403-3, the Offeror shall provide either the requested information, or a written explanation for the inability to fully comply.
(4) Subcontract price evaluation. (i) Offerors shall obtain from subcontractors the minimum information necessary to support a determination of price reasonableness, as described in FAR part 15 and DFARS part 215.
(ii) No cost data may be required from a prospective subcontractor in any case in which there are sufficient non-
Government sales of the same item to establish reasonableness of price.
(iii) If the Offeror relies on relevant sales data for similar items to determine the price is reasonable, the Offeror shall obtain only that technical information necessary--
(A) To support the conclusion that items are technically similar; and
(B) To explain any technical differences that account for variances between the proposed prices and the sales data presented.
(e) Subcontracts. The Offeror shall insert the substance of this provision, including this paragraph (e), in subcontracts exceeding the simplified acquisition threshold defined in FAR part 2. The Offeror shall require prospective subcontractors to adhere to the requirements of--
(1) Paragraphs (c) and (d) of this provision for subcontracts above the threshold for submission of certified cost or pricing data in FAR 15.403-4; and http://dx.doi.org/10.6028/NIST.SP.800-171
(2) Paragraph (d) of this provision for subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.
(End of provision)
252.215-7010 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN
CERTIFIED COST OR PRICING DATA--ALTERNATE I (JAN 2018)
* (To be provided as applicable, in accordance with individual task order(s))
(a) Definitions. As used in this provision--
Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from sources independent of the offerors.
Non-Government sales means sales of the supplies or services to non-Governmental entities for purposes other than governmental purposes.
Relevant sales data means information provided by an offeror on sales of the same or similar items that can be used to establish price reasonableness taking into consideration the age, volume, and nature of the transactions (including any related discounts, refunds, rebates, offsets, or other adjustments).
Sufficient non-Government sales means relevant sales data that reflects market pricing and contains enough information to make adjustments covered by FAR 15.404-1(b)(2)(ii)(B).
Uncertified cost data means the subset of ``data other than certified cost or pricing data'' (see FAR 2.101) that relates to cost.
(b) Exceptions from certified cost or pricing data.
(1) In lieu of submitting certified cost or pricing data, the Offeror may submit a written request for exception by submitting the information described in paragraphs (b)(1)(i) and (ii) of this provision. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted and whether the price is fair and reasonable.
(i) Exception for price set by law or regulation--Identification of the law or regulation establishing the price offered.
If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Commercial item exception. For a commercial item exception, the Offeror shall submit, at a minimum, information that is adequate for evaluating the reasonableness of the price for this acquisition, including prices at which the same item or similar items have been sold in the commercial market. Such information shall include--
(A) For items previously determined to be commercial, the contract number and military department, defense agency, or other DoD component that rendered such determination, and if available, a Government point of contact;
(B) For items priced based on a catalog--
(1) A copy of or identification of the Offeror's current catalog showing the price for that item; and
(2) If the catalog pricing provided with this proposal is not consistent with all relevant sales data, a detailed description of differences or inconsistencies between or among the relevant sales data, the proposed price, and the catalog price (including any related discounts, refunds, rebates, offsets, or other adjustments);
(C) For items priced based on market pricing, a description of the nature of the commercial market, the methodology used to establish a market price, and all relevant sales data. The description shall be adequate to permit the DoD to verify the accuracy of the description;
(D) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item; or
(E) For items provided by nontraditional defense contractors, a statement that the entity is not currently performing and has not performed, for at least the 1-year period preceding the solicitation of sources by the DoD for the procurement or transaction, any contract or subcontract for the DoD that is subject to full coverage under the cost accounting standards prescribed pursuant to 41 U.S.C. 1502 and the regulations implementing such section.
(2) The Offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and to determine the reasonableness of price.
(c) Requirements for certified cost or pricing data. If the Offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:
(1) The Offeror shall submit certified cost or pricing data and supporting attachments in the following format: [Insert description of the data and format that are required, and include access to records necessary to permit an adequate evaluation of the proposed price in accordance with FAR 15.408, Table 15-2, Note 2. The Contracting Officer shall insert the description at the time of issuing the solicitation or specify that the format regularly maintained by the offeror or prospective subcontractor in its business operations will be acceptable. The Contracting Officer may amend the description as the result of negotiations.]
(2) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the Offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR
15.406-2.
(d) Requirements for data other than certified cost or pricing data.
(1) Data other than certified cost or pricing data submitted in accordance with this provision shall include all data necessary to permit a determination that the proposed price is fair and reasonable, to include the requirements in
DFARS 215.402(a)(i) and 215.404-1(b).
(2) In cases in which uncertified cost data is required, the information shall be provided in the form in which it is regularly maintained by the Offeror or prospective subcontractor in its business operations.
(3) The Offeror shall provide information described as follows: [Insert description of the data and the format that are required, including access to records necessary to permit an adequate evaluation of the proposed price in accordance with FAR 15.403-3.]
(4) Within 10 days of a written request from the Contracting Officer for additional information to support proposal analysis, the Offeror shall provide either the requested information, or a written explanation for the inability to fully comply.
(5) Subcontract price evaluation.
(i) Offerors shall obtain from subcontractors the information necessary to support a determination of price reasonableness, as described in FAR part 15 and DFARS part 215.
(ii) No cost information may be required from a prospective subcontractor in any case in which there are sufficient non-Government sales of the same item to establish reasonableness of price.
(iii) If the Offeror relies on relevant sales data for similar items to determine the price is reasonable, the Offeror shall obtain only that technical information necessary--
(A) To support the conclusion that items are technically similar; and
(B) To explain any technical differences that account for variances between the proposed prices and the sales data presented.
(e) Subcontracts. The Offeror shall insert the substance of this provision, including this paragraph (e), in all subcontracts exceeding the simplified acquisition threshold defined in FAR part 2. The Offeror shall require prospective subcontractors to adhere to the requirements of--
(1) Paragraph (c) and (d) of this provision for subcontracts above the threshold for submission of certified cost or pricing data in FAR 15.403-4; and
(2) Paragraph (d) of this provision for subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.
(End of provision)
252.215-7012 REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)
* (To be provided as applicable, in accordance with individual task order(s))
The Offeror shall submit the cost portion of the proposal via the following electronic media: [ ___ Insert media format, e.g., electronic spreadsheet format, electronic mail, etc.]
(End of provision)
252.225-7018 Photovoltaic Devices--Certificate (JAN 2018)
* (To be provided as applicable, in accordance with individual task order(s))
(a) Definitions. ``Bahrainian photovoltaic device,'' ``Canadian photovoltaic device,'' ``Caribbean Basin photovoltaic device,'' ``designated country,'' ``designated country photovoltaic device, ``domestic photovoltaic device,'' ``foreign photovoltaic device,'' ``Free Trade Agreement country,'' ``Free Trade Agreement photovoltaic device,'' ``Korean photovoltaic device,'' ``least developed country photovoltaic device,'' ``Moroccan photovoltaic device,''
``Panamanian photovoltaic device,'' ``Peruvian photovoltaic device,'' ``photovoltaic device,'' ``qualifying country,''
``qualifying country photovoltaic device,'' ``United States,'' ``U.S.-made photovoltaic device,'' and ``WTO GPA country photovoltaic device'' have the meanings given in the Photovoltaic Devices clause of this solicitation.
(b) Restrictions. The following restrictions apply, depending on the estimated aggregate value of photovoltaic devices to be utilized under a resultant contract:
(1) If less than $180,000, then the Government will not accept an offer specifying the use of—
(i) Other foreign photovoltaic devices in paragraph (d)(2)(iii), (d)(3)(iii), (d)(4)(iii), or (d)(5)(iii) of this provision, unless the offeror documents to the satisfaction of the Contracting Officer that the price of the foreign photovoltaic device plus 50 percent is less than the price of a comparable domestic photovoltaic device and the…