B.08.02_Amendment_0002.pdf
PDF 1 MB Posted
- Attached to
- Hydrant Fueling Systems Alterations
- Solicitation number
- W9127S20R6003
About this file
This solicitation requests proposals for the construction of a new pump house, three 600-GPM pumps, filter separators, a jockey pump, and associated piping and appurtenances at Little Rock Air Force Base. The Department of the Army Corps of Engineers Engineering District Little Rock will evaluate offers and make award. Proposals are due by August 12, 2020. Offerors must submit separate price and non-price proposals, with the non-price proposal limited to descriptions of relevant experience and past performance on similar projects, as well as a technical approach and schedule for this work. The selected contractor will be responsible for design, procurement, construction, and performance testing of the new hydrant fueling systems. Pricing shall be provided using the schedule in Section 001100. This document provides instructions to offerors on requirements for preparing and submitting proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate the projnet questions and answ ers, the site visit attendance sheet, & site visit slides. The correct w age determinations w ill be provided and section 00 22 00 w ill be revised as a result of this amendment. The changes in section 00 22 00 w ill annotated in red. FAR provision 52.204-24 has been changed from by reference to full text and all offerors are required to submit completed FAR provisions 52.204-24 & 52.204-26 in their proposal submission.
1. CONTRACT ID CODE PAGE OF PAGES
1 32
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127S20R6003
X 9B. DATED (SEE ITEM 11)
12-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE
DATE
04-Sep-2020
CODE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
1. Submission of Offers. Submit signed and dated offer at or before the exact time specified in this solicitation. Failure to provide all required documents or information may exclude the offeror(s) from further consideration. Both the electronic copy and paper/hard copy offer will be accepted at the address identified below. Only signed offers submitted on the SF 1442 will be accepted. Emailed and faxed proposals will not be considered.
Submit proposals to:
CONTRACTING DIVISION
USACE, LITTLE ROCK (W9127S)
ATTN: MARCUS D. MITCHELL
700 W. CAPITOL AVENUE, RM 7315
LITTLE ROCK AR 72201-3225
The Packaging:
The Proposals shall be marked:
“Proposals for Solicitation Number: W9127S20R6003 DLA Hydrant Fueling System Alterations LRAFB “DO NOT OPEN”
a. Electronic submissions via email or fax will not be accepted. Offers should be mailed through a commercial/Government carrier or hand carried.
b. This is an electronic solicitation release. No hard copies will be mailed.
Amendments to the solicitation will be posted through the Federal Business Opportunities www.beta.SAM.gov website. It is the responsibility of each Offeror to review the webpage for notice of amendments, updates, or changes to current information.
c. Questions and/or comments relative to these documents should be submitted via e-mail to Mr. Marcus D. Mitchell at Marcus.D.Mitchell@usace.army.mil.
d. Technical inquiries and questions relating to proposal procedures are to be submitted via ProjNet at http://www.projnet.org/projnet . To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page identified above please use the following directions:
Click BID tab select Bidder Inquiry, select agency USACE; enter Key for this solicitation listed below, and your e-mail address, click login.
Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
From this page you may view all proposal inquiries or add inquiry
Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W9127S20R6003 The Bidder Inquiry Key is: N248XP-RV55SS The Review will be open from August 10, 2020 through August 31, 2020 at 12:00 PM
CDT
Offerors are requested to review the solicitation in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals
Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
As this is a competitive negotiation acquisition, there is no public bid opening and no information will be given out as to the number of Offerors or the results of the competition until an award is made.
SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS
The following have been modified:
EVALUATION CRITERIA
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
a. REQUIREMENT FOR SEPARATE PRICE AND NON-PRICE PROPOSALS.
(1) Each Offeror must submit both a Price Proposal and a Non Price Factor Proposal. The Price Proposal and the Non Price Factor Proposal must be submitted as separate volumes. Ensure that the outside of each separate volume is clearly marked to indicate its contents; and the identity of the offeror.
Additionally, clearly identify the “original” cost/price proposal and the “original” technical proposal on the outside cover.
(2) Both the Price Proposal and the Non Price Factor Proposal must be received by the closing date and time set for receipt of proposals.
(3) No dollar amounts from the Price Proposal are to be included in the Non Price Factor Proposal.
(4) All information intended to be evaluated as part of the Non Price Factor Proposal must be submitted as part of the Non Price Factor Proposal. Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.
(5) Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined "unacceptable" and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to submission of the offer. Notwithstanding the above, the Offeror must clearly describe in the Proposal Cover Sheet submitted with the Price Proposal any exceptions to the contractual and/or technical terms and conditions of the solicitation contained in the Offer.
b. DISCUSSIONS. The Government does not intend to enter into discussions in accordance with FAR 52.215-1, Instructions to Offerors—Competitive Acquisitions.
c. COST OR PRICING DATA. Offerors are not required to submit Cost or Pricing Data with their offers.
d. GENERAL INSTRUCTIONS.
(1) Submit only the hard-copy paper documents and the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc.
(2) Use only 8 ½ by 11 inch paper for hard copy submissions, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use fold-outs (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers.
(3) The preferred method for assembling your proposals is to use three-ring binders; however, the use of pressboard or other report covers with compression or other type fasteners is acceptable. Do not use spring clamps or exceed the recommended capacity of the fastener or binder. Do not use plastic multi-hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages.
(4) “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors— Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.
(5) In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.
(6) For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, fold-out pages (11" x 14" or 11" x 17") will count as one page. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are not included in the page limitation.
e. SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL
(1) Number of Sets of the Price Proposal. Submit two (2) Hard Copies and 2 CD ROM copies of the Price Proposal. Please note that number of copies reflected in block 13A of the SF1442 is referencing the number of hard copies for the price proposal only.
(2) Size Restrictions and Page Limits. Use only 8 ½” x 11” pages. There are no page limits set for the price proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation.
(3) Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart. Note: If the Offeror is not required to submit any information under a listed Tab in accordance with the instructions below, that tab can be omitted. However, do not renumber the subsequent tabs.
TAB
CONTENTS OF THE PRICE PROPOSAL
#1
The Proposal Cover Sheet
#2
The SF1442 and Acknowledgement of Amendments
#3
Section 001100, Pricing Schedule
#4
Representations, Certifications, and Other Statements of Offerors (if the offeror does not have electronic certifications in ORCA)
#5
JV Agreement, if applicable.
#6
Pre-Award Survey
#7
Offer Guarantee
(4) Detailed Submission Instructions for the Price Proposal
TAB 1: The proposal cover sheet is required by FAR 52.215-1(2) (c) (i)-(v) and must be submitted by all offerors. This provision, titled “Instructions to Offerors—Competitive Acquisition,” and the format for the proposal cover sheet as shown here:
PROPOSAL COVER SHEET
1. Solicitation Number:
2. The name, address, and telephone and facsimile numbers of the Offeror (and electronic address if available):
3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item. Statement to include any exceptions in technical or cost/price proposal or exceptions inherent in Offeror’s standard terms and conditions.
4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation:
5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
TAB 2: The SF 1442, Solicitation, Offer, and Award is to be completed by all Offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102. All amendments must be acknowledged by all Offerors in accordance with the instructions on the Standard Form 30, Amendment of Solicitation.
TAB 3: Section 001100, Pricing Schedule is to be completed in its entirety by all Offerors.
See Section 001100 with attached notes, for further instructions.
TAB 4: All Offerors must have electronically completed the annual representations and certifications on the “Online Representations and Certifications Application” (ORCA) website or respond with the completed representations / certifications found in the solicitation.. The offerors are responsible for ensuring that these on-line Representations and Certifications are updated as necessary to reflect changes, but at least annually to ensure that they are kept current, accurate and complete. Additionally, the offeror must also complete and return the “Representations, Certifications, and Other Statements of Offerors” included in the solicitation. If the offeror is a Joint Venture, all participants must separately complete both the ORCA Representations and Certifications.
TAB 5: If the Offeror is a Joint Venture (JV), include a copy of the JV Agreement. If a JV
Agreement has not yet been finalized/approved, indicate its status. JV Agreements must clearly indicate the percentages of the JV participants, in particular the percent of the controlling party, and a clear delineation of responsibilities and authorities between the JV parties.
TAB 6: The Pre-Award Survey (found on the following pages) must be completed by all offerors and submitted as part of their price proposal. This document will be used by the Contracting Officer for the Contracting Officer’s Determination of Responsibility done prior to contract award in accordance with FAR Part 9.
TAB 6: Offer Guarantee must be provided in accordance with FAR 52.228-1.
CONSTRUCTION CONTRACTOR EXPERIENCE DATA
PRE-AWARD SURVEY INFORMATION
DATE:
Firm Name and Telephone Number Main Office Address (Street, City, and State)
Branch Offices Services Rendered Construction Design Consultant
Organization Individual Joint Venture Partnership Corporation
Date Organized Date Incorporated:
State:
Names of Officers and Other Key Personnel
I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below) Partners:
Officers:
Other Key:
Remainder: Subtotal Permanent:
Maximum Personnel at Any Time:
Date:
Total:
II—EQUIPMENT OWNED III—FINANCIAL DATA AS OF
(DATE): Present Value ($)
Current Assets:
Acquisition Cost ($) Current Liabilities:
Net Worth:
IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION
WORK IN PAST 6 YRS EXCLUSIVE OF JOINT VENTURE
(LIST MOST RECENT FIRST)
V—LARGEST JOB EVER
CONTRACTED
(If Other Than in Past Six Years)
$ LARGEST JOB IN PAST 6 YRS Contract Amount:
Date:
Description:
Owner:
$ Contract Amount:
Date:
Description:
Owner:
Avg. Annual Income
VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES
NAME AND POSITION/TITLE OF PERSON SIGNING
SIGNATURE
NOTE: Use reverse side for explanations or detailed description of item(s) reported above.
SCHEDULE A
EXISTING COMMITMENTS
Contract Number and Total Value
Description of the Work
Project Owner*
Performance Period
% of work subcontracted
* PLEASE PROVIDE NAME OF ORGANIZATION, POINT OF CONTACT, AND TELEPHONE NUMBER
FOR CONTACT
SCHEDULE B
EXPERIENCE DATA
List below the principal projects the firm has completed within the past 5 years.
Contract Number and Total Value
Description of the Work
Contact Person for the project and phone number
% of work subcontracted
SCHEDULE C
EQUIPMENT AND PERSONNEL
Provide a detailed statement below as to the availability of specific plant/personnel/equipment needed in order to perform the work in accordance with the contract and schedule requirements of this Request for Proposal and resulting project. Include names of personnel and types of equipment or equipment vendors and availability of each to provide equipment in a timely manner.
f. SPECIFIC INSTRUCTIONS FOR THE NON-PRICE FACTOR PROPOSAL
(1) Number of Sets of the Technical Proposal. Submit FOUR (4) Hard Copies and FOUR (4) CD-ROM Copies of the written Non Price Proposal, with each set separately packaged.
(2) Format and Contents of the Technical Proposal and List of Tabs. The original and all copies of the technical proposal will be appropriately labeled as such. Each set shall be organized using the tabs specified in the following chart.
TAB
CONTENTS OF THE NON-PRICE FACTOR
PROPOSAL
Factor 1
TECHNICAL
Sub Factor 1.1
RELEVANT CONSTRUCTION EXPERIENCE
OF OFFEROR/PRIME
Sub Factor 1.2
PROPOSED TECHNICAL APPROACH
Factor 2
PAST PERFORMANCE
Sub Factor 2.1
PAST PERFORMANCE
(3) Page Limitations. See paragraphs d.(2) and .d.(6) in attachment 3 above for format and page count instructions. The following page limitations are established for each factor described above:
Sub Factor 1.1, Relevant Construction Experience of Offeror/Prime – Limited to 4 double-sided pages or 8 single sided pages
Sub Factor 1.2, Proposed Technical Approach– Limited to 5 double-sided pages or 10 single-sided pages; The Project Schedule shall not exceed 10 11” x 17” single-sided pages
Sub Factor 2.1, Past Performance – No page limitation
Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.
(4) Detailed Submission Requirements for the Technical Proposal. The following is a detailed description of the information to be submitted under each TAB.
(i) TAB 1: SUB FACTOR 1.1, RELEVANT CONSTRUCTION EXPERIENCE OF OFFEOR/PRIME: (Definitions for the purposes of this factor):
Relevant construction project means a construction project located on an active United States military installation (located within the continental United States, Alaska, Hawaii, or United States territory) that is capable of offloading, transferring, storing, and delivering aviation fuel, constructed for the purpose of fueling aircraft.
Substantially completed means at a minimum turned over for beneficial occupancy in its entirety (not partially turned over).
Key Subcontractor means a subcontractor who at a minimum directly performed all the major or critical aspects of a relevant construction project. Major or critical aspects are the facilities or systems for offloading, transferring, storing, and delivering aviation fuel.
The Offeror shall submit a minimum of two (2) and no more than four (4) examples of relevant construction projects on which the Offeror performed either as the prime contractor or as a Key Subcontractor (how the Offeror performed must be clearly indicated).
a) The Offeror may also submit projects where its Key Subcontractor performed either as the prime contractor or as a Key Subcontractor (how the Key Subcontractor performed must be clearly indicated); however, at least one of the total number of submitted projects must have been performed by the Offeror (i.e., all projects submitted cannot have all been performed by the Key Subcontractor). If any project submitted is that of a Key Subcontractor, it must be accompanied by a signed Letter of Commitment from that Key Subcontractor committing them as a member of the team for this project.
b) The submitted projects shall either be 100% construction progress complete or substantially complete within six (6) ten (10) years from the date of issuance of this solicitation.
At least one project example shall include all elements of the following four phases of airfield fueling: [1] offload, [2] transfer (systems of pumps, filters and pipes), [3] aviation fuel storage, and [4] fuel delivery to equipment that incorporates refueler truck fill stands or otherwise complies with the direct aircraft fueling systems criteria for Type III, IV, or V hydrant fueling systems as specified in the Unified Facilities Criteria (UFC) 3-460-01. The construction contract for this project example shall be a minimum of $10 million in magnitude.
All other project examples shall include at a minimum two (2) elements of the following four (4) phases of airfield fueling, but may include multiple or all phases: [1] offload, [2] transfer (systems of pumps, filters and pipes), [3] aviation fuel storage, or [4] fuel delivery to equipment that incorporates refueler truck fillstands or otherwise complies with the direct aircraft fueling systems criteria for Type III, IV, or V hydrant fueling systems as specified in the Unified Facilities Criteria (UFC) 3-460-01. The construction contract for these project examples shall be a minimum of $7 $5 million in magnitude.
Using a Relevant Experience Matrix similar to that shown below in Table 3, clearly identify to which phase of airfield fueling each project example submitted pertains.
Table 3: Factor A – Relevant Experience Matrix Example
Offload Transfer Aviation
Fuel Storage
Fuel Delivery to Equipment
Project #1 –IAW Para. 5.2.2 (Must have 4 phases of refueling):
Offeror, Project Title, Project Location, Contract Amount, Date of 100% completion or substantial completion
X X X X
Project #2 – IAW Para 5.2.3 (At least 2 phases of refueling):
Offeror, Project Title, Project Location, Contract Amount, Date of 100% completion or substantial completion
X X
Project #3 – IAW Para 5.2.3 (At least 2 phases of refueling):
Offeror, Project Title, Project Location, Contract Amount, Date of 100% completion or substantial completion
X X
Note: Table 3 above is an example. All projects submitted must meet all applicable requirements.
The Offeror shall also submit an explanation briefly justifying each designation in the Relevant Experience Matrix for each submitted example project. This explanation shall not exceed four (4) 8.5” x 11” double-sided pages or eight (8) 8.5” x 11” single-sided pages, regardless of the total number of projects submitted.
a) For each project submitted where work was performed as a Key Subcontractor as opposed to a prime contractor, the Offeror shall submit an additional, separate statement that includes the total contract amount, the dollar amount of the work performed as the Key Subcontractor, a description of the elements of work specifically completed by the Offeror (or the Offeror’s Key Subcontractor) while working as a Key Subcontractor, and the percentage of work performed as the Key Subcontractor of the overall project work. The statement shall also justify how the Offeror (or the Offeror’s Key Subcontractor) meets the definition of “Key Subcontractor” in the context of the example project(s) submitted. The statement shall not exceed two (2) 8.5” x 11” double-sided pages or four (4) 8.5” x 11” single-sided pages. If it is determined by the Government that based on the information provided by the Offeror that it does not in fact meet the definition of a Key Subcontractor, the project will not be considered for evaluation.
If the Offeror submits more than four (4) project examples, the Government will only evaluate the first four (4) submitted projects.
Evaluation Method for this Sub Factor:
Factor A will be evaluated to determine whether the Offeror’s submission meets the requirements of this factor. If any of the required information is not provided in the Offeror’s proposal or fails to meet the requirements, the Offeror will be evaluated as “Unacceptable.”
TAB 1 SUB FACTOR 1.1 - RELEVANT CONSTRUCTION EXPERIENCE OF
OFFEROR/PRIME
Rating: Description:
Acceptable The proposal clearly demonstrates how at least two (2) of the project examples submitted meets the requirements of this Sub Factor
Unacceptable The proposal does not clearly demonstrate how at least two (2) of the project examples submitted meets the requirements of this Sub Factor
(SEE EXPERIENCE INFORMATION FORM NEXT PAGE)
Relevant Construction Experience of Offeror
Offeror must complete the applicable paragraphs as noted below.
Provide the following information to show examples of projects your company constructed within the last six (6) years for Factor A indicating experience with projects of comparable type and scope.
Use one form per project.
(a) Type of Facility Represented
(b) Your Firm’s Name
(c) Name of Project
(d) Location of Project
(e) Owner
(f) General Scope of Construction Project:
(g) Your Role (Prime, Joint Venture, or Subcontractor, etc.) and Work Your Company Self- Performed:
(h) Construction Cost (value of prime contract)
(i) Extent and Type of Work You Subcontracted Out / Or Extent and Type of Work You Performed as Key Subcontractor:
(j) Dates Construction Began: Completed:
(k) Percent Complete:
(l) Were You Terminated or Assessed Liquidated Damages?
[If either is “Yes,” attach an Explanation]
(m) Project Owner’s Point of Contact for Reference (Or Prime Contractor POC if
Submitting Subcontracting Experience) [Name and Company]
(n) Current Telephone Number of Reference POC:
(o) Describe how the project relates to the especially relevant experience areas under Factors A, B, C:
W9127S20R6003
(ii) TAB 1: SUB FACTOR 1.2, Proposed Technical Approach: The Offeror shall demonstrate their clear and complete understanding of this project by providing a Project Narrative that discusses their means and methods proposed for this particular project, including, but not limited to, their plan for commissioning and performance testing the system.
a) The Project Narrative shall not exceed five (5) 8.5” x 11” double-sided pages or ten (10)
8.5” x 11” single-sided pages.
The Offeror shall also submit a Project Schedule, broken down to the feature of work level and amount of days per feature.
a) The Project Schedule shall not exceed ten (10) 11” x 17” single-sided pages.
In the event the Offeror is awarded this solicitation, nothing in the submitted narrative or schedule will be considered an approved contract modification in the event there are elements of the narrative or schedule that are not in accordance with either the solicitation’s drawings or specifications.
Evaluation Method for this Sub Factor:
The Government will evaluate the narrative and schedule considering the extent to which the Offeror demonstrates a clear and complete understanding of the requirements of the project.
The Government will evaluate the effectiveness of the technical approach to determine adherence to the requirements of the solicitation.
TAB 1: SUB FACTOR 1.2 – PROPOSED TECHNICAL APPROACH EVALUATION RATING
Rating: Description:
Acceptable The narrative and schedule clearly demonstrate a complete understanding of the requirements of the project.
Unacceptable The narrative and schedule do not clearly demonstrate a complete understanding of the requirements of the project.
(iii) TAB 2: SUB FACTOR 2.1, PAST PERFORMANCE: The project examples submitted for Sub Factor 1.1 will be used for evaluation of Past Performance of the Offeror (or Affiliate), as well as any other past performance information that the Government may independently obtain.
Past Performance References: For the projects submitted, the government will query the Contractor Performance Assessment Reporting System (CPARS) to validate past performance ratings. For each project that does not have a final CPARS evaluation, Offerors shall provide a NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0) to the point of contact, clearly identifying the project to be evaluated. A NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0) is included at the end of the RFP as Attachment 2. When completed, these forms shall be mailed, faxed or emailed to the Little Rock District Contract Specialist identified in the RFP. It is the contractor’s responsibility to ensure that the reference documentation is provided as the Government may not make additional requests for past performance information from the references.
Offerors submitting responses shall present a list of reference contacts that were mailed a past performance questionnaire to complete. The Offeror shall briefly discuss its past performance on each project identified above in order to explain any ratings that may impact its overall rating for this factor (positively or negatively).
The Government will assess the degree of success of the Offeror’s past performance in recent relevant projects. Owners/references will be asked to comment on items such as quality of construction, timeliness, management of subcontractor work, including timely payment to subs or suppliers, safety, relations between owner and designer or contractor, level of support for such items or tasks as as-built documentation, O&M manuals, training, correcting construction errors, warranty work, etc. The Government will target areas identified in the requirements of this solicitation including records conforming to quality, schedule, cost control, customer satisfaction, and level of support for such things as as-built documentation, O&M manuals, training, and problem resolution for construction errors, warranty work, and safety
Other Sources: The Government may contact sources other than those provided by the Offeror for information with respect to past performance on projects completed, or at least 50% complete.
These other sources may include, but are not limited to CPARS, telephone interviews with organizations familiar with the Offeror’s performance, and Government personnel with personal knowledge of the Offeror’s performance capability. The Government may be unable to obtain any qualitative information under subcontracts due to the Government’s lack of privity with subcontractors. Unless otherwise requested by the subcontractor, adverse subcontractor performance information will be provided to the Offeror if discussions are held and/or during a requested debriefing.
Evaluation Method for this Sub Factor:
The Government will evaluate an Offeror’s past performance based on a demonstrated record of performance in accordance with FAR 15.305(a)(2). Past performance information is an indicator of an Offeror’s ability to perform the contract successfully.
The Government will evaluate the successful completion of all project examples for the past six
(6) years. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction.
The Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS). This information may involve the Offeror’s Affiliate if an Affiliate’s project is submitted for Factor A.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
TABLE 5: FACTOR B – PAST PERFORMANCE OF OFFEROR EVALUATION RATING
Rating: Description:
Acceptable
Based on the Offeror’s (or Affiliate’s) past performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown.
Unacceptable
Based on the Offeror’s (or Affiliate’s) past performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.
NOTE: In the case of an Offeror without a record of past performance or for whom information on past performance is not available; the Offeror’s past performance may not be evaluated as favorable or unfavorable. [Ref: FAR 15.305(a)(2)(iv)]. Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS.
CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance
E VG S M U N
with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
12. GENERAL TECHNICAL CRITERIA
a. Material omission(s) may cause the technical proposal to be rejected as unacceptable.
b. Proposals which are generic, vague, or lacking in detail may be considered unacceptable. The offeror’s failure to include information that the Government has indicated is necessary should be included may result in the proposal being found deficient if inadequate detail is provided.
c. The Government cannot make award based on a deficient offer. Therefore, receipt of an
“UNACCEPTABLE” determination of acceptability for any factor will make the offer ineligible for award, unless the Government elects to enter into discussions with that Offeror and all deficiencies are remedied in a revised proposal.
SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS
The following were previously included by reference and are now included by full text:
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in the provision at 52.204-26, Covered Telecommunications Equipment or Services--Representation, or in paragraph (v) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items.
(a) Definitions. As used in this provision-
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to--
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to--
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."
(d) Representations. The Offeror represents that--
(1) It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that--
It [ ] does, [ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.
(e) Disclosures.
(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment--
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(ii) For covered services--
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the…