A.07.24_Solicitation_Amendment_0002_FBO_A3.pdf

PDF 109 KB Posted

Attached to
Erosion Control, Bank Stabilization, Structure Repairs & Channel Improvements
Solicitation number
W9127S17B0003
Issued by

About this file

Solicitation Amendment Paperwork 0002 recognized as fbo.gov Amendment 3.

View the file

Other files

File Type Posted
A.01.29_Specifications_Rev1.pdf PDF
A.07.24_Solicitation_Amendment_0001.pdf PDF
A.01.13_Drawings_Rev1.pdf PDF
A.07.24_A1_Solicitation_Slip_Page,_Page_1.pdf PDF
A.01.13_Drawings.pdf PDF
A.07.23_Solicitation.pdf PDF
A.01.29_Specifications.pdf PDF
A.02.02_Presolicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Attaches tw o additional Projnet answ ers. The entire Projnet questions and answ ers document is attached. How ever, the last tw o questions are the only new questions and answ ers.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 31-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127S17B0003

X 9B. DATED (SEE ITEM 11)

07-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Sep-2017

CODE

CONTRACTING DIVISION

USACE, LITTLE ROCK (W9127S)

700 W. CAPITOL AVE, RM 7315

LITTLE ROCK AR 72201-3225

W9127S 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127S17B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

PROJNET Q&A, AMENDMENT 0002

See attached Projnet Q&A document..

(End of Summary of Changes)

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: Erosion Control - Protection, Bank Stabilization Structure Repairs & Channel Improvements Review: RFI Review (00001) (sorted by CommentID ) Displaying 6 inquiries.

Id Discipline Sheet Detail Spec 7105911 Contracting 1 1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

I have a few suggestions and questions that I hope you will take into consideration concerning the above referenced project.

The bid date and time is September 5, 2017 at 10:00 a.m. This is the day after Labor Day and a morning bid time. I would like to request revising the bid date to at least September 6, 2017 and change to an afternoon time such as 2:00 p.m., 2:30 p.m., etc.

2 The Bid schedule does not provide for a Mobilization/Demobilization item. I would like to suggest such an item be added to the bid schedule in the form of a Lump Sum item to provide for a contractor to include such cost in the bid.

3 Page 4 of 38 in the bid solicitation indicates the delivery date for each line item is "360 dys. ANP". What is ANP ?

4 The magnitude of Construction is shown to be between $1,000,000 and $5,000,000. Do these values reflect only the Base Bid ?

5. The bid schedule indicates the unit for the stone is "Dry Ton". Please clarify that Dry Ton is synonymous with Short Ton at 2,000 lbs.

6 Will the COE close the tainter gates adjacent to the stone placing operation ?

7 The navigation pool elevations shown in the drawings at both lock and dams all indicate elevation 196. Please correct and show actual pool elevations at both lock and dams.

On: Aug 14 2017.

Government Response. . 1) The bid opening date will be changed via amendment to September 07, 2017 at 2:00

P.M. CDST.

2) A separate contract line item for mobilization and demobilization is not required.

3) ANP = after notice to proceed

4) Yes, amendment forthcoming removing the bid options.

5) Dry ton is the U.S. short ton, measured when the material is relatively dry with a stable moisture content. The long ton is British.

6) The contractor may request coordination of tainter gate closure during execution of the contract, however, no guarantee of gate closure will provided in the contract.

7) Amendment forthcoming removing V-101 L&D4. On: Aug 25 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

7108691 Contracting 52.228-1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Solicitation set-aside: Small Business = $36.5 million per year.

Solicitation Magnitude between $1,000,000.00 and $5,000,000.00 However items 0001 thru 0003 will far exceed $5,000,000.00.

Section 52.228-1 Bid Guarantee says 20% of bid amount or $3,000,000.00 The question is: Does a small business bond the $5 million ? or are we having to put up over a year's bonding to cover all three items of work?

On: Aug 15 2017.

Government Response. . Amendment forthcoming to remove the bid options (CLINs 0002 and 0003). On: Aug 25 Current Request Status: Request Closed

Information for this report is procurement sensitive.

7108695 Contracting time time Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 1 of 2ProjNet: Logged In User

8/31/2017https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strR...

The Solicitation outlines 360 Calendar days for each item.

Is that 360 calendar days to perform each item? Totaling 1,080 calendar days..... OR We get 360 calendar days to perform all three items of work?

On: Aug 15 2017.

Government Response. . 360 days to execute all contract requirements. Amendment forthcoming removing optional bid items. On: Aug 25 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

7110658 Contracting 1 1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please clarify the performance time for the base bid and option items. Standard form 1442 indicates that the contractor should see Section 00 73 00 but Section 00 73 00 is not included in the specifications. Please provide Section 00 73 00 in addendum.

Please extend the bid date 7 calendar days

On: Aug 16 2017.

Government Response. . 360 days to execute all contract requirements. On: Aug 25 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

7125580 Contracting 1 1 1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The listed amendment is the first page of the original solicitation.

On: Aug 28 2017.

Government Response. . Amendment 1 was a new front page to specific projnet.org dates. FBO Amendment 2 which has a SF30 and shows Amendment/Modification No. 0001 is what needs to be acknowledged in bids. On:

Aug 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

7129161 Contracting 1 1 1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

On FBO there are two amendments listed, amendment no.1 and amendment no.2. However, amendment no. 1 doesn't appear to be an amendment and amendment no.2 has amendment no. 1 paperwork. On the 1442 what do we acknowledge?

On: Aug 30 2017.

Government Response. . Amendment 1 was a slip page to specify the RFI location at projnet.org. As such is doesn't need to be acknowledged.

FBO's amendment 2 which has 0001 on the SF 30 and 1 on the attachments requires acknowledgment. On: Aug 31 Current Request Status: Request Closed

Information for this report is procurement sensitive.

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.

Page 2 of 2ProjNet: Logged In User

8/31/2017https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strR...

A.07.24 Solicitation Amendment 0002
ProjNet2

File details come from the government source that posted it. Updated .