PN462909

Erosion Control-Protection and Bank Stabilization Arkansas River, Arkansas R.M. 86.4 to 66.0

SECTION 01 11 00 Page 1 of 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes placement of stone for erosion control and protection of navigation lock and dam structures, filling scour holes, scour repairs, and incidental related work.

***AMD01***

The work shall be filling of scour areas up and downstream of Lock and Dam 5.

Scour surveys in Appendix B, display approximate scour locations and volumes that were produced using data procured prior to 2017 high water event on the MKARNS. The contractor shall sound the noted scour locations and provide cross sectional data to the Contracting Officer prior to stone placement.

***AMD01***

1.2.2 Location

The work shall be located on the McClellan-Kerr Arkansas River Navigation System waters from R.M. 86.4 to 66.0, approximately as indicated in Appendix B. The exact location will be shown by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 14 00 Page 1 of 6

SECTION 01 14 00

WORK RESTRICTIONS

1.1 PROTECTION OF GOVERNMENT PROPERTY

1.1.1 Protection of Government Facilities

Take whatever measures are necessary or required for protection of the existing navigation lock and dam structures, buildings, grounds, parking area and other Government facilities.

1.2 WORK SCHEDULE

1.2.1 WORK HOURS

Arrange work schedule so that the work performed at the Government installation will be during the normal day shift established as 7:00 a.m. to 4:30 p.m., Monday through Friday, except Federal holidays, with the option of working weekends with the approval of the Contracting Officer. Work at the installation during other periods of time will be permitted only on the specific approval of the Contracting Officer or his authorized representative for each specified time. In the event an operation is necessary which cannot be completed within the day shift period specified above without loss or additional cost to the Contractor, the work day period for that operation may be extended upon request of the Contractor and approval of the Contracting Officer.

1.2.2 INSPECTION HOURS

The contract requires that sounding of scour locations be performed in the presence of the Contracting Officer or his representative. These soundings will be scheduled between 08:30 a.m. and 03:00 p.m., Monday through Thursday, excluding Federal holidays; the Government shall be given 72 hours advance notice.

1.3 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

1.3.1 This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the contract clause entitled "Default (Fixed Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

1.3.1.1 The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

SECTION 01 14 00 Page 2 of 6

1.3.1.2 The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

1.3.2 The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

15 12 15 11 10 9 5 4 9 10 15 14

1.3.3 Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled workday.

The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph, above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the contract clause entitled "Default (Fixed Price Construction)"

1.4 QUALITY CONTROL

1.4.1 General

The Contractor shall establish and maintain quality control for his operations to assure compliance with contract requirements and maintain records of his quality control for all construction operations under the contract as specified in SECTION 01 45 00.00 10 15 QUALITY CONTROL.

1.4.2 Technical Provisions

This requirement shall apply equally to each section of the Technical Provisions, except where therein the QUALITY CONTROL requirements set forth critical items of work requiring special attention by the Contractor.

1.4.3 Quality Control Inspector Safety Responsibilities

Each Contractor quality control inspector shall be responsible for inspecting the work under his surveillance for compliance with EM 385-1-1, and shall immediately bring to the attention of the Contractor's supervisory

SECTION 01 14 00 Page 3 of 6 personnel all unsafe working conditions, unsafe work practices, unsafe tools or equipment and instances of noncompliance with the Safety and Health Requirements Manual.

1.4.4 Quality Control Inspector Environmental Responsibilities

The Contractor quality control inspector shall be responsible for quality control for environment protection specified in SECTION 01 57 20.00 10:

ENVIRONMENTAL PROTECTION, and shall immediately bring to the attention of the Contractor's supervisory personnel all instances of noncompliance.

1.4.5 Records and Tests

A copy of the records and tests, as well as the records of corrective action taken, will be furnished the Government as directed by the Contracting Officer.

1.6 BULLETIN BOARD, PROJECT SIGN, SAFETY SIGN

1.6.1 Bulletin Board

The Contractor shall furnish, install, and maintain for the duration of the contract, a weather tight bulletin board, having hinged or sliding glazed doors, on which shall be displayed legible copies of (1) the poster entitled "equal employment opportunity is the law" (OFCCP Publication 1420) as required by CONTRACT CLAUSES: EQUAL OPPORTUNITY, AFFIRMATIVE ACTION

COMPLIANCE REQUIREMENTS FOR CONSTRUCTION, AFFIRMATIVE ACTION FOR SPECIAL

DISABLED AND VIETNAM ERA VETERANS, AND AFFIRMATIVE ACTION FOR HANDICAPPED

WORKERS; (2) the Notice to Employees Poster (WH Publication 1321); (3) the schedule of minimum wage rates for the contract as required by CONTRACT CLAUSE: DAVIS-BACON ACT; and (4) current safety posters. The bulletin board shall be mounted where and as approved by the Contracting Officer, in a prominent place accessible to all employees of the Contractor and subcontractors, and to applicants for employment. The bulletin board shall remain the property of the Contractor and shall be removed by him upon completion of the contract work.

1.6.2 Project and Safety Signs

The requirements for the signs (see Appendix A Forms and Attachments), their content, and location shall be as shown on the drawings. Exact location and name of sponsor, to be placed on the sign, shall be determined by the Contracting Officer. Verify with the Contracting Officer, the exact text to be placed on the signs prior to construction of the signs.

1.7 RIGHTS-OF-WAY

1.7.1 Land Access

If the Contractor uses the access right-of-way provided by the Government, he shall assume the responsibility for improving as necessary, maintaining, and the repair of any damage to the roads by his equipment or vehicles on and off the levees and cattle guards. The basis for determining the extent of damage will be a survey made before and after construction by the Contracting

SECTION 01 14 00 Page 4 of 6

Officer and the Contractor. Existing or relocated gates within the Contractor's work area shall be closed during nonworking hours and, if used to access work under this contract, shall be attended by one or more gate tenders, as required, during working hours. Upon completion of the work under this contract, the Contractor shall remove the fence crossings constructed by the Contractor and restore the fences to at least their original condition, as determined by the preconstruction survey. The Contractor will be responsible for immediate removal from the roads and rights-of-way any materials or equipment that becomes dislodged from the Contractor's vehicles.

The Contractor may elect to access the contract sites from the river channel as described in the below Paragraph “River Access".

1.7.2 River Access

Scour locations can be accessed directly from the river by a barge which is 35' wide by 195' long with a loaded draft of 5'. THE CONTRACTOR

MAY BE EXPECTED TO TRAVEL TO AND FROM WORK IN AREAS WHERE THE WATER IS ONLY

5’ FEET DEEP; THOSE AREAS SHALL BE CONSIDERED TO HAVE DIRECT ACCESS BY

FLOATING PLANT.

1.8 SIGNAL LIGHTS

The Contractor shall display signal lights and conduct his operations in accordance with the General Regulations of the Department of the Army and of the Coast Guard governing lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations, lights to be displayed on dredge pipe lines, and day signals to be displayed by vessels of more than 65 feet in lengths moored or anchored in a fairway or channel, and the passing of other vessels of floating plant working in navigable channels, as set forth in Commandant U.S. Coast Guard Instruction M16672.2, Navigation Rules: International-Inland (COMOTINST M16672.2), or 33 CFRB1 Appendix A(International) and 33 CFR 84 Through 33 CFR 89 (Inland) as applicable.

1.9 FUEL OIL TRANSFER SAFETY REQUIREMENTS

All marine plant used in this contract shall meet applicable U.S. Coast Guard regulations for fuel oil transfer operations. For uninspected vessels, Coast Guard regulations contained in 33 CFR 156.120 and 33 CFR

155.320 regarding fuel coupling devices and provisions for fuel oil discharge containment are applicable. Venting of the fuel tanks is necessary when using the couplings prescribed by 33 CFR 156.120(1) or (2). (SWDSO dated 4 Mar 81, LRD).

1.10 CONSTRUCTION CONSTRAINTS

During the months of May, June, July, and August, surveys for Interior Least Tern populations shall be performed in the project area before any work is started. Should any tern be found, “no work shall be conducted within 100 meters (or approximately 328 feet) of any nesting area until nesting activities have ceased and young terns have fledged”. Stockpiled stone or excavated material shall not be placed within 100 meters of nesting locations as required by the "Management Plan for the Recovery of the Interior Least Tern". In addition, these materials shall not be placed

SECTION 01 14 00 Page 5 of 6 in areas or in such a manner that would adversely affect other significant fish and wildlife resources. In the event that least tern nesting areas force delay of the work at any site, and work is required and can be performed at another site within the contract reach, such work will be made available to the Contractor. All expenses in moving to the new site and returning to the original site when repairs can again be made shall be borne by the Contractor.

1.11 RIVER STAGE AND WEATHER LIMITATIONS:

1.11.1 No work will be permitted under this contract at times when the river is at or above natural high bank, or when the local gage in the vicinity of the work indicates flood stage or higher, unless specifically authorized in writing by the Contracting Officer. When construction work is prevented during such times and because of such actions, the Contracting Officer will determine the extent of the delay to the work as a whole, and the time fixed for completion of the contract will be extended for the period of such delay.

1.11.2 Low River Stages

1.11.2.1 In the event low water river stages require the Contractor to lighten his barges to a draft of less than 5 feet or to suspend operations entirely, the Contracting Officer will determine the extent of the delay to the work as a whole, and the time fixed for completion of the contract will be extended for the periods of such delay.

1.12 ORDER OF WORK

1.12.1 Unless directed by the Contracting Officer, construction shall begin with the first item in each task order.

1.12.2 Work on each specific scour repair, shall begin at the upstream end or landward end of each structure and shall proceed downstream or riverward unless variation is authorized in writing by the Contracting Officer.

1.12.3 The Contractor will be allowed to work on more than one scour location at a time provided work on scour locations is not delayed by work on repairs listed in each task order

1.12.4 The Contractor shall not be allowed to stockpile stone on the bank near any repair site.

1.12.5 The Contractor shall not begin placement of stone fill below the water surface when the discharge is predicted to exceed 40,000 feet per second during the required construction period unless otherwise directed in writing by the Contracting Officer. In the event that river stages force cessation of the work at any site, and work is required and can be performed at another site within the contract reach, such work will be made available to the Contractor. All expenses in moving to the new site and returning to the original site when repairs can again be made shall be borne by the Contractor.

1.13 WORK ADJACENT TO AND AROUND GOVERNMENT STRUCTURES

SECTION 01 14 00 Page 6 of 6

1.13.1 The requirements of the erosion control and protection work, such as location, proximity and limits of stone to be placed in structure and bank protection, and in scour hole repairs, will be determined by information provided to the Contractor in each task order and in the field by the Contracting Officer.

1.13.2 Before work is to begin at any site, the Contractor shall inspect that site with the Contracting Officer. The Contractor shall ascertain the types, size and approximate quantities of materials and specific equipment necessary to perform the repairs and/or stone placement indicated at that site and shall have sufficient material, supplies, and equipment available for use at the said site in time to permit the work to begin and progress without delay.

1.13.3 For underwater placement, stone shall be placed with a skip bucket, clam bucket, crane or other approved equipment capable of discharging the material underwater with minimum free fall to reduce segregation. Stone shall be placed systematically beginning at the base of structure slopes.

When placing large stone near existing structures, including concrete walls, concrete pilings or sheet pilings as well as dams and locks, stone shall be mechanically placed with equipment suitable for stone of the Graded R2200 size for a distance of 25 feet up to and adjacent to the concrete structures, in a safe manner that prevents any damage to the structure.

1.14 WORK BY OTHER CONTRACTORS ON BANK STABILIZATION STRUCTURES

The Government reserves the right to contract with other contractors to do bank stabilization and channel improvement work during the ***AMD01***360 day performance period***AMD01 of this contract provided the Contractor (or Contractors) for work of this contract receives a minimum contract amount of $250,000.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

Arkansas River, Arkansas

SECTION 01 22 00 Page 1 of 2

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

1.1 UNIT PRICE PAYMENT ITEMS AND FIELD SURVEY MEASUREMENTS

Unit Price Payment Items

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

Field Survey Measurements

Make original and final surveys for individual work item shown on Bidding Schedule and furnish original survey notes to Contracting Officer on a daily basis. From these surveys Government will verify that surfaces are within the specified tolerances. If the surfaces are out of tolerance, provide additional surveys to the Government as necessary to verify surfaces have been revised and are within tolerances. All surveys shall be conducted with Contracting Officer present.

1.1.5 Lock and Dam 5 R2200 Scour Fill (Line item 0001)

1.1.5.1 Payment

Payment will be made for Item " Lock and Dam 5 R2200 Scour Fill " which prices and payments thereof shall constitute full compensation for furnishing, hauling and placing Graded R2200 Stone in place, complete including all materials, labor, equipment, tools, and incidentals necessary to complete the work, as specified herein and as in the task order.

Reference appendix B, sheet 2, for approximate location of scour holes.

1.1.5.2 Measurement

The unit of measurement for stone furnished by the Contractor will be the dry ton (2,000 match bid schedule estimated quantity and unit. pounds) of stone satisfactorily placed in the work.

The stone is to be delivered by barge, the weight of each barge load of stone shall be determined by displacement at the job site, with deductions for water or ballast. The Contractor shall furnish dimensions of the barge or barges to be used for delivery of stone. The Contractor shall also prepare displacement tables and furnish them to the Contracting Officer for checking and agreement on accuracy.

Arkansas River, Arkansas R.M. 86.4 to 66.0

SECTION 01 22 00 Page 2 of 2

1.1.5.3 Unit of Measure

Unit of measure: Cubic yard

1.1.6 Not Used

1.1.7 Not Used

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)