AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
As an amendment to the solicitation, the follow ing changes are made:
1. The price schedule is revised. See Continuation Page for additional details. The attached revised price schedule is incorporated in full and replaces the previous version in its entirety.
2. Section 00800 Clause 52.211-10 Commencement, Prosecution, and Completion of Work is updated to reflect revisions to the table providing the number of contract extension days for exercising optional Contract Line Items Numbers (CLINs).
3. Section 01 22 00.00 82 Paragraphs 3.1.9 and 3.1.10 are revised. The attached revised paragraphs are incorporated in full and replace the previous versions in their entirety.
4. Section 35 20 23.00 82 Paragraph 3.1.4 a. (2) (e) is revised. The attached revised paragraph is incorporated in full and replaces the previous version in its entirety.
5. See Continuation Page for item number 5.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-17-B-0005
X 9B. DATED (SEE ITEM 11)
03-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Mar-2017
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been added by full text:
AMENDMENT 0004
5. Drawing WCH-CLW-000 DWG 4 OF 7 is revised to include examples of BMRD work areas that are (1) between 30,000 and 75,000 CY and (2) greater than 75,000 CY available in the dredging pay prism. The attached revised version is incorporated in full and replaces the previous version in its entirety.
SECTION 00100 - BIDDING SCHEDULE / INSTRUCTIONS TO BIDDERS
CLIN 0010
The pricing detail quantity has decreased by 200,000.00 from 375,000.00 to
175,000.00.
The option status has changed from No Status to Option.
CLIN 0013
The CLIN extended description has changed from CLW Maintenance, RM 3+00 to
RM 105+00, Bin Measure to Required Depth, (FL) Placement to CLW Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth, Work Area Qty 30,000 to 75,000 cy, (FL) Placement.
CLIN 0014
The CLIN extended description has changed from CLW Maintenance, RM 3+00 to
RM 105+00, Bin Measure to Required Depth, (FL) Placement to CLW Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth, Work Area Qty Greater than 75,000 cy, (FL) Placement.
The pricing detail quantity has increased by 200,000.00 from 175,000.00 to 375,000.00.
The option status has changed from Option to No Status.
The following Delivery Schedule item for CLIN 0010 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 14-APR-2017 TO
17-JAN-2018
N/A PORTLAND DISTRICT RESIDENT OFFICE
CENWP-EC-CV
USACE PORTLAND DISTRICT
4480 SE COLUMBIA WAY
VANCOUVER WA 98661
360-448-7796 FOB: Destination
960439
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 14-APR-2017 TO
17-JAN-2018
N/A PORTLAND DISTRICT RESIDENT OFFICE
CENWP-EC-CV
USACE PORTLAND DISTRICT
4480 SE COLUMBIA WAY
VANCOUVER WA 98661
360-448-7796 FOB: Destination
960439
The following Delivery Schedule item for CLIN 0014 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 14-APR-2017 TO
17-JAN-2018
N/A PORTLAND DISTRICT RESIDENT OFFICE
CENWP-EC-CV
USACE PORTLAND DISTRICT
4480 SE COLUMBIA WAY
VANCOUVER WA 98661
360-448-7796 FOB: Destination
960439
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 14-APR-2017 TO
17-JAN-2018
N/A PORTLAND DISTRICT RESIDENT OFFICE
CENWP-EC-CV
USACE PORTLAND DISTRICT
4480 SE COLUMBIA WAY
VANCOUVER WA 98661
360-448-7796 FOB: Destination
960439
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract after the date the Contractor receives the notice to proceed as stated in Section 01 10 10.00 82 paragraph 1.1.2 a. “Order of Work” as follows:
(1) Humboldt Bay, California: Commence work accordingly to complete all awarded base and optional work by 30 June 2017.
(2) Mouth of the Columbia River and/ or the Columbia River: Commence work between 15 June 2017 and 7 July 2017
(3) The following work windows apply to locations contained within this Contract.
HUM: No environmental restrictions.
CLW: Dredging must take place between 1 June and 15 December.
COO: 15 June to 31 Oct.
MCR: All dredging at MCR must take place between June 1st and November 30th. No placement in the North Jetty Site is allowed on or after October 1st.
(b) Prosecute the work diligently, and (c) complete the entire work ready for use not later than:
FINAL CONSTRUCTION PHYSICAL COMPLETION date is 17 October 2017.
CONTRACT END DATE: 17 January 2018.
The time stated for FINAL CONSTRUCTION PHYSICAL COMPLETION includes physical completion of all site work, site cleanup, and demobilization.
The time stated for CONTRACT END DATE includes submission and approval of all final remaining work documents.
The contract will be extended with the award of each optional item, based on the table below:
Bid Item Description Days
0006 Humboldt Bay Bar and Entrance Maintenance Dredging and Placement 10
Columbia River RM 3+00 to RM 105+00, Pre/Post Dredge Survey, Flow Lane
Placement
Columbia River RM 3+00 to RM 105+00, Pre/Post Dredge Survey, Flow Lane
Placement
Columbia River RM 3+00 to RM 105+00, Pre/Post Dredge Survey, Flow Lane
Placement
0019 Coos Bay Entrance Channel Maintenance Dredging and Placement 6
Mouth of the Columbia River (MCR) Maintenance Dredging and Placement
Mouth of the Columbia River (MCR) Maintenance Dredging and Placement
NOTES:
*Definition: Commence work means having dredge on site and ready to dredge **The Government intends to issue NTP on or about 14 April 2017
(End of clause)
(End of Summary of Changes)
Section 00010 - Solicitation Contract Form
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0001 Mobilization and Demobilization
1 Job
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0002 Government
Directed Stand-by
8 Hours
OPTION Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0003 Government
Directed Stand-by
8 Hours
OPTION Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0004 Government
Directed Stand-by
8 Hours
OPTION Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0005 Humboldt Bay
Bar/Entrance Channel (HUM)
300,000 Cubic Yard EST
00010-3 AMD# 0004
HUM, Bin Measure to Required Depth, HOODS Ocean Disposal
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0006 Humboldt Bay
Bar/Entrance Channel (HUM)
250,000 Cubic Yard EST
OPTION HUM, Bin Measure to Required Depth, HOODS Ocean Disposal
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0007 Humboldt Bay
Bar/Entrance Channel (HUM)
1 Job
Contractor Survey Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0008 Humboldt Bay
Bar/Entrance Channel (HUM)
1 Job
OPTION Contractor Survey Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0009 Columbia River
(CLW)
200,000 Cubic Yard EST
CLW Maintenance, RM 3+00 to RM 105+00, Bin Measure, Flow Lane (FL) Placement
Funded:
00010-4 AMD# 0004
0010 Columbia River
(CLW)
175,000 Cubic Yard EST
OPTION CLW Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0011 Columbia River
(CLW)
150,000 Cubic Yard EST
OPTION CLW Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0012 Columbia River
(CLW)
150,000 Cubic Yard EST
OPTION CLW Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0013 Columbia River
(CLW)
375,000 Cubic Yard EST
CLW Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth, Work Area Qty 30,000 to 75,000 cy, (FL) Placement
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0014 Columbia River 375,000 Cubic Yard EST
00010-5 AMD# 0004
(CLW)
CLW Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth, Work Area Qty Greater than 75,000 cy, (FL) Placement
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0015 Columbia River
(CLW)
OPTION CLW Increment Times Transit Mile for Material Placement Site (beyond five miles one-way), Pre/Post
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0015AA Columbia River
(CLW)
850,000 Cubic Yard EST
OPTION First 850,000 Cubic Yards Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0015AB Columbia River
(CLW)
150,000 Cubic Yard EST
OPTION Over 850,000 Cubic Yards Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0016 Columbia River
(CLW)
OPTION CLW Incremental Time Transit Mile for Material Placement Site (beyond five miles one-way), Bin Measure and/or Bin Measure to Required Depth
00010-6 AMD# 0004
0016AA Columbia River
(CLW)
850,000 Cubic Yard EST
OPTION First 850,000 Cubic Yards Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0016AB Columbia River
(CLW)
150,000 Cubic Yard EST
OPTION Over 850,000 Cubic Yards Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0017 Columbia River
(CLW)
CLW Intra-Project Transit Miles Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0017AA Columbia River
(CLW)
150 Miles EST
First 150 miles Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0017AB Columbia River
(CLW)
50 Miles EST
Over 150 miles Funded:
00010-7 AMD# 0004
0018 Coos Bay
Entrance Channel (COO)
500,000 Cubic Yard EST
COO, Bin Measure to Required Depth, Site F Placement
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0019 Coos Bay
Entrance Channel (COO)
200,000 Cubic Yard EST
OPTION COO, Bin Measure to Required Depth, Site F Placement
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0020 Coos Bay
Entrance Channel (COO)
1 Job
OPTION Contractor Survey Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0021 Mouth of the
Columbia River
(MCR)
1,700,000 Cubic Yard EST
00010-8 AMD# 0004
MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0022 Mouth of the
Columbia River
(MCR)
300,000 Cubic Yard EST
OPTION MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0023 Mouth of the
Columbia River
(MCR)
250,000 Cubic Yard EST
OPTION MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0024 Mouth of the
Columbia River
(MCR)
300,000 Cubic Yard EST
MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement
00010-9 AMD# 0004
0025 Mouth of the
Columbia River
(MCR)
300,000 Cubic Yard EST
OPTION MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement
Funded:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0026 Mouth of the
Columbia River
(MCR)
300,000 Cubic Yard EST
OPTION MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement
Funded:
TOTALS
SUBTOTAL FOR MANDATORY LINE ITEMS $__________________
SUBTOTAL FOR OPTIONAL LINE ITEMS $ __________________
TOTAL FOR ALL LINE ITEMS $___________________
AMENDMENT 0004
5. Drawing WCH-CLW-000 DWG 4 OF 7 is revised to include examples of BMRD work areas that are (1) between 30,000 and 75,000 CY and (2) greater than 75,000 CY available in the dredging pay prism. The attached revised version is incorporated in full and replaces the previous version in its entirety.
00010-10 AMD# 0004
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0015AA Destination Government Destination Government 0015AB Destination Government Destination Government 0016 Destination Government Destination Government 0016AA Destination Government Destination Government 0016AB Destination Government Destination Government 0017 Destination Government Destination Government 0017AA Destination Government Destination Government 0017AB Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government 0022 Destination Government Destination Government 0023 Destination Government Destination Government 0024 Destination Government Destination Government 0025 Destination Government Destination Government 0026 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
00010-11 AMD# 0004
0001 POP 14-APR-2017 TO
N/A PORTLAND DISTRICT RESIDENT OFFICE
CENWP-EC-CV
USACE PORTLAND DISTRICT
4480 SE COLUMBIA WAY
VANCOUVER WA 98661
360-448-7796 FOB: Destination
960439
0002 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0003 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0004 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0005 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0006 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0007 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0008 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0009 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0010 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0011 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0012 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0013 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0014 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0015 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0015AA POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
00010-12 AMD# 0004
0015AB POP 14-APR-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0016 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0016AA POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0016AB POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0017 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0017AA POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0017AB POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0018 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0019 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0020 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0021 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0022 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0023 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0024 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0025 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
960439
0026 POP 14-APR-2017 TO
17-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination
00010-13 AMD# 0004
West Coast Hopper Dredging 2017
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.00 82 CONTRACT ADMINISTRATION DATA (DREDGING)
01 10 10.00 82 CONTRACTOR'S OPERATIONS AND REQUIREMENTS (DREDGING)
01 22 00.00 82 MEASUREMENT AND PAYMENT
01 35 26.00 82 GOVERNMENTAL SAFETY REQUIREMENTS (DREDGING)
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 82 QUALITY CONTROL (DREDGING)
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 57 20.00 82 ENVIRONMENTAL PROTECTION (DREDGING)
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23.00 82 DREDGING AND CHANNEL CLEARING
35 20 23.03 82 MECHANICAL ULLAGE SENSORS
35 20 23.06 82 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM HOPPER DREDGE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 82
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL INFORMATION
1.3 UNIT PRICE PAYMENT ITEMS
1.4 JOB PAYMENT ITEMS
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 MEASUREMENT AND PAYMENT
3.1.1 Mobilization and Demobilization, CLIN 0001
3.1.2 Government Directed Stand-by (Optional)CLIN 0002
3.1.3 Government Directed Stand-by (Optional)CLIN 0003
3.1.4 Government Directed Stand-by (Optional)CLIN 0004
3.1.5 HUM, Bin Measure to Required Depth, In Water Placement, Base and Optional Line Items, CLINs 0005 and 0006
3.1.6 HUM, Contractor Survey, Base Line Item, CLIN 0007
3.1.7 HUM, Contractor Survey, Optional Line Item, CLIN 0008
3.1.8 CLW Maintenance, RM 3+00+00 to RM 105+00+00, Bin Measure, Flow
Lane (FL) Placement, Base Line Item, CLIN 0009
3.1.9 CLW Maintenance, RM 3+00+00 to RM 105+00+00, Pre/Post Dredge
Survey, FL Placement, Optional Line Items, CLINs 0010, 0011, and
3.1.10 CLW Maintenance, RM 3+00+00 to RM 105+00+00, Bin Measure to Required Depth, FL Placement, Base Line Items, CLINs 0013 and 0014
3.1.11 CLW Increment Times Transit Mile for Material Placement Site (beyond five miles one-way), Pre/Post Dredge Survey, Optional Line Item, CLIN 0015
3.1.12 CLW Increment Times Transit Mile for Material Placement Site (beyond five miles one-way), Bin Measure and/or Bin Measure to Required Depth, Optional Line Item, 0016
3.1.13 CLW, Intra-Project Transit Miles, CLIN 0017
3.1.14 COO, Bin Measure to Required Depth, Site F Placement, Base and
Optional Line Items, CLINs 0018 and 0019
3.1.15 COO, Contractor Survey, Optional Line Item, CLIN 0020
3.1.16 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site
(NJS) Placement, Base and Optional Line Items, CLINs 0021, 0022, and 0023
3.1.17 MCR, Bin Measure, Increment for Operations and Maintenance Deep Water Site (DWS) Placement, Base and Optional Line Items, CLINs 0024, 0025, and 0026
3.2 PAYMENT METHODS
3.2.1 Bin Measure
3.2.2 Bin Measure to Required Depth
3.2.3 Pre/Post Dredge Survey
SECTION 01 22 00.00 82 Page 1 adjacent to all four sides of the site in its entirety.
3.1.8 CLW Maintenance, RM 3+00+00 to RM 105+00+00, Bin Measure, Flow Lane (FL) Placement, Base Line Item, CLIN 0009
a. Measurement and payment for the bid items stated above will be considered complete and full compensation for the effort and cost to excavate the required quantities from within the limits of the dredging pay prism in accordance with Section 35 20 23.00 82, DREDGING AND CHANNEL CLEARING, including placement of all dredged material within the Government-furnished in-water placement areas, and will be paid at the Contract unit price (cubic yards of dredged material) for this item.
b. Quantity measurement: Reference paragraph 3.1.5 CLINs 0005 and 0006 subitem (b).
c. Non-Payable Material: Reference paragraph 3.1.5 CLINs 0005 and 0006 subitem (c).
3.1.9 CLW Maintenance, RM 3+00+00 to RM 105+00+00, Pre/Post Dredge Survey, FL Placement, Optional Line Items, CLINs 0010, 0011, and 0012
a. Measurement and payment for this bid item will be considered complete and full compensation for the effort and cost to excavate the entire dredging pay areas to not less than the required dredging depths in accordance with Section 35 20 23.00 82, DREDGING AND CHANNEL CLEARING, including placement of all dredged material within the Government furnished in-water placement areas, and will be paid at the Contract unit price (cubic yards of dredged material) for this item.
b. The Government will determine cubic yard quantities for payment by taking pre-dredge and post-dredge surveys utilizing electronic depth sounding and horizontal positioning equipment. Payment will be made for material removed from within the dredge pay prism in accordance with paragraph QUANTITY SURVEYS.
c. Non-Payable Material: Reference paragraph CLIN 0005 subitem (c).
3.1.10 CLW Maintenance, RM 3+00+00 to RM 105+00+00, Bin Measure to Required Depth, FL Placement, Base Line Items, CLINs 0013 and 0014
a. Measurement and payment for this bid item will be considered complete and full compensation for the effort and cost to excavate the entire dredging pay areas to not less than the required dredging depths in accordance with Section 35 20 23.00 82, DREDGING AND CHANNEL CLEARING, including placement of all dredged material within the Government-furnished in-water placement areas, and will be paid at the Contract unit price (cubic yards of dredged material) for this item.
b. Quantity measurement: Reference paragraph 3.1.5 CLINs 0005 and 0006 subitem (b).
c. Non-Payable Material: Reference paragraph 3.1.5 CLINs 0005 and 0006 subitem (c).
SECTION 01 22 00.00 82 Page 7
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 23.00 82
DREDGING AND CHANNEL CLEARING
PART 1 GENERAL
1.1 GENERAL INFORMATION
PART 2 PRODUCTS
2.1 CHARACTER OF MATERIALS
2.1.1 SITE SPECIFIC MATERIAL DESCRIPTION
PART 3 EXECUTION
3.1 DREDGING
3.1.1 General
3.1.2 Equipment
3.1.2.1 Dredge Plants
3.1.2.2 Obstructions and Debris
3.1.3 Layout of Work
3.1.4 Dredging Requirements
3.1.5 Skimming of Hoppers
3.2 PLACEMENT OF EXCAVATED MATERIAL IN WATER
3.2.1 General
3.2.2 Dispersal of Material In-Water
3.2.3 Contractor-Furnished Material Placement Site
3.2.4 Misplaced Material
-- End of Section Table of Contents --
SECTION 35 20 23.00 82 Page 1
c. Debris Delays: Anticipate delays that may occur for removal and disposal of debris. The time to remove debris will not be the basis for a Contract time extension.
3.1.3 Layout of Work
The Contractor will be provided layout charts for all dredging areas based on the schedule of work, the Contractor's hydrosurvey requests, and/or the results of Government hydrographic survey monitoring. The most current Government hydrosurvey information will be displayed on the dredging layout charts and provided to the Contractor. All depths are measured from mean lower low water (MLLW) with the exception of reaches in CLW above RM 20 which is measured in Columbia River Datum (CRD) as shown. Other pertinent information to be included with each layout package will be: payment method, required and maximum dredging depths, coordinates for the material placement site, distance one-way from dredging location to placement site (CLW), specific placement site instructions, supplemental tide gauge information, horizontal control locations, and computed hydrosurvey quantities.
3.1.4 Dredging Requirements
a. Dredging Locations:
(1) HUM
(a) As determined by the results of a hydrographic survey monitoring, the Government will direct the Contractor to dredging areas within Humboldt Bay Entrance. The Government will provide a required dredging depth between -42 to -50 feet MLLW with a maximum pay depth 1- to 2-feet below that. Payment will be made by bin measure to required depth from mechanical ullage sensors. See 01 22 00.00 82, MEASUREMENT AND PAYMENT for additional information.
(b) Material placement will be HOODS site. See Section 01 22 00.00 82, MEASUREMENT AND PAYMENT for more details.
(c) It is possible that a Government dredge will conduct dredging operations at HUM prior to the arrival of the Contractor. Careful consideration of the timing of pre dredge surveys should be given.
(2) CLW (RM 3+00+00 to RM 105+00+00)
(a) As determined by the results of hydrographic survey monitoring, the Government will direct the Contractor to dredging areas within CLW between RM 3+00+00 to RM 105+00+00.
This direction will be provided in the form of a written direction to commence work and attached layout package as referenced in subitem (b). In chronic shoaling areas, the Contractor may be directed to dredge up to 100 feet outside of the navigation channel in the "advanced maintenance width" area.
(b) Anticipate the necessity to perform work at many CLW dredging areas during the performance period. The Contractor may be directed to multiple work areas in succession or may be directed to return to other projects after completing just one.
SECTION 35 20 23.00 82 Page 4
Dredging must commence at the first dredging area within 48 hours of receiving written direction and the applicable dredging area layout chart (if the dredge is transiting from MCR). In successive dredge areas, the layout chart will be provided within 24 hours prior to the start of dredging at a new area. The Contractor must provide notice 72 hours in advance of the anticipated completion of a work area, or immediately upon receiving the layout drawing if completion is anticipated in less than 72 hours.
(c) In Bin Measure work areas, the Government will provide a dredging pay depth between -40 to -48 feet. The required quantity will be a minimum of 50,000 CY, unless mutually agreed upon between the Government and the Contractor.
(d) In Pre/Post Dredge Survey work areas, the Government will provide a required dredging depth between -40 to -47 feet with a maximum pay depth one foot below the required depth. There will be greater than 75,000 CY available in the dredging pay prism, unless mutually agreed upon between the Government and the Contractor.
(e) In Bin Measure to Required Depth work areas, the Government will provide a required channel depth between -40 to -47 feet with a maximum pay depth one foot below the required depth.
Based on the CLIN from which payment will be made off of, namely CLINs 0013 and 0014, there will be either between 30,000 and 75,000 CY, or greater than 75,000 CY available in the dredging pay prism, unless mutually agreed upon between the Government and the Contractor. For information on specific CLIN structure, reference Sections 00010 and 01 22 00.00 82.
(f) Material placement areas will be within five Columbia River miles (one way) from the centroid of the dredging area to the centroid of the placement area. In the event that the material placement location is greater than five Columbia River miles (one way), an incremental cost will be applied as detailed in Section 01 22 00.00 82, MEASUREMENT AND PAYMENT.
(3) COO
(a) As determined by the results of a hydrographic survey monitoring, the Government will direct the Contractor to dredging areas within Coos Bay Entrance. The Government will provide a required dredging depth between -37 to -51 feet MLLW with a maximum pay depth 1 foot below that. The Contractor should take note of the transition zone between RM 0+20 and RM 0+40 where channel depths transition from -47 feet MLLW to -37 feet MLLW plus 5 advanced maintenance (see Plan Drawing WCH-COO-000 for details). Payment will be made by bin measure to required depth from mechanical ullage sensors. See 01 22 00.00 82, MEASUREMENT AND PAYMENT for additional information.
(b) Material placement will be Site F placement site. See Section 01 22 00.00 82, MEASUREMENT AND PAYMENT for more details.
(4) MCR
SECTION 35 20 23.00 82 Page 5
| Amd_0004_W9127N-17-B-0005 |
| Revised Price Schedule Amd 0004 |
| Amendment 4 |
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 22 00.00 82 - MEASUREMENT AND PAYMENT |
| 01 22 00.00 82 - MEASUREMENT AND PAYMENT |
| PART 3 EXECUTION |
| 3.1 MEASUREMENT AND PAYMENT |
| 3.1.8 CLW Maintenance, RM 3+00+00 to RM 105+00+00, Bin Measure, Flow Lane |
| 3.1.9 CLW Maintenance, RM 3+00+00 to RM 105+00+00, Pre/Post Dredge Survey, |
| 3.1.10 CLW Maintenance, RM 3+00+00 to RM 105+00+00, Bin Measure to Required |
| DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION |
| 35 20 23.00 82 - DREDGING AND CHANNEL CLEARING |
| 35 20 23.00 82 - DREDGING AND CHANNEL CLEARING |
| PART 3 EXECUTION |
| 3.1 DREDGING |
| 3.1.3 Layout of Work |
| 3.1.4 Dredging Requirements |
| [4]: [4] |
| Amd0004: AMD #0004 |