Amd_0001_W9127N-17-B-0005.pdf
PDF 227 KB Posted
- Attached to
- West Coast Hopper Dredging 2017
- Solicitation number
- W9127N-17-B-0005
About this file
Amendment 0001, W9127N-17-B-0005
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
As an amendment to the solicitation, the follow ing changes are made:
1. The solicitation Table of Contents is revised to remove Section 00150 Source Selection Criteria.
2. Division 01 -- General Requirements: Section 01 22 00.00 82 Paragraph 3.1.13 is revised. The attached revised paragraph is incorporated in full and replaces the previous version in its entirety.
3. Division 01 -- General Requirements: Section 01 35 26.00 82 Paragraph 1.16 is revised. The attached revised paragraph is incorporated in full and replaces the previous version in its entirety.
4. Division 35 -- Waterw ay and Marine Construction: Section 35 20 23.06 82 is revised. The attached revised section is incorporated in full and replaces the previous version in its entirety.
5. The "Bid Opening" provision in Section 00100 is updated to reflect new information and instructions concerning the location of and access to the bid opening conference room.
6. UAI clauses and provisions are updated as show n in the continuation pages.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Feb-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-17-B-0005
X 9B. DATED (SEE ITEM 11)
03-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Feb-2017
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE / INSTRUCTIONS TO BIDDERS
The following have been added by full text:
UAI 5152.211-9000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)
Item Nos. 0015, 0016, and 0017 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
(End of provision)
The following have been modified:
BID OPENING
The bid opening will be held in the Summit Room on the 10th Floor of the Block 300 Building, 333 SW First Avenue, Portland, Oregon.
NOTICE:
Due to increased security all individuals intending to either submit their bid in person (before or at the time of opening), or attend the bid opening will need to clear security prior to being allowed into the 10th floor of Block
300. Therefore, allow adequate time for arrival and security screening. Bids will not be accepted from company representative(s) who are in the building, but not in the bid room by 2:00 PM. The bid must be in the bid room prior to closing of the door.
Individuals requesting access to the 10th floor of Block 300 for the bid opening can expedite security processing by sending an email to the individual identified below. In the email subject line use title, “WEST COAST HOPPER
DREDGING 2017 BID OPENING”
It is required that the following information be included in the email.
FULL NAME
COMPANY
CITIZENSHIP
If more than one individual from one company is attending, then the above information is requested for each person attending.
Send your attendance email to: david.c.boone@usace.army.mil
If you do not receive an email confirmation that your information has been received then call 503-808-4614.
The following have been deleted:
52.211-5000 EVALUATION OF SUBDIVIDED ITEMS NOV 2014
SECTION 00700 - CONTRACT CLAUSES
The following have been added by full text:
UAI 5152.211-9001 VARIATIONS IN ESTIMATED QUANTITIES, SUBDIVIDED ITEMS (MAR
1995)
This variation in estimated quantities clause is applicable only to Items Nos. 0015, 0016, and 0017.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for Items Nos. 0015, 0016, and 0017 is less than 85% of the quantity of the first sub-item listed under such item, the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
(c) If the actual quantity of work performed under Items Nos. 0015, 0016, and 0017 exceeds 115% or is less than 85% of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Items Nos. 0015, 0016, and 0017 exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
(End of clause)
The following have been deleted:
52.211-5001 Variations in Estimated Quantites, Subdivided Items (Mar 1995)
AUG 2013
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
UAI 5152.249-9000 BASIS FOR SETTLEMENT OF PROPOSALS (MAR 2009)
Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under Federal Acquisition Regulation (FAR) 49.206-2(b). In evaluating a termination settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:
(a) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.
(b) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.
(c) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.
(d) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of Federal Acquisition Regulation (FAR) 31.205-11).
(e) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.
(End of clause)
The following have been deleted:
52.249-5000 Basis for Settlement of Proposals MAY 1999
(End of Summary of Changes)
TOC-1 AMD# 0001
TABLE OF CONTENTS
00010 SOLICITATION, OFFER, AND AWARD (SF 1442)
WEST COAST HOPPER DREDGING 2017
VARIOUS LOCATIONS
SF 30 INFORMATION ON AMENDMENT: NOT USED
00010 PRICE SCHEDULE
00100 INSTRUCTIONS TO BIDDERS
00600 REPRESENTATION AND CERTIFICATIONS
00700 CONTRACT CLAUSES
00800 SPECIAL CONTRACT REQUIREMENTS
GENERAL AND TECHNICAL REQUIREMENTS: SEE PROJECT TABLE OF CONTENTS
ATTACHMENTS
A1: Project Identification Sign
A2: Floating Plant Inspection Checklist for Hopper Dredge
A3: Descriptive Sketch-Payable/Non-Payable Quantity
A4: Spill Emergency - Initial Report Form
A5: Daily Report of Operations, NPP Form 430
A6: Hydrographic Survey Request Form
A7: Washington State Water Quality Certification - MCR
A8: Oregon State Water Quality Certification - MCR
A9: Washington State Water Quality Certification - CR
A10: Oregon State Water Quality Certification - CR
A11: Oregon State Water Quality Certification - CB
A12: Water Quality Monitoring Plan - MCR & CR
A13: Water Quality Monitoring Plan for Corps Coastal Projects
TOC-2 AMD# 0001
WEST COAST HOPPER DREDGING 2017
VARIOUS LOCATIONS
A14: Sample Disposal Plan
A15: Sample Disposal Load Report
A16: Sample Daily Disposal Report
A17: Oregon State Davis Bacon Wages
A18: Washington State Davis Bacon Wages
A19: California State Davis Bacon Wages
A20: Overflow Report Form
A21: Notice to Mariners
A22: Subcontracting Plan Notice to Large Business
A23: CY Mile-Example
A24: Ullage Sensor
A25: HOODS Conditions for USACE
A26: Contract File Name Convention
A27: Reporting Plan for Sick, Dead, or Entangled Species
West Coast Hopper Dredging 2017
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 82
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL INFORMATION
1.3 UNIT PRICE PAYMENT ITEMS
1.4 JOB PAYMENT ITEMS
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 MEASUREMENT AND PAYMENT
3.1.1 Mobilization and Demobilization, CLIN 0001
3.1.2 Government Directed Stand-by (Optional)CLIN 0002
3.1.3 Government Directed Stand-by (Optional)CLIN 0003
3.1.4 Government Directed Stand-by (Optional)CLIN 0004
3.1.5 HUM, Bin Measure to Required Depth, In Water Placement, Base and Optional Line Items, CLINs 0005 and 0006
3.1.6 HUM, Contractor Survey, Base Line Item, CLIN 0007
3.1.7 HUM, Contractor Survey, Optional Line Item, CLIN 0008
3.1.8 CLW Maintenance, RM 3+00+00 to RM 105+00+00, Bin Measure, Flow
Lane (FL) Placement, Base Line Item, CLIN 0009
3.1.9 CLW Maintenance, RM 3+00+00 to RM 105+00+00, Pre/Post Dredge
Survey, FL Placement, Base and Optional Line Items, CLINs 0010, 0011, and 0012
3.1.10 CLW Maintenance, RM 3+00+00 to RM 105+00+00, Bin Measure to Required Depth, FL Placement, Base and Optional Line Items, CLINs 0013 and 0014
3.1.11 CLW Increment Times Transit Mile for Material Placement Site (beyond five miles one-way), Pre/Post Dredge Survey, Optional Line Item, CLIN 0015
3.1.12 CLW Increment Times Transit Mile for Material Placement Site (beyond five miles one-way), Bin Measure and/or Bin Measure to Required Depth, Optional Line Item, 0016
3.1.13 CLW, Intra-Project Transit Miles, CLIN 0017
3.1.14 COO, Bin Measure to Required Depth, Site F Placement, Base and
Optional Line Items, CLINs 0018 and 0019
3.1.15 COO, Contractor Survey, Optional Line Item, CLIN 0020
3.1.16 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site
(NJS) Placement, Base and Optional Line Items, CLINs 0021, 0022, and 0023
3.1.17 MCR, Bin Measure, Increment for Operations and Maintenance Deep Water Site (DWS) Placement, Base and Optional Line Items, CLINs 0024, 0025, and 0026
3.2 PAYMENT METHODS
3.2.1 Bin Measure
3.2.2 Bin Measure to Required Depth
SECTION 01 22 00.00 82 Page 1
3.1.11 CLW Increment Times Transit Mile for Material Placement Site (beyond five miles one-way), Pre/Post Dredge Survey, Optional Line Item, CLIN 0015
This line item applies to Columbia River Maintenance Dredging and Placement unless otherwise specified.
a. Measurement for this bid item will be an increment for each additional one-way transit mile and cubic yard (CY) to any placement location greater than five Columbia River miles (one-way) from the centroid of the dredging area to the centroid of the placement area as indicated in Section 35 20 23.00 82, DREDGING AND CHANNEL CLEARING.
The total distance from the centroid of the dredging area and the centroid of the placement site must be rounded to the nearest 0.10 mile and shown on the Contract layout drawings. Dredge material placement areas will be established by the Government.
b. Payment for this item will be an incremental cost in addition to the price per cubic yard for CLW Dredging and Placement, Pre/Post dredge survey items. Payment will be calculated per cubic yard multiplied by the number of one-way miles beyond five miles as shown in Attachment A23. If there are multiple placement sites for a single pre/post dredge area, a percentage of pay cubic yards to each placement site will be calculated using a percentage of quantity measured by bin soundings credited to each placement site.
3.1.12 CLW Increment Times Transit Mile for Material Placement Site (beyond five miles one-way), Bin Measure and/or Bin Measure to Required Depth, Optional Line Item, 0016
This line item applies to Columbia River Maintenance Dredging and Placement unless otherwise specified.
a. Measurement for this bid item will be an increment for each additional one-way transit mile and cubic yard (CY) to any placement location greater than five Columbia River miles (one-way) from the centroid of the dredging area to the centroid of the placement area as indicated in Section 35 20 23.00 82, DREDGING AND CHANNEL CLEARING.
The total distance from the centroid of the dredging area and the centroid of the placement site must be rounded to the nearest 0.10 mile. Dredge material placement areas will be established by the Government.
b. Payment for this item will be an incremental cost in addition to the price per cubic yard for CLW Dredging and Placement, Bin Measure and Bin Measure to Required Depth Survey items. Payment will be calculated per cubic yard multiplied by the number of one-way miles beyond five miles as shown in Attachment A23.
3.1.13 CLW, Intra-Project Transit Miles, CLIN 0017
Measurement and payment for CLW Intra-Project Transit Miles will be considered complete and full compensation for all costs associated with mobilizing all dredging plant, equipment, and personnel, at the Government's direction, and will be paid for at the Contract unit price (miles) for this item. Measurement and payment for this bid item will be paid from the centroid of the current dredging location to the centroid of the next dredging location unless the dredge has completed work under the Contract and is demobilizing. As it is anticipated that the first work area following Humboldt Bay work will be within the CLW project, the
SECTION 01 22 00.00 82 Page 8 initial payment for mileage from MCR to CLW under this item will occur upon the dredge's arrival at MCR river mile 3+00+00. Payment under this item will end once the project has been accepted finally, regardless of the location of the final dredging area. Payment under this item will not be made for mileage not directed by the Government; for example, transit necessitated by weather or sea conditions, transiting to and from the designated foul weather back-up dredging location, or mileage accumulated as a result of a second or subsequent mobilization in order to re-dredge for final acceptance. Payment under this item will be made for mileage from MCR to CLW, between CLW work locations and back to MCR if needed.
3.1.14 COO, Bin Measure to Required Depth, Site F Placement, Base and Optional Line Items, CLINs 0018 and 0019
a. Measurement and payment for this bid item will be considered complete and full compensation for the effort and cost to excavate the entire dredging pay areas to not less than the required dredging depths in accordance with Section 35 20 23.00 82, DREDGING AND CHANNEL CLEARING, including placement of all dredged material within the Government-furnished in-water placement areas, and will be paid at the Contract unit price (cubic yards of dredged material) for this item.
b. Quantity measurement: Reference paragraph 3.1.5 CLINs 0005 and 0006 subitem (b).
c. Non-Payable Material: Reference paragraph 3.1.5 CLINs 0005 and 0006 subitem (c).
3.1.15 COO, Contractor Survey, Optional Line Item, CLIN 0020
a. Provide a 3rd Party Surveyor to complete Pre/Post survey of the work area(s), as well as a Pre/Post survey of both Ocean Placement Sites ODMDS Coos Bay Site F Nearshore and Offshore utilized during the Coos Bay dredging event. This bid item will consist of two separate surveys- specifically, one Pre Dredge survey prior to commencement of dredge work, and one Post Dredge survey following performance of dredge work. These circumstances may require remobilization of the surveyor for the Post Dredge survey. The contractor will be required to coordinate survey timing with the Government's designated representative.
b. The surveyor's equipment must be equal to the equipment listed under Section 01 22 00.00 82, 3.3.b.1, or approved equal. The survey must be conducted by an experienced technician working under the direction and supervision of a Professional Land Surveyor (PLS) and be acceptable to the Contracting Officer's Representative. Survey data meeting the requirements of Section 01 45 00.00 82, 3.6.1(b)(19), will be provided to the Government within 24 hours of the completion of collecting the data.
3.1.16 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement, Base and Optional Line Items, CLINs 0021, 0022, and 0023
a. Measurement and payment for the bid items stated above will be considered complete and full compensation for the effort and cost to excavate the required quantities from within the limits of the dredging pay prism in accordance with Section 35 20 23.00 82, DREDGING AND CHANNEL CLEARING, including placement of all dredged material within the Government-furnished in-water placement areas, and will be paid at
SECTION 01 22 00.00 82 Page 9
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 26.00 82
GOVERNMENTAL SAFETY REQUIREMENTS (DREDGING)
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 REGULATORY REQUIREMENTS
1.4 DRUG AND ALCOHOL USE PREVENTION PROGRAM
1.5 SITE QUALIFICATIONS, DUTIES, AND MEETINGS
1.5.1 Personnel Qualifications
1.5.1.1 Staffing for USACE Dredging Contracts
1.5.1.2 SSHO Requirements for Dredging
1.5.1.3 Designated Representative (DR) Requirements for Dredging
1.5.1.4 Safety Personnel Training Requirements for Dredging
1.5.1.5 Crane Operators
1.5.1.6 Competent Person for Confined Space Entry
1.5.1.7 Competent Person for the Health Hazard Control and
Respiratory Protection Program
1.5.2 Personnel Duties
1.5.2.1 Site Safety and Health Officer (SSHO)
1.5.3 Meetings
1.5.3.1 Preconstruction Conference
1.5.3.2 Safety Meetings
1.5.3.3 Work Phase Meetings
1.6 TRAINING
1.6.1 New Employee Indoctrination
1.6.2 Periodic Training
1.6.3 Training Plan
1.6.4 Fall Protection Training Program
1.7 ACCIDENT PREVENTION PLAN (APP)
1.7.1 General Information
1.7.2 EM 385-1-1 Contents
1.8 ACTIVITY HAZARD ANALYSIS (AHA)
1.8.1 General
1.8.2 Periodic AHA Review and Updating
1.9 DISPLAY OF SAFETY INFORMATION
1.10 SITE SAFETY REFERENCE MATERIALS
1.11 EMERGENCY MEDICAL TREATMENT
1.12 PROJECT SAFE CLEARANCE PROCEDURE
1.13 FLOATING CRANES/DERRICKS, CRANE BARGES, AND AUXILIARY
SHIPBOARD-MOUNTED CRANES
1.14 REPORTS
1.14.1 Accident Notification
1.14.2 Accident or Mishap Reports
1.14.3 Crane Testing Reports
1.14.4 Certificate of Compliance
1.15 HOT WORK
1.16 SPECIAL SAFETY REQUIREMENTS
SECTION 01 35 26.00 82 Page 1
1.17 SEVERE STORM PLAN
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 CONSTRUCTION AND OTHER WORK
3.1.1 General
3.1.2 Hazardous Material Exclusions
3.1.3 Unforeseen Hazardous Material
3.2 PRE-OUTAGE COORDINATION MEETING
3.3 FALL HAZARD PROTECTION AND PREVENTION PROGRAM
3.3.1 General
3.3.2 Fall Protection Equipment and Systems
3.3.2.1 General
3.3.2.2 Personal Fall Arrest Equipment
3.3.3 Work Over Water
3.3.4 Existing Anchorage
3.3.5 Horizontal Lifelines
3.3.6 Guardrails and Safety Nets
3.3.7 Rescue and Evacuation Procedures
3.3.8 Aerial Lift Equipment and Movable Work Platforms
3.3.9 Safety Monitoring System
3.3.10 Controlled Access Zones
3.4 SCAFFOLDING
3.5 EQUIPMENT
3.5.1 Load Handling Equipment (LHE)
3.5.2 Cranes, Hoists, and Rigging
3.6 EXCAVATIONS
3.6.1 Soil Classification
3.6.2 Utility Locations
3.6.3 Utility Location Verification
3.6.4 Utilities Within and Under Concrete, Bituminous Asphalt, and
Other Impervious Surfaces
3.7 ELECTRICAL
3.7.1 Conduct of Electrical Work
3.7.2 Portable Extension Cords
3.8 WORK IN CONFINED SPACES
3.9 CRYSTALLINE SILICA
3.10 HOUSEKEEPING
3.10.1 Clean-Up
3.10.2 Dust control
-- End of Section Table of Contents --
SECTION 01 35 26.00 82 Page 2 certifications on the crane.
1.15 HOT WORK
a. Submit and obtain a written permit prior to performing "Hot Work" (i.e. welding or cutting, etc.) or operating other flame-producing/spark producing devices. Contractors are required to meet all criteria before a permit is issued. In accordance with EM 385-1-1, provide at least two 20 pound 4A:20 BC rated extinguishers for normal "Hot Work". All extinguishers must have current inspection tag, approved safety pin, and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done. The Fire Watch must be trained in accordance with NFPA 51B and remain on-site for a minimum of 60 minutes after completion of the task or as specified on the hot work permit.
b. For floating plant, obtain services from a NFPA Certified Marine Chemist for "HOT WORK" within or around flammable materials (such as fuel systems, welding/cutting on fuel pipes) or confined spaces (such as sewer wet wells, manholes, vaults, etc.) that have the potential for flammable or explosive atmospheres.
1.16 SPECIAL SAFETY REQUIREMENTS
In addition to Section 00700, Contract Clause 52.236-13 Alt I, ACCIDENT PREVENTION (Nov 1991)- Alternative I, and the referenced Safety and Health Requirements Manual, EM 385-1-1, comply with the following safety requirements:
a. Conduct transfer of supplies or personnel by launch in a safe manner and in accordance with the procedures established under subitem (b) below. Transfers in rough conditions are at the discretion of the launch operator.
b. File a Float Plan when required by EM 385-1-1.
c. Personnel and Supply Transfer by Boat
(1) Transfer of supplies or personnel by launch while working at the MCR must be done upriver of Buoy 10, in a safe manner, on the leeward side of the vessel, and in accordance with the procedures established under subitem (f) below. Transfers may be allowed downstream of Buoy 10 in favorable weather and sea conditions at the discretion of the ship's captain and the launch operator.
(2) Transfer of supplies or personnel by launch while working at HUM and CB must be done in a protected location, in a safe manner, on the leeward side of the vessel and in accordance with the procedures established under all requirements of this Part. The Government recommends abeam USCG Station Humboldt Bay at HUM, and and at a minimum upstream at of green buoy number 5 at CB.
Transfers may be allowed in other locations in favorable weather and sea conditions at the discretion of the ship's captain and the launch operator.
(3) All transfers of personnel between launches and dredges must be made deck to deck.
(4) Establish a written procedure for transfer of personnel by
SECTION 01 35 26.00 82 Page 17 boat. Include as a minimum the following items:
(a) Sea and weather conditions under which a personnel transfer will, or will not, be allowed.
(b) Procedure for establishing present sea conditions.
(c) Clear lines of authority regarding determination of safe sea conditions for a personnel transfer.
(5) Establish a written safety briefing for all personnel transferring by boat. Include the following items at a minimum and post on board both the launch and dredge:
(a) A requirement for the boat operator to provide a copy of the procedure and a verbal briefing for all personnel upon their initial transit to each work location (dredge or placement site).
(b) A log containing the names, dates, and location of each briefing provided.
(c) Detailed procedures for personnel transfer.
d. All U.S. Coast Guard Rules and Regulations including, but not limited to, the use of lights and day signals, draft limitations, safe speed in fog or limited visibility, and radio monitoring VHF-FM channel 13 or 16 as required must be strictly followed.
e. Give consideration to other channel users when going to and from the dredged material placement site. Take caution to avoid damage to crab pots or fishing nets in or near the channel or when transiting to placement areas. Reduced speed is required where there is a concentration of boats.
f. Immediately report to the GQAR any malfunctioning equipment that affects the safety of the personnel or plant.
g. Due to local sea and weather conditions, provide AHA's, and include Personal Locator Beacon (PLB/EPIRB) procedures in the AHA's for the following:
(1) Personnel working on deck without handrails.
(2) Personnel outside the handrails without fall protection.
h. Personal Locator Beacons (PLB) and Receiver unit.
(1) Furnish a Receiver unit located on the bridge, on or near the ships helm, but within sight of the mate or operator of the vessel.
(2) As a minimum, the following personnel must wear Personal Locator Beacons:
(a) All personnel in an area that is not protected by handrails. A fall protection system can only be worn where feasible, safe, and practical. Where it is not feasible, safe or practical to provide a fall arrest system, all personnel accessing unguarded decks, must be equipped with a PLB.
SECTION 01 35 26.00 82 Page 18
(b) All personnel transiting in small boats including project visitors.
(c) All personnel actively conducting hydrographic surveys.
(d) Anytime there are less than three personnel transiting by boat.
(3) Submit a Personal Locator Beacon system for review as part of the Accident Prevention Plan.
(4) Supply one Personal Locator Beacon to the Government prior to commencement of work. This will be returned within 30 days after physical completion of all work. In addition, provide PLB's to all personnel transiting on Contractor boats including Government visitors.
(5) Remove and replace all Personal Locator Beacons (including the PLB(s) provided to the GQARs) that malfunction or break immediately, regardless of the fault or cause. No dredging or placement will be allowed to occur without the required number of PLB(s) on site. It is recommended that a sufficient number of spare PLB(s) are kept on site to avoid delays in the dredging and placement, should a PLB malfunction or be damaged. Train all personnel in the use of PLBs. Brief all personnel assigned to the project on the procedure if the system is activated.
(6) Specifications on Personal Locator Beacon and direction/location finder.
(a) Miniature Personal Water Activated 121.5 MHz or other approved frequency PLB/EPIRB (Alerting Unit) OR beacon with AIS (Automatic Identification System) and DSC (Digital Selective Calling) capabilities. Beacons must automatically activate upon entry into the water and be incapable of being turned off. Beacons must have a 24+ hour operational life and 7-year or greater battery life.
(b) PLB/EPIRB's utilizing a 121.5 MHz or other approved frequency must alert a Direction finder within two minutes (Base Unit). For AIS/DSC beacons, parent vessels and rescue boats must be VHF, DSC, and AIS equipped and monitored during working hours, and alert a receiver within 15 seconds.
(7) Receivers for monitoring PLB's: Keep receivers at the following locations for the purpose of monitoring the PLB signal.
Keep a monitored receiver within range of all personnel wearing PLBs, to include:
(a) All Contractor boats.
(b) Contractor's field office(s).
(c) Government office.
(8) For radio frequency PLB systems, mount a directional antenna on the rescue boat, with an external speaker that can be clearly heard over the engine noise, in and around the boat.
SECTION 01 35 26.00 82 Page 19
i. Rescue System
(1) Rescue boat must be equipped with a rescue man overboard system that can be used by a single person. Train all personnel working on these vessels, on man overboard rescue techniques and procedures.
(2) Train all personnel, on all floating plant, in man overboard rescue. Provide man overboard training to all GQAR(s) overseeing the monitoring; anticipate training four to six GQAR(s) periodically.
(3) No vessel specified in subitem (n)(1) above to have a rescue system will be allowed to operate on this Contract without a rescue system installed and crew trained on its use.
j. VHF Radios: Have VHF radios at all steering stations on board all dredges, survey vessels, launches and other boats used on the project.
k. Personal Flotation Devices (PFDs): Meet the requirements of EM 385-1-1. In addition to the requirements of EM 385-1-1, PFDs must be worn on the decks of all launches and motorboats regardless of whether handrails are installed. Launches and motorboats include survey vessels and all other small boats used on the project.
l. When bin measurements are obtained in rough seas, the vessel's speed and direction must be altered to minimize ship motion and wave action over the deck. Under no circumstances can soundings be taken when conditions are determined to be un-safe by either the Captain or the
GQAR.
1.17 SEVERE STORM PLAN
In the event of a severe storm warning:
a. Secure outside equipment and materials and place materials that could be damaged in protected areas.
b. Check surrounding area for loose material, equipment, debris, and other objects that could be blown away or against existing work.
c. Ensure that temporary erosion controls are adequate.
d. Provide a Severe Storm Plan for removing or securing plant and evacuation of personnel for floating plants in emergencies. Include this plan as part of the APP and meet the requirements of EM 385-1-1.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 CONSTRUCTION AND OTHER WORK
3.1.1 General
Comply with EM 385-1-1, NFPA 241, ASME B30-PKG, the APP, the AHA, Federal and/or State OSHA regulations, and other related submittals and activity fire and safety regulations. The most stringent standard will prevail.
SECTION 01 35 26.00 82 Page 20
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 23.06 82
NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM HOPPER DREDGE
PART 1 GENERAL
1.1 DESCRIPTION
1.2 SUBMITTALS
1.3 PAYMENT
1.4 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM CERTIFICATION
1.5 DREDGE PLANT INSTRUMENTATION PLAN (DPIP)
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 REQUIREMENTS FOR REPORTED DATA
3.1.1 Date and Time
3.1.2 Load Number
3.1.3 Horizontal Positioning
3.1.3.1 Vessel Horizontal Positioning
3.1.3.2 Draghead Horizontal Positioning
3.1.4 Hull status
3.1.5 Dredge Course
3.1.6 Dredge Speed
3.1.7 Dredge Heading
3.1.8 Tide
3.1.9 Draft
3.1.10 Hopper Ullage Sounding
3.1.11 Instantaneous Mechanical Sounding
3.1.12 Mechanical/Instantaneous Volume
3.1.13 Hopper Volume
3.1.14 Displacement
3.1.15 Empty Displacement
3.1.16 Draghead depths
3.1.17 Slurry Densities of Dragarms
3.1.18 Slurry Velocities of Dragarms
3.1.19 Pump RPM
3.1.20 Sea Suction Valve for Dragarm
3.1.21 Pumpout
3.1.22 Project Trip Number
3.2 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SYSTEM REQUIREMENTS
3.2.1 Computer Requirements
3.2.2 Software
3.2.3 Network Hub
3.2.4 Uninterruptible Power Supply (UPS)
3.2.5 Internet Access
3.2.6 Data Routing Requirements
3.2.7 Data Reporting Frequency
3.2.8 Data Format
3.2.9 Data Reporting
SECTION 35 20 23.06 82 Page 1
REPLACED IN ITS ENTIRETY AMD# 0001
3.2.10 Contractor Data Backup
3.3 PERFORMANCE REQUIREMENTS
3.4 COMPLIANCE QUALITY ASSURANCE CHECKS
3.4.1 Draft and Displacement Check
3.4.2 Draghead Depth Check
3.4.3 Ullage Sounding and Volume Check
3.4.4 Position Check
3.4.5 Water Load Test
3.5 CONTRACTOR QUALITY CONTROL
3.6 LIST OF ITEMS TO BE PROVIDED BY THE CONTRACTOR
-- End of Section Table of Contents --
SECTION 35 20 23.06 82 Page 2
SECTION 35 20 23.06 82
NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM
HOPPER DREDGE
PART 1 GENERAL
1.1 DESCRIPTION
a. The work under this Contract requires use of the National Dredging Quality Management Program (DQM)to monitor the dredge's status at all times during the Contract and manage data history.
b. This performance-based specification Section identifies the minimum required output and precision and instrumentation requirements. The requirements may be satisfied using equipment and technical procedures selected by the Contractor.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office responsible for review of the submittal for the Government. The following must be submitted in accordance with Section 01 10 10.00 25, CONTRACTOR'S
OPERATIONS AND REQUIREMENTS (DREDGING):
SD-01 Preconstruction Submittals
Dredge Plant Instrumentation Plan Revisions or Addendums; G, CESAM-OP-J
SD-07 Certificates
Letter of National Dredging Quality Management Program Certification; G, CENWP-EC-V
SD-06 Test Reports
Data Appropriately Archived e-mail, Section 3.2.11; G, CENWP-EC-V
1.3 PAYMENT
No separate payment will be made for installation, operation, and maintenance of the DQM certified system as specified herein for the duration of the dredging operations; all costs in connection therewith shall be considered a subsidiary obligation of the Contractor and covered under the Contract unit prices for dredging in the bidding schedule.
1.4 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM CERTIFICATION
a. The Contractor is required to have a current certification from the DQM for the hopper dredge instrumentation system to be used under this Contract. Criteria for certification shall be based on the most recent
SECTION 35 20 23.06 82 Page 3 specification posted on the DQM website (http://dqm.usace.army.mil/Specifications/Index.aspx). Compliance with these criteria shall be verified by annual on-site quality assurance (QA) checks conducted by DQM Support Center Data Acquisition and Analysis Team, and by periodic review of the transmitted data. DQM Certification is valid for one year from the date of the annual QA checks. Certification is contingent upon the system's ability to continuously meet the performance requirements as outlined in sections PERFORMANCE REQUIREMENTS and CONTRACTOR QUALITY CONTROL. If issues with data quality are not corrected within 48 hours, the system certification shall be revoked and additional QA checks by the Data Acquisition Team may be necessary. Annual DQM Certification shall be based on:
(1) A series of QA checks as described in section COMPLIANCE
QUALITY ASSURANCE CHECKS
(2) Verification of data acquisition and transfer as described in section PERFORMANCE REQUIREMENTS
(3) Review of the DREDGE PLANT INSTRUMENTATION PLAN (DPIP) as described in section 1.5
b. The Contractor must have personnel who are familiar with the system instrumentation and who have the ability to recalibrate the sensors on site during the QA process. The dredging Contractor must coordinate pickup times and locations and provide transportation to and from any platform with a DQM system to team personnel in a timely manner. As a general rule, Data Acquisition and Analysis Team personnel will come with PPE consisting of hardhats, steel toe boots, and life jackets. If additional safety equipment is needed, such as eye protection, safety harnesses, work gloves or personal location beacons, these items must be provided to the team while on site. It is the dredging Contractor's obligation to inform the QA team if the location designated for the QA checks has any site specific safety concerns prior to their arrival on site.
c. The owner or operator of the hopper dredge must contact the DQM at DQM-AnnualQA@rpsgroup.com on an annual basis at least three weeks prior to the certification expiration, to schedule QA checks for renewal.
This notification is meant to make the Data Acquisition Team aware of a target date for the annual QA checks for the dredge. At least one week prior to the target date, the Contractor must contact the Data Acquisition team and verbally coordinate a specific date and time. The Contractor must then follow-up this conversation with a written e-mail confirmation. The owner/operator must coordinate the QA checks with all local authorities, including but not limited to, the local USACE Contracting officer.
d. Re-certification is required for any yard work which produces modification to displacement (i.e. change in dredge lines, repositioning or repainting hull marks), modification to bin volume (change in bin dimensions or addition or subtraction of structure) or changes in sensor type or location; these changes must be reported in the sensor log section of the DPIP. A system does not have to be transmitting data between jobs, however in order to retain its certification during this period, the system sensors or hardware should not be disconnected or removed from the dredge. If the system is powered down, calibration coefficients must be retained.
SECTION 35 20 23.06 82 Page 4
1.5 DREDGE PLANT INSTRUMENTATION PLAN (DPIP)
The Contractor must have a digital copy of the DPIP on file with the National DQM Support Center. The Contractor must also maintain a copy of the DPIP on the dredge while working on site which is easily accessible to government personnel at all times. This document must describe the sensors used, configuration of the system, how sensor data will be collected, how quality control on the data will be performed, and how sensors/data reporting equipment will be calibrated and repaired if they fail. A description of computed dredge specific data and how the sensor data will be transmitted to the DQM Database will also be included. The Contractor must submit to the DQM Support Center any addendum or modifications made to the plan, subsequent to its original submission, prior to start of work.
The DPIP must include the following as a minimum:
(DPIP must have table of contents in the following order and tabs separating sections)
Cover Page
-- Dredge Name -- Date -- Photo of plant
Table of Contents
New Page
- Dredge Contacts
Dredging Company -- Dredge Point of Contact on-site -- Phone Number -- Email address
Dredge Monitoring System Provider -- Dredge Monitoring System Point of Contact -- Telephone Number -- Email address
New Page
- Table of dredge characteristics -- Dimensions of dredge -- Dimensions of hopper -- Method of disposal -- Capacity -- Minimum and maximum digging depth -- Minimum and maximum drafts and displacements -- RPM and velocity range -- ID of suction and discharge pipes
New Page
- Sensor data collection method
-- Any averaging -- Route from sensor to DQM computer
SECTION 35 20 23.06 82 Page 5
-- Internet connection type and provider
- Sensor descriptions, locations and calibration methods
Positioning system
-- Brand name, model and accuracy -- Any calculation done external to the instrumentation -- Sensor location with referenced dimensions
Dredge heading instrumentation
-- Brand name, model and accuracy -- Any calculation done external to the instrumentation
Hull status
-- Brand name, model and accuracy -- Any calculation done external to the instrumentation -- Sensor location with referenced dimensions -- Calibration procedure
Draft
-- Brand name, model and accuracy -- Any calculation done external to the instrumentation -- Sensor location with referenced dimensions -- Calibration procedure
Ullage
-- Brand name, model and accuracy -- Any calculation done external to the instrumentation -- Sensor location with referenced dimensions -- Calibration procedure
Dragarm depths
-- Brand name, model and accuracy -- Any calculation done external to the instrumentation -- Sensor location with referenced dimensions -- Calibration procedure
Density
-- Brand name, model and accuracy -- Any calculation done external to the instrumentation -- Sensor location with referenced dimensions including pipe diameter -- Calibration procedure
Velocity
-- Brand name, model and accuracy -- Any calculation done external to the instrumentation -- Sensor location with referenced dimensions including pipe diameter -- Calibration procedure
SECTION 35 20 23.06 82 Page 6
Pump RPM
-- Brand name, model and accuracy -- Any calculation done external to the instrumentation -- Sensor location with referenced dimensions -- Calibration procedure
Pumpout (if instrumented)
-- Brand name, model and accuracy -- Any calculation done external to the instrumentation -- Sensor location with referenced dimensions -- Calibration procedure
- Calculated Parameters
Displacement
-- Method used by Contractor to calculate displacement -- Tables listing (fresh and salt water) displacement as a function of draft in feet and tenths of feet
Hopper Volume
-- Method used by Contractor to calculate hopper volume -- Table listing the hopper volume as a function of hopper ullage in feet and tenths of feet -- Description of datum for ullage sounding measurements
Drag Head Position
-- Method used by Contractor to calculate drag head position
Load number
-- Method used to increment load number
- Quality Control
Description of Contractors quality control process Log of sensor calibrations, repairs and modifications
- Appendices
Hydrostatic curves
Certified Displacement and Volume Tables
Legible dimensioned drawings of the dredge with units in feet
-- A typical plan of the dredge showing:
--- Overall dredge and hopper dimensions --- Locations of required sensors referenced to uniform longitudinal and transverse reference points --- Distance between the draft sensors --- Distance between the ullage sensors --- Dimensions of dragarm
SECTION 35 20 23.06 82 Page 7
-- A profile view of the dredge showing:
--- Overall dredge and hopper dimensions --- Distance between draft sensors and draftmarks --- Locations of required sensors referenced to uniform vertical and longitudinal reference points -- Typical vessel cross section through the hopper
Sensor manuals and certificates of calibration
Any changes to the computation methods must be approved by the National Dredging Quality Management Program Support Center prior to their implementation.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 REQUIREMENTS FOR REPORTED DATA
a. The Contractor must provide, operate and maintain all hardware and software to meet these specifications. The Contractor shall be responsible for replacement, repair and calibration of sensors and other necessary data acquisition equipment needed to supply the required data.
b. Repairs must be completed within 48 hours of any sensor failure.
Upon completion of a repair, replacement, installation, modification or calibration, the Contractor must notify the Contracting Officer's Representative (COR). The COR may request re-calibration of sensors or other hardware components at any time during the Contract as deemed necessary.
c. The Contractor must keep a log of sensor repair, replacement, installation, modification and calibration in the dredge's onboard copy of the DPIP. The log must contain a three-year history of sensor maintenance to include: the time of sensor failures (and subsequent repairs), the time and results of sensor calibrations, the time of sensor replacements, and the time that backup sensor systems are initiated to provide required data. It must also contain the name of the person responsible for the sensor work.
d. Sensors installed must be capable of collecting parameters within specified accuracies and resolutions indicated in the following subsections.
e. Reported sensor values for ullage, draft and draghead depth should represent a weighted average with the highest and lowest values not included in the calculated average for the given interval. This information should be documented in the DPIP sections that say "Calculations done external to the instrumentation".
3.1.1 Date and Time
The date and time must be reported to the nearest second and referenced to UTC time based on a 24 hour format; mm/dd/yyyy hh:mm:ss. This reported time must be such that it cannot be modified in any computer. One possible solution is to use the time reported by the GPS in the NMEA string.
SECTION 35 20 23.06 82 Page 8
3.1.2 Load Number
A load number must document the end of a disposal event. Load numbering will begin at number 1 at the start of the Contract, and will be incremented by 1 at the completion of each disposal event or emptying of the hopper. Whenever possible, the load number must be calculated off of the sensors aboard the dredge, and must be a mathematically repeatable routine. Efforts must be made to include logic that avoids false load number increments while also not allowing the routine to miss any disposal event. If manual incrementing of the load number is in place, extra attention should be paid to this value in the CONTRACTOR'S QUALITY CONTROL section.
3.1.3 Horizontal Positioning
All locations must be obtained using a Positioning System operating with a minimum accuracy level of 1 to 3 meters horizontal Circular Error Probable (CEP). Positions must be reported as Latitude/Longitude WGS 84 in decimal degrees. West Longitude and South Latitude values are reported as negative.
3.1.3.1 Vessel Horizontal Positioning
Geographic coordinates of the vessel as indicated by the location of the GPS antenna.
3.1.3.2 Draghead Horizontal Positioning
Geographic coordinates of the heel on centerline of the draghead(s). Any offset calculations from the GPS antenna should be described in the DPIP.
3.1.4 Hull status
Open/closed status of the hopper dredge, corresponding to the split/non-split condition of a split hull hopper dredge must be monitored.
For dredges with hopper doors, the status of a single door that is the first opened during normal disposal operations may be monitored. An "OPEN" value must indicate the hopper door is open, or in the case of split hull dredges, the hull is split. A "CLOSED" value indicates the hopper doors are closed, or in the case of split hull dredges, the hull is not split.
For this Contract, hull status must register closed prior to leaving the disposal area.
3.1.5 Dredge Course
Dredge course-over-ground (COG) must be provided using industry standard equipment. The Contractor must provide dredge course over ground to the nearest whole degree with values from 000 (true north) to 359 degrees referenced to a clockwise positive direction convention.
3.1.6 Dredge Speed
Dredge speed-over-ground must be provided in knots using industry standard equipment with a minimum accuracy of 1 knot and resolution to the nearest
0.1 knot.
3.1.7 Dredge Heading
Dredge heading must be provided using industry standard equipment. The dredge heading must be accurate to within 5 degrees and reported to the
SECTION 35 20 23.06 82 Page 9 nearest whole degree, with values from 000 (true north) to 359 degrees referenced to a clockwise positive direction convention.
3.1.8 Tide
Tide data must be obtained using appropriate equipment to give the water level with an accuracy of +/- 0.1 feet and a resolution of 0.01 feet. Tide values above project datum described in the dredging specification must be entered with a positive sign, those below with a negative sign.
3.1.9 Draft
All reported draft measurements must be in feet, tenths and hundredths with an accuracy of +/- 0.1 foot, relative to observed physical draft readings.
The measurements must be reported at a resolution of two decimal places (hundredths of a foot). Reported forward draft value must be equal to the sum of the visual forward port and starboard draft mark readings divided by
2. Reported aft draft value must be equal to the sum of the visual aft port and starboard draft mark readings divided by 2. Forward draft, aft draft and average draft will be reported. Sensors must be placed at an optimum location on the vessel to be reflective of observed physical draft mark readings at any trim or list. Minimum accuracies are conditional to relatively calm water. The sensor value reported must be an average of at least 10 samples per event, remove at least one maximum value and one minimum value, and average the minimum 8 remaining values. When average draft is calculated for the purpose of determining displacement, significant digits for average draft must be maintained such that if forward draft was 0.15 and aft draft was 0.1 then the average draft would be 0.125.
3.1.10 Hopper Ullage Sounding
All reported ullage soundings must be in feet, tenths and hundredths with an accuracy of +/- 0.1 foot with respect to the combing, and be representative of the forward and aft extents of the hopper as close to centerline as is possible. The measurements must be reported at a resolution of two decimal places (hundredths of a foot). Forward ullage and aft ullage soundings will be reported.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .