CENWP-OD-SAF-385-1__HECP__28_May_2014.pdf
PDF 1 MB Posted
- Attached to
- Fall Creek Fish Facility Upgrades
- Solicitation number
- W9127N-16-R-0005
About this file
SAF-385-1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GENERAL_SHEET_FILES.pdf | ||
| W9127N-16-R-0005_Amend_0003.pdf | ||
| The_video_files_information.docx | DOCX document | |
| W9127N-16-R-0005_Amend_0002.pdf | ||
| W9127N-16-R-0005_Amend_0001.pdf | ||
| A.07.20_Site_visit_Attendee_List.pdf | ||
| A.07.20_FCFF_Pre-Bid_03_29_2016.pptm | PPTM file | |
| Attachment_C_SubK_Plan_16-R-0005_Fall_Creek_Fish_Facility.docx | DOCX document | |
| Attachment_B_Offerors_Experience_Form.docx | DOCX document | |
| FCFF-ELECTRICAL-DWGS.pdf | ||
| FCFF-MECHANCIAL-DWGS.pdf | ||
| FCFF-ARCHITECTURAL-DWGS.pdf | ||
| Attachment_A_Past_Performance_Questionnaire_(PPQ).docx | DOCX document | |
| FCFF-GENERAL-DWGS.pdf | ||
| EM_385-1-1_30_Nov_2014.pdf | ||
| A.02.23_W9127N-16-R-0005_RFP.pdf | ||
| FCFF-INFO-DWGS.pdf | ||
| Bidder_Inquiry_Instructions.pdf | ||
| FCFF-STRUCTURAL-DWGS.pdf | ||
| FCFF-CIVIL-DWGS.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Portland District
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 1 of 60
CENWP-OD Standing Safety Procedure 385-1
SAFETY
Portland District Supplement (Fixed Plant) to USACE Hazardous Energy Control Program
Table of Contents 28 May 2014
1.0 Purpose
2.0 Applicability
3.0 References
4.0 Related Procedures
5.0 Definitions
6.0 Responsibilities
7.0 Procedures
8.0 Records & Measurements
Attachments / Flow Chart
Foreword
This Standing Safety Procedure (SAF), Hazardous Energy Control Program, is supplemental to, and is authorized by ER 385-1-31, The Control of Hazardous Energy. ER 385-1-31 is the overall governing document for USACE HEC programs and it mandates that Districts will supplement its contents with specific procedures. This SAF not intended to be the all encompassing single source document for the HEC Program. This document strives to capture those processes which have been identified to establish consistent procedures and criteria for the safe and reliable control of hazardous energy at Portland District operated facilities. Instances not specifically identified in this document may very well require additional research into those documents identified in paragraph 3.0 of this document and possibly other industry standard publications to include manufacturer maintenance guidance.
The proponent office for this document is the Operations Division Technical Operations Branch staff and any questions or comments should be directed to this office at:
CENWP-OD-T
333 SW First Ave Portland, OR 97204 Phone: (503) 808 - 4332
FAX: (503) 808 - 4329
Review. This document will be reviewed at a minimum of annually or if conditions change.
History. This document supersedes NWP-HECP-01, Control of Hazardous Energy dated 19 October 2011. .
Change Management. No changes to this document shall be made without concurrence of the Management Representative. Any change must be approved by the Chief, Operations Division.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 2 of 60
Record of Review and Changes
C ha ng e
N o.
Page / Paragraph/
Section:
Statement of Review or Change:
Date:
Approval:
This document supersedes the CENWP HECP supplement dated 19 Oct 2011. It reformats the previous document into the approved standing procedure format. ENG Forms referenced but not included have been added to this SOP.
Most notable changes include the clarification to the definition of the “Affected person” and the deletion of allowing a supervisor to lock on for his/her entire crew.
Added sections covering Interconnects and Hold Orders, paragraphs 7.13 and 7.14. Added paragraph 7.16 addressing non-standard equipment maintenance.
28 May 2014
DEW
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 3 of 60
1.0 Purpose
This document establishes procedures and operating criteria that shall be complied with throughout the Portland District. It prescribes procedures for the safety of personnel and equipment protection when working on or near any system that produces, uses, or stores hazardous energy. It establishes minimum performance requirements and standards for the control of hazardous energy at Portland District operated facilities.
2.0 Applicability.
This procedure applies to all personnel assigned to the Operations Division of the Portland District, U.S.
Army Corps of Engineers and those individuals conducting business at any of the assigned Fixed Plant Operating Projects.
3.0 References.
ER 385-1-31, Engineering Regulation, Safety and Occupational Health, The Control of Hazardous Energy, 1 November 2009.
29 CFR 1910.147, Control of Hazardous Energy (Lockout/Tag out).
29 CFR 1910.269, Hazardous Energy Control (Lockout/Tag out) Procedures.
29 CFR 1910.333, Selection and Use of Safe Work Practices.
OSHA Directive #CPL 02-00-147, The Control of Hazardous Energy – Enforcement Policy and Inspection.
ANSI C2, National Electrical Safety Code, 2012.
ANSI/ASSE A10.44, Control of Energy Sources (Lockout/Tag out) for Construction and Demolitions Operations, 2006.
EM 385-1-1, Engineer Manual, Department of the Army Safety and Health Requirements, 15 September 2008.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 4 of 60
AR 690-700, Personnel Relations and Services (General) Chapter 751, 15 November 1981.
Bureau of Reclamation, Facilities Instructions, Standards, and Techniques (FIST) Manuals, Volume 1-1, Hazardous Energy Control Program, January 2012.
4.0 Related Procedures. Switching procedures, CENWP-OD SAF 385-2.
5.0 Definitions.
Activity Hazard Analysis (AHA) – A documented process by which the steps (procedures) required to accomplish a work activity are outlined, the actual or potential hazards of each step are identified, and measures for the elimination or control of those hazards are developed.
Affected Person (AP) – A qualified person whose job requires them to operate, service, or maintain a system under a Safe Clearance or those individuals whose duties require them to work within the physical boundary of a safe clearance. APs must sign onto the Clearance and place a personal lock on the lock box.
Authorized Individual (AI) – An individual designated in writing by the RO who is qualified and authorized to request, receive and implement energy control procedures.
Caution Order – A procedure to direct attention to abnormal conditions or equipment or special operating instructions which are to be followed.
Caution Order Record, ENG Form 1928 (see Attachment 6) – A form on which to record information pertinent to each Caution Order issued.
Caution Order Tag, ENG Form 1924 (see Attachment 2) – The tag attached to equipment to implement the Caution Order procedure.
Clearance perimeter – The established working boundary or zone of equipment declared isolated from the sources of hazardous energy specified in a clearance. A clearance perimeter may include a combination of interrelated but different forms of hazardous energy common to the equipment.
Danger - Do Not Operate Tag, ENG Form 1925 (see Attachment 4) – The tag to attach to each energy isolation device on equipment or entry point to an area requiring a safe clearance.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 5 of 60
Computer generated tags are authorized as long as the tag retains compliance with the requirements for tag out devices.
Designated Representative to the Issuing Individual (DRII) – A qualified person who is designated in writing by the RO to place and remove locks and tags on energy isolation devices.
Emergency – A situation in which: (a) facilities are in a condition as to be a hazard to the public, personnel, or USACE power or water system equipment, or (b) there is a power outage to customers that could be hazardous to life or property.
Energy Isolation Device – A physical device that prevents the transmission or release of energy, including but not limited to manually operated circuit breakers, disconnect switches, slide gates, slip blinds, line valves, blocks, or similar devices with a position indicator capable of blocking or isolating energy. The term does not include push buttons, selector switches, and other control circuit type devices.
Energy Source – Electrical, mechanical, hydraulic, pneumatic, chemical, thermal, nuclear, stored, or other energy that could cause injury to personnel.
Fixed Plant – Permanently located operational facilities owned and or operated by the Portland District. Fixed plant facilities in the Portland District include Operational Hydroelectric and Flood Control Projects, U.S. Moorings and fish hatchery and processing facilities. Dredges and survey boats are considered floating plants and are covered under separate guidance.
Full personnel protection – A condition required when a tag out device is used in place of a lockout device. Full personnel protection is provided when
1. The tag out device is attached at the same location as the lockout device would have been attached;
2. All tag out-related requirements of this regulation have been complied with;
3. Additional means have been taken to provide a level of safety commensurate with that of a lockout device. Such additional means include the removal of an isolating circuit element, blocking of a control switch, opening and tagging an extra (separated by distance) disconnecting device, or the removal of a valve handle to reduce the likelihood of energizing.
General switching – Switching performed for line sectionalizing or system equipment rearrangement for testing and/or changes in operating conditions.
Hazardous Energy – Any energy source that may cause injury or death.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 6 of 60
Hazardous Energy Control (HEC) – The control of any and all hazardous energy sources.
Hazardous Energy Control Procedure – The written procedure which clearly and specifically identifies responsibilities and procedural steps for lockout and tag out and the requirements for testing the effectiveness of energy control measures.
Hazardous Energy Control Program – The written program that includes, at a minimum, identification of roles and responsibilities, energy control procedures, energy control locks and tags, procedures for removing energy control locks and tags, employee training, procedure inspections and program review. The Hazardous Energy Control Program shall be developed at the USACE District level to insure the greatest level of consistency among facilities and areas of responsibility.
Incidental Person (IP) – A person (visitor or other personnel) not working on hazardous energy producing equipment or systems. Non-working personnel but who may have general access to the areas containing equipment or controls affected by the HEC program.
Isolation – An activity which physically prevents the transmission or release of energy.
Isolation Locks – Hazardous energy control locks that are placed and removed by the II/DRII.
Issuing Individual (II) – A qualified person who is designated in writing by the RO to issue Safe
Clearances. The Issuing Individual is a person with jurisdiction over an area, dredge, or project.
E.g., the Issuing Individual may be the operator in charge of a shift at a powerhouse or lock, the supervisory engineer or project superintendant of a project or facility, chief engineer on a dredge, or other designee having operational control of systems to be placed under HEC procedures.
II Clearance – II Clearances are temporary, generic clearances not specifically issued to an
Authorized Individual. As such, the issuing and releasing responsibility rests with the II on shift.
Lockbox – A device used during lockout to secure keys for the lockout devices.
Lockout – The placement of a lockout device on an energy isolation device in accordance with an established procedure ensuring that the energy isolation device and the equipment being controlled cannot be operated until the lockout device is removed.
Lockout and Tag out – A lockout and tag out procedure used when service and/or maintenance is performed by a crew, craft, department or other group and which affords each employee a level of protection equivalent to that provided by the use of a personal lockout or tag out device.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 7 of 60
Lockout Device – A device that utilizes a positive means such as a lock and any associated hardware needed to secure an energy isolation device in the safe or off position to prevent the energizing of machines or equipment. The device must be identifiable, durable, and require excessive force or unusual tools/techniques to be removed by someone other than the Authorized Individual that attached the device. Blank flanges and bolted slip blinds are included.
Non-project Personnel – All personnel who do not fall under the chain of command of the RO.
Personal Lock – Uniquely keyed safety lock issued to or available to personnel to be used only for Hazardous Energy Control procedures. The lock shall identify the person to whom it is issued.
Personal Lockout – Lockout/Tag out not requiring a Safe Clearance.
Personal Tag – A tag required to be used during Personal Lockout (different from the ENG Form
1925).
Point of Contact (POC) – A designated representative to work with non-project personnel or contractors.
Principal Authorized Individual (PAI) – An individual designated by the RO who is qualified and authorized to request, receive and implement energy control procedures. An individual qualified and authorized to oversee a group of workers; this individual is required to have knowledge of the type and magnitude of hazards of the energy involved and the methods used to control this energy.
Public Access Area - Area where the general public has unescorted access to isolation points.
Responsible Official (RO) – The person in charge of the project or facility who designates the
Issuing and Authorized Individuals and approves and directs the HEC Program.
Restricted area – Any area where hazardous conditions exist or have the potential to exist, such as inside electrical vaults or tanks with potentially contaminated atmospheres.
Safe Clearance Order Sheet – Documentation from the II to the PAI/AI declaring that the equipment to be worked on has been isolated from sources of hazardous energy. The clearance is the authorization to perform specified work within the perimeter of the clearance. Once the clearance is issued and hung, the order is filed in the clearance notebook and secured in the control room.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 8 of 60
Safe Clearance Activity Log – Documentation of any changes to the safe clearance; for example, additional tag points, temporary tag lifts, clearance transfers, and removal of tag points.
The Activity Log is filed in the work permit notebook.
Safe Clearance Points List – List of isolation points included in the Work Permit.
Safe Clearance Request - The form on which requests for safe clearances, safe clearance releases, and all other pertinent data in connection with safe clearances is maintained. Computer generated facsimiles are authorized. (see Attachment 8)
Safe Clearance Sign-In Sheet – A document log of each individual who is working under the
Safe Clearance and locks on to the lockbox.
Safe Clearance Transfer Form – A form used to document the transfer of a Safe Clearance.
Station Logbook – Legally binding record of station activity.
Stored Energy – Energy (electrical, mechanical, chemical, gravitational, etc.) that might be found in a charged capacitor, a loaded spring, chemical solutions, air and liquid reservoirs and piping, or similar forms.
Switching/Clearing Order – The step by step procedures to isolate or restore sources of energy.
System – Machinery, equipment, and electrical, hydraulic, or pneumatic lines that are under the operational control of a plant operator or equivalent.
Tag out – The placement of a hazardous energy control tag (ENG Form 1925) on an energy isolation device, in accordance with established procedures, to indicate that the energy isolation device and the equipment being controlled may not be operated until the tag is removed.
Temporary Lift Order – A switching/clearing order allowing isolation point locks and tags to be temporarily removed to perform testing and adjustments.
Temporary Protective Grounds (TPGs) – Equipment as prescribed by the National Electric Safety Code.
Work Permit – HEC program documentation used by the PAI/AI to manage a Safe Clearance.
The Work Permit shall include at a minimum the Safe Clearance Points List, Safe Clearance Sign-In Sheet, and Safe Clearance Activity Log.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 9 of 60
6.0 Responsibilities
6.1 Responsible Official (RO) (Operations Project Manager [OPM], or Designee)
a. Responsible for the development and implementation of Portland District’s HEC Program at their respective project.
b. Maintains overall responsibility for Portland District's HEC Program and associated procedures at their respective project.
c. Ensures that the requirements of this supplemental regulation are properly applied and adhered to.
d. Ensures the local HEC Program supplement complies with EM 385-1-1 and ER 385-1-31.
e. Designates in writing, the Issuing Individuals (II), Designated Representatives to the Issuing Individual (DRII), Principal Authorized Individuals (PAIs), Authorized Individuals (AI) and any special conditions at their respective project.
f. Assures that the HEC Program is reviewed and updated annually utilizing attachment 9 self inspection checklist.
g. Assures periodic inspections of the facilities’ HEC procedures.
h. Assures that plant documentation is available to all persons involved in issuing and holding Safe Clearances.
i. Ensures that initial and periodic training on Portland District’s HEC Program and its procedures is provided.
j. Coordinates HEC procedures between project operating and maintenance personnel, resource personnel, and contractors or other affected off-site personnel.
k. Ensures contractors and other affected government or non-government off-site personnel understand and comply with the provisions of the HEC Program.
l. Assures that appropriate action is taken subsequent to violations of HEC procedures.
6.2 Issuing Individual (II)
a. Maintains responsibility for implementing the HEC procedures for all equipment affecting power and water systems as appropriate to their areas of responsibility.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 10 of 60
b. Maintains all documentation associated with HEC Program in accordance with record retention requirements.
c. Temporarily relinquishes control of equipment to PAIs for the accomplishment of service and/or maintenance work under a Safe Clearance.
d. Directs the switching/clearing and related operations needed to place and remove Safe Clearances and to perform temporary tag lift procedures.
e. Accepts and releases Safe Clearances issued to the position for the following conditions: line terminal clearances on tie lines and supply lines to and from outside utilities/agencies to establish safe working conditions within areas of high voltage equipment energized by these authorities.
f. In consultation with the PAI, ensures equipment is ready for service after work has been completed and the PAI has requested release of a Safe Clearance.
6.3 Designated Representative to the Issuing Individual (DRII)
a. Assures proper positioning of energy isolation devices to isolate hazardous energy sources, as well as draining and depressurizing fluids from equipment as directed by the II.
b. Places appropriate locks and tags while verifying their integrity.
c. Shall not proceed with switching if any of the following conditions exist until resolved by the
II.
1) The instruction is not clearly understood.
2) They believe the instruction is incorrect.
3) At any point in the operations, an unexpected condition could or does result.
4) A device is found in a position other than that indicated on the Safe Clearance Request
Form.
d. Reports to the II upon the start and completion of switching/clearing.
e. Performs operations as directed by the II.
f. Resolves questions that arise at any point during the switching/clearing sequence.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 11 of 60
6.4 Principal Authorized Individual (PAI)
a. Uses an activity hazard analysis (AHA) to identify and analyze all hazardous energy sources for the scope of work to be performed.
b. Requests and holds Safe Clearances.
c. Responsible for the Safe Clearance and manages work performed by personnel working under the Safe Clearance.
d. Responsible for the placement and removal of all physical barriers as required.
e. Inspects the work area to ensure non-essential items have been removed from the system and the system components are operationally intact.
6.5 Authorized Individuals (AI)
a. Uses the activity hazard analysis (AHA) to identify and analyze all hazardous energy sources for the scope of work to be performed.
b. Requests and holds Safe Clearances for themselves only.
c. Responsible for the placement and removal of all physical barriers as required.
d. Inspects the work area to ensure non-essential items have been removed from the system and the system components are operationally intact.
6.6 Affected Person (AP). Performs servicing and maintenance within the physical boundaries of a safe clearance in accordance with this regulation and local HEC Program requirements.
6.7 Incidental Persons (IP). Individuals identified as Incidental Persons must understand the consequences of violations of the HEC Procedures.
7.0 Procedures
7.1 The Hazardous Energy Control Program
a. HEC Program has been developed to establish and maintain the greatest practical level of consistency within the Portland District relative to hazardous energy control.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 12 of 60
b. Training shall be provided to ensure that the purpose and function of Portland District’s HEC Program is understood by all personnel.
c. The scope, purpose, authorization, rules, and techniques that will be used to control hazardous energy sources are outlined throughout this document.
d. All personnel shall report violations of the HEC procedures to the Responsible Official for documentation. Violators shall be subject to appropriate disciplinary action.
e. Refer to plant documentation for the application of lockout and tag out devices.
7.2 Emergencies
a. In an emergency, the Responsible Official or his designated representative may modify or suspend any of these requirements temporarily as considered necessary to permit proper handling of the specific emergency. However, in handling such emergencies, safety of personnel and members of the public shall be given predominant consideration.
b. If emergency switching/clearing is required and Designated Representatives to the Issuing Individual are not available, any person may perform switching/clearing if deemed qualified by the Responsible Official.
7.3 Inspections and Program Review
a. At least annually, a district level review of the HEC Program local supplemental will be conducted. The committee should include a representative from each project.
b. At least annually, periodic inspections at the project level shall be designed and conducted to identify and correct any weaknesses (or potential weaknesses) in the program, procedures, and employee training.
c. The RO shall appoint a Safe Clearance Committee for the purpose of evaluating the HEC Program.
d. The Safe Clearance Committee should consist of one Issuing Individual (II), one Principal Authorized Individual (PAI), and the project Safety Officer.
e. Periodic inspections of HEC procedures shall cover the procedure details of at least one Safe Clearance in progress and shall include a review between the inspectors and individuals involved in the Safe Clearance being inspected.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 13 of 60
f. Inspections shall be documented (date, persons involved, results) and identified deficiencies noted. Corrective actions taken to improve the program or employee knowledge of the program must include how any revision of specific procedures or a general change is communicated to the workers.
g. HEC Program inspection documentation provided in Attachment 9 will be completed and forwarded to the RO. The original copy will be filed by the II and kept for a minimum of five years.
7.4 HECP Training Program.
a. ER 385-1-31 and HEC Program training shall be provided by the RO or a designated individual.
b. Employees involved with HEC procedures shall have initial training and must demonstrate adequate working knowledge of HEC policy and local programs and procedures prior to being authorized and identified to assume any of the associated roles.
c. Training verification, containing each employee’s name and dates of training, is required for both initial training and retraining.
d. All training documentation shall be maintained at the project for at least two years.
e. At a minimum, ROs, PAI/AIs and II/DRIIs shall be trained in:
1) Type and magnitude of energy present in the workplace;
2) Recognizing hazardous energy sources;
3) Methods and means to isolate and control energy;
4) Limitations of tags;
5) Requirements of the local HEC program; and
6) Consequences of violations.
f. APs shall be trained in:
1) HEC procedures;
2) Recognizing HEC locks and tags;
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 14 of 60
3) Limitations of tags;
4) Understanding the prohibition against attempting to restart or re-energize a machine, circuit or any equipment that is removed from service by implementation of an HEC procedure; and,
5) Consequences of violations.
g. Training for IPs shall include:
1) Instruction regarding HEC procedures and the prohibition against altering or removing a lockout or tag out device and attempting to restart, reenergize, or operate the machinery; and
2) Consequences of violations.
3) Training for IP’s to be accomplished via face to face briefings
h. Retraining shall occur:
1) At least annually.
2) When a periodic inspection reveals deviations from procedures or inadequacies in knowledge or use of HEC procedures.
3) When an employee is in violation of HEC Procedures.
4) When there is a change in job assignment, a change in hazards, or a change in the HEC Program.
i. Non-trained personnel requiring access within the boundaries of a Safe Clearance must be escorted by a PAI/AI.
7.5 Use of Locks and Tags.
a. Locks
1) Are capable of withstanding the conditions to which they are exposed for the maximum period of time the exposure is expected and are substantial enough to prevent removal without the use of excessive force or unusual techniques (such as with the use of bolt cutters).
2) Are standardized within every facility and recognizable as an HEC lock.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 15 of 60
3) Examples of personal locks and clearance locks are displayed in Attachments 2 and 3.
4) Each shall be uniquely marked for positive identification
b. Personal Locks:
1) Shall be used by all personnel that are protected by the Safe Clearance.
2) Shall not be used for any other purpose besides individual personal protection.
3) Shall indicate the identity of the person who applied them.
4) Shall only be removed by the person who applied the device.
5) Shall be used in conjunction with personal tags when locking/tagging out without a clearance.
c. Tags
1) Are standardized within every facility and have content and format equivalent to the example of ENG Form 1924, Caution Order Tag and the ENG Form 1925, Danger – Do Not Operate Tag, shown in Attachments 4 and 5.
2) Are constructed and printed so that exposure to weather conditions, wet or damp locations, or corrosive environments will not cause the tag to deteriorate or the message to become illegible.
3) Shall be attached by means which are non-reusable; self-locking; substantial enough to prevent inadvertent or accidental removal; non-releasable, with a minimum unlocking strength of no less than 50 pounds; and at least equivalent to a one-piece, all-environment-tolerant nylon cable tie.
4) Identify the person to whom the Safe Clearance is issued.
5) Examples of personal tags, clearance tags, and caution order tags are displayed in Attachments 4 5, and 6.
d. Personal Tags
1) Are standardized at each facility with the words “Danger – Do Not Operate.”
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 16 of 60
2) Identify the person to whom the personal tag is issued.
3) No more than four personal tags per person are issued.
4) Are constructed and printed so that exposure to weather conditions, wet or damp locations, or corrosive environments will not cause the tag to deteriorate, or the message to become illegible.
5) Shall be attached by hand by means which are self-locking; substantial enough to prevent inadvertent or accidental removal; non-releasable, with a minimum unlocking strength of no less than 50 pounds; and at least equivalent to a one-piece, all-environment-tolerant nylon cable tie.
6) Examples of personal tags are displayed in Attachment 2.
c. Positive Controls in Public Access Areas
1) In areas with public access, locks and other positive controls shall be used on the energy isolation devices.
2) Tags without a lock are not permitted in public access areas.
7.6 Hazardous Energy Control Procedures
a. Activity Hazard Analysis (AHA) (see Attachment 8, CENWP-OD HECP Form 1.)
1) A current AHA will be used to determine if the work to be performed will require a Safe Clearance.
2) The AHA shall identify, analyze and provide controls for potential hazardous energy sources and be completed prior to conducting work (shall also address potential emergency situations).
b. Requirements for a Safe Clearance
1) An orderly and systematic procedure to shutdown and restore equipment shall be utilized to avoid any additional or increased hazards to personnel or equipment.
2) Any system operated by a remotely controlled source will be completely isolated so that it cannot be operated by the remote source or any other source.
3) Computer software, or any other type of programming, will not be used as isolation points.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 17 of 60
4) When only tags are used (no locks), the following conditions shall be met.
In areas with public access, tags without locks are NOT permitted.
Personnel shall be instructed in the limitations of tags.
Additional means shall be employed to provide a level of protection equivalent to that provided by a lock (e.g. placement of the tag in a manner which prohibits operation of the energy isolation device, removal of an isolating circuit mechanism, opening of an extra disconnecting device, removal of a valve handle to reduce the likelihood of inadvertent energizing, etc).
Tags shall be treated as locks and shall only be removed by the II or DRII.
Tags shall never be bypassed, ignored, or otherwise defeated.
5) Lockboxes shall be kept in a secure location.
NOTE: Prior to starting any work on equipment under a Safe Clearance, isolation of all hazardous energy sources must be verified.
c. Abnormal Conditions
1) Abnormal Removal of Personal Locks. When the individual who applied a personal lock is not available to remove it due to extraordinary circumstances, the individual’s immediate supervisor shall assume full responsibility for the removal of the personal lock after performing the following actions.
Verify that the individual who applied the personal lock is not at the facility.
Make all reasonable efforts to contact the individual to inform them that their personal lock will be removed.
Ensure that the individual will be informed of the removal before they resume work at that facility by signing the Abnormal Removal of a Personal Lock Form (Attachment 8).
Obtain written authorization from the RO or their Designee to remove the individual’s personal lock.
Documentation provided in Attachment 8 must be filled in and attached to the Safe Clearance as a permanent record of the action.
2) Abnormal Release of a Safe Clearance. When, due to extraordinary circumstances, it is not possible for the PAI/AI to release the Safe Clearance, the PAI/AI’s Immediate Supervisor shall assume full responsibility for the release of the Safe Clearance and removal of their personal lock after performing the following actions.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 18 of 60
Verify that the PAI/AI who holds the Safe Clearance and applied their personal lock onto the lockbox is not at the facility.
Make all reasonable efforts to contact the PAI/AI to inform them that their Safe Clearance and personal lock will be removed.
Ensure that the PAI/AI will be informed of the removal before they resume work at that facility by signing the Abnormal Release of Safe Clearance Form (Attachment 8).
Obtain written authorization from the RO or their designee to release the Safe Clearance and remove the PAI/AI’s personal lock.
3) Abnormal Transfer of a Clearance When, due to extraordinary circumstances, it is not possible for the PAI/AI to transfer their Safe Clearance, the PAI/AI’s Immediate Supervisor shall assume full responsibility for the transfer of the Safe Clearance after performing the following actions.
Verify that the PAI/AI who holds the Safe Clearance and applied their personal lock onto the lockbox is not at the facility.
Make all reasonable efforts to contact the PAI/AI to inform them that their Safe Clearance will be transferred and their personal lock will be removed.
Ensure that the PAI/AI will be informed of the transfer before they resume work at that facility by signing the Abnormal Transfer of Safe Clearance Form (Attachment 8).
Obtain written authorization from the RO or their designee to transfer the Safe Clearance and remove the PAI/AI’s personal lock.
Personal Lockout (Lockout/Tag out without a Clearance)
The RO has authorized personnel who can utilize a personal lockout and may designate equipment to be removed from service without a Safe Clearance.
Personal locks and tags shall be used when removing the designated equipment from service.
Personal Lockout must be approved and documented by the II, including the start time, end time and date. Use of this process is permitted only when the following criteria are met.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 19 of 60
The employee is authorized to work only under their own personal locks and tags.
Equipment is easily isolated such that the employee can exercise close control over the isolation points.
Equipment would not adversely affect the mission.
Equipment is rated at 480-volt or lower.
The operation or work to be accomplished is limited to one shift.
A maximum of four isolation points is allowed.
The equipment has no potential for stored or residual energy or accumulation of stored energy after shutdown which could endanger employees.
The servicing or maintenance does not create hazards for other employees.
Personal Lockout shall be recorded in the Station Logbook.
7.7 Caution Orders.
NOTE: Caution Orders shall be reviewed by the RO or their designee at least every six months to ensure the caution order is still needed. If used for more than one year, the caution order shall be removed and operating procedures shall be developed to reflect current operational conditions.
a. Caution orders shall not be used to provide personnel protection.
b. Caution orders must be approved and documented by the II.
c. Caution orders are issued to direct attention to abnormal or unusual conditions or to special operating instructions to be followed.
d. Each caution order shall be assigned an identification number.
e. Caution orders will be logged in the station logbook.
f. ENG Form 1928, “Caution Order” Sheet, will be prepared for each caution order issued. This will supplement the Station Logbook entry at those projects maintaining Station Logbooks and provide the necessary project records at other projects. Records shall be maintained for a minimum of two years.
g. ENG Form 1924, Caution Order Tag, will be properly completed and attached to appropriate control devices and equipment.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 20 of 60
7.8 Lockout/Tag out Requiring a Safe Clearance
a. Requests for a Safe Clearance
1) The PAI/AI identifies the scope of work to be performed and makes a request with sufficient time for the II to provide a Safe Clearance. The Safe Clearance Request Form will denote the requirement for Temporary Protective Grounds (TPGs) and Temporary Lifts as applicable.
2) CENWP-OD HECP Form, Safe Clearance Request Form, or equivalent is used to formalize and document each step in the process of placing and releasing Safe Clearances.
3) Requests for a Safe Clearance should be specific and provide adequate information to complete the Safe Clearance Order Sheet.
4) The PAI/AI and II shall ensure that the equipment to be placed under a Safe Clearance will be effectively isolated for the requested scope of the work to be performed.
5) Non-routine or complex clearances should be peer reviewed when possible.
b. Application of the Requested Safe Clearance
1) Upon approval of a Safe Clearance Request, the II shall:
Verify that the requesting person is qualified and authorized in the appropriate project supplement;
Ensure that the Safe Clearance correctly designates the positioning of all energy isolation devices specified in the Safe Clearance Points List and provides for locking and tagging all points accordingly;
Ensure that the proposed devices will be applied and removed in proper sequence.
Make all necessary arrangements for interruption of services, including notification of customers and coordination with appropriate agencies and other entities to ensure isolation of systems to be cleared; AND
Prepare the Safe Clearance and the associated Safe Clearance Tags.
2) If there are any questions regarding the completeness or correctness of the Safe Clearance, the questions shall be resolved before switching/clearing is started. If a question arises at any point during the switching/clearing sequence, it shall be resolved by the II or DRII and the PAI/AI before continuing with the switching/clearing.
3) The II or DRII performs the switching/clearing following these requirements:
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 21 of 60
The II authorizes the start and is notified at the completion of switching/clearing operations.
The equipment/system shall be isolated in accordance with the switching/clearing order.
Prior to the application of locks and tags to energy isolating devices, all known potentially hazardous stored or residual energy shall be relieved, disconnected, restrained, or otherwise rendered safe.
Energy isolating devices needed to control energy to, or within the system shall be physically located and positioned in such a manner as to isolate energy sources and secure the isolation point in the safe position by placing a lock on the isolation devices.
Tags shall be affixed to each energy isolation device at the same point where the lock is attached and the tag will clearly indicate that the operation or movement of the energy isolation devices from the safe position is prohibited.
Upon completion of the switching/clearing step, the DRII will initial each tag and write the time/date, lock number and initial the Switching/Clearing Order.
If there is a re-accumulation of stored energy to a hazardous level, corrective measures shall be taken prior to the completion of switching/clearing.
After the locks have been applied to the isolation points, the II or DRII will then place the isolation lock keys in the lockbox.
4) The II shall provide the PAI/AI with the Work Permit.
5) PAI/AI will verify that the isolation key(s) are in the lockbox.
6) PAI/AI shall place their personal lock on the lockbox.
7) PAI/AI shall assure that energy isolation devices are properly positioned, locked, and tagged.
8) PAI/AI will initial each isolation point tag upon verification of that device’s position and condition.
9) PAI signs the Safe Clearance Order or notifies the II, who may sign for him.
c. Issuing a Safe Clearance
1) Upon PAI/AI acceptance of the Safe Clearance, the II issues a Safe Clearance to the PAI/AI. The following data will be entered in the station logbook: safe clearance number; purpose of the safe clearance; system to be cleared; date and military time of issue; name of II; and name of PAI/AI receiving the Safe Clearance.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 22 of 60
2) The preferred method of issuing Safe Clearances is in person.
3) TPGs shall be placed and added to the Safe Clearance as appropriate.
4) The II shall remain cognizant of equipment condition and status during a Safe Clearance.
5) If there is a re-accumulation of stored energy to a hazardous level, work shall stop until corrective measures have been taken.
6) Personnel being protected by the clearance shall:
Be briefed on HEC Procedures, understand the protection provided by the Safe Clearance, and be afforded the opportunity to verify proper application of locks and tags;
Obtain permission from the PAI/AI prior to placing their personal lock on the lockbox and signing onto the Safe Clearance Sign-In Sheet;
Keep the PAI/AI informed of any additional protection deemed necessary;
Prior to starting any work on equipment under a Safe Clearance, verify isolation of pertinent hazardous energy sources; AND
Keep the PAI/AI informed of equipment conditions and the status of work.
7) Contractors shall comply with the requirements of ER 385-1-31, to wit, “Each Affected Person working under the group clearance shall sign the Master Tag (work permit) verifying he fully understands the details of the job, the energy isolation devices actuated, the locks and tags installed, and will then place their personal lock on the group lock box;”.
d. Adding/Releasing Clearance Points
1) The PAI/AI requests the addition or release of Safe Clearance isolation points from the II.
2) PAI shall notify all personnel that specific isolation points will be added or released.
3) All personnel will sign off the Safe Clearance Sign-In Sheet and remove their personal locks from the lockbox.
4) If necessary, PAI/AI will remove their personal lock from the lockbox only long enough to allow the II or the DRII to deposit or retrieve keys.
5) DRII performs applicable switching/clearing procedures.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 23 of 60
6) The PAI/AI shall verify and initial the additional isolation points for accuracy and assure that energy isolation devices are properly positioned, locked, and tagged.
7) PAI/AI documents the addition or release of isolation points in the Safe Clearance Activity Log.
8) PAI notifies personnel signing and locking back onto the Safe Clearance of the new boundaries.
e. Temporary Protective Grounds (TPGs)
1) Protective grounds are part of the Safe Clearance.
2) The National Electrical Safety Code shall be used as a guide in grounding requirements and procedures.
3) Locks are not required on TPGs.
4) TPGs are placed as additional tag points to the Safe Clearance per the following procedures.
Safe Clearance is initially accepted and documented on the Safe Clearance Activity Log by the PAI/AI and issued by the II.
PAI/AI notifies II that grounds will be placed.
Personnel hanging TPGs will sign onto the Safe Clearance Sign-In Sheet and place their personal lock on the lockbox.
TPGs are then placed by an electrically qualified journeyman or a trainee under the direct supervision of an electrically qualified journeyman.
II/DRII places the appropriate clearance tag on each individual TPG immediately after all TPGs are placed and initials each tag.
The PAI/AI will initial each additional TPG tag upon verification of that device’s position and
The PAI/AI will accept the additional Safe Clearance points and they will be documented on the Safe Clearance Activity Log.
The II will record TPGs in the Station Logbook.
The system is now considered safe for work to be performed.
5) TPGs are removed prior to the release of the associated Safe Clearance, as per the following:
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 24 of 60
PAI/AI requests the release of TPG Clearance tags.
All personnel, with the exception of personnel removing TPGs, will sign off the Safe Clearance and remove their personal lock from the lockbox.
II/DRII removes all TPG tags.
Immediately after tags are removed, the TPGs are removed by an electrically qualified journeyman or a trainee under the direct supervision of an electrically qualified journeyman.
TPG removal shall be documented on the Safe Clearance Activity Log and Station Logbook.
f. The Safe Clearance can then be re-accepted or released as the need may be.
1) Temporary Removal of Locks and Tags (Temp Lifts)
2) In situations where the PAI/AI requests temporary removal of locks and tags from the energy isolating devices and energizing of the system for testing or repositioning purposes, the action must be fully coordinated in advance with the II.
3) If more than one Safe Clearance is issued or there are overlapping Safe Clearances, the PAI/AI shall coordinate the action with all PAI/AIs.
4) A Temp Lift Order will be issued by the II once the following conditions have been met.
Clear the system of tools and equipment.
PAI/AI shall notify all personnel that specific isolation locks and tags will be removed.
All personnel will sign off the Safe Clearance Sign-In Sheet and remove their personal lock from the lockbox.
PAI/AI will remove their personal lock from the lockbox only long enough to allow the II or DRII to retrieve the keys for the affected isolation locks and tags required to perform the testing requested.
Temporary Lifts shall be documented on the Safe Clearance Activity Log as well as the
Clearance Hanging and Removal Record.
II or DRII removes the affected isolation points’ locks and tags.
II or DRII will line out the initials on the tag when removing.
Current Approved Version X January 2014). Printed copies are for “Information Only.” The controlled version resides on the CENWP-OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
CENWP-OD-SAF-385-1 Page 25 of 60
DRII to place the removed locks and tags in the lockbox.
Only the personnel authorized by the PAI will then sign onto the Safe Clearance Sign-In Sheet and re-hang their personal lock on the lockbox.
Personnel will then perform the testing as requested.