REQUEST FOR PROPOSAL

W9127N-16-R-0005

FALL CREEK DAM, LANE COUNTY, OREGON

FALL CREEK ADULT FISH FACILITY

COLLECTION UPGRADE

PROJECT MANUAL

TOC-1

NAME OF PROJECT: Fall Creek Dam and Reservoir Adult Fish Facility Upgrade

LOCATION OF PROJECT: Lane County, Oregon

MAGNITUDE OF CONSTRUCTION: Betw een $10,000,000 and $25,000,000

SOCIO-ECONOMIC CONSIDERATION: Unrestricted

MICHAEL I GRASSO 503-808-4612

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

10-Mar-2016

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______7 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10 Alt1

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________14 Apr 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS

333 SW FIRST AVE

PORTLAND OR 97204-3495

W9127N

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

503-808-4605FAX:TEL: 503-808-4612 TEL: FAX:

W9127N-16-R-0005 70

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00010 - Solicitation Contract Form

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0001 Design of Contractor

Designed Features 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0002 Mobilization &

Demobilization 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0003 Civil 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0004 Common Excavation

For informational purposes only.

See sub-CLINs 0004AA and 0004AB.

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0004AA First 10,000 Cubic

Yards 10,000 Cubic Yard

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0004AB Over 10,000 Cubic

Yards 3,000 Cubic Yard

OPTION Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0005 Rock Excavation

For informational purposes only.

See sub-CLINs 0005AA and 0005AB.

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0005AA First 3,000 Cubic Yards 3,000 Cubic Yard

Funded:

00010-3

0005AB Over 3,000 Cubic

Yards 1,500 Cubic Yard

OPTION Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0006 Existing Upstream

Migrant Facility 1 Each

Modifications Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0007 Upper Fish Ladder

Structure 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0008 Pre-Sort Pool &

Facility Water Supply 1 Each

Structure Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0009 Sorting Structure 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0010 Post-Sort Structure 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0011 Headbox Dewatering

Flume 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0012 Juvenile Bypass

Transport Pipe 1 Each

Helix Support Tower Funded:

00010-4

0013 Facility Access

Walkways 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0014 Fish Facility Water

Supply 1 Each

Isolation Valve Structure Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0015 Return Water Pipe

Thrust Block and 1 Each

Supports Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0016 Architectural Features 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0017 Mechanical Demolition 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0018 Mechancial Features in

Existing Facility 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0019 Pre-Sort Pool Features 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0020 Sorting Structure

Features 1 Each

Funded:

00010-5

0021 Post-Sort Features 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0022 Fish Return Piping

Features 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0023 Facility Water Supply 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0024 Compressed Air

System 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0025 Electrical and Controls 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0026 Commissioning

Support 1 Each

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0027 Pipe Lining 1 Each

OPTION Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0028 Operations Storage

Area 1 Each

OPTION Funded:

00010-6

TOTAL

SUBTOTAL FOR BASE LINE ITEMS (0001-0026) $ -

SUBTOTAL FOR OPTIONAL LINE ITEMS (0027-0028) $ ________________

TOTAL FOR ALL LINE ITEMS (0001-0028) $ _

00010-7

Section 00100 - Bidding Schedule / Instructions to Bidders

EVALUATION CRITERIA

PROJECT BACKGROUND AND OBJECTIVES

The U. S. Army Corps of Engineers (USACE), Portland District, seeks a contractor to perform the construction of the Fall Creek Fish Facility Upgrades, and incidental related work. The project will substantially improve fish handling and passage conditions for Upper Willamette River (UWR) Chinook salmon and UWR steelhead trout.

These fish are listed as Threatened under the Endangered Species Act. Secondary species of concern are lamprey and native resident fish. The upgraded facility will include the following major features:

1. Modifications to existing fish facility

2. Fish Ladder Extension

3. Pre-sort pool

4. Sorting area

5. Post sort pools with underneath truck loading

6. Fish return to river pipe

7. Water supply and discharge piping

8. Building and shade structures.

9. Electrical improvements

10. Civil site improvements

11. Spray in place pipe lining

12. Commissioning

The work is located at Fall Creek Dam, Lane County, Oregon.

BASIS OF AWARD

A. General.

(1) This solicitation is an unrestricted competitive acquisition using Lowest Price Technically Acceptable (LPTA) source selection process for the award of a firm fixed-price contract. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptable standards for non-cost factors. This acquisition will utilize FAR Part 15 LPTA source selection procedures, leading to selection of the proposal representing the best value to the Government.

(2) Offerors shall submit a technical proposal, and a price proposal. The evaluation results of the non-price and price proposals will determine an awardee. In order to be considered awardable, the offeror’s proposal must receive an “acceptable” rating in every non-price factors.

(3) The Government intends to make an award without discussions, but reserves the right to conduct discussions should discussions prove to be necessary or advantageous to the Government. Because the Government does not intend to hold discussions Offerors are encouraged to include their best pricing in their initial proposal.

(4) All proposals received will stand alone and be considered complete and final. The evaluation board will not consider any information or data incorporated by reference or otherwise referred to. The successful Offeror will be selected solely on the basis of the evaluation factors set forth below. Accordingly, proposals submitted in response to this solicitation should provide clear, complete, concise, and straightforward responses to the evaluation factors. Elaborate proposals, color brochures, and other excesses are discouraged.

00100-1

EVALUATION FACTORS

Volume I – Technical (Non-Price) Submission Requirements and Evaluation Method:

FACTOR 1 (TAB 1) – Experience

Submission Requirements:

The Offeror shall submit information for up to two projects that demonstrates the offeror’s experience installing and/or modifying adult fish collection facilities and/or wastewater treatment facilities.

Information submitted for each project must include the information outlined in Attachment B, Offeror’s Experience Form.

To be evaluated, projects must have been completed or must be substantially complete within five years of the date that proposals are due and be projects valued over $5,000,000.00. Substantially complete is defined as being 75% complete by the date that proposals are due. If an offeror submits a project that it represents is “substantially complete,” the offeror must reasonably explain why the project is considered at least 75% complete. If an offeror submits an ongoing project without providing an accompanying reasonable explanation that explains how the project is at least 75% complete, the Government reserves the right to reject the project.

A maximum of two projects will be evaluated. If an offeror disregards these instructions and submits more than two projects, only the first two projects will be evaluated. Offerors should describe each project with enough detail to ensure that the Government can meaningfully assess whether the projects submitted meet the minimum evaluation criteria outlined below.

Evaluation criteria: Experience will be rated on an “acceptable” or “unacceptable” basis.

Acceptable: To be determined “acceptable,” the offeror’s proposal must demonstrate that the offeror has experience installing and/or modifying an adult fish collection facility or waste water treatment facility valued over $5,000,000. The offeror’s proposal must also demonstrate that the offeror has performed civil, structural, mechanical, and electrical work at an adult fish collection facility or waste water treatment facility valued over $5,000,000. To be determined acceptable under this factor, each project submitted does not need to demonstrate all functional categories (civil, structural, mechanical, and electrical work) for each individual project. Rather, to be acceptable an offeror must submit a proposal that includes up to two projects that collectively demonstrate the offeror’s experience with all four discrete categories of work:

civil, structural, mechanical, and electrical.

Unacceptable: The offeror’s proposal fails to demonstrate experience installing and/or modifying an adult fish collection facility or waste water treatment facility valued over $5,000,000. The offeror’s proposal fails to demonstrate experience performing civil, structural, mechanical, and electrical work at an adult fish collection facility or waste water treatment facility valued over $5,000,000.

Table 1. TECHNICAL Acceptable/Unacceptable RATINGS

RATING DESCRIPTION

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

00100-2

FACTOR 2 (TAB 2) – Past Performance

Submission Requirements:

The offeror shall provide past performance information for each project listed by the offeror under Factor 1, Experience. Recent and relevant projects are those projects completed or substantially completed** within five years of the date that proposals are due that are valued over $5,000,000 and that are similar in scope and complexity to the work in this requirement.

** Substantially completed is defined as having completed more than 75% of the project work at the time proposals are due.

If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal. Do not submit a PPQ when a completed CPARS is available.

Completed PPQs should be submitted with your proposal if a CPARS is not available. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment A), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Michael I. Grasso, via email at Michael.I.Grasso@usace.army.milprior to proposal closing date. The offerors shall instruct the clients to refer to the solicitation number in the subject line. The PPQs are Source Selection materials. All successfully submitted PPQs will receive an e-mail confirmation upon receipt. If the offeror does not receive the confirmation, it is their responsibility to follow up to ensure the government has received the information.

Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted past performance information in the past performance evaluation.

Offerors may provide explanation on problems encountered on past projects and the corrective actions taken by the offeror.

In addition to the above, the Government may review other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS, including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s),FAPIIS, telephone interviews with organizations familiar with the offeror’s performance, Government personnel with personal knowledge of the offeror’s performance capability, and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

Evaluation Method:

The past performance evaluation results is an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offeror’s record of relevant and recent past performance information that pertain to the project outlined in the solicitation requirements.

00100-3

There are two aspects to the past performance evaluation. The first is to evaluate whether the offeror’s present/past performance is relevant or not relevant to the project.

The second aspect of the past performance evaluation is to determine how well the contractor performed on the contracts. The Government will evaluate the offeror’s past performance to ensure previous work performance satisfactorily met the contract requirements, performance schedules, prescribed quality of work, safety requirements, and other customer expectations on these projects.

The Government reserves the right to obtain or verify offeror’s past performance information from references and other sources available to the Government.

Past performance under Factor 2 shall be evaluated using the following rating of an “acceptable” or “unacceptable” basis using the ratings stated in Table 2:

Table 2. PAST PERFORMANCE EVALUATION RATINGS

RATING DESCRIPTION

Acceptable Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. (See note below.)

Unacceptable Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.

Note: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

FACTOR 3- Work Plan

Submission Requirements:

The Offeror shall submit a work plan explaining the offeror’s technical approach for completing the project in accordance with the specifications outlined in this solicitation. The plan shall include a detailed narrative that addresses the procedures proposed for the successful completion of the following major features of work:

1. Modifications to existing fish facility

2. Fish Ladder Extension

3. Pre-sort pool

4. Sorting area

5. Post sort pools with underneath truck loading

6. Fish return to river pipe

7. Water supply and discharge piping

8. Building and shade structures.

9. Electrical improvements

10. Civil site improvements

11. Spray in place pipe lining

12. Commissioning

The work plan shall also include the offeror’s schedule, in Gantt chart format, for completing the work within the proscribed timeframes described in the solicitation requirements. At a minimum, the schedule shall include the following:

00100-4

1. Critical path,

2. Contractual milestones described in 52.211-10,

3. Fish facility shutdown periods,

4. In-water work periods,

5. Pre-construction submittals,

6. Mobilization,

7. Major features of work as described in the Project Background and Objectives,

8. Demobilization, and

9. Closeout submittals.

Evaluation Method: The Work Plan will be rated on an “acceptable” or “unacceptable” basis.

Acceptable: To be determined “acceptable,” the offeror’s proposed work plan must include the offeror’s plan for completing each feature of work outlined in the submission requirements above and demonstrate a feasible plan for completing the work in accordance with the requirements outlined in the solicitation specifications. The offeror’s work plan must also include a Gantt chart that includes a feasible schedule for completing the work items outlined in the submission requirements above, and within the timeframes described in the solicitation specifications.

Unacceptable: The offeror’s proposed work plan fails to include all of the features of work included in the submission requirements. The offeror’s proposed work plan is not feasible or fails to demonstrate the ability to complete the work in accordance with the requirements of the solicitation. The offeror’s plan fails to include a schedule in Gantt chart format addressing each of the work items contained in the submission requirements. The offeror’s proposed schedule demonstrates an inability to complete the work within the timeframes described in the solicitation specifications or inability to feasibly complete the work on time.

Table 1. TECHNICAL Acceptable/Unacceptable RATINGS

RATING DESCRIPTION

Acceptable The proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

Volume II - Price.

Price Evaluation

Award will be made on the basis of the lowest evaluated price (sum of all CLINs) of proposals meeting or exceeding the acceptability standards for non-cost factors.

The Price Proposal will be evaluated to determine fairness and reasonableness. For evaluation purposes, the total evaluated price will be calculated by adding the total price for all optional items to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the options.

The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated

00100-5 as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the

Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

SUBMISSION OF PROPOSALS AND EVALUATION

A. Administrative Details and General Instructions: Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

(1) General Proposal Format: Submit each copy of the proposal in tabbed, 3-ring binders with a “D” ring or locking closures.

Title Page. Each copy must include the Offeror’s name and address, phone number and email address, title of the solicitation, solicitation number and date of submittal clearly identified on the front cover of the binder.

Table of Contents. Each binder of the proposal shall contain a detailed table of contents. The complete table of contents shall be included in each binder.

Printed Matter Submissions. Pages containing text are expected to be 8 ½ x 11 inches with at least one-inch margins at the top, bottom, and both sides. Paragraphs should be separated by at least one blank line. A standard 11-point font in either Arial or Times New Roman is preferred.

Organization charts or schedules. A folded 11” x 17” format may be used. Larger format drawings or tables may be added by folding them to fit within the binder.

All information must be confined to the appropriate volume. If the materials do not fit within a single volume, they should be separated in additional binders, but clearly identified as such. Each volume of the proposal is expected to contain a table of contents, summary section with a brief abstract of the volume, and the narrative discussion.

THE OFFEROR SHALL SUBMIT AN ELECTRONIC VERSION OF EACH PROPOSAL. The electronic version shall be on a readable CD. Any discrepancies between the electronic and paper copies shall give precedence to the paper copy.

(2) Proposal Content Limitations.

The Offeror must confine the proposal to relevant information and documentation sufficient to provide an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of the proposal. The page count is at the discretion of the Offeror, however the proposal may not be more than 50 pages total.

The evaluation panel for the Government is instructed to evaluate the non-price proposal factors on the basis of the information provided. Extraneous information provided in the proposals will not be considered in the evaluations; therefore, the Offeror should only provide information that satisfies the solicitation requirements. Merely restating the specifications without sufficient elaboration demonstrates a lack of understanding of the requirement.

DO NOT cross reference past performance information. It is acceptable to repeat data, project information or experience in more than one non-price area as long as it satisfies the requirements of the factor.

00100-6

Proprietary information must be clearly marked.

B. Content of Proposals: All proposals must be prepared in two volumes: A technical proposal (Volume I), a price proposal (Volume II). Each of the volumes shall be separate and complete in itself so that evaluation of one may be accomplished independently from evaluation of the other. The technical proposal (Volume I) must not contain reference to price. The narrative and content structure of the proposal shall follow the format shown under Volume I below. Offerors who fail to submit a complete proposal may be excluded and thus receive no further consideration for award.

(1) Technical Proposal, Volume I: Provide one (1) original and three (3) copies and one (1) pdf. file on a CD-ROM. Volume I shall consist of information for the six (6) factors, and the associated sub-factors, listed in tabular form, as noted below. Repeating or restating the specifications without sufficient elaboration will be determined to show a lack of understanding of the requirement.

Volume I – Technical (Non-Price) Factors and Sub-factors:

Tab 1 - Factor 1 - Experience

Tab 2 - Factor 2 – Past Performance

Tab 3 - Factor 3 – Work Plan

Volume II – Price Proposal:

Price Proposal, Volume II: The Price Proposal shall be complete, detailed and submitted on forms provided in the Request for Proposal (RFP) (one (1) original and one (1) pdf. file on a CD-ROM).

Offeror shall provide pricing and complete all line items on Standard Form 1442 (SF 1442).

Volume II - Price. Offeror’s price proposal must be prepared in accordance with below paragraphs and must include:

Tab 1 - SF1442, Solicitation, Offer, and Award.

The SF1442 shall be filled out completely by the Offeror and signed by an official that is authorized to bind the company. The Offeror shall also acknowledge all amendments to the solicitation in accordance with the instructions on the Standard Form 30 or Block 19 of SF1442.

Tab 2 – Section 00010, Proposal Price / Bid Schedule.

The Offeror shall fully complete this section.

Tab 3 - Representations, Certifications and other Statements of Offerors.

The Offeror shall complete all representations and certifications in Section 00600 and also ensure current registration and completed/updated Annual Representations and Certifications on the System for Award Management (SAM) website, www.sam.gov.

Tab 4 – Banking and Bonding point of contacts.

The Government is required to determine Contractor’s responsibility; the Offeror shall provide contact information (Company name, point of contact, address, email, and phone number) for the offeror’s bank and bonding institutions.

Tab 5 - Bid/Offer Guarantee. The Bid Bond shall be at least 20% of the bid price, but shall not exceed $3million.

00100-7

Submission of Proposals: Proposals must arrive at the location designated in the RFP for receipt of such proposals prior to the time and date established in Block 13, SF 1442. There will not be a public proposal opening. In order for the proposal to be considered, it MUST be prepared in ENGLISH, and must be submitted as a hardcopy original (Volume I, and II) and three (3) copies (Volume I only) with the required electronic CD-ROM:

BY HAND OR COURIER TO:

U. S. ARMY CORPS OF ENGINEERS, NWP

Block 300 (10th Floor USACE Security Desk) 333 SW. First Avenue Portland, Oregon 97204 Attention: Michael I. Grasso – CECT-NWP-C

OR SURFACE MAIL ADDRESS:

U. S. ARMY CORPS OF ENGINEERS, NWP

P. O. Box 2946 Portland, OR 97208-2946 Attention: Michael I. Grasso – CECT-NWP-C

NOTE: E-MAIL SUBMISSIONS WILL NOT BE CONSIDERED. If the electronic CD-ROM proposal differs from the hard copy, the hard copy will take precedence.

OFFEROR SHALL MARK THE OUTSIDE ENVELOPE(S) (PURSUANT TO FAR 14.201-5) AS

FOLLOWS:

Envelope(s) shall be plainly marked with the following information:

Solicitation No. W9127N-16-R-0005

Opening Date: _______________________________________________________ Number of each amendment that has been received: _________________________

00100-8

ATTACHMENT A

PAST PERFORMANCE QUESTIONNAIRE

1. The USACE Form PPQ shall be utilized for all evaluations that require a Past Performance Questionnaire.

2. Solicitations:

“Solicitation Submittal Requirements: IF A COMPLETED CPARS EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH THE PROPOSAL. IF THERE IS NOT A COMPLETED CPARS EVALUATION, the PPQ included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 3, Recent of Current Past Performance. AN OFFEROR

SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.

IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment A), which will provide contract and client information for the respective project(s). Offerors should follow- up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Michael I. Grasso, via email at Michael.I.Grasso@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.”

USACE Form PPQ will be made accessible on FBO website as a separate attachment. (Word version)

ATTACHMENT B

OFFEROR’S EXPERIENCE FORM will be made accessible on FBO website as a separate attachment. (Word version)

ATTACHMENT C

SMALL, SMALL DISADVANTAGED, WOMEN-OWNED, HUBZONE, VETERAN-OWNED SMALL

BUSINESS, AND SERVICE DISABLED VETERAN-OWNED SMALL BUSINESS SUBCONTRACTING

PLAN will be made accessible on FBO website as a separate attachment. (Word version)

00100-9

DEPARTMENT OF THE ARMY

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OREGON 97208-2946

REPLY TO

ATTENTION OF

Contracting Division 7 March 2016

SUBJECT: Solicitation No. W9127N-16-R-0005; Fall Creek Fish Facility Upgrades, Lane County, Oregon.

NOTICE TO LARGE BUSINESS FIRMS

Please see FAR Clauses 52.219-8, “Utilization of Small Business Concerns (Jul 2013)” and 52.219-9, "Small Business Subcontracting Plan (Jul 2013).” Large business concerns submitting offers of $700,000 or more for supplies or services or $1,500,000 for construction are required to submit a subcontracting plan as part of their proposal. Award will not be made under this solicitation without a subcontracting plan approved by the Contracting Officer.

DEFINITIONS:

Subcontract means any agreement (other than one involving an employer-employee relationship) entered into by a Government prime contractor or subcontractor calling for supplies and/or services required for performance of the contract, contract modification, or subcontract.

Small Business Concern means a concern, including its affiliates that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria and size standards in FAR 19.102. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged.

Electronic Subcontracting Reporting System (eSRS) means the Government wide, electronic, web-based system for small business subcontracting program reporting. The eSRS is located at http://www.esrs.gov.

The following goals are considered reasonable and achievable during the performance of the contract resulting from this solicitation and are included for information purposes. Final goals will be negotiated prior to contract award, and subcontracting plan will then become a material part of the contract.

a. 70% of planned subcontracting dollars will be placed with all small business concerns.

For the purpose of this subcontracting plan, Small Disadvantaged Business (SDB), Women-owned Small Business (WOSB), HUBZone Small Business, Veteran-owned Small Business, and Service Disabled Veteran-owned Small Business concerns are subsets of small business concerns.

b. 5% of planned subcontracting dollars will be placed with small disadvantaged business concerns. To be considered a small disadvantaged business concern, business must be certified by the Small Business Administration in addition to meeting the definition under FAR Clause 52.219-8(c)(3).

c. 5% of planned subcontracting dollars will be placed with small women-owned business concerns. Women-owned business concerns may meet the definition of a small disadvantaged business. If so, it will also be considered a subset of a small disadvantaged business concern.

d. 3% of planned subcontracting dollars will be placed with HUBZone small business concerns. To be considered a HUBZone small business concern, business must be certified by the U.S. Small Business Administration in addition to meeting the definition under FAR Clause 52.219-8(c)(3).

e. 5% of planned subcontracting dollars will be placed with Service Disabled Veteran-owned small business concerns.

f. 3% of planned subcontracting dollars will be placed with Veteran-owned small business concerns.

The proposed subcontracting plan must address how the offeror will maximize subcontracting opportunities within the small business communities of the project location. Demonstrated outreach efforts through conference attendance, use of SAM.gov, and corporate support of the Small Business Program Liaison Officer and Small Business Program must be addressed in the proposed subcontracting plan.

Subcontracting plans will be evaluated using Appendix DD to the Army Federal Acquisition Regulation Supplement (AFARS) 5119.705-4(d) to determine the offeror’s ability to carry out the terms and conditions set forth in the contract clauses. If discussions during this review raise doubts regarding intentions or ability to comply with contractual obligations, it could result in disqualification for award.

A subcontracting plan template is attached. The use of this template is recommended, but not mandatory and does not guarantee an acceptable plan. The subcontracting plan must include the requirements under FAR 19.704 “Subcontracting Plan Requirements”.

Should you have any questions related to the subcontracting plan requirement please call Carol McIntyre at (503) 808-4602.

Sincerely, Tracy L. Wickham Contracting Officer Enclosure

WICKHAM.TRACY.

LYNN.1141218790

Digitally signed by

WICKHAM.TRACY.LYNN.1141218790

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=WICKHAM.TRACY.LYNN.1141218790 Date: 2016.03.07 10:28:28 -08'00'

SMALL, SMALL DISADVANTAGED, WOMEN-OWNED, HUBZONE, VETERAN-OWNED

SMALL BUSINESS, AND SERVICE DISABLED VETERAN-OWNED SMALL BUSINESS

SUBCONTRACTING PLAN

DATE:

CONTRACTOR:

ADDRESS:

PHONE NO:

PROJECT TITLE:

SOLICITATION NO: W9127N-16-R-0005

1. In accordance with the contract clauses at 52.219-8 and 52.219-9, [Name of Contractor] submits the following Subcontracting Plan.

2. Corresponding dollar values for percentages cited in Paragraph 3 for the base period only:

Duplicate this section and complete for every option year, if applicable.

a. Total contract amount is Not to Exceed $ .

b. Total dollars planned to be subcontracted (to all types of businesses): $ .

c. Total dollars planned to be subcontracted to small business (including ANCs and Indian Tribes) concerns (including 2d, 2e, 2f and 2g below): $ .

d. Total dollars planned to be subcontracted to small disadvantaged business (including ANCs and Indian tribes) concerns: $ .

e. Total dollars planned to be subcontracted to small woman-owned business concerns:

f. Total dollars planned to be subcontracted to HUBZone small business: $ .

g. Total dollars planned to be subcontracted to service disabled veteran-owned small business concerns: $ .

h. Total dollars planned to be subcontracted to veteran-owned small business concerns:

3. The following percentage goals (expressed in terms of a percentage of total planned subcontracting dollars) are applicable to the base period of the contract awarded under the solicitation cited above: Duplicate this section and complete for every option year, if applicable.

a. The total estimated percentage of all planned subcontracting to all types of business concerns under this contract is (2b divided by 2a) %.

b. Small Business Concerns (2c divided by 2b): % of total planned subcontracting dollars under this contract will go to subcontractors who are small business concerns including 3c. and 3d.

c. Small Disadvantaged Business Concerns (2d divided by 2b): % of total planned subcontracting dollars under this contract will go to subcontractors who are small disadvantaged individuals.

d. Small Woman-Owned Business Concerns (2e divided by 2b): % of total planned subcontracting dollars under this contract will go to subcontractors who are small woman-owned businesses.

e. Small HUBZone Business Concerns (2f divided by 2b): % of total planned subcontracting dollars under this contract will go to subcontractors who are HUBZone small business contractors. See FAR Clause 52.219-8(c) or go to:

http://www.sba.gov/hubzone/ for further information.

f. Small Service Disabled Veteran-Owned Business Concerns (2g divided by 2b): % of total planned subcontracting dollars under this contract will go to subcontractors who are service disabled veteran-owned small businesses.

g. Small Veteran-owned Business Concerns (2h divided by 2b): % of total planned subcontracting dollars under this contract will go to subcontractors who are service disabled veteran-owned small businesses

4. The principal items or areas to be subcontracted under this contract are:

a. Of the items or areas listed in Paragraph 4, the following are planned to be subcontracted to Small Businesses (including ANCs and Indian Tribes):

[List the name(s) and responsibility of firm(s)]

b. Of the items or areas listed in Paragraph 4a, the following are planned to be subcontracted to Small Disadvantaged Businesses:

[List the name(s) and responsibility of firm(s)]

c. Of the items or areas listed in Paragraph 4a, the following are planned to be subcontracted to Small Women-Owned Businesses:

[List the name(s) and responsibility of firm(s)]

d. Of the items or areas listed in Paragraph 4a, the following are planned to be subcontracted to HUBZone small business concerns:

[List the name(s) and responsibility of firm(s)]

e. Of the items or areas listed in Paragraph 4a, the following are planned to be subcontracted to Small Service Disabled Veteran-Owned Businesses:

[List the name(s) and responsibility of firm(s)]

5. Description of the method used to develop the subcontracting goals in Paragraph 3:

6. Description of the method used to identify potential sources:

7. Indirect costs were were not used in establishing subcontracting goals.

[If indirect costs were used in establishing goals, furnish a description of the method used to determine the proportionate share of indirect costs to be incurred with (i) small business concerns (ii) HUBZone small business concerns (iii) small disadvantaged business concerns

(iv) women-owned business concerns, (v) small veteran-owned business concerns, and (vi) service disabled veteran-owned business concerns.]

8. The following individual will administer (name of contractor) Subcontracting Program:

(NOTE TO OFFERORS: The individual named here will be expected to perform and manage your plan and contract clause 52.219-9). Site Construction project managers may not be acceptable as your small business advocate who manages your Corporate Small Business Program).

Name:

Title:

Address:

Phone #:

Email:

This individual’s specific duties with regard to the conduct of our firm’s Subcontracting Plan will include, but will not be limited to, the following:

a. Developing and maintaining bidders lists of small business, HUBZone small business, small disadvantaged business and women-owned small business concerns using sources such as the System for Award Management (SAM), US Department of Commerce, Local Minority Business Development Centers, Economic Development Centers, and National Center for American Indian Enterprise Development.

b. Assuring the inclusion of small business, small disadvantaged business, women-owned small business, HUBZone small business, veteran owned small business, and service disabled veteran-owned small business concerns in all solicitations for products or services which they are capable of providing; and ensuring that all solicitations are structured to permit the maximum possible participation by small business, small disadvantaged business, women-owned small business, HUBZone small business, veteran owned small business, and service disabled veteran-owned small business concerns.

c. Establishing and maintaining records of all solicitations and subcontract awards to ensure that the members of the firm who review bidders proposals document their reasons for selecting or not selecting a bid submitted by a small business, HUBZone small business, small disadvantaged business, women-owned small business, veteran-owned small business, or service disabled veteran-owned small business concern, and monitoring the firm’s progress towards achievement of its percentage goals.

d. Attendance at DOD sponsored training programs in order to develop guidance and training to firm personnel on the policy of the federal government to aid, assist, and counsel small business under this and other government contracts.

e. Conducting or arranging for all other activities necessary to further the intent and attainment of the goals in the Plan to include motivational training of the firm’s purchasing personnel, attendance at workshops, seminars and trade fairs conducted by or on behalf of small business, HUBZone small business, and/or small disadvantaged and/or women-owned small business, Veteran-owned small business, and/or service disabled veteran-owned small business concerns; and general cooperation with members of the small, small disadvantaged, small women-owned, veteran owned small business, and service disabled veteran-owned small business concerns or their representatives.

9. The following steps will be taken to ensure that small business, HUBZone small business, small disadvantaged business, women-owned small business, veteran-owned small business, and service disabled veteran-owned small business concerns receive notice of and have an equitable opportunity to compete for intended awards of subcontracts and/or purchase orders for the products and/or services describe in Paragraph 4 above:

a. Sources will be requested through SAM, business development organizations, minority and small business trade associations and at small, minority, women-owned, HUBZone, veteran-owned, and service disabled veteran-owned small business procurement conferences; sources will be contacted; and bidding materials will be provided to all responding parties expressing an interest.

b. Internally, motivational training will be conducted to guide and encourage purchasing personnel; source lists and guides to small business, HUBZone small business, small disadvantaged, women-owned small business, veteran-owned small business, and service disabled veteran-owned small business concerns will be maintained and utilized by purchasing personnel while soliciting subcontracts and purchase orders; activities will be monitored to ensure sufficient time is allowed for interested bidders to prepare their proposals and to evaluate continuing compliance with the Subcontracting Plan.

10. [Name of Contractor] agrees that Clause 52.219.8 entitled "Utilization of Small Business Concerns"(Oct 2000) will be included in all subcontracts that offer further subcontracting opportunities. All subcontractors, except small business concerns, who receive subcontracts in excess of $700,000 ($1,500,000 in the case of construction) will be required to adopt a plan that complies with Clause 52.219-9 entitled “Small Business Subcontracting Plan.” Such plans will be reviewed to assure that all minimum requirements of an acceptable subcontracting plan have been satisfied. The acceptability of percentaged goals shall be determined on a case-by-case basis depending on the supplies/services involved, the availability of potential small business, HUBZone small business, small disadvantaged, women-owned, veteran-owned, and service disabled veteran-owned, subcontractors, and prior experience. Once approved and implemented, plans will be monitored through the submission of periodic reports and, as time and availability of funds permit, periodic visits to subcontractors facilities to review applicable records and subcontracting program progress.

11. [Name of Contractor] agrees to submit such periodic reports and cooperate in any studies or surveys as may be required by the Contracting agency or Small Business Administration in order to determine the extent of compliance by the offeror with the subcontracting plan and with the clause entitled “Utilization of Small Business Concerns” contained in the contract.

12. [Name of Contractor] agrees to maintain at least the following types of records to document compliance with the Subcontracting Plan:

a. The names of all organizations, agencies, and associations contacted for small business, HUBZone small business, small disadvantaged, women-owned small business sources, and veteran-owned small business along with records of attendance at conferences, seminars and trade fairs where additional sources were developed.

b. Source lists, guides, and other data identifying small business, HUBZone small business, small disadvantaged, women-owned and veteran-owned small business subcontractors and vendors.

c. Records on all subcontract solicitations resulting in an award of more than $150,000 on a contract-by-contract basis, indicating (1) whether small business concerns were solicited, and if not, why not; (2) whether small disadvantaged business concerns were solicited, and if not, why not; (3) whether small women-owned business concerns were solicited, and if not, why not; (4) whether HUBZone small business were solicited, and if not, why not; (5) whether veteran-owned small business were solicited, and if not, why not; (6) whether service disabled veteran-owned small business were solicited, and if not, why not; and (7) reasons for the failure of solicited small business, small disadvantaged business, women-owned small business, HUBZone small business, veteran owned small business, and service disabled veteran-owned small business concerns to receive a subcontract award.

d. Records of all subcontract award data to include subcontractor’s name and address, to be kept on a contract-by-contract basis.

e. Records of outreach efforts.

f. Minutes of internal motivational and training meetings held for the guidance and encouragement of purchasing personnel, and records of all monitoring activities performed for compliance evaluation.

13. [Name of Contractor] will submit an Individual Subcontracting Report (ISR) and/or a Summary Subcontract Report (SSR) using the Electronic Subcontracting System (eSRS) at http:www.esrs.gov. Report will be submitted semi-annually within 30 days of reporting period end date. Reporting period end dates are March 31st and September 30th.

14. [Name of Contractor] will submit a final ISR and/or SSR using eSRS within 30 days of contract completion.

15. In closing, [Name of Contractor] states that it will be the policy of [Name of Contractor] to afford every practicable opportunity for small business, small disadvantaged business, women-owned small business, HUBZone…