W9127820R0077 RTA DRAWINGS VOL2.pdf
PDF 18 MB Posted
- Solicitation number
- W9127820R0077
About this file
This document provides details for a federal contract opportunity to construct a maintenance training facility at Hurlburt Field, Florida. The solicitation requests the construction of a 36,800 square foot high bay facility including a concrete foundation, auger cast pilings, floor slab, steel frame, masonry walls, and sloped metal roof. Functional areas include space for a dedicated weapons load trainer, a full size C-130 aircraft, small training devices, classrooms, instructors' offices, storage, and supporting facilities such as utilities, pavements, site improvements, communications, and all necessary support. Special considerations include the removal and disposal of a large quantity of unsuitable material and the installation of suitable fill. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Mobile.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AM05.pdf | ||
| AM04.pdf | ||
| AM03.pdf | ||
| AM02.pdf | ||
| AM02 DRAWINGS.pdf | ||
| AM01.pdf | ||
| W9127820R0077 EM 385-1-1.pdf | ||
| W9127820R0077 VOL3.PDF | ||
| W9127820R0077 RTA DRAWINGS VOL 1.pdf | ||
| W9127820R0077 VOL2.PDF | ||
| W9127820R0077 VOL1.PDF | ||
| W9127820R0077 VOL4.PDF |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
MOBILE DISTRICT
109 SAINT JOSEPH STREET
MOBILE AL 36602
FTEV153007
SOF MAINTENANCE TRAINING FACILITY
HURLBURT FIELD, FLORIDA
OKALOOSA COUNTY
JUNE 2020
SMALL BUSINESS SET ASIDE
MOBILE DISTRICT PROJECT CODE: MEF20006
RFP NUMBER: W9127820R0077
VOLUME 2 OF 2
HU
RL
BU
RT
F
IE
LD
, F
LO
RI
DA
M
TF
PR
O
JE
C T
N O
. F
TE
V1
M O
BI
LE
D
IS
TR
IC
T M
O
BI
LE
, A
LA
BA
M A
Mobile District
US Army Corps of Engineers ®
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
AR
D P
AR
KW
AY
KA
N
SA
S C
IT
Y, M O
BU
RN
S
M cD
O
NN
EL
L
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
SB
M
T
BY
PL
O
T
SC
AL
E:
SI
ZE
" x
4"
FI
LE
N
AM
E:
C
KD
B Y:
PL
O
T D
AT
E:
D
AT
E:
SO
LI
C
IT
AT
IO
N N
U M
BE
R
PR
O
JE
C
T N
U M
BE
R
C
AD
D C
O D
E:
AP
R
IL
, 2
W
0R
FT
EV
M
EF
AP
RI
L, A.
M
AS
HE
K
4/15/2020 11:30:32 AM
A.
S
NE
TH
EN
A.
S
NE
TH
EN
A.
M
AS
HE
K
G-001-0006
G-
1-
G-001
SH
EE
T
IN
D
EX
MTF - VOLUME 1 - STRUCTURAL DRAWING LIST
NUMBER NAME
S-001 GENERAL NOTES
S-002 GENERAL NOTES
S-003 LEGENDS AND ABBREVIATIONS
S-004 WIND ISOMETRIC
S-005 WIND ISOMETRIC
S-100 OVERALL FOUNDATION AND SLAB PLAN
S-101 FOUNDATION AND SLAB PLAN - AREA A
S-102 FOUNDATION AND SLAB PLAN - AREA B
S-110 OVERALL ROOF FRAMING PLAN
S-111 ROOF FRAMING PLAN - AREA A
S-112 ROOF FRAMING PLAN - AREA B
S-120 FRAMING ELEVATIONS PLAN
S-125 MASONRY WALL ELEVATIONS PLAN
S-200 FRAMING ELEVATION
S-201 FRAMING ELEVATION
S-202 FRAMING ELEVATION
S-210 MASONRY WALL ELEVATIONS
S-211 MASONRY WALL ELEVATIONS
S-400 ELEVATED SLAB PLANS
S-500 STANDARD CONCRETE DETAILS
S-501 STANDARD CONCRETE DETAILS
S-502 FOUNDATION DETAILS
S-503 FOUNDATION DETAILS
S-515 STANDARD MASONRY DETAILS
S-516 STANDARD MASONRY DETAILS
S-520 STANDARD ROOF DECK & JOIST DETAILS
S-521 FRAMING DETAILS
S-522 FRAMING DETAILS
S-530 MECHANICAL PLATFORM MAINTENENCE MONORAIL ELEVATION AND DETAILS
S-600 COLUMN SCHEDULE
MTF - VOLUME 1 - FIRE PROTECTION DRAWING LIST
NUMBER NAME
FA001 FIRE ALARM NOTES, LEGEND AND ABBREVIATIONS
FA101 FIRE ALARM AND MASS NOTIFICATION PLAN - AREA A
FA102 FIRE ALARM AND MASS NOITIFICATION PLAN - AREA B
FA501 FIRE ALARM DETAILS
FA601 FIRE ALARM ONE-LINE DIAGRAM
FA602 FIRE ALARM AND MASS NOTIFICATION MATRIX
FX001 FIRE SUPPRESSION NOTES, LEGEND AND ABBREVIATIONS
FX101 FIRE SUPPRESSION PLAN - AREA A
FX102 FIRE SUPPRESSION PLAN - AREA B
FX301 FIRE SUPPRESSION SECTION VIEW - AREA B
FX601 FIRE SUPPRESSION RISER DIAGRAM
MTF - VOLUME 1 - CIVIL/INFRASTRUCTURE DRAWING LIST
NUMBER NAME
GC001 CIVIL LEGEND AND ABBREVIATIONS
GC002 LOCATION AND VICINITY MAP
GC003 SITE ACCESS AND HAUL ROUTE
GC004 STAGING AND LAYDOWN PLAN
GC005 GENERAL CONSTRUCTION NOTES
GC006 GENERAL CONSTRUCTION NOTES
GC007 CIVIL GENERAL NOTES
GC008 CIVIL GENERAL NOTES
GC009 BORROW PIT LOCATION
GC010 BORROW PIT B-40
B-100 BORING LOCATION PLAN
B-101 BORING LOGS 1
B-102 BORING LOGS 2
B-103 BORING LOGS 3
B-104 BORING LOGS 4
V-100 SURVEY LIMITS PLAN 1
V-101 SURVEY LIMITS PLAN 2
CD101 DEMOLITION PLAN 1
CD102 DEMOLITION PLAN 2
CS101 SITE PLAN
CS150 ATFP PLAN
CS500 PAVEMENT DETAILS
CS501 SITE DETAILS 1
CS502 SITE DETAILS 2
CG101 GRADING PLAN
CG501 EROSION CONTROL DETAILS
CG502 EROSION CONTROL DETAILS
CU101 UTILITY PLAN 1
CU102 UTILITY PLAN 2
CU103 UTILITY PLAN 3
CU201 SANITARY SEWER PROFILES
CU202 STORM PROFILES
CU203 WATER PROFILES 1
CU204 WATER PROFILES 2
CU205 NATURAL GAS PROFILE
CU206 ELECTRICAL PROFILES
CU207 COMMUNICATION PROFILES
CU501 UTILITY DETAILS 1
CU502 UTILITY DETAILS 2
CU503 UTILITY DETAILS 3
CU504 UTILITY DETAILS 4
CU505 UTILITY DETAILS 5
CU506 UTILITY DETAILS 6
CU507 UTILITY DETAILS 7
CU508 CATHODIC PROTECTION DETAILS 1
CU509 CATHODIC PROTECTION DETAILS 2
CU510 LIFT STATION DETAILS 1
CU511 LIFT STATION DETAILS 2
CU512 LIFT STATION DETAILS 3
MTF - VOLUME 1 - ARCHITECTURAL DRAWING LIST
NUMBER NAME
A-671 LOUVER DETAILS
A-672 LOUVER DETAILS
A-681 TRANSLUCENT WALL PANEL SCHEDULE & DETAILS
A-701 ROOM FINISH SCHEDULE
A-711 FINISH & SIGNAGE PLAN - AREA A
A-712 FINISH & SIGNAGE PLAN - AREA B
A-741 SIGNAGE SCHEDULE AND DETAILS
A-742 SIGNAGE DETAILS
I-010 OVERALL GROUND FLOOR FURNITURE PLAN
I-101 GROUND FLOOR FURNITURE PLAN - AREA A
I-102 GROUND FLOOR FURNITURE PLAN - AREA B
I-103 DEMOUNTABLE PARTITION & SYSTEMS PANEL PLAN - AREA A
F-010 LIFE SAFETY CODE AND CRITERIA
F-011 OVERALL LIFE SAFETY PLAN
F-012 ENLARGED LIFE SAFETY PLAN - AREA A
F-013 ENLARGED LIFE SAFETY PLAN - AREA B
F-014 CODE COMPLIANCE PLAN
MTF - VOLUME 1 - ARCHITECTURAL DRAWING LIST
NUMBER NAME
A-001 ARCHITECTURAL LEGEND AND ABBREVIATIONS
A-002 ARCHITECTURAL GENERAL NOTES
A-003 ABA INFORMATION
A-004 ABA INFORMATION
A-010 AIRCRAFT CLEARANCE REQUIREMENTS PLAN - AREA B
A-011 AIRCRAFT CLEARANCE SECTION
A-020 OVERALL AIR BARRIER FLOOR PLAN
A-021 AIR BARRIER SECTIONS
A-101 OVERALL FLOOR PLAN
A-102 OVERALL GROUND FLOOR REFLECTED CEILING PLAN
A-103 OVERALL ROOF PLAN
A-111 ENLARGED FLOOR PLAN - AREA A
A-112 ENLARGED FLOOR PLAN - AREA B
A-113 ENARGED FLOOR PLAN MECHANICAL PLATFORM
A-121 REFLECTED CEILING PLAN - AREA A
A-122 REFLECTED CEILING PLAN - AREA B
A-201 EXTERIOR BUILDING ELEVATIONS
A-210 ENTRANCE ELEVATIONS
A-301 BUILDING SECTIONS
A-311 WALL SECTIONS
A-312 WALL SECTIONS
A-401 ENLARGED FLOOR PLANS
A-421 TOILET PLANS AND ELEVATIONS
A-422 TOILET ELEVATIONS
A-431 INTERIOR ELEVATIONS
A-501 PARTITION TYPES
A-502 PARTITION TYPE DETAILS
A-503 PENETRATION DETAILS
A-504 PENETRATION DETAILS
A-510 SECTION DETAILS
A-511 SECTION DETAILS
A-512 SECTION DETAILS
A-513 MISCELLANEOUS DETAILS
A-514 EXPANSION JOINT DETAILS
A-515 CANOPY DETAILS
A-531 CEILING DETAILS
A-541 CASEWORK DETAILS
A-561 ROOF DETAILS
A-562 ROOF HATCH DETAILS
A-563 EXPANSION JOINT AXONOMETRIC
A-601 DOOR, LOUVER & WINDOW SCHEDULES
A-621 DOOR DETAILS
A-622 DOOR DETAILS
A-661 WINDOW DETAILS
HU
RL
BU
RT
F
IE
LD
, F
LO
RI
DA
M
TF
PR
O
JE
C T
N O
. F
TE
V1
M O
BI
LE
D
IS
TR
IC
T M
O
BI
LE
, A
LA
BA
M A
Mobile District
US Army Corps of Engineers ®
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
N O
US
A
RM
Y
CO
RP
S O
F
EN
G
IN
EE
RS
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
AR
D P
AR
KW
AY
KA
N
SA
S C
IT
Y, M O
BU
RN
S
M cD
O
NN
EL
L
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
SB
M
T
BY
PL
O
T
SC
AL
E:
SI
ZE
" x
4"
FI
LE
N
AM
E:
C
KD
B Y:
PL
O
T D
AT
E:
D
AT
E:
SO
LI
C
IT
AT
IO
N N
U M
BE
R
PR
O
JE
C
T N
U M
BE
R
C
AD
D C
O D
E:
AP
R
IL
, 2
W
0R
FT
EV
M
EF
AP
RI
L, A.
M
AS
HE
K
4/15/2020 11:30:38 AM
A.
S
NE
TH
EN
A.
S
NE
TH
EN
A.
M
AS
HE
K
G-002-0006
G-
2-
G-002
SH
EE
T
IN
D
EX
MTF - VOLUME 2 - MECHANICAL DRAWING LIST
NUMBER NAME
M-001 MECHANICAL NOTES, LEGEND, SYMBOLS & ABBREVIATIONS
M-100 MECHANICAL PLAN - OVERALL
M-101 HVAC PLAN - AREA A
M-102 HVAC PLAN - AREA B
M-111 HVAC PIPING PLAN - AREA B
M-301 MECHANICAL SECTIONS
M-302 MECHANICAL SECTIONS
M-401 MECHANICAL FLOOR PLAN - ENLARGED
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL DETAILS
M-506 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-603 MECHANICAL SCHEDULES
M-610 HVAC AIR FLOW DIAGRAM
M-611 CHILLED WATER FLOW DIAGRAM
M-701 CONTROL LEGEND
M-702 SYSTEMS ARCHITECTURE AND MISCELLANEOUS CONTROLS
M-703 CONTROLS SCHEMATIC - AHU-101
M-704 CONTROL POINTS - AHU-101
M-705 CONTROLS - VAV TERMINAL UNITS
M-706 CONTROLS - TRAINING BAY
M-707 CONTROLS SCHEMATIC - MAU-101
M-708 CONTROLS SCHEMATIC - TEMPERATURE CONTROLLED EXHAUST FAN
M-709 CONTROLS SCHEMATIC - EXHAUST FAN
M-710 CONTROLS SCHEMATIC - AIR COOLED CHILLED WATER SYSTEM
M-711 CONTROLS POINTS - AIR COOLED WATER SYSTEM
M-901 ISOMETRIC VIEWS
MTF - VOLUME 2 - PLUMBING DRAWING LIST
NUMBER NAME
P-001 PLUMBING NOTES, LEGEND, SYMBOLS & ABBREVIATIONS
P-100 UNDERGROUND PLUMBING PLAN - OVERALL
P-101 UNDERGROUND PLUMBING PLAN - AREA A
P-102 UNDERGROUND - PLUMBING PLAN - AREA B
P-111 ABOVEGROUND PLUMBING PLAN - AREA A
P-112 ABOVEGROUND PLUMBING PLAN - AREA B
P-401 PLUMBING PLAN - ENLARGED
P-402 PLUMBING PLAN - ENLARGED
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-901 WASTE AND VENT RISER DIAGRAM
P-902 DOMESTIC WATER RISER DIAGRAM
P-903 NATURAL GAS RISER DIAGRAM
MTF - VOLUME 2 - ELECTRICAL DRAWING LIST
NUMBER NAME
E-001 ELECTRICAL SYMBOLS LEGEND
E-002 ELECTRICAL SYMBOLS LEGEND
ES101 ELECTRICAL SITE PLAN
ES102 ELECTRICAL SITE PLAN
ES501 SITE DETAILS
ES502 SITE DETAILS
ES503 SITE DETAILS
EG101 GROUNDING PLAN
EG102 LIGHTNING PROTECTION PLAN
EG501 GROUNDING DETAILS
EG502 GROUNDING DETAILS
EG601 GROUNDING SCHEMATIC
EL101 GROUND FLOOR LIGHTING PLAN - AREA A
EL102 GROUND FLOOR LIGHTING PLAN - AREA B
EL103 LIGHTING CONTROL MATRIX
EL501 LIGHTING DETAILS
EL502 LIGHTING DETAILS
EL503 LIGHTING DETAILS
EL601 LIGHTING SCHEDULE
EP101 POWER PLAN - AREA A
EP102 POWER PLAN - AREA B
EP401 ENLARGED ELECTRICAL PLANS
EP501 POWER DETAILS
EP502 POWER DETAILS
EP504 POWER DETAILS
EP601 ELECTRICAL ONE-LINE DIAGRAM
EP602 PANELBOARD SCHEDULES
EP603 PANELBOARD SCHEDULES
EP604 PANELBOARD SCHEDULE
EP605 MECHANICAL EQUIPMENT SCHEDULE
MTF - VOLUME 2 - TELECOMMUNICATIONS DRAWING LIST
NUMBER NAME
T-001 TELECOMMUNICATIONS LEGEND
TS101 TELECOMMUNICATIONS SITE PLAN
T-101 TELECOMMUNICATIONS PLAN - AREA A
T-102 TELECOMMUNICATIONS PLAN - AREA B
T-401 TELECOMMUNICATIONS ENLARGED PLAN AND RACK ELEVATION
T-502 TELECOMMUNICATIONS DETAILS
T-503 TELECOMMUNICATIONS DETAILS
T-505 TELECOMMUNICATIONS DETAILS
T-701 COMMUNICATIONS RISERS
4" FD-A
EWC-1
JS-1
SK-1
U-2
U-1
WC-2
WC-1
LAV-1
PLUMBING SYMBOLS LEGEND
SIZE - FLOOR DRAIN
DUAL ELECTRIC WATER COOLER
JANITOR SINK
KITCHEN SINK
URINAL, ACCESSIBLE
URINAL
WATER CLOSET - ACCESSIBLE
WATER CLOSET
LAVATORY, COUNTER MOUNTED
PRESSURE/TEMPERATURE RELIEF VALVE
HB HOSE BIBB
WH WALL HYDRANT
LAV-2 LAVATORY, WALL MOUNTED
MB-1 MOP BASIN
SK-2 SINK
EEWS-1 EMERGENCY EYEWASH / SHOWER
SH-1 SHOWER
SK-3 UNDER MOUNT SINK
EEW-1 EMERGENCY EYEWASH
WCO
FLOOR DRAIN / EQUIPMENT DRAIN
PLUMBING FIXTURE TRAP
FLOOR OR WALL PENETRATION
VENT THRU ROOF (VTR)
CLEANOUT (CO) IN RISER
RISER DIAGRAM LEGEND
CO
FCO
CLEANOUT (FCO) IN FLOOR
WATER HAMMER ARRESTORWHA-A
WALL CLEANOUT (WCO)
ISOMETRIC DIRECTION ARROW
UP
DN
PIPE LINE ACCESSORIES
3-WAY VALVE
2-WAY VALVE
ANGLE VALVE
AV
AUTOMATIC AIR VENT
ASSEMBLY
BFP
BACKFLOW PREVENTION
ASSEMBLY
BALANCING VALVE / CIRCUIT
SETTER
BALL VALVE
BLIND FLANGE
BUTTERFLY VALVE
CHECK VALVE
FLEX CONNECTION
FLOW ARROW
FM FLOW METER
GATE VALVE
GLOBE VALVE
HOSE GATE DRAIN VALVE
IF
INSULATING FLANGE
MV
MANUAL AIR VENT ASSEMBLY
- SEE SPECIFICATIONS FOR
APPROPRIATE VALVE TYPE
M METER
M MOTORIZED CONTROL VALVE
OS&Y
OUTSIDE SCREW & YOKE VALVE
PIPE WITH HEAT TRACE
PLUG VALVE
PRESSURE GUAGE
SELF CONTAINED PRESSURE
REDUCING (REGULATING)
VALVE
PUMP
REDUCER (CONCENTRIC)
RELIEF, SAFETY OR THERMAL
RELIEF VALVE
REMOVABLE CAP
REMOVABLE PLUG
S STRAINER
SUCTION DIFFUSER
TEST CONNECTION
THERMOMETER
UNION
Y-TYPE STRAINER
SRC SPRING RETURN CLOSED BALL
VALVE
PIPE SYMBOLS
PIPE ELBOW
PIPE DOWN
PIPE UP
PIPE CONTINUATION
PIPE LINE DESIGNATIONS
VENT
STORM (ABOVE GRADE)
STORM (BELOW GRADE)
STORM OVERFLOW
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RECIRCULATION
SANITARY SEWER (ABOVE GRADE)
SANITARY SEWER (BELOW GRADE)
CONDENSATE DRAIN
COMPRESSED AIR
NATURAL GAS
CLEANOUT IN RISER
CLEANOUT IN WALL
CLEANOUT IN FLOOR
SS
SS
COND
V
DCW
DHW
DHWR
CA
NG
OD
ST
ST
CO
WCO
FCO
PLUMBING ABBREVIATIONS GENERAL NOTES:
DETAIL / ENLARGED
CALLOUT SYMBOL
A
M-001
INDICATES
LIMITS OF
DETAIL/SECTION
DETAIL/SECTION
DESIGNATOR
SHEET WHERE
DETAIL/SECTION IS
SHOWN
DETAIL/SECTION TITLE
TITLE
A1
LOCATION WHERE
DETAIL / SECTION
IS SHOWN ON
SHEET
SECTION CUT SYMBOL
A
M-001
INDICATES PERSPECTIVE
AND LIMITS OF SECTION
SECTION
DESIGNATOR
DRAWING WHERE
SECTION IS SHOWN
AC AIR COCK
AFF ABOVE FINISHED FLOOR
AG AIR GAP
ARV AIR RELEASE VALVE
BF BLIND FLANGE
BOP BOTTOM OF PIPE
BW BUTT WELD
CH OP CHAIN WHEEL OPERATOR
CONC CONCENTRIC
CORP STOP CORPORATION STOP
CPVC CHLORINATED POLYVINYL CHLORIDE
D DRAIN
DI DUCTILE IRON
DN DOWN
DWH DOMESTIC WATER HEATER
ELL ELBOW
EXIST EXISTING
FCA FLANGED COUPLING ADAPTER
FD FLOOR DRAIN
FE FLANGED END
FF FLAT FACED
FI FLOW INDICATOR
FLGD FLANGED
FM FLOW METER
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FOV FLOAT OPERATED VALVE
FRP FIBERGLASS REINFORCED PIPE
FW FIELD WELD
HD HUB DRAIN
I.E. INVERT ELEVATION
IF INSULATED FLANGE
LC LOCK CLOSED
LO LOCK OPEN
LR LONG RADIUS
NPSH NET POSITIVE SUCTION HEAD
NRS NON-RISING STEM
NWL NORMAL WATER LEVEL
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
PVC POLYVINYL CHLORIDE
RED REDUCER-REDUCING
RS RISING STEM
SCH SCHEDULE
SCRD SCREWED
SR SHORT RADIUS
TD TRENCH DRAIN
TOC TOP OF CONCRETE
TOG TOP OF GRATING
TOP TOP OF PIPE
TOS TOP OF STEEL
TP TRAP PRIMER
VTR VENT THROUGH ROOF
1. UNLESS NOTED OTHERWISE, THE CIVIL AND MECHANICAL INTERFACE POINT IS 5 FEET
OUTSIDE OF THE BUILDING WALL.
2. COORDINATE ALL PIPE SLEEVE REQUIREMENTS WITH FOUNDATION SUBCONTRACTOR.
3. COORDINATE MECHANICAL ROOM FLOOR DRAINS WITH ACTUAL EQUIPMENT LOCATIONS
AND DRAINAGE REQUIREMENTS.
4. LEGEND IS GENERAL IN NATURE AND NOT ALL ITEMS SHOWN MAY BE USED ON THIS
PROJECT.
5. INSTALL SANITARY PIPING WITH THE FOLLOWING SLOPE DOWNWARD IN DIRECTION OF
FLOW: 2% FOR 3" AND SMALLER PIPE, 1% FOR 4" AND LARGER PIPE.
6. INSTALL VENT PIPING WITH 1% SLOPE DOWNWARD TOWARD FIXTURE OR STACK.
7. ALL FIXTURES SHALL HAVE A P-TRAP INSTALLED.
8. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE PLUMBING SYSTEMS AS
INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.
9. INSTALL ALL PLUMBING FIXTURES, EQUIPMENT AND APPURTENANCES IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND
APPLICABLE CODES AND REGULATIONS.
10. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH STRUCTURAL, CIVIL,
ELECTRICAL WORK ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.
11. MAINTAIN A MINIMUM OF 6' - 8" CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL ROOMS.
12. LOCATE ALL PLUMBING EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS
PANELS, CONTROLS, AND VALVING.
13. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.
14. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF PIPE UNLESS NOTED
OTHERWISE.
15. INVERT ELEVATIONS GIVEN RELATIVE TO FINISHED FLOOR ELEVATION OF 100'-0".
ACTUAL FLOOR ELEVATION IS 35.33' AMSL.
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S O
F
E N
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
M
A S
H E
K
4/16/2020 9:58:57 AM
L
D A
N A
H E
R
C
M cA
F E
E R
JO
R D
A N
P-001-0006
P -0
-0
P-001
P L U
M B
IN
G
N O
T E
S L E
G E
N D
S
Y M
B O
L S
A
B B
R E
V
IA
T
IO
N S ldanahe Danaher MO Seal ldanahe Typewritten Text 4/17/20
103104
121 120 130 131 132
125A
2 3 4 5 6 7 81
H
G
F
E
D
C
B
A
J
4.3 5.5
N
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
KEY PLAN
NOT TO SCALE
B
A
M A
S H
E K
4/16/2020 9:59:02 AM
/1
'-0
L
D A
N A
H E
R
C
M cA
F E
E R
JO
R D
A N
P-100-0006
P -1
-0
P-100
U N
D E
R G
R O
U N
D P
L U
M B
IN
G
P L A
N
O V
E R
A L
L
SCALE: 1/16" = 1'-0"A1
UNDERGROUND PLUMBING PLAN - OVERALL
SPACE SCHEDULE
NUMBER NAME
101 MTF CLASSROOM 4
102 MQTP CLASSROOM 4
103 MQTP CLASSROOM 3
104 MQTP CLASSROOM 2
105 MTF CLASSROOM 1
106 MTF CLASSROOM 2
107 MQTP CLASSROOM 6
108 MQTP CLASSROOM 5
109 WLT CLASSROOM
110 MTF CLASSROOM 3
111 MQTP CLASSROOM 1
112 POTFF WAITING
113 COUNSELING OFFICE
114 COUNSELING OFFICE
115 POTFF GROUP ROOM
116 STOR
117 MQTP/ MTF STORAGE
118 CONFERENCE
120 SUPERINTENDENT WSS
121 WINGS WEAPON MANAGER
122 MQTP/ MTF STORAGE
123 VR CLASSROOM 2
124 VR CLASSROOM 1
125 LSC OPEN OFFICE
125A SLC OPEN OFFICE
126 COPY
127 MOTHERS ROOM
128 BREAK
130 SECTION CHIEF MQTP
131 SECTION CHIEF MTF
132 SCHEDULER
133 INSTRUCTOR OPEN OFFICE
134 JAN
135 MENS RESTROOM
136 WOMENS RESTROOM
137 VEST
138 VEST
139 Space
140 VEST
141 CORRIDOR
142 CORRIDOR
143 CORRIDOR
144 VEST
145 CORRIDOR
146 CORRIDOR
201 TRAINING BAY
202 COMM
203 ELEC
204 FIRE PUMP
205 MECHANICAL
206 CTK STORAGE
207 C-130 TRAINING BAY STORAGE
GENERAL NOTES
1. SEE SHEET P-001 FOR PLUMBING GENERAL
NOTES, SYMBOLS AND ABBREVIATIONS.
N
SCALE IN FEET
0 8' 16' 32' ldanahe Danaher MO Seal ldanahe
BFP
103104
121 120 130 131 132
125A
2 3 4 5 6 7 81
H
G
F
A1
P-401
4" SS
INV. EL. 95.83'. SEE
CIVIL DRAWING FOR
CONTINUATION
3" SS UP
TO WCO-1
3" SS UP
TO FD-A
2" SS UP
TO SK-1
2" SS UP
TO SK-22" SS UP
TO EWC-1
4" SS
MATCHLINE SEE SHEET P-102 FOR CONTINUATION
2" NG2" NG UP
4" SS
4" SS
3" SS3" SS
J
4.3 5.5
4" SS UP
TO FCO-1
N
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T
M O
B
IL
E A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
KEY PLAN
NOT TO SCALE
B
A
M A
S H
E K
4/16/2020 9:59:05 AM
/8
'-0
L
D A
N A
H E
R
C
M c A
F E
E R
JO
R D
A N
P-101-0006
P -1
-0
P-101
U N
D E
R G
R O
U N
D P
L U
M B
IN
G
P L A
N
A
R E
A A
GENERAL NOTES
1. SEE SHEET P-001 FOR PLUMBING GENERAL
NOTES, SYMBOLS AND ABBREVIATIONS.
N
SCALE IN FEET
0 4' 8' 16'
SCALE: 1/8" = 1'-0"A1
UNDERGROUND - PLUMBING PLAN - AREA A
ldanahe Danaher MO Seal ldanahe
2 3 4 5 6 7 81
F
E
D
C
B
A
4" SS 4" SS 2" SS
2" SS UP
TO FD-B
2" SS UP
TO FD-B
2" SS
4" SS UP
TO FD-B 4" SS UP
TO FCO-2
MATCHLINE SEE SHEET P-101 FOR CONTINUATION
2" NG
SEE CU101 FOR
CONTINUATION
SEE CU101 FOR
CONTINUATION
2" V UP
4" SS
2" SS UP
TO MB-1
2" SS
4.3 5.5
4" SS
4" SS
2" V UP
3" DCW
4" V UP
TO WCO-1
3" DCW UP
N
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T
M O
B
IL
E A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
KEY PLAN
NOT TO SCALE
B
A
M A
S H
E K
4/16/2020 9:59:08 AM
/8
'-0
L
D A
N A
H E
R
C
M c A
F E
E R
JO
R D
A N
P-102-0006
P -1
-0
P-102
U N
D E
R G
R O
U N
D
P L
U M
B
IN
G
P L A
N
A R
E A
B
SCALE: 1/8" = 1'-0"A1
UNDERGROUND - PLUMBING PLAN - AREA B
GENERAL NOTES
1. SEE SHEET P-001 FOR PLUMBING GENERAL
NOTES, SYMBOLS AND ABBREVIATIONS.
N
SCALE IN FEET
0 4' 8' 16' ldanahe Danaher MO Seal ldanahe
B
P
103104
121 120 130 131 132
125A
2 3 4 5 6 7 81
H
G
F
A3
P-401
WH-1
WH-1
WH-1
3" FD-A
MB-1
SK-2
SK-1
EWC-1
MATCHLINE SEE SHEET P-112 FOR CONTINUATION
2" NG DN
3/4" DCW
3/4" DCW
1/2" DCW DN
1/2" DHW DN
1/2" DCW DN
3/4" DCW
3/4" DCW
3/4" DHWR
2" DHW
2 1/2" DCW
3/4" DHWR
2" DHW
2 1/2" DCW
1" DCW
1" DHW
1/2" DCW
1/2" DHW
1/2" DCW DN
1/2" DHW DN
3" DCW
2" DHW
3/4" DHWR
1/2" DCW DN
1/2" DHW DN
J
4.3 5.5
IM-1
1 1/4" V
1/2" DCW DN
3/4" DHWR
1 1/2" DHW
1/2" DCW
CIRCUIT SETTER
BFP-3
N
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T
M O
B
IL
E A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
KEY PLAN
NOT TO SCALE
B
A
M A
S H
E K
4/16/2020 9:59:12 AM
/8
'-0
L
D A
N A
H E
R
C
M c A
F E
E R
JO
R D
A N
P-111-0006
P -1
-0
P-111
A B
O V
E G
R O
U N
D P
L U
M B
IN
G
P L A
N
A
R E
A A
SCALE: 1/8" = 1'-0"A1
ABOVE GROUND - PLUMBING PLAN - AREA A
GENERAL NOTES
1. SEE SHEET P-001 FOR PLUMBING GENERAL
NOTES, SYMBOLS AND ABBREVIATIONS.
N
SCALE IN FEET
0 4' 8' 16'
KEYED NOTES
SET CIRCUIT SETTER TO .32 GPM.1
ldanahe Danaher MO Seal ldanahe
2 3 4 5 6
F
E
D
C
B
A
MB-1
WH-1
4" FD-B
WH-1
WH-1
WH-1
EEW-1
EEW-1
EEW-1
EEW-1
MATCHLINE SEE SHEET P-111 FOR CONTINUATION
1/2" DCW DN
1/2" DHW DN
3/4" DCW
1/2" DCW DN
3/4" DCW DN
3/4" DCW
3/4" DCW DN
1/2" DCW DN
3/4" DCW
3/4" DCW DN
3/4" DCW DN
1/2" DCW DN
1/2" DCW DN
4.3 5.5
1" NG DN
TO MAU
2" V UP
A2
P-402
3/4" DCW
20' - 0" BOP EL
3/4" DHW
20' - 0" BOP EL
3/4" DHWR
20' - 0" BOP EL
3/4" DCW
C2
P-402
CIRCUIT SETTER
SET TO .20 GPM
N
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T
M O
B
IL
E A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
KEY PLAN
NOT TO SCALE
B
A
M A
S H
E K
4/16/2020 9:59:16 AM
/8
'-0
L
D A
N A
H E
R
C
M c A
F E
E R
JO
R D
A N
P-112-0006
P -1
-0
P-112
A B
O V
E G
R O
U N
D P
L U
M B
IN
G
P L A
N
A
R E
A B
SCALE: 1/8" = 1'-0"A1
ABOVE GROUND - PLUMBING PLAN - AREA B
GENERAL NOTES
1. SEE SHEET P-001 FOR PLUMBING GENERAL
NOTES, SYMBOLS AND ABBREVIATIONS.
KEYED NOTES
PIPE TO BE SUPPORTED BY PIPE SUPPORTS
FROM WALL.
N
SCALE IN FEET
0 4' 8' 16' ldanahe Danaher MO Seal ldanahe
H
G
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
LAV-2
2" FD-A
UR-1
UR-1
UR-1
UR-2
UR-1
UR-1
SH-1
3" FD-A
2" FD-A
SH-2
2" FD-A
WC-1 WC-1 WC-1 WC-2
2" FD-A
EWC-1
LAV-2 LAV-1 LAV-1 LAV-1 LAV-1
2" FD-A
SH-2
WC-1 WC-1 WC-1 WC-2
2" FD-A
2" FD-A
MB-1 1/2" DHW DN
1/2" DCW DN
1/2" DHW DN
1/2" DCW DN
1" DCW
3/4" DHW
3/4" DHWR
1 1/2" DCW
1 1/2" DHW
3/4" DHWR
1 1/2" DHW
2" DCW
1 1/2" DCW DN
1 1/2" DCW DN
1 1/2" DHW DN
1 1/2" DCW DN
1/2" DHW DN
1" DCW DN
1/2" DHW DN
1/2" DCW DN
1" DHW DN
1" DCW DN
1/2" DCW DN
3" V UP
TO 4" VTR
1 1/2" V
1 1/2" V
2" V
1 1/2" V
2" V
1 1/4" V
1 1/2" V
1 1/2" V
1 1/2" V
(TYP. OF 2)
2" V 2" V
1 1/2" V DN
2" V
1 1/2" V
1 1/2" V DN
1 1/2" V DN
(TYP. OF 2)
(TYP. OF 2)
1 1/4" V DN
1/2" DCW DN
TO TP-3
1/2" DCW DN
TO TP-2
1 1/2" V DN
H
G
2" FD-A
2" FD-A
2" FD-A
3" FD-A
2" FD-A
2" FD-A
2" FD-A
2" FD-A
2" SS UP
4" SS UP
2" SS UP
3" SS UP
2" SS UP
3" SS UP
TO WCO-1
3" SS
3" SS
3" SS
3" SS
3" SS 3" SS2" SS
2" SS UP
TO EWC-1
3" SS
2" SS
3" SS
2" SS
2" SS
2" SS
3" SS
4" SS
3" FD-A
1 1/2" V UP
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
M
A S
H E
K
4/16/2020 9:59:21 AM
/4
'-0
L
D A
N A
H E
R
C
M cA
F E
E R
JO
R D
A N
P-401-0006
P -4
-0
P-401
P L
U M
B
IN
G P
L A
N
E N
L A
R G
E D
SCALE: 1/4" = 1'-0"A3
ENLARGED PLAN - ABOVE GROUND
SCALE: 1/4" = 1'-0"A1
ENLARGED PLAN - UNDERGROUND
GENERAL NOTES
1. SEE SHEET P-001 FOR PLUMBING GENERAL
NOTES, SYMBOLS AND ABBREVIATIONS.
KEYED NOTES
PROVIDE ISOLATION VALVES AS SHOWN.1
N
SCALE IN FEET
0 2' 4' 8'
N
SCALE IN FEET
0 2' 4' 8'
1 1 ldanahe Danaher MO Seal ldanahe
BFP
B F
P
7 8
F
2" FD-B
2" FD-B
DWH-1
2" NG DN
3" DCW
1" NG UP
TO MAU
RP-1
TP-1
TO CHILLED
WATER SYSTEM
1" NG
9' - 0" BOP EL
3" DCW
2" DHW
3/4" DHWR
2" V UP
GAS METER
1" NG UP
1 1/4" NG DN
WATER METER
3" DCW DN
3/4" DCW
10' - 6" BOP EL
WCO-1
3/4" MW
BFP-1
BFP-2
3/4" DHWR UP
3/4" DHW UP
1 1/2" DCW UP
6"ø FE
3" DCW
7 8
EF-106
3/4" DCW
3/4" DHW
3/4" DHWR
MAU-101
1" NG DN
2" V
3/4" DHW DN
3/4" DHWR DN
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T
M O
B
IL
E A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
M
A S
H E
K
4/16/2020 9:59:24 AM
/4
'-0
L
D A
N A
H E
R
C
M c A
F E
E R
JO
R D
A N
P-402-0006
P -4
-0
P-402
P L
U M
B
IN
G P
L A
N
E N
L A
R G
E D
SCALE: 1/4" = 1'-0"A2
ABOVE GROUND - ENLARGED PLUMBING PLAN - AREA B
GENERAL NOTES
1. SEE SHEET P-001 FOR PLUMBING GENERAL
NOTES, SYMBOLS AND ABBREVIATIONS.
KEYED NOTES
PROVIDE INSOLATION VALVES AS SHOWN.1
N
SCALE IN FEET
0 2' 4' 8'
SCALE: 1/4" = 1'-0"C2
ABOVE GROUND - PLUMBING PLAN - AREA B - PLATFORM
N
SCALE IN FEET
0 2' 4' 8' ldanahe Danaher MO Seal ldanahe
IF
DOUBLE CHECK
VALVE BFP
TO EMCS
MECH. ROOM FLOOR
DCW TO SYSTEM
SEE PLANS FOR SIZE
WATER METER
DCW - (SEE PLANS
FOR SIZES
F L O
W
CHECK VALVE
FOR CONTINUATION
& SIZE, SEE FLOOR PLAN
GATE (OR BALL) VALVE
DIAL TYPE PRESSURE
GAUGE (0-100 PSIG)
IN-LINE CIRCULATING
PUMP (SEE PUMP
SCHEDULE)
GAUGE COCK
UNION
REDUCING TEE (OR
TEST PLUG FOR
INSERTION OF GAUGE)
AQUASTAT FOR
CONTROL OF PUMP
(SET AT 100 DEG. F)
FLOOR DRAIN
SERVICE SINK
OR SHOWER
THREADED OUTLET
DRAIN PIPING - SEE
PLANS FOR SIZE.
COVER
CLEANOUT PLUG
MAIN LINE
FINISHED FLOOR
OR CONCRETE PAD
CAULK, BUNA-N
OR VITON SEAL
RISER EXTENSION
UP TO CLEANOUT.
NEED NOT BE
LARGER SIZE THAN 4"
GRADE
BYPASS
REDUCER
GAS METER (1150 CFH @ 2 PSIG)
GAS COCK
(LOCKING)
PRESSURE GAUGE
PRESSURE REDUCING
VALVE (30 PSIG IN &
2 PSIG OUT)
UNION (TYP.)
STRAINER
GAS COCK
(LOCKING)
MAIN GAS GAS COCK (NON-LOCKING)
WALL
SANITARY / VENT
IN WALL
PUSH HANDLE
TO FIRE ALARM
DOUBLE POLE SINGLE
THROW NORMALLY OPEN
FLOW SWITCHFS
ALARM HORN
AND STROBE
1/2" DCW
WALL
BRACKET
EYEWASH WITH
STAINLESS
STEEL BOWL
A
1.
2.
3.
4.
NOTES:
110° F
HOT WATER TO SYSTEM
THERMOMETER
3-WAY MIXING VALVE, SEE NOTE 3.
UNION
CHECK VALVE
STRAINER
BALL
VALV
E
DCW
DHWR FROM RECIRC PUMP
DCW
140° F HOT WATER
FROM STORAGE
TANK DCW
RECIRC.
PUMP
DHWR (SEE PLANS FOR SIZE)
FLOOR
AQUASTAT
EQUIPMENT PAD
DRAIN
FULL SIZE OF P&T
RELIEF VALVE OUTLET
EXPANSION TANK
(3 GALLON)
COMBINATION GAS VALVE
AND PRESSURE REGULATOR
(2 PSIG IN AND 8" W.C. OUT)
GAS COCK
FULL SIZE DIRT LEG
NATURAL GAS
DHW
DOMESTIC
WATER
HEATER
FOR PIPE SIZES, SEE FLOOR PLAN.
FOR HEATER SELECTIONS, SEE SCHEDULES ON DRAWINGS.
MIXING VALVE TO OPEN TO COLD WATER FLOW ON THERMOSTAT FAILURE.
HOT WATER PIPED TO NORMALLY CLOSED PORT OF MIXING VALVE.
ALL GAS VALVES SHALL BE INDIVIDUALLY VENTED TO BUILDING EXTERIOR.
TEMPERATURE GAGE
VENT, SEE NOTE 4.
SACRIFICIAL
ANODE
FLUE
EXHAUST
DRAIN
NEUTRALIZER
FD
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
M
A S
H E
K
4/16/2020 9:59:25 AM
L
D A
N A
H E
R
C
M cA
F E
E R
JO
R D
A N
P-501-0006
P -5
-0
P-501
P L
U M
B
IN
G D
E T
A
IL
S
NTSSCALE:C1
DOMESTIC WATER SERVICE ENTRANCE
NTSSCALE:A4
DOMESTIC WATER CIRCULATING PUMP
NTSSCALE:A1
FLOOR DRAIN IN SERVICE SINK OR SHOWER
NTSSCALE:B1
FLOOR CLEANOUT
NTSSCALE:B2
NATURAL GAS PRESSURE REGULATOR WITH BYPASS
NTSSCALE:A2
EMERGENCY EYEWASH
NTSSCALE:C2
GAS-FIRED WATER HEATER
ldanahe Danaher MO Seal ldanahe
TRAP PRIMER VALVE SHOULD BE MOUNTED ONE FOOT ABOVE
THE FINISHED FLOOR FOR EVERY 20 FOOT OF PRIME LINE.
A METERED AMOUNT OF WATER FROM THE FLOOR DRAIN
TRAP PRIMER IS DISTRIBUTED TO AS MANY AS (4) INDIVIDUAL
FLOOR DRAIN TRAPS.
INSTALL ASSEMBLY WITH ACCESS FOR PERIODIC INSPECTION.
NOTES:
1.
2.
3.
DISTRIBUTION
UNIT
DCW SUPPLY
M
IN
IM
U
M
N O
T E
FINISHED FLOOR
ISOLATION VALVE
UNION
TRAP PRIMER
VALVE
COPPER TYPE L
(TYP.)
TRANSITION TO TYPE
K COPPER (TYP.)
PLASTIC TUBING (PEX EQUIVALENT) (TYP.)
MIN 1/2" FLOOR DRAIN
TRAP MAKE-UP WATER LINE. (TYP.)
ELECTRONIC
CONTROL
MODULE
S
3/4" SUPPLY, EXTEND TO
CONNECT TO MAIN
UNION
ATMOSPHERIC VACUUM
BREAKER
STRAINER
SOLENOID CONTROL VALVE
TRAP PRIMER DISTRIBUTION
MANIFOLD
CAP UNUSED OUTLETS
1/2" PEX, EXTEND AND CONNECT
TO FLOOR DRAIN BODY (TYP)
INSTALL TRAP PRIMER ASSEMBLY A MINIMUM OF 12"
ABOVE FLOOR RIM ELEVATION OF HIGHEST DRAIN
CONNECTED.
EACH OUTLET SHALL BE CONNECTED ONLY TO ONE
FLOOR DRAIN OR FLOOR SINK.
TRAP PRIMER DISTRIBUTION PIPING SHALL BE
BUBBLE TIGHT AND SEALED.
PROGRAM CONTROL MODULE TO OPEN SOLENOID
CONTROL VALVE AT MANUFACTURER'S
RECOMMENDED FREQUENCY AND DURATION.
GALVANIZED WALL BOX AND COVER PROVIDED BY
TRAP PRIMER MANUFACTURER.
POWER CONNECTION, PROVIDED BY OTHERS.
NOTES:
1.
2.
3.
KEYED NOTES:
NOTE:
B
C
D
F
E
2" 154-330
1-1/4"
1-1/2"
3/4"
1"
61-113
114-154
12-32
33-60
SHOWER
SINK
JANITOR'S SINK
LAVATORY
1.5
0.75 0.75
A
SIZE
SINGLE FIXTURE
PDI
PDI SIZE "A"
1/2"
SIZE
PIPE
1-11
UNIT LOAD
FIXTURE
STANDARDS AND
INSTALL PER PDI
INSTRUCTIONS
MANUFACTURER'S
HOT OR COLD WATER SUPPLY
VALVE WATER CLOSET
MULTIPLE FIXTURES
FIXTURE UNIT TABULATION
IF HORIZONTAL BRANCH IS LESS THAN 20'
LONG, PROVIDE ONE WHA AT END OF LINE.
IF BRANCH IS GREATER THAN 20' LONG,
PROVIDE ANOTHER WHA IN MIDDLE, EACH
SIZED FOR HALF THE FIXTURE UNITS.
FIXTURE
COLD
HOT
URINAL * --
1.5 1.5
1.5
2.25 2.25
1. PROVIDE WATER HAMMER
ARRESTERS. INSTALL IN HORIZONTAL
OR VERTICAL POSITION, BUT NEVER
UPSIDE DOWN. INSTALL IN LINE WITH
WATER FLOW DIRECTION IF POSSIBLE.
SIZE THE UNITS AS SHOWN ON THE
DRAWINGS AND/OR PER THE TABLES
SHOWN.
V E
N T
E X
T E
N S
IO
N
A S
R E
Q U
IR
E
D
VENT PIPE 3" MIN.
MASTIC
STAINLESS STEEL
CLAMPING RING
EPDM PREMOLDED
PIPE SEAL
SPLICING CEMENT
LAP SEALANT
METAL ROOF
METAL DECK
ROOF PENETRATION
BY ROOF MFGR.
INCREASER
IF REQUIRED
VENT
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
M
A S
H E
K
4/16/2020 9:59:27 AM
L
D A
N A
H E
R
C
M cA
F E
E R
JO
R D
A N
P-502-0006
P -5
-0
P-502
P L
U M
B
IN
G D
E T
A
IL
S
NTSSCALE:B4
TRAP PRIMER
NTSSCALE:B1
ELECTRONIC TRAP PRIMER
NTSSCALE:A1
WATER HAMMER ARRESTORS
NTSSCALE:A3
VENT FLASHING
ldanahe Danaher MO Seal ldanahe
U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
M
A S
H E
K
4/16/2020 9:59:31 AM
L
D A
N A
H E
R
C
M cA
F E
E R
JO
R D
A N
P-601-0006
P -6
-0
P-601
P L
U M
B
IN
G S
C H
E D
U L
E S
PLUMBING FIXTURE SCHEDULE
TAG NO. DESCRIPTION
FIXTURE FITTING
TRAP CARRIER REMARKS MOUNTING HEIGHT
CONNECTION SIZE
TYPE SIZE TYPE C.W. H.W. WASTE VENT
EEW-1 EMERGENCY EYE
WASH
EYE WASH N/A 11" STAINLESS STEEL BOWL WITH FLIP TOP SPRAY
HEADS, FULL FLOW STAY-OPEN BALL VALVE, 0.6
GPM EYE WASH
N/A N/A WALL MOUNTED, PROVIDE WITH
OPTIONAL HORN AND STROBE
N/A 1/2" N/A N/A N/A
EWC-1 ADA ELECTRIC
WATER COOLER
BI-LEVEL, WALL HUNG BARRIER-FREE UNIT 36" W x 41" H x 19" D LEAD-FREE BUBBLER WITH FRONT, EASY TOUCH
CONTROLS, WITH BOTTLE FILLER
1-1/2" N/A STAINLESS STEEL ORIFICE HT. 40" AFF &
ACCESSIBLE ORIFICE HT. 34" AFF
1/2" N/A 1-1/2" 1-1/4"
IM-1 ICE MACHINE GALVANIZED STEEL ICE MAKER OUTLET BOX 10" x 8" 1/4 TURN LOW LEAD VALVE N.A N/A NONE 48" AFF 1/2" N/A N/A N/A
LAV-1 COUNTER MOUNTED
LAVATORY
UNDERCOUNTER MOUNTED STAINLESS STEEL 19" x 17" OVAL 4" CENTERSET, DOUBLE BLADE HANDLES, MANUAL
0.5 GPM FAUCET AND PERFORATED GRID STRAINER
2"
W/CLEAN
OUT PLUG
N/A PROVIDE WITH OVERFLOW HT. SET BY COUNTERTOP 1/2" 1/2" 2" 1-1/2"
LAV-2 COUNTER MOUNTED
LAVATORY
UNDERCOUNTER MOUNTED STAINLESS STEEL 19" x 17" OVAL 4" CENTERSET, DOUBLE BLADE HANDLES, MANUAL
0.5 GPM FAUCET AND PERFORATED GRID STRAINER
2"
W/CLEAN
OUT PLUG
N/A PROVIDE WITH OVERFLOW HT. SET BY COUNTERTOP
ACCESSIBLE
1/2" 1/2" 2" 1-1/2"
MB-1 SQUARE MOP BASIN PRECAST TERRAZO, MOLDED MARBLE CHIPS AND
PORTLAND CEMENT BASIN WITH DROPPED
THRESHOLD AND SS SPLASH PANELS
24" X 24" X 12" DEEP WALL-MOUNTED FAUCET, 8" CENTERS, VACCUUM
BREAKER SPOUT, PAIL HOOK WALL BRACE, AND
3/4" MALE THREAD HOSE CONNECTION, 36" HOSE,
AND SS WALL HOOK
3" N/A INTEGRAL CORROSION-RESISTANT
METAL DRAIN WITH REMOVABLE
STRAINER AND 3" BOTTOM OUTLET
FAUCET: 36" AFF & BASIN -
FLOOR MOUNTED
3/4" 3/4" 3" 1-1/2"
SH-1 SHOWER TERRAZO SHOWER BASE WITH PRESSURE
BALANCING SHOWER VALVE
N/A PRESSURE BALANCING MIXING VALVE W/INTEGRAL
SERVICE STOPS, 1.5 GPM SHOWER HEAD, FLANGE,
AND ESCUTCHEON
2" N/A PROVIDE CAST IRON DRAIN WITH
TWO PIECE BODY, INTEGRAL
CLAMPING COLLAR, AND STAINLESS
STEEL DRAIN STRAINER PLATE
HEAD: 75" AFF & CONTROL
VALVE 48" AFF
1/2" 1/2" 2" 1-1/2"
SH-2 ADA SHOWER INTEGRAL FLOOR/SHOWER BASE WITH PRESSURE
BALANCING SHOWER VALVE
N/A PRESSURE BALANCING MIXING VALVE W/INTEGRAL
SERVICE STOPS, 1.5 GPM HAND SHOWER HEAD, 60"
FLEXIBLE HOSE, 30" ADJUSTABLE MOUNTING BAR,
FLANGE, AND ESCUTCHEON
2" N/A PROVIDE CAST IRON DRAIN WITH
TWO PIECE BODY, INTEGRAL
CLAMPING COLLAR, AND STAINLESS
STEEL DRAIN STRAINER PLATE
HEAD: 75" AFF & CONTROL
VALVE 48" AFF
1/2" 1/2" 2" 1-1/2"
SK-1 SINGLE SINK SINGLE BOWL, TYPE 304 18 GA SS, UNDERCOUNTER
MOUNTED, WITH SOUND DEADENING
18 1/2" X 18 1/2" X 9" DEEP SINGLE HOLE FAUCET, 8" SWIVEL SPOUT, SINGLE
METAL LEVER HANDLE, AND 1.5 GPM AERATOR
HOSE SPRAY
1-1/2" N/A PROVIDE SS BASKET STRAINER HT. SET BY COUNTER TOP 1/2" 1/2" 2 1-1/2"
SK-2 SINGLE SINK SINGLE BOWL, TYPE 304 18 GA SS, UNDERCOUNTER
MOUNTED, WITH SOUND DEADENING
14" X 11" X 7" DEEP SINGLE HOLE FAUCET, 8" SWIVEL SPOUT, SINGLE
METAL LEVER HANDLE, AND 1.5 GPM AERATOR
1-1/2" N/A PROVIDE SS BASKET STRAINER HT. SET BY COUNTER TOP 1/2" 1/2" 2 1-1/2"
UR-1 URINAL 0.125 GPF, BACK OUTLET, WHITE VITREOUS CHINA 3/4" SPUD MANUAL FLUSHOMETER INTEGRAL WALL CARRIER NONE RIM 24" AFF 3/4" N/A 2" 1-1/2"
UR-2 ADA URINAL 0.125 GPF, BACK OUTLET, WHITE VITREOUS CHINA 3/4" SPUD MANUAL FLUSHOMETER INTEGRAL WALL CARRIER NONE RIM 17" AFF 3/4" N/A 2" 1-1/2"
WC-1 WATER CLOSET 1.28 GPF, ELONGATED BOWL, WALL MOUNT BACK
DISCHARGE WHITE VITREOUS CHINA
1-1/2" SPUD MANUAL FLUSHOMETER INTEGRAL WATER CLOSET
CARRIER
PROVIDE SOLID PLASTIC, OPEN
FRONT SEAT (LESS COVER)
RIM 15" AFF 1-1/4 N/A 4 2
WC-2 WATER CLOSET
ACCESSIBLE
1.28 GPF, ELONGATED BOWL, WALL MOUNT BACK
DISCHARGE WHITE VITREOUS CHINA. ABA/ADA
1-1/2" SPUD MANUAL FLUSHOMETER INTEGRAL WATER CLOSET
CARRIER
PROVIDE SOLID PLASTIC, OPEN
FRONT SEAT (LESS COVER)
RIM 17" AFF 1-1/4 N/A 4 2
WH-1 WALL HYDRANT EXTERIOR WALL HYDRANT N/A BRASS AUTOMATIC DRAINING, FREEZELESS, WITH
ANTI-SIPHON VACUUM BREAKER, TEE KEY HANDLE,
AND HOSE CONNECTION
N/A N/A WALL SURFACE MOUNTED W/BRASS
FINISH
24" AFF 3/4" N/A N/A N/A
DRAIN SCHEDULE
TAG NO. DESCRIPTION OUTLET SIZE TYPE STRAINER REMARKS
2" FD-A CAST IRON, TWO PIECE BODY, INTEGRAL
CLAMPING COLLAR, TRAP PRIMER CONNECTION
AS SHOWN FLOOR DRAIN - ROUND 5"ø ADJUSTABLE, NICKEL-BRONZE
2" FD-B CAST IRON, TWO PIECE BODY, INTEGRAL
CLAMPING COLLAR, TRAP PRIMER CONNECTION
AS SHOWN FLOOR DRAIN - HEAVY
DUTY
9"ø CAST IRON TRACTOR GRATE, HEAVY
DUTY
3" FD-A CAST IRON, TWO PIECE BODY, INTEGRAL
CLAMPING COLLAR, TRAP PRIMER CONNECTION
AS SHOWN FLOOR DRAIN - ROUND 5"ø ADJUSTABLE, NICKEL-BRONZE
4" FD-B CAST IRON, TWO PIECE BODY, INTEGRAL
CLAMPING COLLAR, TRAP PRIMER CONNECTION
AS SHOWN FLOOR DRAIN - HEAVY
DUTY
9"ø CAST IRON TRACTOR GRATE, HEAVY
DUTY
WATER HEATER SCHEDULE (WH)
TAG
NO. TYPE LOCATION
HEATING
SOURCE
INPUT
(BTU/HR) CAPACITY (GAL)
RECOVERY (GAL/HR AT
100 DEG F.)
HOT WATER TEMP.
SETTING (DEG. F.)
INLET WATER
CONNECTION SIZE (IN)
OUTLET WATER
CONNECTION SIZE (IN) VOLTS PHASE REMARKS
DWH-1 GAS FIRED MECHANICAL ROOM NATURAL GAS 150,000 100 178 140 3/4 3/4 120 1 1, 2
NOTES:
1. 95% THERMAL EFFICIENCY, MODULATING BURNING.
1 ASME TANK CONSTRUCTION.
CLEANOUT SCHEDULE
TAG NO. DESCRIPTION COVER
FCO-1 FLOOR CLEANOUT ROUND NICKEL BRONZE SCORIATED
FCO-2 HEAVY DUTY FLOOR CLEANOUT ROUND HEAVY DUTY SECURED SCORIATED CAST IRON
COVER
WCO-1 WALL CLEANOUT STAINLESS STEEL ACCESS COVER
RECIRCULATION PUMP SCHEDULE
TAG NO. TYPE LOCATION SERVICE
MAXIMUM FLUID
TEMP. - DEG. F.
CAPACITY
- GPM
HEAD -
TDH SUCTION SIZE - IN.
MOTOR ELECTRICAL
REMARKS
MOTOR -
RPM
MOTOR -
HP VOLTS PHASE
RP-1 IN-LINE
CENTRIFUGAL
MECH ROOM
DHWR 140 0.5 6 0.75 2800 0.1 115 1 1, 2
NOTES:
1. PROVIDE WITH SINGLE POINT ELECTRICAL CONNECTION.
2. PROVIDE WITH AQUASTAT. SYSTEM SHALL BE ENABLED WHEN DHWR TEMP IS BELOW 100 DEG. F
TRAP PRIMER SCHEDULE (TP)
TAG NO.
TRAP PRIMER
TYPE
TRAP PRIMER
LOCATION
NUMBER OF
DRAINS PIPE SIZE
MIN DIFF PRESSURE
(PSIG) REMARKS
TP-1 ETP MECH ROOM 205 ELECTRONIC 0.75 0.00 psi
TP-2 ATP MENS RESTROOM
4 0.5 10.00 psi
TP-3 ATP MENS RESTROOM
4 0.5 10.00 psi
NOTES:
ETP = ELECTRIC TRAP PRIMER
ATP = AUTOMATIC TRAP PRIMER
BACKFLOW PREVENTER SCHEDULE
TAG NO. TYPE LOCATION SYSTEM SIZE
DESIGN
FLOW
(GPM)
PRESSURE LOSS AT
DESIGN FLOW RATE
(PSIG) REMARKS
BFP-1 RPZ MECH ROOM
DOMESTIC WATER 3" 0 GPM 10.00 psi 1
BFP-2 DOUBLE CHECK MECH ROOM
DOMESTIC WATER 3/4" 0 GPM 10.00 psi
BFP-3 DOUBLE CHECK ROOM 128 DOMESTIC WATER 1/2" 0 GPM 10.00 psi
NOTES:
1. PROVIDE WITH AIR GAP FITTING AND 2" PIPING DRAIN FROM BACKFLOE PREVENTER TO FLOOR DRAIN.
ldanahe Danaher MO Seal ldanahe
SK-1
3" V
4" SS
2" V
2" V
MB-1
FCO-2
WCO-1
2" SS
3" V
2" V
4" SS
4" SS
4" SS
3" SS
4" SS
SH-2
LAV-1
LAV-1
LAV-1
LAV-1
LAV-2
WCO
WCO
EWC-1
FD-A
WC-2
WC-2
WC-1
WC-1
WC-1
WC-1
WC-1
WC-1
WCO
3" SS
WCO
EWC-1
SK-2
LAV-2
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
UR-1
UR-1
UR-1
3" SS
UR-1
UR-1
UR-1
UR-2
3" SS
SH-1
SH-2
MB-1
4" SS
4" SS
4" SS
4" SS
4" SS
4" V
3" V
WCO
WCO
WCO
1 1/4" V
1 1/2" V
1 1/2" V
1 1/2" V
1 1/4" V
1 1/2" V
2" V
1 1/2" V
1 1/2" V
2" V
1 1/2" V
3" SS
2" SS
3" SS1 1/4" V
2" SS4" SS
1 1/2" V
1 1/2" V
3" SS
3" SS
2" SS
FCO-1
2" FD-A
2" FD-B
4" FD-B
2" FD-B
2" FD-A
2" FD-A
2" FD-A
2" FD-A
2" FD-A
2" FD-A
2" FD-A
2" FD-B
4" FD-B
2" FD-B
2" FD-A
2" FD-A
2" FD-A
2" FD-A
2" FD-A
2" FD-A
2" FD-A
1 1/2" V
1 1/2" V
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T
M O
B
IL
E A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
M
A S
H E
K
4/16/2020 9:59:32 AM
L
D A
N A
H E
R
C
M c A
F E
E R
JO
R D
A N
P-901-0006
P -9
-0
P-901
W A
S T
E A
N D
V E
N T
R
IS
E R
D
IA
G R
A M
UP
DN
N
S E
W
GENERAL NOTES
1. SEE SHEET P-001 FOR PLUMBING GENERAL
NOTES, SYMBOLS AND ABBREVIATIONS.
NTSSCALE:A1
SANITARY RISER DIAGRAM
ldanahe Danaher MO Seal ldanahe
SK-1
MB-1
DWH-1
LAV-1
EWC-1
2 1/2" DCW
WC-2
WC-2
WC-1
WC-1
SK-2
LAV-2
WH-1
3/4" DCW
1 1/2" DCW
WH-1
LAV-1
LAV-1
LAV-1LAV-2
SH-2
2" DHW
3/4" DHWR
3" DCW
2" DHW
3/4" DHWR
3" DCW
WH-1
EEW-1
WH-1
EEW-1
EEW-1
WH-1
EEW-1
WH-1
3/4" DCW
3/4" DCW
3/4" DCW
3/4" DCW
3/4" DHW
3/4" DHWR
1/2" DCW
1/2" DHW
3/4" DCW
WC-1
WC-1
WC-1
WC-1
TP-3
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
UR-1
UR-1
UR-1
TP-2
UR-1
UR-1
UR-1
UR-2
SH-1
SH-2
MB-1
WH-1
3/4" DCW
3/4" DCW
EWC-1
1/2" DCW
3/4" DCW
IM-1
1/2" DHW
1/2" DCW
2 1/2" DCW
2" DHW
3/4" DHWR
1" DCW
3/4" DHW
1 1/2" DCW
1 1/2" DHW
3/4" DHWR
TP-1
3/4" MW
3/4" DCW
BFP-1
WATER METER
3" DCW
RP-101
(4 FD'S IN RM 135)
(FD IN RM 128 & 134)
BFP-3
BFP-2
CIRCUIT SETTER
SET AT .32 GPM
CIRCUIT SETTER
SET AT .20 GPM
3" DCW
2" DHW
3/4" DHWR
WHA-C
WHA-B
WHA-A
WHA-A
WHA-A
1 1/2" DCW
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
M
A S
H E
K
4/16/2020 9:59:33 AM
L
D A
N A
H E
R
C
M cA
F E
E R
JO
R D
A N
P-902-0006
P -9
-0
P-902
D O
M E
S T
IC
W
A T
E R
R
IS
E R
D
IA
G R
A M
GENERAL NOTES
1. SEE SHEET P-001 FOR PLUMBING GENERAL
NOTES, SYMBOLS AND ABBREVIATIONS.
NTSSCALE:A1
DOMESTIC WATER RISER DIAGRAM
UP
DN
N
S E
W ldanahe Danaher MO Seal ldanahe
MAU-102
MAU-101
DWH-1
GAS METER
2" NG
1" NG
1" NG
PRESSURE
REDUCING
VALVE
1 1/4" NG
1" NG
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T
M O
B
IL
E A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
M
A S
H E
K
4/16/2020 9:59:34 AM
L
D A
N A
H E
R
C
M c A
F E
E R
JO
R D
A N
P-903-0006
P -9
-0
P-903
N A
T U
R A
L G
A S
R
IS
E R
D
IA
G R
A M
NTSSCALE:A1
NATURAL GAS RISER DIAGRAM
GENERAL NOTES
1. SEE SHEET P-001 FOR PLUMBING GENERAL
NOTES, SYMBOLS AND ABBREVIATIONS.
ldanahe Danaher MO Seal ldanahe
PIPE SYMBOLS
PIPE ELBOW
PIPE DOWN
PIPE UP
PIPE CONTINUATION
HVAC LEGEND
M
CONTROL DAMPER, MOTOR
OPERATED
MANUAL BALANCE DAMPER
BD
BACKDRAFT DAMPER
AD
AD
ACCESS DOOR (AD)
ACCESS PANEL (AP)
S
AD
S
DAMPERS:
FIRE (F) -
SMOKE (S) -
FIRE SMOKE (F/S) -
AD
SECURITY BARS
FLEXIBLE DUCT CONNECTION
RECTANGLUAR ELBOW WITH
TURNING VANES
RECTANGULAR TEE WITH
TURNING VANES
RECTANGULAR RADIUS ELBOW
R RISE IN RESPECT TO AIR-FLOW
D DROP IN RESPECT TO AIR-FLOW
SQUARE OR RECTANGULAR TO
ROUND TRANSITION
SUPPLY AIR OR OUTSIDE AIR
RECTANGULAR DUCT SECTION
RETURN AIR RECTANGULAR
DUCT SECTION
EXHAUST AIR RECTANGULAR
DUCT SECTION
ROUND FLEXIBLE DUCT
(5'-0" MAX LENGTH)
SQUARE OR RECTANGULAR
SUPPLY DIFFUSER
RETURN AIR DIFFUSER
EXHAUST AIR DIFFUSER
T THERMOSTAT
CO2 CARBON DIOXIDE SENSOR
H HUMIDISTAT
LINEAR SLOT DIFFUSER
VAV- VARIABLE AIR VOLUME
TERMINAL BOX
(3'-0") FINNED TUBE RADIATION.
LENGTH OF ELEMENT SHOWN
IN PARENTHESIS
ESS EMERGENCY SHUT-OFF SWITCH
M MOTOR
FCP FAN CONTROL PANEL
AIRFLOW ARROW
BA BREATHING AIR DROP
CA COMPRESSED AIR DROP
SUPPLY AIR OR OUTSIDE AIR
ROUND DUCT SECTION
RETURN AIR ROUND DUCT
SECTION
EXHAUST AIR ROUND DUCT
SECTION
DP DIFFERENTIAL PRESSURE
SENSOR
S STATIC PRESSURE SENSOR
OCC OCCUPANCY SENSOR
ROUND & RECTANGULAR DUCT
TAKEOFF
CO CARBON MONOXIDE SENSOR
PIPE LINE ACCESSORIES
3-WAY VALVE
2-WAY VALVE
ANGLE VALVE
AV
AUTOMATIC AIR VENT
ASSEMBLY
BFP
BACKFLOW PREVENTION
ASSEMBLY
BALANCING VALVE / CIRCUIT
SETTER
BALL VALVE
BLIND FLANGE
BUTTERFLY VALVE
CHECK VALVE
FLEX CONNECTION
FLOW ARROW
FM FLOW METER
GATE VALVE
GLOBE VALVE
HOSE GATE DRAIN VALVE
IF
INSULATING FLANGE
MV
MANUAL AIR VENT ASSEMBLY
- SEE SPECIFICATIONS FOR
APPROPRIATE VALVE TYPE
M METER
M MOTORIZED CONTROL VALVE
OS&Y
OUTSIDE SCREW & YOKE VALVE
PIPE WITH HEAT TRACE
PLUG VALVE
PRESSURE GUAGE
SELF CONTAINED PRESSURE
REDUCING (REGULATING)
VALVE
PUMP
REDUCER (CONCENTRIC)
RELIEF, SAFETY OR THERMAL
RELIEF VALVE
REMOVABLE CAP
REMOVABLE PLUG
S STRAINER
SUCTION DIFFUSER
TEST CONNECTION
THERMOMETER
UNION
Y-TYPE STRAINER
SRC SPRING RETURN CLOSED BALL
VALVE
PIPELINE ABBREVIATIONS
MECHANICAL ABBREVIATIONS GENERAL NOTES:
DETAIL / ENLARGED
CALLOUT SYMBOL
A
M-001
INDICATES
LIMITS OF
DETAIL/SECTION
DETAIL/SECTION
DESIGNATOR
SHEET WHERE
DETAIL/SECTION IS
SHOWN
DETAIL/SECTION TITLE
TITLE
A1
LOCATION WHERE
DETAIL / SECTION
IS SHOWN ON
SHEET
SECTION CUT SYMBOL
A
M-001
INDICATES PERSPECTIVE
AND LIMITS OF SECTION
SECTION
DESIGNATOR
DRAWING WHERE
SECTION IS SHOWN
AIR DISTRIBUTION DEVICE
IDENTIFICATION
AIR FLOW NECK SIZE
QUANTITY
SYSTEM TYPE SPEC. TYPE
SA-A
(2)175-8Ø
1. LEGEND IS GENERAL IN NATURE AND MAY INDICATE MORE INFORMATION THAN IS APPLICABLE TO
PROJECT. SEE PLANS FOR SPECIFIC SYMBOLS AND ABBREVIATIONS.
2. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE
DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE.
3. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND
REGULATIONS.
4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH STRUCTURAL, CIVIL, ELECTRICAL
WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.
5. UNLESS OTHERWISE INDICATED MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL ROOMS.
6. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.
7. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.
8. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF DUCT, PIPE, OR PIPE INSULATION
UNLESS NOTED OTHERWISE.
9. DUCT DIMENSIONS INDICATED REFER TO SHEET METAL DIMENSIONS. SHEET METAL SIZE SHALL BE AIR OPENING DIMENSION PLUS THE THICKNESS OF ACOUSTICAL LINER WHERE LINER IS INSTALLED.
WHERE LINER IS NOT INSTALLED, AIR OPENING SIZE AND SHEET METAL SIZE SHALL BE THE SAME.
10. LOCATE TRANSFER AIR DUCTS AND OPENINGS 24" ABOVE HIGHEST CEILING ELEVATION UNLESS
OTHERWISE NOTED.
11. COORDINATE ALL WALL AND ROOF PENETRATIONS WITH STRUCTURAL AND ARCHITECTURAL PLANS.
12. INSTALL TEMPERATURE CONTROLS AT 48" ABOVE FINISHED FLOOR AND COORDINATE WITH OTHER
DEVICES LOCATED ON WALLS. COORDINATE WITH ARCHITECTURAL WALL FINISHES.
13. OCCUPANCY SENSORS SHALL BE PROVIDED BY DIVISION 26. WIRE OCCUPANCY SENSOR BACK TO CORRESPONDING VAV BOX AS SCHEDULED FOR VENTILATION CONTROL. WIRE CO2 SENSORS SHALL
BE PROVIDED BY DIVISION 23. CO2 SENSOR BACK TO EMCS PANEL FOR ALARM.
14. PROVIDE STRUCTURAL EQUIPMENT PADS IN ACCORDANCE WITH STRUCTURAL DRAWINGS AND
SPECIFICATIONS.
15. MOUNT ALL OVERHEAD MECHANICAL EQUIPMENT AND FIXTURES WEIGHING 31 POUNDS OR MORE TO SUPPORTS THAT SHALL RESIST FORCES OF 0.5 TIMES THE EQUIPMENT WEIGHT IN ANY HORIZONTAL
DIRECTION AND 1.5 TIMES THE EQUIPMENT WEIGHT IN THE DOWNWARD DIRECTION.
BLWDN BLOWDOWN
CD CONDENSATE DRAIN
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSATE RETURN
CT CHEMICAL TREATMENT
CTB COOLING TOWER BLOWDOWN
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DRAIN
DI DEIONIZED WATER
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
HPS HIGH PRESSURE STEAM
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
LPS LOW PRESSURE STEAM
MPS MEDIUM PRESSURE STEAM
MW MAKEUP WATER (AFTER
BACKFLOW PREVENTER)
N NITROGEN
NG NATURAL GAS
O OXYGEN
PCR PUMPED CONDENSATE RETURN
V VACUUM
IH INFRARED HEATER
IN. W.C INCHES WATER COLUMN
L LOUVER
LAT LEAVING AIR TEMPERATURE
LR LONG RADIUS
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKEUP AIR UNIT
MFR MANUFACTURER
MJ MECHANICAL JOINT
MW MAKE-UP WATER (AFTER BACKFLOW
PREVENTER)
NC NORMALLY CLOSED (FAIL POSITION)
NG NATURAL GAS
NO NORMALLY OPEN (FAIL POSITION)
OA OUTSIDE AIR
OB OPPOSED BLADE
OD OVERFLOW DRAIN
PA PRESSURIZATION AIR
PB PARALLEL BLADE
PCW PROCESS COLD WATER
PFX PLATE AND FRAME HEAT EXCHANGER
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
RA RETURN AIR
RED REDUCER-REDUCING
RG REFRIGERANT HOT GAS DISCHARGE
RL REFRIGERANT LIQUID
RMJ RESTRAINED MECHANICAL JOINT
RS REFRIGERANT SUCTION
SA SUPPLY AIR
SCH SCHEDULE
SCR SPRING RETURN CLOSED
SHR SHORT RADIUS
SP STATIC PRESSURE SENSOR
SR SUPPLY REGISTER
ST STEAM TRAP
STM STEAM
SW SOCKET WELD
TA TRANSFER AIR
TOA TREATED OUTSIDE AIR
TOC TOP OF CONCRETE
TOD TOP OF DUCT
TOS TOP OF STEEL
UH UNIT HEATER
V VENT
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
WB WET BULB
WE WELD END
WN WELD NECK
12"Ø ROUND DUCT DIMENSION
24x12 RECTANGULAR DUCT DIMENSION
(INCHES)
ACU AIR CONDITIONING UNIT
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AHU AIR HANDLING UNIT
ARF ABOVE RAISED FLOOR
AS AIR SEPARATOR
BBO BOILER BLOW-OFF
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BP BOOSTER PUMP
BS BRANCH SELECTOR (VRF SYSTEM)
CF CEILING FAN
CFM CUBIC FEET PER MINUTE
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CL CENTER LINE OF PIPE ELEVATION
CONC CONCENTRIC
COND COOLING COIL CONDENSATE DRAIN
CRAC COMPUTER ROOM AIR CONDITIONER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
DB DRY BULB
DH DEHUMIDIFIER
DN DOWN
DRG DIFFUSER, REGISTER, GRILLE
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
EL ELEVATION
ELL ELBOW
EMCS ENERGY MANAGEMENT CONTROL
SYSTEM
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
EXIST EXISTING
FCU FAN COIL UNIT
FD FEEDWATER
FF FLAT FACED
FO FLAT OVAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
HWB HEATING HOT WATER BOILER
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
I.E. INVERT ELEVATION
IA INSTRUMENT AIR
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
, 2
A
. M A
S H
E K
4/16/2020 9:57:38 AM
L.
D
A N
A H
E R
J.
M cG
IN
T Y
R . J
O R
D A
N
M-001-0006
M -0
-0
M-001
M E
C H
A N
IC
A
L N
O T
E S
L
E G
E N
D
S Y
M B
O L
S
A B
B R
E V
IA
T
IO
N
S
2 3 4 5 6 7 81
G
F
E
D
C
B
A
130 131 132
125A
J
4.3 5.5
N
H U
R L
B U
R T
F
IE
L D
F
L O
R
ID
A M
T F
P R
O J E
C T
N O
F
T E
V
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
A P
R
IL
W
R
F T
E V
M E
F
A P
R
IL
A
KEY PLAN
NOT TO SCALE
B
A
M A
S H
E K
4/16/2020 9:57:45 AM
/1
'-0
L
D A
N A
H E
R
J.
M cG
IN
T Y
R
JO
R
D A
N
M-100-0006
M -1
-0
M-100
M E
C H
A N
IC
A
L P
L A
N
O V
E R
A L
L
N
SPACE SCHEDULE
NUMBER NAME
101 MTF CLASSROOM 4
102 MQTP CLASSROOM 4
103 MQTP CLASSROOM 3
104 MQTP CLASSROOM 2
105 MTF CLASSROOM 1
106 MTF CLASSROOM 2
107 MQTP CLASSROOM 6
108 MQTP CLASSROOM 5
109 WLT CLASSROOM
110 MTF CLASSROOM 3
111 MQTP CLASSROOM 1
112 POTFF WAITING
113 COUNSELING OFFICE
114 COUNSELING OFFICE
115 POTFF GROUP ROOM
116 STOR
117 MQTP/ MTF STORAGE
118 CONFERENCE
120 SUPERINTENDENT WSS
121 WINGS WEAPON MANAGER
122 MQTP/ MTF STORAGE
123 VR CLASSROOM 2
124 VR CLASSROOM 1
125 LSC OPEN OFFICE
125A SLC OPEN OFFICE
126 COPY
127 MOTHERS ROOM
128 BREAK
130 SECTION CHIEF MQTP
131 SECTION CHIEF MTF
132 SCHEDULER
133 INSTRUCTOR OPEN OFFICE
134 JAN
135 MENS RESTROOM
136 WOMENS RESTROOM
137 VEST
138 VEST
139 Space
140 VEST
141 CORRIDOR
142 CORRIDOR
143 CORRIDOR
144 VEST
145 CORRIDOR
146 CORRIDOR
201 TRAINING BAY
202 COMM
203 ELEC
204 FIRE PUMP
205 MECHANICAL
206 CTK STORAGE
207 C-130 TRAINING BAY STORAGE
GENERAL NOTES
1. SEE SHEET M-001 FOR MECHANICAL GENERAL
NOTES, SYMBOLS AND ABBREVIATIONS.
SCALE: 1/16" = 1'-0"A1
FIRST FLOOR - HVAC PLAN - OVERALL
SCALE IN FEET
0 8' 16' 32'
121 120
125A
2 3 4 5 6
H
G
F
EF-104
VAV-101
VAV-102
VAV-103VAV-104
VAV-117 VAV-118
VAV-119
VAV-115
VAV-116
VAV-120
VAV-122
VAV-123
VAV-121
VAV-109VAV-111
VAV-112 VAV-110
VAV-108
VAV-107
VAV-113
VAV-105
VAV-114
VAV-106
MATCHLINE SEE SHEET M-102 FOR CONTINUATION
20"ø SA
"ø
S A
18"ø SA
14"ø SA
14"ø SA
10"ø SA
10"ø SA
"x
R A
36"x12" RA
22"ø SA
J
4.3 5.5
(4)90-6"ø
SA-A
(2)150-8"ø
SA-A
(2)155-8"ø
SA-A
(2)125-8"ø
SA-A
(12)75-6"ø
SA-A
8"x6" SA
10"x10" SA
8"x6" SA
12"x10" SA 8"x6" SA
8"x6" SA 14"x14" SA
10"ø SA
10' - 8" BOD EL
(6)115-6"ø
SA-A
10"x10" SA
12"x12" SA
10"ø SA
10' - 1" BOD EL
(2)65-8"ø
SA-A
(2)65-6"ø
SA-A
(4)120-6"ø
SA-A
100-6"ø
SA-A
145-8"ø
SA-A
100-8"x8"
RA-C
145-8"x8"
RA-C
(2)225-8"ø
SA-A
450-14"x8"
RA-C
(2)175-6"ø
SA-A
12"x10" SA
10"ø SA
(2)45-6"ø
SA-A
90-8"x8"
RA-C
85-6"ø
SA-A
70-6"ø
SA-A
205-8"ø
SA-A
205-10"x10"
RA-C
70-8"x8"
RA-C
(4)95-8"ø
SA-A
(2)110-8"ø
SA-A
50-6"ø
SA-A
55-6"ø
SA-A
70-6"ø
SA-A
70-6"ø
SA-A
70-6"ø
SA-A
(8)85-6"ø
SA-A
(4)200-8"x8"
RA-C
300-10"x10"
RA-C
130-8"x8"
RA-C
(4)75-6"ø
SA-A
50-8"ø
SA-A
480-12"x8"
RA-C
26"x11" RA
6"x6" SA
11' - 11" BOD EL
16"x11" RA
11' - 1" BOD EL
120"x96"
EA-L04
12"x10" SA
12"x8" SA
6"x6" SA
85-12"x8"
RA-C 10"x8" SA
12"x12" SA
10"x8" SA
8"x8" RA
12"x12" RA
10"x10" SA
8"ø SA
12"x12" RA
50-6"ø
SA-A 10"x10" SA
150-12"x12"
RA-C
360-10"x10"
RA-C
(2)50-8"ø
SA-A
8"x10" SA
8"ø SA
10"x10" SA
70-10"x10"
RA-C
250-10"x10"
RA-C
8"x8" SA
420-10"x10"
RA-C
12"x8" SA
8"x8" SA
250-6"ø
SA-B 8"x6"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .