W9127820R0077 RTA DRAWINGS VOL2.pdf

PDF 18 MB Posted

Attached to
SOF Maintenance Training Facility, Hurlburt Field, FL
Solicitation number
W9127820R0077
Issued by

About this file

This document provides details for a federal contract opportunity to construct a maintenance training facility at Hurlburt Field, Florida. The solicitation requests the construction of a 36,800 square foot high bay facility including a concrete foundation, auger cast pilings, floor slab, steel frame, masonry walls, and sloped metal roof. Functional areas include space for a dedicated weapons load trainer, a full size C-130 aircraft, small training devices, classrooms, instructors' offices, storage, and supporting facilities such as utilities, pavements, site improvements, communications, and all necessary support. Special considerations include the removal and disposal of a large quantity of unsuitable material and the installation of suitable fill. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Mobile.

View the file

Other files

File Type Posted
AM05.pdf PDF
AM04.pdf PDF
AM03.pdf PDF
AM02.pdf PDF
AM02 DRAWINGS.pdf PDF
AM01.pdf PDF
W9127820R0077 EM 385-1-1.pdf PDF
W9127820R0077 VOL3.PDF PDF
W9127820R0077 RTA DRAWINGS VOL 1.pdf PDF
W9127820R0077 VOL2.PDF PDF
W9127820R0077 VOL1.PDF PDF
W9127820R0077 VOL4.PDF PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers

MOBILE DISTRICT

109 SAINT JOSEPH STREET

MOBILE AL 36602

FTEV153007

SOF MAINTENANCE TRAINING FACILITY

HURLBURT FIELD, FLORIDA

OKALOOSA COUNTY

JUNE 2020

SMALL BUSINESS SET ASIDE

MOBILE DISTRICT PROJECT CODE: MEF20006

RFP NUMBER: W9127820R0077

VOLUME 2 OF 2

HU

RL

BU

RT

F

IE

LD

, F

LO

RI

DA

M

TF

PR

O

JE

C T

N O

. F

TE

V1

M O

BI

LE

D

IS

TR

IC

T M

O

BI

LE

, A

LA

BA

M A

Mobile District

US Army Corps of Engineers ®

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

N O

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

AR

D P

AR

KW

AY

KA

N

SA

S C

IT

Y, M O

BU

RN

S

M cD

O

NN

EL

L

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SB

M

T

BY

PL

O

T

SC

AL

E:

SI

ZE

" x

4"

FI

LE

N

AM

E:

C

KD

B Y:

PL

O

T D

AT

E:

D

AT

E:

SO

LI

C

IT

AT

IO

N N

U M

BE

R

PR

O

JE

C

T N

U M

BE

R

C

AD

D C

O D

E:

AP

R

IL

, 2

W

0R

FT

EV

M

EF

AP

RI

L, A.

M

AS

HE

K

4/15/2020 11:30:32 AM

A.

S

NE

TH

EN

A.

S

NE

TH

EN

A.

M

AS

HE

K

G-001-0006

G-

1-

G-001

SH

EE

T

IN

D

EX

MTF - VOLUME 1 - STRUCTURAL DRAWING LIST

NUMBER NAME

S-001 GENERAL NOTES

S-002 GENERAL NOTES

S-003 LEGENDS AND ABBREVIATIONS

S-004 WIND ISOMETRIC

S-005 WIND ISOMETRIC

S-100 OVERALL FOUNDATION AND SLAB PLAN

S-101 FOUNDATION AND SLAB PLAN - AREA A

S-102 FOUNDATION AND SLAB PLAN - AREA B

S-110 OVERALL ROOF FRAMING PLAN

S-111 ROOF FRAMING PLAN - AREA A

S-112 ROOF FRAMING PLAN - AREA B

S-120 FRAMING ELEVATIONS PLAN

S-125 MASONRY WALL ELEVATIONS PLAN

S-200 FRAMING ELEVATION

S-201 FRAMING ELEVATION

S-202 FRAMING ELEVATION

S-210 MASONRY WALL ELEVATIONS

S-211 MASONRY WALL ELEVATIONS

S-400 ELEVATED SLAB PLANS

S-500 STANDARD CONCRETE DETAILS

S-501 STANDARD CONCRETE DETAILS

S-502 FOUNDATION DETAILS

S-503 FOUNDATION DETAILS

S-515 STANDARD MASONRY DETAILS

S-516 STANDARD MASONRY DETAILS

S-520 STANDARD ROOF DECK & JOIST DETAILS

S-521 FRAMING DETAILS

S-522 FRAMING DETAILS

S-530 MECHANICAL PLATFORM MAINTENENCE MONORAIL ELEVATION AND DETAILS

S-600 COLUMN SCHEDULE

MTF - VOLUME 1 - FIRE PROTECTION DRAWING LIST

NUMBER NAME

FA001 FIRE ALARM NOTES, LEGEND AND ABBREVIATIONS

FA101 FIRE ALARM AND MASS NOTIFICATION PLAN - AREA A

FA102 FIRE ALARM AND MASS NOITIFICATION PLAN - AREA B

FA501 FIRE ALARM DETAILS

FA601 FIRE ALARM ONE-LINE DIAGRAM

FA602 FIRE ALARM AND MASS NOTIFICATION MATRIX

FX001 FIRE SUPPRESSION NOTES, LEGEND AND ABBREVIATIONS

FX101 FIRE SUPPRESSION PLAN - AREA A

FX102 FIRE SUPPRESSION PLAN - AREA B

FX301 FIRE SUPPRESSION SECTION VIEW - AREA B

FX601 FIRE SUPPRESSION RISER DIAGRAM

MTF - VOLUME 1 - CIVIL/INFRASTRUCTURE DRAWING LIST

NUMBER NAME

GC001 CIVIL LEGEND AND ABBREVIATIONS

GC002 LOCATION AND VICINITY MAP

GC003 SITE ACCESS AND HAUL ROUTE

GC004 STAGING AND LAYDOWN PLAN

GC005 GENERAL CONSTRUCTION NOTES

GC006 GENERAL CONSTRUCTION NOTES

GC007 CIVIL GENERAL NOTES

GC008 CIVIL GENERAL NOTES

GC009 BORROW PIT LOCATION

GC010 BORROW PIT B-40

B-100 BORING LOCATION PLAN

B-101 BORING LOGS 1

B-102 BORING LOGS 2

B-103 BORING LOGS 3

B-104 BORING LOGS 4

V-100 SURVEY LIMITS PLAN 1

V-101 SURVEY LIMITS PLAN 2

CD101 DEMOLITION PLAN 1

CD102 DEMOLITION PLAN 2

CS101 SITE PLAN

CS150 ATFP PLAN

CS500 PAVEMENT DETAILS

CS501 SITE DETAILS 1

CS502 SITE DETAILS 2

CG101 GRADING PLAN

CG501 EROSION CONTROL DETAILS

CG502 EROSION CONTROL DETAILS

CU101 UTILITY PLAN 1

CU102 UTILITY PLAN 2

CU103 UTILITY PLAN 3

CU201 SANITARY SEWER PROFILES

CU202 STORM PROFILES

CU203 WATER PROFILES 1

CU204 WATER PROFILES 2

CU205 NATURAL GAS PROFILE

CU206 ELECTRICAL PROFILES

CU207 COMMUNICATION PROFILES

CU501 UTILITY DETAILS 1

CU502 UTILITY DETAILS 2

CU503 UTILITY DETAILS 3

CU504 UTILITY DETAILS 4

CU505 UTILITY DETAILS 5

CU506 UTILITY DETAILS 6

CU507 UTILITY DETAILS 7

CU508 CATHODIC PROTECTION DETAILS 1

CU509 CATHODIC PROTECTION DETAILS 2

CU510 LIFT STATION DETAILS 1

CU511 LIFT STATION DETAILS 2

CU512 LIFT STATION DETAILS 3

MTF - VOLUME 1 - ARCHITECTURAL DRAWING LIST

NUMBER NAME

A-671 LOUVER DETAILS

A-672 LOUVER DETAILS

A-681 TRANSLUCENT WALL PANEL SCHEDULE & DETAILS

A-701 ROOM FINISH SCHEDULE

A-711 FINISH & SIGNAGE PLAN - AREA A

A-712 FINISH & SIGNAGE PLAN - AREA B

A-741 SIGNAGE SCHEDULE AND DETAILS

A-742 SIGNAGE DETAILS

I-010 OVERALL GROUND FLOOR FURNITURE PLAN

I-101 GROUND FLOOR FURNITURE PLAN - AREA A

I-102 GROUND FLOOR FURNITURE PLAN - AREA B

I-103 DEMOUNTABLE PARTITION & SYSTEMS PANEL PLAN - AREA A

F-010 LIFE SAFETY CODE AND CRITERIA

F-011 OVERALL LIFE SAFETY PLAN

F-012 ENLARGED LIFE SAFETY PLAN - AREA A

F-013 ENLARGED LIFE SAFETY PLAN - AREA B

F-014 CODE COMPLIANCE PLAN

MTF - VOLUME 1 - ARCHITECTURAL DRAWING LIST

NUMBER NAME

A-001 ARCHITECTURAL LEGEND AND ABBREVIATIONS

A-002 ARCHITECTURAL GENERAL NOTES

A-003 ABA INFORMATION

A-004 ABA INFORMATION

A-010 AIRCRAFT CLEARANCE REQUIREMENTS PLAN - AREA B

A-011 AIRCRAFT CLEARANCE SECTION

A-020 OVERALL AIR BARRIER FLOOR PLAN

A-021 AIR BARRIER SECTIONS

A-101 OVERALL FLOOR PLAN

A-102 OVERALL GROUND FLOOR REFLECTED CEILING PLAN

A-103 OVERALL ROOF PLAN

A-111 ENLARGED FLOOR PLAN - AREA A

A-112 ENLARGED FLOOR PLAN - AREA B

A-113 ENARGED FLOOR PLAN MECHANICAL PLATFORM

A-121 REFLECTED CEILING PLAN - AREA A

A-122 REFLECTED CEILING PLAN - AREA B

A-201 EXTERIOR BUILDING ELEVATIONS

A-210 ENTRANCE ELEVATIONS

A-301 BUILDING SECTIONS

A-311 WALL SECTIONS

A-312 WALL SECTIONS

A-401 ENLARGED FLOOR PLANS

A-421 TOILET PLANS AND ELEVATIONS

A-422 TOILET ELEVATIONS

A-431 INTERIOR ELEVATIONS

A-501 PARTITION TYPES

A-502 PARTITION TYPE DETAILS

A-503 PENETRATION DETAILS

A-504 PENETRATION DETAILS

A-510 SECTION DETAILS

A-511 SECTION DETAILS

A-512 SECTION DETAILS

A-513 MISCELLANEOUS DETAILS

A-514 EXPANSION JOINT DETAILS

A-515 CANOPY DETAILS

A-531 CEILING DETAILS

A-541 CASEWORK DETAILS

A-561 ROOF DETAILS

A-562 ROOF HATCH DETAILS

A-563 EXPANSION JOINT AXONOMETRIC

A-601 DOOR, LOUVER & WINDOW SCHEDULES

A-621 DOOR DETAILS

A-622 DOOR DETAILS

A-661 WINDOW DETAILS

HU

RL

BU

RT

F

IE

LD

, F

LO

RI

DA

M

TF

PR

O

JE

C T

N O

. F

TE

V1

M O

BI

LE

D

IS

TR

IC

T M

O

BI

LE

, A

LA

BA

M A

Mobile District

US Army Corps of Engineers ®

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

N O

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

AR

D P

AR

KW

AY

KA

N

SA

S C

IT

Y, M O

BU

RN

S

M cD

O

NN

EL

L

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SB

M

T

BY

PL

O

T

SC

AL

E:

SI

ZE

" x

4"

FI

LE

N

AM

E:

C

KD

B Y:

PL

O

T D

AT

E:

D

AT

E:

SO

LI

C

IT

AT

IO

N N

U M

BE

R

PR

O

JE

C

T N

U M

BE

R

C

AD

D C

O D

E:

AP

R

IL

, 2

W

0R

FT

EV

M

EF

AP

RI

L, A.

M

AS

HE

K

4/15/2020 11:30:38 AM

A.

S

NE

TH

EN

A.

S

NE

TH

EN

A.

M

AS

HE

K

G-002-0006

G-

2-

G-002

SH

EE

T

IN

D

EX

MTF - VOLUME 2 - MECHANICAL DRAWING LIST

NUMBER NAME

M-001 MECHANICAL NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

M-100 MECHANICAL PLAN - OVERALL

M-101 HVAC PLAN - AREA A

M-102 HVAC PLAN - AREA B

M-111 HVAC PIPING PLAN - AREA B

M-301 MECHANICAL SECTIONS

M-302 MECHANICAL SECTIONS

M-401 MECHANICAL FLOOR PLAN - ENLARGED

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-505 MECHANICAL DETAILS

M-506 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-603 MECHANICAL SCHEDULES

M-610 HVAC AIR FLOW DIAGRAM

M-611 CHILLED WATER FLOW DIAGRAM

M-701 CONTROL LEGEND

M-702 SYSTEMS ARCHITECTURE AND MISCELLANEOUS CONTROLS

M-703 CONTROLS SCHEMATIC - AHU-101

M-704 CONTROL POINTS - AHU-101

M-705 CONTROLS - VAV TERMINAL UNITS

M-706 CONTROLS - TRAINING BAY

M-707 CONTROLS SCHEMATIC - MAU-101

M-708 CONTROLS SCHEMATIC - TEMPERATURE CONTROLLED EXHAUST FAN

M-709 CONTROLS SCHEMATIC - EXHAUST FAN

M-710 CONTROLS SCHEMATIC - AIR COOLED CHILLED WATER SYSTEM

M-711 CONTROLS POINTS - AIR COOLED WATER SYSTEM

M-901 ISOMETRIC VIEWS

MTF - VOLUME 2 - PLUMBING DRAWING LIST

NUMBER NAME

P-001 PLUMBING NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

P-100 UNDERGROUND PLUMBING PLAN - OVERALL

P-101 UNDERGROUND PLUMBING PLAN - AREA A

P-102 UNDERGROUND - PLUMBING PLAN - AREA B

P-111 ABOVEGROUND PLUMBING PLAN - AREA A

P-112 ABOVEGROUND PLUMBING PLAN - AREA B

P-401 PLUMBING PLAN - ENLARGED

P-402 PLUMBING PLAN - ENLARGED

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-901 WASTE AND VENT RISER DIAGRAM

P-902 DOMESTIC WATER RISER DIAGRAM

P-903 NATURAL GAS RISER DIAGRAM

MTF - VOLUME 2 - ELECTRICAL DRAWING LIST

NUMBER NAME

E-001 ELECTRICAL SYMBOLS LEGEND

E-002 ELECTRICAL SYMBOLS LEGEND

ES101 ELECTRICAL SITE PLAN

ES102 ELECTRICAL SITE PLAN

ES501 SITE DETAILS

ES502 SITE DETAILS

ES503 SITE DETAILS

EG101 GROUNDING PLAN

EG102 LIGHTNING PROTECTION PLAN

EG501 GROUNDING DETAILS

EG502 GROUNDING DETAILS

EG601 GROUNDING SCHEMATIC

EL101 GROUND FLOOR LIGHTING PLAN - AREA A

EL102 GROUND FLOOR LIGHTING PLAN - AREA B

EL103 LIGHTING CONTROL MATRIX

EL501 LIGHTING DETAILS

EL502 LIGHTING DETAILS

EL503 LIGHTING DETAILS

EL601 LIGHTING SCHEDULE

EP101 POWER PLAN - AREA A

EP102 POWER PLAN - AREA B

EP401 ENLARGED ELECTRICAL PLANS

EP501 POWER DETAILS

EP502 POWER DETAILS

EP504 POWER DETAILS

EP601 ELECTRICAL ONE-LINE DIAGRAM

EP602 PANELBOARD SCHEDULES

EP603 PANELBOARD SCHEDULES

EP604 PANELBOARD SCHEDULE

EP605 MECHANICAL EQUIPMENT SCHEDULE

MTF - VOLUME 2 - TELECOMMUNICATIONS DRAWING LIST

NUMBER NAME

T-001 TELECOMMUNICATIONS LEGEND

TS101 TELECOMMUNICATIONS SITE PLAN

T-101 TELECOMMUNICATIONS PLAN - AREA A

T-102 TELECOMMUNICATIONS PLAN - AREA B

T-401 TELECOMMUNICATIONS ENLARGED PLAN AND RACK ELEVATION

T-502 TELECOMMUNICATIONS DETAILS

T-503 TELECOMMUNICATIONS DETAILS

T-505 TELECOMMUNICATIONS DETAILS

T-701 COMMUNICATIONS RISERS

4" FD-A

EWC-1

JS-1

SK-1

U-2

U-1

WC-2

WC-1

LAV-1

PLUMBING SYMBOLS LEGEND

SIZE - FLOOR DRAIN

DUAL ELECTRIC WATER COOLER

JANITOR SINK

KITCHEN SINK

URINAL, ACCESSIBLE

URINAL

WATER CLOSET - ACCESSIBLE

WATER CLOSET

LAVATORY, COUNTER MOUNTED

PRESSURE/TEMPERATURE RELIEF VALVE

HB HOSE BIBB

WH WALL HYDRANT

LAV-2 LAVATORY, WALL MOUNTED

MB-1 MOP BASIN

SK-2 SINK

EEWS-1 EMERGENCY EYEWASH / SHOWER

SH-1 SHOWER

SK-3 UNDER MOUNT SINK

EEW-1 EMERGENCY EYEWASH

WCO

FLOOR DRAIN / EQUIPMENT DRAIN

PLUMBING FIXTURE TRAP

FLOOR OR WALL PENETRATION

VENT THRU ROOF (VTR)

CLEANOUT (CO) IN RISER

RISER DIAGRAM LEGEND

CO

FCO

CLEANOUT (FCO) IN FLOOR

WATER HAMMER ARRESTORWHA-A

WALL CLEANOUT (WCO)

ISOMETRIC DIRECTION ARROW

UP

DN

PIPE LINE ACCESSORIES

3-WAY VALVE

2-WAY VALVE

ANGLE VALVE

AV

AUTOMATIC AIR VENT

ASSEMBLY

BFP

BACKFLOW PREVENTION

ASSEMBLY

BALANCING VALVE / CIRCUIT

SETTER

BALL VALVE

BLIND FLANGE

BUTTERFLY VALVE

CHECK VALVE

FLEX CONNECTION

FLOW ARROW

FM FLOW METER

GATE VALVE

GLOBE VALVE

HOSE GATE DRAIN VALVE

IF

INSULATING FLANGE

MV

MANUAL AIR VENT ASSEMBLY

- SEE SPECIFICATIONS FOR

APPROPRIATE VALVE TYPE

M METER

M MOTORIZED CONTROL VALVE

OS&Y

OUTSIDE SCREW & YOKE VALVE

PIPE WITH HEAT TRACE

PLUG VALVE

PRESSURE GUAGE

SELF CONTAINED PRESSURE

REDUCING (REGULATING)

VALVE

PUMP

REDUCER (CONCENTRIC)

RELIEF, SAFETY OR THERMAL

RELIEF VALVE

REMOVABLE CAP

REMOVABLE PLUG

S STRAINER

SUCTION DIFFUSER

TEST CONNECTION

THERMOMETER

UNION

Y-TYPE STRAINER

SRC SPRING RETURN CLOSED BALL

VALVE

PIPE SYMBOLS

PIPE ELBOW

PIPE DOWN

PIPE UP

PIPE CONTINUATION

PIPE LINE DESIGNATIONS

VENT

STORM (ABOVE GRADE)

STORM (BELOW GRADE)

STORM OVERFLOW

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RECIRCULATION

SANITARY SEWER (ABOVE GRADE)

SANITARY SEWER (BELOW GRADE)

CONDENSATE DRAIN

COMPRESSED AIR

NATURAL GAS

CLEANOUT IN RISER

CLEANOUT IN WALL

CLEANOUT IN FLOOR

SS

SS

COND

V

DCW

DHW

DHWR

CA

NG

OD

ST

ST

CO

WCO

FCO

PLUMBING ABBREVIATIONS GENERAL NOTES:

DETAIL / ENLARGED

CALLOUT SYMBOL

A

M-001

INDICATES

LIMITS OF

DETAIL/SECTION

DETAIL/SECTION

DESIGNATOR

SHEET WHERE

DETAIL/SECTION IS

SHOWN

DETAIL/SECTION TITLE

TITLE

A1

LOCATION WHERE

DETAIL / SECTION

IS SHOWN ON

SHEET

SECTION CUT SYMBOL

A

M-001

INDICATES PERSPECTIVE

AND LIMITS OF SECTION

SECTION

DESIGNATOR

DRAWING WHERE

SECTION IS SHOWN

AC AIR COCK

AFF ABOVE FINISHED FLOOR

AG AIR GAP

ARV AIR RELEASE VALVE

BF BLIND FLANGE

BOP BOTTOM OF PIPE

BW BUTT WELD

CH OP CHAIN WHEEL OPERATOR

CONC CONCENTRIC

CORP STOP CORPORATION STOP

CPVC CHLORINATED POLYVINYL CHLORIDE

D DRAIN

DI DUCTILE IRON

DN DOWN

DWH DOMESTIC WATER HEATER

ELL ELBOW

EXIST EXISTING

FCA FLANGED COUPLING ADAPTER

FD FLOOR DRAIN

FE FLANGED END

FF FLAT FACED

FI FLOW INDICATOR

FLGD FLANGED

FM FLOW METER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FOV FLOAT OPERATED VALVE

FRP FIBERGLASS REINFORCED PIPE

FW FIELD WELD

HD HUB DRAIN

I.E. INVERT ELEVATION

IF INSULATED FLANGE

LC LOCK CLOSED

LO LOCK OPEN

LR LONG RADIUS

NPSH NET POSITIVE SUCTION HEAD

NRS NON-RISING STEM

NWL NORMAL WATER LEVEL

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

PVC POLYVINYL CHLORIDE

RED REDUCER-REDUCING

RS RISING STEM

SCH SCHEDULE

SCRD SCREWED

SR SHORT RADIUS

TD TRENCH DRAIN

TOC TOP OF CONCRETE

TOG TOP OF GRATING

TOP TOP OF PIPE

TOS TOP OF STEEL

TP TRAP PRIMER

VTR VENT THROUGH ROOF

1. UNLESS NOTED OTHERWISE, THE CIVIL AND MECHANICAL INTERFACE POINT IS 5 FEET

OUTSIDE OF THE BUILDING WALL.

2. COORDINATE ALL PIPE SLEEVE REQUIREMENTS WITH FOUNDATION SUBCONTRACTOR.

3. COORDINATE MECHANICAL ROOM FLOOR DRAINS WITH ACTUAL EQUIPMENT LOCATIONS

AND DRAINAGE REQUIREMENTS.

4. LEGEND IS GENERAL IN NATURE AND NOT ALL ITEMS SHOWN MAY BE USED ON THIS

PROJECT.

5. INSTALL SANITARY PIPING WITH THE FOLLOWING SLOPE DOWNWARD IN DIRECTION OF

FLOW: 2% FOR 3" AND SMALLER PIPE, 1% FOR 4" AND LARGER PIPE.

6. INSTALL VENT PIPING WITH 1% SLOPE DOWNWARD TOWARD FIXTURE OR STACK.

7. ALL FIXTURES SHALL HAVE A P-TRAP INSTALLED.

8. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE PLUMBING SYSTEMS AS

INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.

9. INSTALL ALL PLUMBING FIXTURES, EQUIPMENT AND APPURTENANCES IN ACCORDANCE

WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND

APPLICABLE CODES AND REGULATIONS.

10. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH STRUCTURAL, CIVIL,

ELECTRICAL WORK ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.

11. MAINTAIN A MINIMUM OF 6' - 8" CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL ROOMS.

12. LOCATE ALL PLUMBING EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS

PANELS, CONTROLS, AND VALVING.

13. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.

14. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF PIPE UNLESS NOTED

OTHERWISE.

15. INVERT ELEVATIONS GIVEN RELATIVE TO FINISHED FLOOR ELEVATION OF 100'-0".

ACTUAL FLOOR ELEVATION IS 35.33' AMSL.

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T M

O B

IL

E

A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S O

F

E N

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

M

A S

H E

K

4/16/2020 9:58:57 AM

L

D A

N A

H E

R

C

M cA

F E

E R

JO

R D

A N

P-001-0006

P -0

-0

P-001

P L U

M B

IN

G

N O

T E

S L E

G E

N D

S

Y M

B O

L S

A

B B

R E

V

IA

T

IO

N S ldanahe Danaher MO Seal ldanahe Typewritten Text 4/17/20

103104

121 120 130 131 132

125A

2 3 4 5 6 7 81

H

G

F

E

D

C

B

A

J

4.3 5.5

N

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T M

O B

IL

E

A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

KEY PLAN

NOT TO SCALE

B

A

M A

S H

E K

4/16/2020 9:59:02 AM

/1

'-0

L

D A

N A

H E

R

C

M cA

F E

E R

JO

R D

A N

P-100-0006

P -1

-0

P-100

U N

D E

R G

R O

U N

D P

L U

M B

IN

G

P L A

N

O V

E R

A L

L

SCALE: 1/16" = 1'-0"A1

UNDERGROUND PLUMBING PLAN - OVERALL

SPACE SCHEDULE

NUMBER NAME

101 MTF CLASSROOM 4

102 MQTP CLASSROOM 4

103 MQTP CLASSROOM 3

104 MQTP CLASSROOM 2

105 MTF CLASSROOM 1

106 MTF CLASSROOM 2

107 MQTP CLASSROOM 6

108 MQTP CLASSROOM 5

109 WLT CLASSROOM

110 MTF CLASSROOM 3

111 MQTP CLASSROOM 1

112 POTFF WAITING

113 COUNSELING OFFICE

114 COUNSELING OFFICE

115 POTFF GROUP ROOM

116 STOR

117 MQTP/ MTF STORAGE

118 CONFERENCE

120 SUPERINTENDENT WSS

121 WINGS WEAPON MANAGER

122 MQTP/ MTF STORAGE

123 VR CLASSROOM 2

124 VR CLASSROOM 1

125 LSC OPEN OFFICE

125A SLC OPEN OFFICE

126 COPY

127 MOTHERS ROOM

128 BREAK

130 SECTION CHIEF MQTP

131 SECTION CHIEF MTF

132 SCHEDULER

133 INSTRUCTOR OPEN OFFICE

134 JAN

135 MENS RESTROOM

136 WOMENS RESTROOM

137 VEST

138 VEST

139 Space

140 VEST

141 CORRIDOR

142 CORRIDOR

143 CORRIDOR

144 VEST

145 CORRIDOR

146 CORRIDOR

201 TRAINING BAY

202 COMM

203 ELEC

204 FIRE PUMP

205 MECHANICAL

206 CTK STORAGE

207 C-130 TRAINING BAY STORAGE

GENERAL NOTES

1. SEE SHEET P-001 FOR PLUMBING GENERAL

NOTES, SYMBOLS AND ABBREVIATIONS.

N

SCALE IN FEET

0 8' 16' 32' ldanahe Danaher MO Seal ldanahe

BFP

103104

121 120 130 131 132

125A

2 3 4 5 6 7 81

H

G

F

A1

P-401

4" SS

INV. EL. 95.83'. SEE

CIVIL DRAWING FOR

CONTINUATION

3" SS UP

TO WCO-1

3" SS UP

TO FD-A

2" SS UP

TO SK-1

2" SS UP

TO SK-22" SS UP

TO EWC-1

4" SS

MATCHLINE SEE SHEET P-102 FOR CONTINUATION

2" NG2" NG UP

4" SS

4" SS

3" SS3" SS

J

4.3 5.5

4" SS UP

TO FCO-1

N

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

KEY PLAN

NOT TO SCALE

B

A

M A

S H

E K

4/16/2020 9:59:05 AM

/8

'-0

L

D A

N A

H E

R

C

M c A

F E

E R

JO

R D

A N

P-101-0006

P -1

-0

P-101

U N

D E

R G

R O

U N

D P

L U

M B

IN

G

P L A

N

A

R E

A A

GENERAL NOTES

1. SEE SHEET P-001 FOR PLUMBING GENERAL

NOTES, SYMBOLS AND ABBREVIATIONS.

N

SCALE IN FEET

0 4' 8' 16'

SCALE: 1/8" = 1'-0"A1

UNDERGROUND - PLUMBING PLAN - AREA A

ldanahe Danaher MO Seal ldanahe

2 3 4 5 6 7 81

F

E

D

C

B

A

4" SS 4" SS 2" SS

2" SS UP

TO FD-B

2" SS UP

TO FD-B

2" SS

4" SS UP

TO FD-B 4" SS UP

TO FCO-2

MATCHLINE SEE SHEET P-101 FOR CONTINUATION

2" NG

SEE CU101 FOR

CONTINUATION

SEE CU101 FOR

CONTINUATION

2" V UP

4" SS

2" SS UP

TO MB-1

2" SS

4.3 5.5

4" SS

4" SS

2" V UP

3" DCW

4" V UP

TO WCO-1

3" DCW UP

N

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

KEY PLAN

NOT TO SCALE

B

A

M A

S H

E K

4/16/2020 9:59:08 AM

/8

'-0

L

D A

N A

H E

R

C

M c A

F E

E R

JO

R D

A N

P-102-0006

P -1

-0

P-102

U N

D E

R G

R O

U N

D

P L

U M

B

IN

G

P L A

N

A R

E A

B

SCALE: 1/8" = 1'-0"A1

UNDERGROUND - PLUMBING PLAN - AREA B

GENERAL NOTES

1. SEE SHEET P-001 FOR PLUMBING GENERAL

NOTES, SYMBOLS AND ABBREVIATIONS.

N

SCALE IN FEET

0 4' 8' 16' ldanahe Danaher MO Seal ldanahe

B

P

103104

121 120 130 131 132

125A

2 3 4 5 6 7 81

H

G

F

A3

P-401

WH-1

WH-1

WH-1

3" FD-A

MB-1

SK-2

SK-1

EWC-1

MATCHLINE SEE SHEET P-112 FOR CONTINUATION

2" NG DN

3/4" DCW

3/4" DCW

1/2" DCW DN

1/2" DHW DN

1/2" DCW DN

3/4" DCW

3/4" DCW

3/4" DHWR

2" DHW

2 1/2" DCW

3/4" DHWR

2" DHW

2 1/2" DCW

1" DCW

1" DHW

1/2" DCW

1/2" DHW

1/2" DCW DN

1/2" DHW DN

3" DCW

2" DHW

3/4" DHWR

1/2" DCW DN

1/2" DHW DN

J

4.3 5.5

IM-1

1 1/4" V

1/2" DCW DN

3/4" DHWR

1 1/2" DHW

1/2" DCW

CIRCUIT SETTER

BFP-3

N

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

KEY PLAN

NOT TO SCALE

B

A

M A

S H

E K

4/16/2020 9:59:12 AM

/8

'-0

L

D A

N A

H E

R

C

M c A

F E

E R

JO

R D

A N

P-111-0006

P -1

-0

P-111

A B

O V

E G

R O

U N

D P

L U

M B

IN

G

P L A

N

A

R E

A A

SCALE: 1/8" = 1'-0"A1

ABOVE GROUND - PLUMBING PLAN - AREA A

GENERAL NOTES

1. SEE SHEET P-001 FOR PLUMBING GENERAL

NOTES, SYMBOLS AND ABBREVIATIONS.

N

SCALE IN FEET

0 4' 8' 16'

KEYED NOTES

SET CIRCUIT SETTER TO .32 GPM.1

ldanahe Danaher MO Seal ldanahe

2 3 4 5 6

F

E

D

C

B

A

MB-1

WH-1

4" FD-B

WH-1

WH-1

WH-1

EEW-1

EEW-1

EEW-1

EEW-1

MATCHLINE SEE SHEET P-111 FOR CONTINUATION

1/2" DCW DN

1/2" DHW DN

3/4" DCW

1/2" DCW DN

3/4" DCW DN

3/4" DCW

3/4" DCW DN

1/2" DCW DN

3/4" DCW

3/4" DCW DN

3/4" DCW DN

1/2" DCW DN

1/2" DCW DN

4.3 5.5

1" NG DN

TO MAU

2" V UP

A2

P-402

3/4" DCW

20' - 0" BOP EL

3/4" DHW

20' - 0" BOP EL

3/4" DHWR

20' - 0" BOP EL

3/4" DCW

C2

P-402

CIRCUIT SETTER

SET TO .20 GPM

N

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

KEY PLAN

NOT TO SCALE

B

A

M A

S H

E K

4/16/2020 9:59:16 AM

/8

'-0

L

D A

N A

H E

R

C

M c A

F E

E R

JO

R D

A N

P-112-0006

P -1

-0

P-112

A B

O V

E G

R O

U N

D P

L U

M B

IN

G

P L A

N

A

R E

A B

SCALE: 1/8" = 1'-0"A1

ABOVE GROUND - PLUMBING PLAN - AREA B

GENERAL NOTES

1. SEE SHEET P-001 FOR PLUMBING GENERAL

NOTES, SYMBOLS AND ABBREVIATIONS.

KEYED NOTES

PIPE TO BE SUPPORTED BY PIPE SUPPORTS

FROM WALL.

N

SCALE IN FEET

0 4' 8' 16' ldanahe Danaher MO Seal ldanahe

H

G

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

LAV-2

2" FD-A

UR-1

UR-1

UR-1

UR-2

UR-1

UR-1

SH-1

3" FD-A

2" FD-A

SH-2

2" FD-A

WC-1 WC-1 WC-1 WC-2

2" FD-A

EWC-1

LAV-2 LAV-1 LAV-1 LAV-1 LAV-1

2" FD-A

SH-2

WC-1 WC-1 WC-1 WC-2

2" FD-A

2" FD-A

MB-1 1/2" DHW DN

1/2" DCW DN

1/2" DHW DN

1/2" DCW DN

1" DCW

3/4" DHW

3/4" DHWR

1 1/2" DCW

1 1/2" DHW

3/4" DHWR

1 1/2" DHW

2" DCW

1 1/2" DCW DN

1 1/2" DCW DN

1 1/2" DHW DN

1 1/2" DCW DN

1/2" DHW DN

1" DCW DN

1/2" DHW DN

1/2" DCW DN

1" DHW DN

1" DCW DN

1/2" DCW DN

3" V UP

TO 4" VTR

1 1/2" V

1 1/2" V

2" V

1 1/2" V

2" V

1 1/4" V

1 1/2" V

1 1/2" V

1 1/2" V

(TYP. OF 2)

2" V 2" V

1 1/2" V DN

2" V

1 1/2" V

1 1/2" V DN

1 1/2" V DN

(TYP. OF 2)

(TYP. OF 2)

1 1/4" V DN

1/2" DCW DN

TO TP-3

1/2" DCW DN

TO TP-2

1 1/2" V DN

H

G

2" FD-A

2" FD-A

2" FD-A

3" FD-A

2" FD-A

2" FD-A

2" FD-A

2" FD-A

2" SS UP

4" SS UP

2" SS UP

3" SS UP

2" SS UP

3" SS UP

TO WCO-1

3" SS

3" SS

3" SS

3" SS

3" SS 3" SS2" SS

2" SS UP

TO EWC-1

3" SS

2" SS

3" SS

2" SS

2" SS

2" SS

3" SS

4" SS

3" FD-A

1 1/2" V UP

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T M

O B

IL

E

A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

M

A S

H E

K

4/16/2020 9:59:21 AM

/4

'-0

L

D A

N A

H E

R

C

M cA

F E

E R

JO

R D

A N

P-401-0006

P -4

-0

P-401

P L

U M

B

IN

G P

L A

N

E N

L A

R G

E D

SCALE: 1/4" = 1'-0"A3

ENLARGED PLAN - ABOVE GROUND

SCALE: 1/4" = 1'-0"A1

ENLARGED PLAN - UNDERGROUND

GENERAL NOTES

1. SEE SHEET P-001 FOR PLUMBING GENERAL

NOTES, SYMBOLS AND ABBREVIATIONS.

KEYED NOTES

PROVIDE ISOLATION VALVES AS SHOWN.1

N

SCALE IN FEET

0 2' 4' 8'

N

SCALE IN FEET

0 2' 4' 8'

1 1 ldanahe Danaher MO Seal ldanahe

BFP

B F

P

7 8

F

2" FD-B

2" FD-B

DWH-1

2" NG DN

3" DCW

1" NG UP

TO MAU

RP-1

TP-1

TO CHILLED

WATER SYSTEM

1" NG

9' - 0" BOP EL

3" DCW

2" DHW

3/4" DHWR

2" V UP

GAS METER

1" NG UP

1 1/4" NG DN

WATER METER

3" DCW DN

3/4" DCW

10' - 6" BOP EL

WCO-1

3/4" MW

BFP-1

BFP-2

3/4" DHWR UP

3/4" DHW UP

1 1/2" DCW UP

6"ø FE

3" DCW

7 8

EF-106

3/4" DCW

3/4" DHW

3/4" DHWR

MAU-101

1" NG DN

2" V

3/4" DHW DN

3/4" DHWR DN

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

M

A S

H E

K

4/16/2020 9:59:24 AM

/4

'-0

L

D A

N A

H E

R

C

M c A

F E

E R

JO

R D

A N

P-402-0006

P -4

-0

P-402

P L

U M

B

IN

G P

L A

N

E N

L A

R G

E D

SCALE: 1/4" = 1'-0"A2

ABOVE GROUND - ENLARGED PLUMBING PLAN - AREA B

GENERAL NOTES

1. SEE SHEET P-001 FOR PLUMBING GENERAL

NOTES, SYMBOLS AND ABBREVIATIONS.

KEYED NOTES

PROVIDE INSOLATION VALVES AS SHOWN.1

N

SCALE IN FEET

0 2' 4' 8'

SCALE: 1/4" = 1'-0"C2

ABOVE GROUND - PLUMBING PLAN - AREA B - PLATFORM

N

SCALE IN FEET

0 2' 4' 8' ldanahe Danaher MO Seal ldanahe

IF

DOUBLE CHECK

VALVE BFP

TO EMCS

MECH. ROOM FLOOR

DCW TO SYSTEM

SEE PLANS FOR SIZE

WATER METER

DCW - (SEE PLANS

FOR SIZES

F L O

W

CHECK VALVE

FOR CONTINUATION

& SIZE, SEE FLOOR PLAN

GATE (OR BALL) VALVE

DIAL TYPE PRESSURE

GAUGE (0-100 PSIG)

IN-LINE CIRCULATING

PUMP (SEE PUMP

SCHEDULE)

GAUGE COCK

UNION

REDUCING TEE (OR

TEST PLUG FOR

INSERTION OF GAUGE)

AQUASTAT FOR

CONTROL OF PUMP

(SET AT 100 DEG. F)

FLOOR DRAIN

SERVICE SINK

OR SHOWER

THREADED OUTLET

DRAIN PIPING - SEE

PLANS FOR SIZE.

COVER

CLEANOUT PLUG

MAIN LINE

FINISHED FLOOR

OR CONCRETE PAD

CAULK, BUNA-N

OR VITON SEAL

RISER EXTENSION

UP TO CLEANOUT.

NEED NOT BE

LARGER SIZE THAN 4"

GRADE

BYPASS

REDUCER

GAS METER (1150 CFH @ 2 PSIG)

GAS COCK

(LOCKING)

PRESSURE GAUGE

PRESSURE REDUCING

VALVE (30 PSIG IN &

2 PSIG OUT)

UNION (TYP.)

STRAINER

GAS COCK

(LOCKING)

MAIN GAS GAS COCK (NON-LOCKING)

WALL

SANITARY / VENT

IN WALL

PUSH HANDLE

TO FIRE ALARM

DOUBLE POLE SINGLE

THROW NORMALLY OPEN

FLOW SWITCHFS

ALARM HORN

AND STROBE

1/2" DCW

WALL

BRACKET

EYEWASH WITH

STAINLESS

STEEL BOWL

A

1.

2.

3.

4.

NOTES:

110° F

HOT WATER TO SYSTEM

THERMOMETER

3-WAY MIXING VALVE, SEE NOTE 3.

UNION

CHECK VALVE

STRAINER

BALL

VALV

E

DCW

DHWR FROM RECIRC PUMP

DCW

140° F HOT WATER

FROM STORAGE

TANK DCW

RECIRC.

PUMP

DHWR (SEE PLANS FOR SIZE)

FLOOR

AQUASTAT

EQUIPMENT PAD

DRAIN

FULL SIZE OF P&T

RELIEF VALVE OUTLET

EXPANSION TANK

(3 GALLON)

COMBINATION GAS VALVE

AND PRESSURE REGULATOR

(2 PSIG IN AND 8" W.C. OUT)

GAS COCK

FULL SIZE DIRT LEG

NATURAL GAS

DHW

DOMESTIC

WATER

HEATER

FOR PIPE SIZES, SEE FLOOR PLAN.

FOR HEATER SELECTIONS, SEE SCHEDULES ON DRAWINGS.

MIXING VALVE TO OPEN TO COLD WATER FLOW ON THERMOSTAT FAILURE.

HOT WATER PIPED TO NORMALLY CLOSED PORT OF MIXING VALVE.

ALL GAS VALVES SHALL BE INDIVIDUALLY VENTED TO BUILDING EXTERIOR.

TEMPERATURE GAGE

VENT, SEE NOTE 4.

SACRIFICIAL

ANODE

FLUE

EXHAUST

DRAIN

NEUTRALIZER

FD

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T M

O B

IL

E

A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

M

A S

H E

K

4/16/2020 9:59:25 AM

L

D A

N A

H E

R

C

M cA

F E

E R

JO

R D

A N

P-501-0006

P -5

-0

P-501

P L

U M

B

IN

G D

E T

A

IL

S

NTSSCALE:C1

DOMESTIC WATER SERVICE ENTRANCE

NTSSCALE:A4

DOMESTIC WATER CIRCULATING PUMP

NTSSCALE:A1

FLOOR DRAIN IN SERVICE SINK OR SHOWER

NTSSCALE:B1

FLOOR CLEANOUT

NTSSCALE:B2

NATURAL GAS PRESSURE REGULATOR WITH BYPASS

NTSSCALE:A2

EMERGENCY EYEWASH

NTSSCALE:C2

GAS-FIRED WATER HEATER

ldanahe Danaher MO Seal ldanahe

TRAP PRIMER VALVE SHOULD BE MOUNTED ONE FOOT ABOVE

THE FINISHED FLOOR FOR EVERY 20 FOOT OF PRIME LINE.

A METERED AMOUNT OF WATER FROM THE FLOOR DRAIN

TRAP PRIMER IS DISTRIBUTED TO AS MANY AS (4) INDIVIDUAL

FLOOR DRAIN TRAPS.

INSTALL ASSEMBLY WITH ACCESS FOR PERIODIC INSPECTION.

NOTES:

1.

2.

3.

DISTRIBUTION

UNIT

DCW SUPPLY

M

IN

IM

U

M

N O

T E

FINISHED FLOOR

ISOLATION VALVE

UNION

TRAP PRIMER

VALVE

COPPER TYPE L

(TYP.)

TRANSITION TO TYPE

K COPPER (TYP.)

PLASTIC TUBING (PEX EQUIVALENT) (TYP.)

MIN 1/2" FLOOR DRAIN

TRAP MAKE-UP WATER LINE. (TYP.)

ELECTRONIC

CONTROL

MODULE

S

3/4" SUPPLY, EXTEND TO

CONNECT TO MAIN

UNION

ATMOSPHERIC VACUUM

BREAKER

STRAINER

SOLENOID CONTROL VALVE

TRAP PRIMER DISTRIBUTION

MANIFOLD

CAP UNUSED OUTLETS

1/2" PEX, EXTEND AND CONNECT

TO FLOOR DRAIN BODY (TYP)

INSTALL TRAP PRIMER ASSEMBLY A MINIMUM OF 12"

ABOVE FLOOR RIM ELEVATION OF HIGHEST DRAIN

CONNECTED.

EACH OUTLET SHALL BE CONNECTED ONLY TO ONE

FLOOR DRAIN OR FLOOR SINK.

TRAP PRIMER DISTRIBUTION PIPING SHALL BE

BUBBLE TIGHT AND SEALED.

PROGRAM CONTROL MODULE TO OPEN SOLENOID

CONTROL VALVE AT MANUFACTURER'S

RECOMMENDED FREQUENCY AND DURATION.

GALVANIZED WALL BOX AND COVER PROVIDED BY

TRAP PRIMER MANUFACTURER.

POWER CONNECTION, PROVIDED BY OTHERS.

NOTES:

1.

2.

3.

KEYED NOTES:

NOTE:

B

C

D

F

E

2" 154-330

1-1/4"

1-1/2"

3/4"

1"

61-113

114-154

12-32

33-60

SHOWER

SINK

JANITOR'S SINK

LAVATORY

1.5

0.75 0.75

A

SIZE

SINGLE FIXTURE

PDI

PDI SIZE "A"

1/2"

SIZE

PIPE

1-11

UNIT LOAD

FIXTURE

STANDARDS AND

INSTALL PER PDI

INSTRUCTIONS

MANUFACTURER'S

HOT OR COLD WATER SUPPLY

VALVE WATER CLOSET

MULTIPLE FIXTURES

FIXTURE UNIT TABULATION

IF HORIZONTAL BRANCH IS LESS THAN 20'

LONG, PROVIDE ONE WHA AT END OF LINE.

IF BRANCH IS GREATER THAN 20' LONG,

PROVIDE ANOTHER WHA IN MIDDLE, EACH

SIZED FOR HALF THE FIXTURE UNITS.

FIXTURE

COLD

HOT

URINAL * --

1.5 1.5

1.5

2.25 2.25

1. PROVIDE WATER HAMMER

ARRESTERS. INSTALL IN HORIZONTAL

OR VERTICAL POSITION, BUT NEVER

UPSIDE DOWN. INSTALL IN LINE WITH

WATER FLOW DIRECTION IF POSSIBLE.

SIZE THE UNITS AS SHOWN ON THE

DRAWINGS AND/OR PER THE TABLES

SHOWN.

V E

N T

E X

T E

N S

IO

N

A S

R E

Q U

IR

E

D

VENT PIPE 3" MIN.

MASTIC

STAINLESS STEEL

CLAMPING RING

EPDM PREMOLDED

PIPE SEAL

SPLICING CEMENT

LAP SEALANT

METAL ROOF

METAL DECK

ROOF PENETRATION

BY ROOF MFGR.

INCREASER

IF REQUIRED

VENT

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T M

O B

IL

E

A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

M

A S

H E

K

4/16/2020 9:59:27 AM

L

D A

N A

H E

R

C

M cA

F E

E R

JO

R D

A N

P-502-0006

P -5

-0

P-502

P L

U M

B

IN

G D

E T

A

IL

S

NTSSCALE:B4

TRAP PRIMER

NTSSCALE:B1

ELECTRONIC TRAP PRIMER

NTSSCALE:A1

WATER HAMMER ARRESTORS

NTSSCALE:A3

VENT FLASHING

ldanahe Danaher MO Seal ldanahe

U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T M

O B

IL

E

A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

M

A S

H E

K

4/16/2020 9:59:31 AM

L

D A

N A

H E

R

C

M cA

F E

E R

JO

R D

A N

P-601-0006

P -6

-0

P-601

P L

U M

B

IN

G S

C H

E D

U L

E S

PLUMBING FIXTURE SCHEDULE

TAG NO. DESCRIPTION

FIXTURE FITTING

TRAP CARRIER REMARKS MOUNTING HEIGHT

CONNECTION SIZE

TYPE SIZE TYPE C.W. H.W. WASTE VENT

EEW-1 EMERGENCY EYE

WASH

EYE WASH N/A 11" STAINLESS STEEL BOWL WITH FLIP TOP SPRAY

HEADS, FULL FLOW STAY-OPEN BALL VALVE, 0.6

GPM EYE WASH

N/A N/A WALL MOUNTED, PROVIDE WITH

OPTIONAL HORN AND STROBE

N/A 1/2" N/A N/A N/A

EWC-1 ADA ELECTRIC

WATER COOLER

BI-LEVEL, WALL HUNG BARRIER-FREE UNIT 36" W x 41" H x 19" D LEAD-FREE BUBBLER WITH FRONT, EASY TOUCH

CONTROLS, WITH BOTTLE FILLER

1-1/2" N/A STAINLESS STEEL ORIFICE HT. 40" AFF &

ACCESSIBLE ORIFICE HT. 34" AFF

1/2" N/A 1-1/2" 1-1/4"

IM-1 ICE MACHINE GALVANIZED STEEL ICE MAKER OUTLET BOX 10" x 8" 1/4 TURN LOW LEAD VALVE N.A N/A NONE 48" AFF 1/2" N/A N/A N/A

LAV-1 COUNTER MOUNTED

LAVATORY

UNDERCOUNTER MOUNTED STAINLESS STEEL 19" x 17" OVAL 4" CENTERSET, DOUBLE BLADE HANDLES, MANUAL

0.5 GPM FAUCET AND PERFORATED GRID STRAINER

2"

W/CLEAN

OUT PLUG

N/A PROVIDE WITH OVERFLOW HT. SET BY COUNTERTOP 1/2" 1/2" 2" 1-1/2"

LAV-2 COUNTER MOUNTED

LAVATORY

UNDERCOUNTER MOUNTED STAINLESS STEEL 19" x 17" OVAL 4" CENTERSET, DOUBLE BLADE HANDLES, MANUAL

0.5 GPM FAUCET AND PERFORATED GRID STRAINER

2"

W/CLEAN

OUT PLUG

N/A PROVIDE WITH OVERFLOW HT. SET BY COUNTERTOP

ACCESSIBLE

1/2" 1/2" 2" 1-1/2"

MB-1 SQUARE MOP BASIN PRECAST TERRAZO, MOLDED MARBLE CHIPS AND

PORTLAND CEMENT BASIN WITH DROPPED

THRESHOLD AND SS SPLASH PANELS

24" X 24" X 12" DEEP WALL-MOUNTED FAUCET, 8" CENTERS, VACCUUM

BREAKER SPOUT, PAIL HOOK WALL BRACE, AND

3/4" MALE THREAD HOSE CONNECTION, 36" HOSE,

AND SS WALL HOOK

3" N/A INTEGRAL CORROSION-RESISTANT

METAL DRAIN WITH REMOVABLE

STRAINER AND 3" BOTTOM OUTLET

FAUCET: 36" AFF & BASIN -

FLOOR MOUNTED

3/4" 3/4" 3" 1-1/2"

SH-1 SHOWER TERRAZO SHOWER BASE WITH PRESSURE

BALANCING SHOWER VALVE

N/A PRESSURE BALANCING MIXING VALVE W/INTEGRAL

SERVICE STOPS, 1.5 GPM SHOWER HEAD, FLANGE,

AND ESCUTCHEON

2" N/A PROVIDE CAST IRON DRAIN WITH

TWO PIECE BODY, INTEGRAL

CLAMPING COLLAR, AND STAINLESS

STEEL DRAIN STRAINER PLATE

HEAD: 75" AFF & CONTROL

VALVE 48" AFF

1/2" 1/2" 2" 1-1/2"

SH-2 ADA SHOWER INTEGRAL FLOOR/SHOWER BASE WITH PRESSURE

BALANCING SHOWER VALVE

N/A PRESSURE BALANCING MIXING VALVE W/INTEGRAL

SERVICE STOPS, 1.5 GPM HAND SHOWER HEAD, 60"

FLEXIBLE HOSE, 30" ADJUSTABLE MOUNTING BAR,

FLANGE, AND ESCUTCHEON

2" N/A PROVIDE CAST IRON DRAIN WITH

TWO PIECE BODY, INTEGRAL

CLAMPING COLLAR, AND STAINLESS

STEEL DRAIN STRAINER PLATE

HEAD: 75" AFF & CONTROL

VALVE 48" AFF

1/2" 1/2" 2" 1-1/2"

SK-1 SINGLE SINK SINGLE BOWL, TYPE 304 18 GA SS, UNDERCOUNTER

MOUNTED, WITH SOUND DEADENING

18 1/2" X 18 1/2" X 9" DEEP SINGLE HOLE FAUCET, 8" SWIVEL SPOUT, SINGLE

METAL LEVER HANDLE, AND 1.5 GPM AERATOR

HOSE SPRAY

1-1/2" N/A PROVIDE SS BASKET STRAINER HT. SET BY COUNTER TOP 1/2" 1/2" 2 1-1/2"

SK-2 SINGLE SINK SINGLE BOWL, TYPE 304 18 GA SS, UNDERCOUNTER

MOUNTED, WITH SOUND DEADENING

14" X 11" X 7" DEEP SINGLE HOLE FAUCET, 8" SWIVEL SPOUT, SINGLE

METAL LEVER HANDLE, AND 1.5 GPM AERATOR

1-1/2" N/A PROVIDE SS BASKET STRAINER HT. SET BY COUNTER TOP 1/2" 1/2" 2 1-1/2"

UR-1 URINAL 0.125 GPF, BACK OUTLET, WHITE VITREOUS CHINA 3/4" SPUD MANUAL FLUSHOMETER INTEGRAL WALL CARRIER NONE RIM 24" AFF 3/4" N/A 2" 1-1/2"

UR-2 ADA URINAL 0.125 GPF, BACK OUTLET, WHITE VITREOUS CHINA 3/4" SPUD MANUAL FLUSHOMETER INTEGRAL WALL CARRIER NONE RIM 17" AFF 3/4" N/A 2" 1-1/2"

WC-1 WATER CLOSET 1.28 GPF, ELONGATED BOWL, WALL MOUNT BACK

DISCHARGE WHITE VITREOUS CHINA

1-1/2" SPUD MANUAL FLUSHOMETER INTEGRAL WATER CLOSET

CARRIER

PROVIDE SOLID PLASTIC, OPEN

FRONT SEAT (LESS COVER)

RIM 15" AFF 1-1/4 N/A 4 2

WC-2 WATER CLOSET

ACCESSIBLE

1.28 GPF, ELONGATED BOWL, WALL MOUNT BACK

DISCHARGE WHITE VITREOUS CHINA. ABA/ADA

1-1/2" SPUD MANUAL FLUSHOMETER INTEGRAL WATER CLOSET

CARRIER

PROVIDE SOLID PLASTIC, OPEN

FRONT SEAT (LESS COVER)

RIM 17" AFF 1-1/4 N/A 4 2

WH-1 WALL HYDRANT EXTERIOR WALL HYDRANT N/A BRASS AUTOMATIC DRAINING, FREEZELESS, WITH

ANTI-SIPHON VACUUM BREAKER, TEE KEY HANDLE,

AND HOSE CONNECTION

N/A N/A WALL SURFACE MOUNTED W/BRASS

FINISH

24" AFF 3/4" N/A N/A N/A

DRAIN SCHEDULE

TAG NO. DESCRIPTION OUTLET SIZE TYPE STRAINER REMARKS

2" FD-A CAST IRON, TWO PIECE BODY, INTEGRAL

CLAMPING COLLAR, TRAP PRIMER CONNECTION

AS SHOWN FLOOR DRAIN - ROUND 5"ø ADJUSTABLE, NICKEL-BRONZE

2" FD-B CAST IRON, TWO PIECE BODY, INTEGRAL

CLAMPING COLLAR, TRAP PRIMER CONNECTION

AS SHOWN FLOOR DRAIN - HEAVY

DUTY

9"ø CAST IRON TRACTOR GRATE, HEAVY

DUTY

3" FD-A CAST IRON, TWO PIECE BODY, INTEGRAL

CLAMPING COLLAR, TRAP PRIMER CONNECTION

AS SHOWN FLOOR DRAIN - ROUND 5"ø ADJUSTABLE, NICKEL-BRONZE

4" FD-B CAST IRON, TWO PIECE BODY, INTEGRAL

CLAMPING COLLAR, TRAP PRIMER CONNECTION

AS SHOWN FLOOR DRAIN - HEAVY

DUTY

9"ø CAST IRON TRACTOR GRATE, HEAVY

DUTY

WATER HEATER SCHEDULE (WH)

TAG

NO. TYPE LOCATION

HEATING

SOURCE

INPUT

(BTU/HR) CAPACITY (GAL)

RECOVERY (GAL/HR AT

100 DEG F.)

HOT WATER TEMP.

SETTING (DEG. F.)

INLET WATER

CONNECTION SIZE (IN)

OUTLET WATER

CONNECTION SIZE (IN) VOLTS PHASE REMARKS

DWH-1 GAS FIRED MECHANICAL ROOM NATURAL GAS 150,000 100 178 140 3/4 3/4 120 1 1, 2

NOTES:

1. 95% THERMAL EFFICIENCY, MODULATING BURNING.

1 ASME TANK CONSTRUCTION.

CLEANOUT SCHEDULE

TAG NO. DESCRIPTION COVER

FCO-1 FLOOR CLEANOUT ROUND NICKEL BRONZE SCORIATED

FCO-2 HEAVY DUTY FLOOR CLEANOUT ROUND HEAVY DUTY SECURED SCORIATED CAST IRON

COVER

WCO-1 WALL CLEANOUT STAINLESS STEEL ACCESS COVER

RECIRCULATION PUMP SCHEDULE

TAG NO. TYPE LOCATION SERVICE

MAXIMUM FLUID

TEMP. - DEG. F.

CAPACITY

- GPM

HEAD -

TDH SUCTION SIZE - IN.

MOTOR ELECTRICAL

REMARKS

MOTOR -

RPM

MOTOR -

HP VOLTS PHASE

RP-1 IN-LINE

CENTRIFUGAL

MECH ROOM

DHWR 140 0.5 6 0.75 2800 0.1 115 1 1, 2

NOTES:

1. PROVIDE WITH SINGLE POINT ELECTRICAL CONNECTION.

2. PROVIDE WITH AQUASTAT. SYSTEM SHALL BE ENABLED WHEN DHWR TEMP IS BELOW 100 DEG. F

TRAP PRIMER SCHEDULE (TP)

TAG NO.

TRAP PRIMER

TYPE

TRAP PRIMER

LOCATION

NUMBER OF

DRAINS PIPE SIZE

MIN DIFF PRESSURE

(PSIG) REMARKS

TP-1 ETP MECH ROOM 205 ELECTRONIC 0.75 0.00 psi

TP-2 ATP MENS RESTROOM

4 0.5 10.00 psi

TP-3 ATP MENS RESTROOM

4 0.5 10.00 psi

NOTES:

ETP = ELECTRIC TRAP PRIMER

ATP = AUTOMATIC TRAP PRIMER

BACKFLOW PREVENTER SCHEDULE

TAG NO. TYPE LOCATION SYSTEM SIZE

DESIGN

FLOW

(GPM)

PRESSURE LOSS AT

DESIGN FLOW RATE

(PSIG) REMARKS

BFP-1 RPZ MECH ROOM

DOMESTIC WATER 3" 0 GPM 10.00 psi 1

BFP-2 DOUBLE CHECK MECH ROOM

DOMESTIC WATER 3/4" 0 GPM 10.00 psi

BFP-3 DOUBLE CHECK ROOM 128 DOMESTIC WATER 1/2" 0 GPM 10.00 psi

NOTES:

1. PROVIDE WITH AIR GAP FITTING AND 2" PIPING DRAIN FROM BACKFLOE PREVENTER TO FLOOR DRAIN.

ldanahe Danaher MO Seal ldanahe

SK-1

3" V

4" SS

2" V

2" V

MB-1

FCO-2

WCO-1

2" SS

3" V

2" V

4" SS

4" SS

4" SS

3" SS

4" SS

SH-2

LAV-1

LAV-1

LAV-1

LAV-1

LAV-2

WCO

WCO

EWC-1

FD-A

WC-2

WC-2

WC-1

WC-1

WC-1

WC-1

WC-1

WC-1

WCO

3" SS

WCO

EWC-1

SK-2

LAV-2

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

UR-1

UR-1

UR-1

3" SS

UR-1

UR-1

UR-1

UR-2

3" SS

SH-1

SH-2

MB-1

4" SS

4" SS

4" SS

4" SS

4" SS

4" V

3" V

WCO

WCO

WCO

1 1/4" V

1 1/2" V

1 1/2" V

1 1/2" V

1 1/4" V

1 1/2" V

2" V

1 1/2" V

1 1/2" V

2" V

1 1/2" V

3" SS

2" SS

3" SS1 1/4" V

2" SS4" SS

1 1/2" V

1 1/2" V

3" SS

3" SS

2" SS

FCO-1

2" FD-A

2" FD-B

4" FD-B

2" FD-B

2" FD-A

2" FD-A

2" FD-A

2" FD-A

2" FD-A

2" FD-A

2" FD-A

2" FD-B

4" FD-B

2" FD-B

2" FD-A

2" FD-A

2" FD-A

2" FD-A

2" FD-A

2" FD-A

2" FD-A

1 1/2" V

1 1/2" V

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

M

A S

H E

K

4/16/2020 9:59:32 AM

L

D A

N A

H E

R

C

M c A

F E

E R

JO

R D

A N

P-901-0006

P -9

-0

P-901

W A

S T

E A

N D

V E

N T

R

IS

E R

D

IA

G R

A M

UP

DN

N

S E

W

GENERAL NOTES

1. SEE SHEET P-001 FOR PLUMBING GENERAL

NOTES, SYMBOLS AND ABBREVIATIONS.

NTSSCALE:A1

SANITARY RISER DIAGRAM

ldanahe Danaher MO Seal ldanahe

SK-1

MB-1

DWH-1

LAV-1

EWC-1

2 1/2" DCW

WC-2

WC-2

WC-1

WC-1

SK-2

LAV-2

WH-1

3/4" DCW

1 1/2" DCW

WH-1

LAV-1

LAV-1

LAV-1LAV-2

SH-2

2" DHW

3/4" DHWR

3" DCW

2" DHW

3/4" DHWR

3" DCW

WH-1

EEW-1

WH-1

EEW-1

EEW-1

WH-1

EEW-1

WH-1

3/4" DCW

3/4" DCW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

1/2" DCW

1/2" DHW

3/4" DCW

WC-1

WC-1

WC-1

WC-1

TP-3

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

UR-1

UR-1

UR-1

TP-2

UR-1

UR-1

UR-1

UR-2

SH-1

SH-2

MB-1

WH-1

3/4" DCW

3/4" DCW

EWC-1

1/2" DCW

3/4" DCW

IM-1

1/2" DHW

1/2" DCW

2 1/2" DCW

2" DHW

3/4" DHWR

1" DCW

3/4" DHW

1 1/2" DCW

1 1/2" DHW

3/4" DHWR

TP-1

3/4" MW

3/4" DCW

BFP-1

WATER METER

3" DCW

RP-101

(4 FD'S IN RM 135)

(FD IN RM 128 & 134)

BFP-3

BFP-2

CIRCUIT SETTER

SET AT .32 GPM

CIRCUIT SETTER

SET AT .20 GPM

3" DCW

2" DHW

3/4" DHWR

WHA-C

WHA-B

WHA-A

WHA-A

WHA-A

1 1/2" DCW

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T M

O B

IL

E

A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

M

A S

H E

K

4/16/2020 9:59:33 AM

L

D A

N A

H E

R

C

M cA

F E

E R

JO

R D

A N

P-902-0006

P -9

-0

P-902

D O

M E

S T

IC

W

A T

E R

R

IS

E R

D

IA

G R

A M

GENERAL NOTES

1. SEE SHEET P-001 FOR PLUMBING GENERAL

NOTES, SYMBOLS AND ABBREVIATIONS.

NTSSCALE:A1

DOMESTIC WATER RISER DIAGRAM

UP

DN

N

S E

W ldanahe Danaher MO Seal ldanahe

MAU-102

MAU-101

DWH-1

GAS METER

2" NG

1" NG

1" NG

PRESSURE

REDUCING

VALVE

1 1/4" NG

1" NG

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

M

A S

H E

K

4/16/2020 9:59:34 AM

L

D A

N A

H E

R

C

M c A

F E

E R

JO

R D

A N

P-903-0006

P -9

-0

P-903

N A

T U

R A

L G

A S

R

IS

E R

D

IA

G R

A M

NTSSCALE:A1

NATURAL GAS RISER DIAGRAM

GENERAL NOTES

1. SEE SHEET P-001 FOR PLUMBING GENERAL

NOTES, SYMBOLS AND ABBREVIATIONS.

ldanahe Danaher MO Seal ldanahe

PIPE SYMBOLS

PIPE ELBOW

PIPE DOWN

PIPE UP

PIPE CONTINUATION

HVAC LEGEND

M

CONTROL DAMPER, MOTOR

OPERATED

MANUAL BALANCE DAMPER

BD

BACKDRAFT DAMPER

AD

AD

ACCESS DOOR (AD)

ACCESS PANEL (AP)

S

AD

S

DAMPERS:

FIRE (F) -

SMOKE (S) -

FIRE SMOKE (F/S) -

AD

SECURITY BARS

FLEXIBLE DUCT CONNECTION

RECTANGLUAR ELBOW WITH

TURNING VANES

RECTANGULAR TEE WITH

TURNING VANES

RECTANGULAR RADIUS ELBOW

R RISE IN RESPECT TO AIR-FLOW

D DROP IN RESPECT TO AIR-FLOW

SQUARE OR RECTANGULAR TO

ROUND TRANSITION

SUPPLY AIR OR OUTSIDE AIR

RECTANGULAR DUCT SECTION

RETURN AIR RECTANGULAR

DUCT SECTION

EXHAUST AIR RECTANGULAR

DUCT SECTION

ROUND FLEXIBLE DUCT

(5'-0" MAX LENGTH)

SQUARE OR RECTANGULAR

SUPPLY DIFFUSER

RETURN AIR DIFFUSER

EXHAUST AIR DIFFUSER

T THERMOSTAT

CO2 CARBON DIOXIDE SENSOR

H HUMIDISTAT

LINEAR SLOT DIFFUSER

VAV- VARIABLE AIR VOLUME

TERMINAL BOX

(3'-0") FINNED TUBE RADIATION.

LENGTH OF ELEMENT SHOWN

IN PARENTHESIS

ESS EMERGENCY SHUT-OFF SWITCH

M MOTOR

FCP FAN CONTROL PANEL

AIRFLOW ARROW

BA BREATHING AIR DROP

CA COMPRESSED AIR DROP

SUPPLY AIR OR OUTSIDE AIR

ROUND DUCT SECTION

RETURN AIR ROUND DUCT

SECTION

EXHAUST AIR ROUND DUCT

SECTION

DP DIFFERENTIAL PRESSURE

SENSOR

S STATIC PRESSURE SENSOR

OCC OCCUPANCY SENSOR

ROUND & RECTANGULAR DUCT

TAKEOFF

CO CARBON MONOXIDE SENSOR

PIPE LINE ACCESSORIES

3-WAY VALVE

2-WAY VALVE

ANGLE VALVE

AV

AUTOMATIC AIR VENT

ASSEMBLY

BFP

BACKFLOW PREVENTION

ASSEMBLY

BALANCING VALVE / CIRCUIT

SETTER

BALL VALVE

BLIND FLANGE

BUTTERFLY VALVE

CHECK VALVE

FLEX CONNECTION

FLOW ARROW

FM FLOW METER

GATE VALVE

GLOBE VALVE

HOSE GATE DRAIN VALVE

IF

INSULATING FLANGE

MV

MANUAL AIR VENT ASSEMBLY

- SEE SPECIFICATIONS FOR

APPROPRIATE VALVE TYPE

M METER

M MOTORIZED CONTROL VALVE

OS&Y

OUTSIDE SCREW & YOKE VALVE

PIPE WITH HEAT TRACE

PLUG VALVE

PRESSURE GUAGE

SELF CONTAINED PRESSURE

REDUCING (REGULATING)

VALVE

PUMP

REDUCER (CONCENTRIC)

RELIEF, SAFETY OR THERMAL

RELIEF VALVE

REMOVABLE CAP

REMOVABLE PLUG

S STRAINER

SUCTION DIFFUSER

TEST CONNECTION

THERMOMETER

UNION

Y-TYPE STRAINER

SRC SPRING RETURN CLOSED BALL

VALVE

PIPELINE ABBREVIATIONS

MECHANICAL ABBREVIATIONS GENERAL NOTES:

DETAIL / ENLARGED

CALLOUT SYMBOL

A

M-001

INDICATES

LIMITS OF

DETAIL/SECTION

DETAIL/SECTION

DESIGNATOR

SHEET WHERE

DETAIL/SECTION IS

SHOWN

DETAIL/SECTION TITLE

TITLE

A1

LOCATION WHERE

DETAIL / SECTION

IS SHOWN ON

SHEET

SECTION CUT SYMBOL

A

M-001

INDICATES PERSPECTIVE

AND LIMITS OF SECTION

SECTION

DESIGNATOR

DRAWING WHERE

SECTION IS SHOWN

AIR DISTRIBUTION DEVICE

IDENTIFICATION

AIR FLOW NECK SIZE

QUANTITY

SYSTEM TYPE SPEC. TYPE

SA-A

(2)175-8Ø

1. LEGEND IS GENERAL IN NATURE AND MAY INDICATE MORE INFORMATION THAN IS APPLICABLE TO

PROJECT. SEE PLANS FOR SPECIFIC SYMBOLS AND ABBREVIATIONS.

2. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL LABOR

REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE

DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE.

3. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH

MANUFACTURERS RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND

REGULATIONS.

4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH STRUCTURAL, CIVIL, ELECTRICAL

WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.

5. UNLESS OTHERWISE INDICATED MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL ROOMS.

6. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.

7. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.

8. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF DUCT, PIPE, OR PIPE INSULATION

UNLESS NOTED OTHERWISE.

9. DUCT DIMENSIONS INDICATED REFER TO SHEET METAL DIMENSIONS. SHEET METAL SIZE SHALL BE AIR OPENING DIMENSION PLUS THE THICKNESS OF ACOUSTICAL LINER WHERE LINER IS INSTALLED.

WHERE LINER IS NOT INSTALLED, AIR OPENING SIZE AND SHEET METAL SIZE SHALL BE THE SAME.

10. LOCATE TRANSFER AIR DUCTS AND OPENINGS 24" ABOVE HIGHEST CEILING ELEVATION UNLESS

OTHERWISE NOTED.

11. COORDINATE ALL WALL AND ROOF PENETRATIONS WITH STRUCTURAL AND ARCHITECTURAL PLANS.

12. INSTALL TEMPERATURE CONTROLS AT 48" ABOVE FINISHED FLOOR AND COORDINATE WITH OTHER

DEVICES LOCATED ON WALLS. COORDINATE WITH ARCHITECTURAL WALL FINISHES.

13. OCCUPANCY SENSORS SHALL BE PROVIDED BY DIVISION 26. WIRE OCCUPANCY SENSOR BACK TO CORRESPONDING VAV BOX AS SCHEDULED FOR VENTILATION CONTROL. WIRE CO2 SENSORS SHALL

BE PROVIDED BY DIVISION 23. CO2 SENSOR BACK TO EMCS PANEL FOR ALARM.

14. PROVIDE STRUCTURAL EQUIPMENT PADS IN ACCORDANCE WITH STRUCTURAL DRAWINGS AND

SPECIFICATIONS.

15. MOUNT ALL OVERHEAD MECHANICAL EQUIPMENT AND FIXTURES WEIGHING 31 POUNDS OR MORE TO SUPPORTS THAT SHALL RESIST FORCES OF 0.5 TIMES THE EQUIPMENT WEIGHT IN ANY HORIZONTAL

DIRECTION AND 1.5 TIMES THE EQUIPMENT WEIGHT IN THE DOWNWARD DIRECTION.

BLWDN BLOWDOWN

CD CONDENSATE DRAIN

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CR CONDENSATE RETURN

CT CHEMICAL TREATMENT

CTB COOLING TOWER BLOWDOWN

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DRAIN

DI DEIONIZED WATER

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

HPS HIGH PRESSURE STEAM

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

LPS LOW PRESSURE STEAM

MPS MEDIUM PRESSURE STEAM

MW MAKEUP WATER (AFTER

BACKFLOW PREVENTER)

N NITROGEN

NG NATURAL GAS

O OXYGEN

PCR PUMPED CONDENSATE RETURN

V VACUUM

IH INFRARED HEATER

IN. W.C INCHES WATER COLUMN

L LOUVER

LAT LEAVING AIR TEMPERATURE

LR LONG RADIUS

LWT LEAVING WATER TEMPERATURE

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKEUP AIR UNIT

MFR MANUFACTURER

MJ MECHANICAL JOINT

MW MAKE-UP WATER (AFTER BACKFLOW

PREVENTER)

NC NORMALLY CLOSED (FAIL POSITION)

NG NATURAL GAS

NO NORMALLY OPEN (FAIL POSITION)

OA OUTSIDE AIR

OB OPPOSED BLADE

OD OVERFLOW DRAIN

PA PRESSURIZATION AIR

PB PARALLEL BLADE

PCW PROCESS COLD WATER

PFX PLATE AND FRAME HEAT EXCHANGER

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

RA RETURN AIR

RED REDUCER-REDUCING

RG REFRIGERANT HOT GAS DISCHARGE

RL REFRIGERANT LIQUID

RMJ RESTRAINED MECHANICAL JOINT

RS REFRIGERANT SUCTION

SA SUPPLY AIR

SCH SCHEDULE

SCR SPRING RETURN CLOSED

SHR SHORT RADIUS

SP STATIC PRESSURE SENSOR

SR SUPPLY REGISTER

ST STEAM TRAP

STM STEAM

SW SOCKET WELD

TA TRANSFER AIR

TOA TREATED OUTSIDE AIR

TOC TOP OF CONCRETE

TOD TOP OF DUCT

TOS TOP OF STEEL

UH UNIT HEATER

V VENT

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VRF VARIABLE REFRIGERANT FLOW

WB WET BULB

WE WELD END

WN WELD NECK

12"Ø ROUND DUCT DIMENSION

24x12 RECTANGULAR DUCT DIMENSION

(INCHES)

ACU AIR CONDITIONING UNIT

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AHU AIR HANDLING UNIT

ARF ABOVE RAISED FLOOR

AS AIR SEPARATOR

BBO BOILER BLOW-OFF

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BP BOOSTER PUMP

BS BRANCH SELECTOR (VRF SYSTEM)

CF CEILING FAN

CFM CUBIC FEET PER MINUTE

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CL CENTER LINE OF PIPE ELEVATION

CONC CONCENTRIC

COND COOLING COIL CONDENSATE DRAIN

CRAC COMPUTER ROOM AIR CONDITIONER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

DB DRY BULB

DH DEHUMIDIFIER

DN DOWN

DRG DIFFUSER, REGISTER, GRILLE

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EF EXHAUST FAN

EG EXHAUST GRILLE

EL ELEVATION

ELL ELBOW

EMCS ENERGY MANAGEMENT CONTROL

SYSTEM

ER EXHAUST REGISTER

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EWT ENTERING WATER TEMPERATURE

EXIST EXISTING

FCU FAN COIL UNIT

FD FEEDWATER

FF FLAT FACED

FO FLAT OVAL

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

HWB HEATING HOT WATER BOILER

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

I.E. INVERT ELEVATION

IA INSTRUMENT AIR

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T M

O B

IL

E

A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

, 2

A

. M A

S H

E K

4/16/2020 9:57:38 AM

L.

D

A N

A H

E R

J.

M cG

IN

T Y

R . J

O R

D A

N

M-001-0006

M -0

-0

M-001

M E

C H

A N

IC

A

L N

O T

E S

L

E G

E N

D

S Y

M B

O L

S

A B

B R

E V

IA

T

IO

N

S

2 3 4 5 6 7 81

G

F

E

D

C

B

A

130 131 132

125A

J

4.3 5.5

N

H U

R L

B U

R T

F

IE

L D

F

L O

R

ID

A M

T F

P R

O J E

C T

N O

F

T E

V

M O

B

IL

E D

IS

T

R

IC

T M

O B

IL

E

A

L A

B A

M A

Mobile District

US Army Corps of

Engineers ®

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R N

O

U S

A R

M Y

C O

R P

S

G

IN

E E

R S

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

FILE:

DATE:

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y

M O

B U

R N

S

M c D

O N

N E

L L

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L E

S

IZ

E x

F

IL

E N

A M

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

P R

O J E

C T

N U

M B

E R

C A

D D

C O

D E

A P

R

IL

W

R

F T

E V

M E

F

A P

R

IL

A

KEY PLAN

NOT TO SCALE

B

A

M A

S H

E K

4/16/2020 9:57:45 AM

/1

'-0

L

D A

N A

H E

R

J.

M cG

IN

T Y

R

JO

R

D A

N

M-100-0006

M -1

-0

M-100

M E

C H

A N

IC

A

L P

L A

N

O V

E R

A L

L

N

SPACE SCHEDULE

NUMBER NAME

101 MTF CLASSROOM 4

102 MQTP CLASSROOM 4

103 MQTP CLASSROOM 3

104 MQTP CLASSROOM 2

105 MTF CLASSROOM 1

106 MTF CLASSROOM 2

107 MQTP CLASSROOM 6

108 MQTP CLASSROOM 5

109 WLT CLASSROOM

110 MTF CLASSROOM 3

111 MQTP CLASSROOM 1

112 POTFF WAITING

113 COUNSELING OFFICE

114 COUNSELING OFFICE

115 POTFF GROUP ROOM

116 STOR

117 MQTP/ MTF STORAGE

118 CONFERENCE

120 SUPERINTENDENT WSS

121 WINGS WEAPON MANAGER

122 MQTP/ MTF STORAGE

123 VR CLASSROOM 2

124 VR CLASSROOM 1

125 LSC OPEN OFFICE

125A SLC OPEN OFFICE

126 COPY

127 MOTHERS ROOM

128 BREAK

130 SECTION CHIEF MQTP

131 SECTION CHIEF MTF

132 SCHEDULER

133 INSTRUCTOR OPEN OFFICE

134 JAN

135 MENS RESTROOM

136 WOMENS RESTROOM

137 VEST

138 VEST

139 Space

140 VEST

141 CORRIDOR

142 CORRIDOR

143 CORRIDOR

144 VEST

145 CORRIDOR

146 CORRIDOR

201 TRAINING BAY

202 COMM

203 ELEC

204 FIRE PUMP

205 MECHANICAL

206 CTK STORAGE

207 C-130 TRAINING BAY STORAGE

GENERAL NOTES

1. SEE SHEET M-001 FOR MECHANICAL GENERAL

NOTES, SYMBOLS AND ABBREVIATIONS.

SCALE: 1/16" = 1'-0"A1

FIRST FLOOR - HVAC PLAN - OVERALL

SCALE IN FEET

0 8' 16' 32'

121 120

125A

2 3 4 5 6

H

G

F

EF-104

VAV-101

VAV-102

VAV-103VAV-104

VAV-117 VAV-118

VAV-119

VAV-115

VAV-116

VAV-120

VAV-122

VAV-123

VAV-121

VAV-109VAV-111

VAV-112 VAV-110

VAV-108

VAV-107

VAV-113

VAV-105

VAV-114

VAV-106

MATCHLINE SEE SHEET M-102 FOR CONTINUATION

20"ø SA

"ø

S A

18"ø SA

14"ø SA

14"ø SA

10"ø SA

10"ø SA

"x

R A

36"x12" RA

22"ø SA

J

4.3 5.5

(4)90-6"ø

SA-A

(2)150-8"ø

SA-A

(2)155-8"ø

SA-A

(2)125-8"ø

SA-A

(12)75-6"ø

SA-A

8"x6" SA

10"x10" SA

8"x6" SA

12"x10" SA 8"x6" SA

8"x6" SA 14"x14" SA

10"ø SA

10' - 8" BOD EL

(6)115-6"ø

SA-A

10"x10" SA

12"x12" SA

10"ø SA

10' - 1" BOD EL

(2)65-8"ø

SA-A

(2)65-6"ø

SA-A

(4)120-6"ø

SA-A

100-6"ø

SA-A

145-8"ø

SA-A

100-8"x8"

RA-C

145-8"x8"

RA-C

(2)225-8"ø

SA-A

450-14"x8"

RA-C

(2)175-6"ø

SA-A

12"x10" SA

10"ø SA

(2)45-6"ø

SA-A

90-8"x8"

RA-C

85-6"ø

SA-A

70-6"ø

SA-A

205-8"ø

SA-A

205-10"x10"

RA-C

70-8"x8"

RA-C

(4)95-8"ø

SA-A

(2)110-8"ø

SA-A

50-6"ø

SA-A

55-6"ø

SA-A

70-6"ø

SA-A

70-6"ø

SA-A

70-6"ø

SA-A

(8)85-6"ø

SA-A

(4)200-8"x8"

RA-C

300-10"x10"

RA-C

130-8"x8"

RA-C

(4)75-6"ø

SA-A

50-8"ø

SA-A

480-12"x8"

RA-C

26"x11" RA

6"x6" SA

11' - 11" BOD EL

16"x11" RA

11' - 1" BOD EL

120"x96"

EA-L04

12"x10" SA

12"x8" SA

6"x6" SA

85-12"x8"

RA-C 10"x8" SA

12"x12" SA

10"x8" SA

8"x8" RA

12"x12" RA

10"x10" SA

8"ø SA

12"x12" RA

50-6"ø

SA-A 10"x10" SA

150-12"x12"

RA-C

360-10"x10"

RA-C

(2)50-8"ø

SA-A

8"x10" SA

8"ø SA

10"x10" SA

70-10"x10"

RA-C

250-10"x10"

RA-C

8"x8" SA

420-10"x10"

RA-C

12"x8" SA

8"x8" SA

250-6"ø

SA-B 8"x6"…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .