AM02 DRAWINGS.pdf
PDF 8 MB Posted
- Solicitation number
- W9127820R0077
About this file
This document outlines requirements for a federal contract opportunity to construct a maintenance training facility at Hurlburt Field, Florida. Key details include constructing a 36,800 square foot high bay facility with concrete foundation, steel frame, masonry walls and sloped metal roof. Functional areas specified are for a weapons load trainer, C-130 aircraft space, classrooms, storage and support facilities. Additional requirements encompass utilities, site work, communications and special conditions for unsuitable material removal and fill. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Mobile.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AM05.pdf | ||
| AM04.pdf | ||
| AM03.pdf | ||
| AM02.pdf | ||
| AM01.pdf | ||
| W9127820R0077 EM 385-1-1.pdf | ||
| W9127820R0077 RTA DRAWINGS VOL2.pdf | ||
| W9127820R0077 VOL2.PDF | ||
| W9127820R0077 VOL4.PDF | ||
| W9127820R0077 VOL1.PDF | ||
| W9127820R0077 VOL3.PDF | ||
| W9127820R0077 RTA DRAWINGS VOL 1.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
MOBILE DISTRICT
109 SAINT JOSEPH STREET
MOBILE AL 36602
FTEV153007
SOF MAINTENANCE TRAINING FACILITY
HURLBURT FIELD, FLORIDA
OKALOOSA COUNTY
JUNE 2020
SMALL BUSINESS SET ASIDE
MOBILE DISTRICT PROJECT CODE: MEF20006
RFP NUMBER: W9127820R0077
AMENDMENT NO. 0002
GENERAL PROJECT NOTES:
1. NOT USED.
2. CONTRACTORS SHALL KEEP ALL ROADS AND STREETS CLEAN OF
CONSTRUCTION DEBRIS, MUD, ETC. AT ALL TIMES. CONTRACTOR SHALL
PROVIDE EQUIPMENT AND PERSONNEL TO CLEAN ANY STREETS AS
REQUESTED BY THE CONTRACTING OFFICER. CONTRACTOR IS
RESPONSIBLE FOR ALL REPAIRS TO STREETS, PARKING AREAS, AND
BASE OR GOVERNMENT PROPERTY, DUE TO DAMAGE BY THEIR
CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL PROVIDE
PHOTOGRAPHS AND/OR VIDEO RECORDING OF THE EXISTING
CONDITIONS. CONTRACTOR SHALL COORDINATE WITH THE
CONTRACTING OFFICER FOR A PRECONSTRUCTION VIDEO DETAILING
THE EXISTING CONDITION OF ACCESS POINTS, HAUL ROUTES, AND
LAYDOWN AREAS TO BE PERFORMED. SEE SPEC SECTION 01 00 00.
3. CONTRACTOR SHALL CONNECT TO EXISTING OR NEW FIRE HYDRANTS
FOR TEMPORARY CONSTRUCTION WATER. INSTALL QUICK DISCONNECT,
BACK FLOW PREVENTOR, AND SHUT OFF VALVE WITH METER ON 2
HOSE CONNECTION ONLY. BFP MUST HAVE CURRENT INSPECTION TAG
AND BE APPROVED BY THE CE / FIRE DEPARTMENT PRIOR TO
CONNECTING TO ANY BASE FIRE HYDRANT.
4. HURLBURT AIRFIELD BASE CIVIL ENGINEERING FORM AF-103 DIG PERMIT
SHALL BE OBTAINED FROM THE CE OFFICE FOR APPROVAL
SIGNATURES. THIS MAY TAKE APPROXIMATELY 3 WEEKS OR MORE TO
COMPLETE. UPON COMPLETION CONTRACTOR SHALL CALL SUNSHINE
ONE-CALL FOR UTILITY LOCATE SERVICES AT 1-800-522-6543.
5. CONTRACTOR IS REQUIRED TO FILE FAA FORM 7460 IN REFERENCE TO
THE CONTRACTOR'S SITE CONSTRUCTION EQUIPMENT. MAXIMUM
EQUIPMENT HEIGHT IS 150-FEET. CONTRACTOR SHALL COORDINATE
WITH HURLBURT BASE CE OFFICE FOR ANY TEMPORARY AIRFIELD
WAIVERS. REQUEST LOCAL AIRFIELD CONSTRUCTION WAIVERS FROM
CONTRACTING OFFICER, HURLBURT CE OFFICE, AND AIRFIELD
OPERATIONS AT LEAST 45-60 DAYS PRIOR TO CONSTRUCTION ACTIVITY
START DATE. LOCAL AIRFIELD CONSTRUCTION WAIVERS WILL BE
APPROVED AFTER THE CONTRACTOR HAS RECEIVED FAA
APPROVAL/DETERMINATION.
6. CONTRACTOR SHALL COMPLETE THE STORMWATER POLLUTION
PREVENTION PLAN (SWPPP). REFER TO THE SPECIFICATIONS FOR
DETAILS ON STORMWATER POLLUTION PREVENTION MEASURES FOR
THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR FOLLOWING ALL
FLORIDA DEP REQUIREMENTS FOR EROSION CONTROL. THIS PROJECT
SHALL BE CONSTRUCTED IN COMPLIANCE WITH PART 91 OF ACT 451 OF
1994, AS AMENDED. THE SOIL EROSION AND SEDIMENT CONTROL ACT.
CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL
REQUIREMENTS WITH STATE AND LOCAL AUTHORITIES AND
DOCUMENTS TO BE SUBMITTED FOR PERMITTING.
7. THE STABILIZED CONSTRUCTION ENTRANCE LOCATION, AS SHOWN
SHALL BE INSTALLED BY THE CONTRACTOR AND COORDINATED AND
APPROVED BY THE CONTRACTING OFFICER.
8. CONTRACTOR SHALL STOP WORK IMMEDIATELY AND CONTACT THE
CONTRACTING OFFICER IF A UTILITY LINE IS DISTURBED.
9. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED
PERSONNEL OF STATE, LOCAL, AND GOVERNMENT REGULATORY
AGENCIES AND THE CONTRACTING OFFICER.
10. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS
AND SPECIFICATIONS, STATE, LOCAL, AND GOVERNMENT CODES,
ORDINANCES, AND REGULATIONS. IN CASE OF CONTRADICTION OR
DISCREPANCY BETWEEN REQUIREMENTS, CONTRACTOR SHALL
INCORPORATE WHICHEVER IS MOST STRINGENT. WHERE A QUESTION
REMAINS ON WHICH REQUIREMENT IS MOST STRINGENT, CONTRACTOR
SHALL SUBMIT ISSUE TO THE CONTRACTING OFFICER IN WRITING. THE
DECISION OF THE CONTRACTING OFFICER SHALL BE CONSIDERED
FINAL.
11. INSTALL A TEMPORARY FENCE AROUND THE CONSTRUCTION ZONE
STAGING AREA AND LAYDOWN AREAS AS NEEDED FOR SECURITY OF
EQUIPMENT AND MATERIALS AS DIRECTED BY CONTRACTING OFFICER.
SEE DRAWING GC004.
12. COORDINATE THE DISCONNECTION OF UTILITIES THROUGH THE
CONTRACTING OFFICER. DEMOLITION SHALL NOT BEGIN UNTIL WRITTEN
BASE APPROVAL IS RECEIVED. ALL EXISTING UTILITIES ARE TO BE
TERMINATED AT THEIR POINT OF CONNECTION TO THE MAINS. WHERE
CONNECTIONS OF NEW UTILITIES TO EXISTING UTILITIES ARE SHOWN
ON THE PLANS, THE CONTRACTOR SHALL EXPOSE THE EXISTING LINES
AT THE PROPOSED CONNECTIONS TO VERIFY THE LOCATIONS AND
DEPTHS PRIOR TO EXCAVATION FOR THE NEW LINES.
13. THE CONTRACTOR SHALL EXPOSE, VERIFY AND BACKFILL ALL EXISTING
UNDERGROUND UTILITIES AND STRUCTURES AT UTILITY CROSSINGS
PRIOR TO EXCAVATION OF PIPELINE TRENCH. UTILITY CROSSINGS AT A
DEPTH GREATER THAN 12-INCHES BELOW TRENCH BOTTOM DO NOT
NEED TO BE EXPOSED. UTILITY ALIGNMENT AND GRADE MAY BE
CHANGED IF THERE ARE CONFLICTS WITH ANY EXISTING
UNDERGROUND UTILITIES AND STRUCTURES, WHETHER SHOWN ON THE
PLANS OR NOT. COORDINATE WITH THE CONTRACTING OFFICER AND
DESIGN ENGINEER.
14. FACILITIES IN THE UTILITY CORRIDOR SHALL BE RESTORED UPON
COMPLETION OF CONSTRUCTION. PAVEMENTS, FENCES, VEGETATION,
AND OTHER LANDSCAPING SHALL BE REPLACED IN LIKE KIND TO THE
ORIGINAL FEATURES AND TO THE APPROVAL OF THE CONTRACTING
OFFICER. COORDINATE WITH CONTRACTING OFFICER.
15. CONTRACTOR IS RESPONSIBLE FOR MOWING AND MAINTAINING ALL
AREAS WITHIN THE FENCED PROJECT LIMITS. FROM
NOTICE-TO-PROCEED DATE THROUGH THE DURATION OF THE PROJECT.
MOW TO A MAXIMUM AVERAGE HEIGHT OF 3-INCHES FOR
SPRING/SUMMER MAINTENANCE AND 6-INCHES FOR FALL/WINTER
MAINTENANCE.
16. EROSION CONTROL DEVICES SHALL BE USED FOR THE STAGING AREA
AND ANY MATERIAL STOCK PILES WHEN NECESSARY TO CONTROL
EROSION AND STORM WATER RUNOFF, IN ACCORDANCE WITH ALL
FEDERAL, STATE, AND LOCAL REGULATIONS.
ACCESS AND SAFETY NOTES:
1. THE GENERAL CONTRACTOR'S WORKING HOURS, AND ACCESS TO THE
SITE IS FROM 0600 - 1800 LOCAL TIME, MONDAY THRU FRIDAY, EXCEPT
ON FEDERAL HOLIDAYS OR ASSOCIATED MILITARY DOWN DAYS.
CONSTRUCTION ACCESS TO THE PROJECT SITE SHALL BE THROUGH
THE COMMERCIAL VEHICLE GATE ON DOWNS ROAD. SEE DRAWING
GC003.
2. ACCESS TO THE PROJECT FOR ALL CONTRACTOR PERSONNEL,
VEHICLES, AND EQUIPMENT IS ILLUSTRATED ON GC003. ACCESS
ROUTES MAY BE SUBJECT TO CHANGE BASED ON OPERATIONAL
REQUIREMENTS ON BASE. POTENTIAL SCHEDULE IMPACTS SHALL BE
COORDINATED WITH THE CONTRACTING OFFICER.
3. THE EXISTING BASE ROAD SPEED LIMITS AND LOAD LIMITS ARE
STRICTLY ENFORCED. ALL CONCRETE TRUCKS SHALL PUT DOWN
EXTRA AXLES WHEN TRAVELING ON HURLBURT AIRFIELD PROPERTY.
4. CONTRACTOR SHALL PROVIDE AND INSTALL A PROFESSIONALLY
PAINTED SIGN, MEETING CONTRACTING OFFICER APPROVAL, AT THE
CONSTRUCTION ENTRANCE TO DIRECT MATERIAL SUPPLIERS AND
EMPLOYEES TO THE CONSTRUCTION SITE. CONTRACTOR SHALL
PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE CONTRACTING
OFFICER REGARDING OVERSIZED OR CONSTRUCTION DELIVERIES TO
THE HURLBURT AIRFIELD COMMERCIAL TRUCK GATE PRIOR TO THOSE
DELIVERIES. DELIVERIES SHALL BE SCHEDULED MONDAY - FRIDAY, 0600
TO 1800. CONTRACTOR SHALL COORDINATE DELIVERIES WITH BASE
SECURITY FORCES BY SUBMISSION OF THE CORRECT ENTRY PASS
PAPERWORK VIA THE CONTRACTING OFFICER.
5. EXISTING BASE ROADS USED AS HAUL ROADS SHALL BE MAINTAINED
SUCH THAT UNOBSTRUCTED ACCESS WILL BE PROVIDED AT ALL TIMES
FROM THE ROAD TO THE STAGING AREA AND FROM THE STAGING AREA
TO THE WORK SITE AND FACILITATE GOVERNMENT ACCESS TO THE
BASE AT ALL TIMES. THE MAINTENANCE OF HAUL ROADS SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR AT NO ADDITIONAL COST TO THE
GOVERNMENT. THE HAUL ROAD LOCATIONS SHALL BE AS INDICATED ON
THE DRAWINGS AND APPROVED BY THE CONTRACTING OFFICER.
CONTRACTOR IS REQUIRED TO IMMEDIATELY CLEAN ANY DEBRIS
DEPOSITED ONTO THE SITE, ROADS, ETC FROM CONTRACTOR'S
EQUIPMENT OR OPERATIONS. MATERIAL DROPPED WITHIN THESE
AREAS SHALL BE CONTINUOUSLY REMOVED BY SURFACE SWEEPERS
OR OTHER APPROVED METHODS DURING WORKING HOURS.
CONTRACTOR TO MAINTAIN ONE FULLY OPERATIONAL STREET
SWEEPER/VAC TRUCK ON SITE AT ALL TIMES.
6. CONTRACTOR SHALL COORDINATE ACTIVITIES THROUGHOUT THE
PROJECT IN A MANNER THAT ALLOWS EMERGENCY ACCESS TO ALL
EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAYS TO EMERGENCY
VEHICLE'S RESPONSE TIME.
7. ALL CONTRACTOR VEHICLES AND PERSONNEL MAY BE SEARCHED BY
HURLBURT AIRFIELD SECURITY POLICE WHEN ENTERING THE BASE AND
MAY EXPERIENCE DELAYS. ALL PERSONNEL ENTERING HURLBURT
AIRFIELD MUST HAVE A VALID PHOTO ID PER BASE SECURITY
REQUIREMENTS. ALL VEHICLES ENTERING THE BASE MUST HAVE
CURRENT/VALID REGISTRATION, CURRENT/VALID INSURANCE, AND
CURRENT/VALID DRIVER'S LICENSE FOR THE OPERATOR. ALL
CONTRACTOR VEHICLES AND PERSONNEL SHALL BE RESPONSIBLE FOR
COORDINATING WITH THE BASE SECURITY OFFICER IN OBTAINING
PROPER SECURITY CLEARANCE AND BADGING PRIOR TO ENTERING
SECURE AREAS.
8. CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER'S
REPRESENTATIVE CONCERNING ANY GOVERNMENT-OWNED EQUIPMENT
REQUIRING RELOCATION TO COMPLETE PROJECT WORK.
9. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, THE
CONTRACTOR'S CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE
PARKED WITHIN THE STAGING AREA OR FENCED CONSTRUCTION AREA.
10. ALL AREAS DISTURBED BY ANY CONSTRUCTION ACTIVITIES INCLUDING
BORROW AREAS, STOCKPILE AREAS, MATERIAL LAYDOWN , EQUIPMENT
PARKING, CONTRACTOR PARKING, EARTHWORK ACTIVITIES, UTILITY
TRENCHING, OVERHEAD UTILITY WORK, ETC SHALL BE RESTORED TO
EXISTING CONDITIONS. AS APPROVED BY THE CONTRACTING OFFICER
REPRESENTATIVE (COR) AT THE COMPLETION OF CONSTRUCTION.
11. CONTRACTOR SHALL PROVIDE ALL NECESSARY WATER AND TOILET
FACILITIES FOR HIS WORKERS WITHIN THE CONSTRUCTION ZONE.
CONTRACTOR WORKERS SHALL NOT USE GOVERNMENT FACILITIES
UNLESS SPECIFICALLY INDICATED OTHERWISE. LOCATIONS OF
FACILITIES SHALL BE COORDINATED WITH CONTRACTING OFFICER.
12. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO
CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER, POLICE, LOCAL FIRE AUTHORITY, AND ALL
OTHER EMERGENCY SERVICES OF THE CLOSURE AT LEAST 21 DAYS IN
ADVANCE FOR APPROVAL. SEE NOTE 6 UNDER TRAFFIC CONTROL.
COORDINATION AND COMMUNICATION DURING
CONSTRUCTION:
1. CONTRACTOR SHALL APPOINT A PROJECT MANAGER AND
CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE
CONTRACTING OFFICER, WHO SHALL BE PRESENT ON THE
CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS WHILE
JOB IS IN PROGRESS. THE PROJECT MANAGER SHALL BE DESIGNATED
THE RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO SHALL BE
AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S
REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN
ALTERNATE REPRESENTATIVE SHALL BE PROVIDED.
TRAFFIC CONTROL:
1. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL CORDON OFF THE
WORK AREAS AND STREET CROSSINGS BY USING BARRICADES
APPROVED BY THE CONTRACTING OFFICER.
2. ALL CONSTRUCTION EQUIPMENT AND CONTRACTOR CONSTRUCTION
VEHICLES SHALL BE MARKED WITH COMPANY PAINTED DESIGNS,
INSIGNIAS OR OTHER COMPANY MARKINGS, WHICH ARE CLEARLY
VISIBLE.
3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING
DEVICES TO SOUND AN ALARM WHEN MOVING IN REVERSE.
4. ONLY RUBBER-TIRED VEHICLES SHALL BE ALLOWED ON EXISTING
PAVEMENT THAT IS TO REMAIN.
5. NON-CONSTRUCTION PEDESTRIAN TRAFFIC SHALL NOT BE ALLOWED
INSIDE THE CONSTRUCTION FENCE LIMITS.
6. CONTRACTOR SHALL PROVIDE A MINIMUM 21 DAY NOTICE TO HURLBURT
AIRFIELD CE OFFICE AND THE CONTRACTING OFFICER PRIOR TO ANY
REQUESTED ROAD CLOSURE. THE 21 DAY ADVANCE NOTICE DOES NOT
MEAN THE REQUEST WILL BE AUTOMATICALLY APPROVED. THE 21 DAYS
PROVIDES NECESSARY TIME FOR BASE CE TO COORDINATE AND VERIFY
IF CLOSURE IS ACCEPTABLE. CONTRACTOR SHALL WORK WITH THE
BASE CE AND CONTRACTING OFFICER TO FINALIZE DATES IF THE BASE
HAS CONFLICTS WITH OTHER ACTIVITIES.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING AND
SUBMITTING OUTAGE REQUEST WITH BASE CE OFFICE FOR ANY WORK
BLOCKING TEN OR MORE EXISTING PARKING SPACES.
EQUIPMENT AND STOCKPILE HEIGHT:
1. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO
PREVENT ITS MOVEMENT BY WIND FORCES.
2. TEMPORARY OBSTRUCTIONS, SUCH AS CRANES, MUST BE MARKED AND
LIGHTED IN ACCORDANCE WITH FAA AC 70/7460. ALL HAZARDOUS AREAS
(SUCH AS EXCAVATIONS OR STOCKPILED MATERIALS) MUST BE
DELINEATED WITH LIGHTED BARRICADES ON ALL EXPOSED (VISIBLE OR
ACCESSIBLE) SIDES. CONTRACTOR SHALL PROVIDE ALL NECESSARY
INFORMATION TO THE BASE CE FOR CONSTRUCTION CRANES,
EQUIPMENT, AND RELATED EQUIPMENT, AND RELATED ACTIVITIES. ALL
FORMS SHALL BE APPROVED PRIOR TO USING OR BRINGING EQUIPMENT
ON SITE. BASE CE TO SUBMIT 7460 FORMS TO FAA FOR PERMANENT
BUILDING. CONTRACTOR TO SUBMIT 7460 FORMS TO FAA FOR ALL
TEMPORARY CONSTRUCTION.
3. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT
OPERATING IN AN AIRCRAFT OPERATIONS AREA IS GOVERNED BY FAA
AC 150/5370-2F AND AC 150/5300-13A (CURRENT EDITIONS). TEMPORARY
OBSTRUCTIONS, SUCH AS CRANES AND EQUIPMENT LESS THAN 150'-0"
IN HEIGHT REQUIRE ADDITIONAL LOCAL APPROVAL AS WELL AS FAA
7460 APPROVAL. COORDINATE WITH CONTRACTING OFFICER AND BASE
CE OFFICE FOR LOCAL OBSTRUCTION APPROVAL. WHEN EQUIPMENT IS
EXPECTED TO PENETRATE THE AIRFIELD APPROACH SURFACES OR
WHEN CRANES WILL BE USED ON-SITE, CONTRACTOR SHALL PROVIDE A
MINIMUM NOTICE OF 45-60 DAYS TO THE CONTRACTING OFFICER AND
BASE AIRFIELD OPERATIONS PRIOR TO THE START OF CONSTRUCTION
TO COORDINATE THE SUBMITTAL OF FAA FORM 7460 TO THE FAA
REGIONAL OFFICE. PERMISSION TO USE CRANES SHALL BE ISSUED BY
BASE AIRFIELD OPERATIONS AND THE CONTRACTING OFFICER AFTER
APPROVAL BY THE FAA. SEE SPEC SECTION 01 00 00.
4. OBSTRUCTION LIGHT FIXTURES SHALL BE AVIATION RED INCANDESCENT
STEADY BURNING FAA AC 150/5345-43, TYPE L-810. AIR FORCE POLICY
DOES NOT ALLOW USE OF LED FIXTURES FOR OBSTRUCTION LIGHTING.
5. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL HAVE
BOOMS OR ARMS LOWERED TO THEIR LOWEST ELEVATION.
6. CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION MATERIALS,
SPOILS, OR DEBRIS IN ANY AREA WHERE SUCH STOCKPILES WOULD
PENETRATE AVIATION SURFACES. A 360 DEGREE RED OBSTRUCTION
LIGHT SHALL BE PLACED AT THE HIGHEST POINT OF THE STOCKPILE.
STOCKPILING OF MATERIAL WITHIN THE AIRFIELD SAFETY AREAS IS
PROHIBITED.
EXCAVATION AND TRENCHES:
1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF
OSHA REGULATIONS, THE STATE OF FLORIDA LAWS CONCERNING
EXCAVATION, AND USACE EM 385-1-1 SAFETY AND HEALTH
REQUIREMENT MANUAL.
2. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE
SHALL BE PROMINENTLY MARKED WITH ORANGE BARRICADES WITH
FLASHING RED LIGHTS ACCEPTABLE TO THE CONTRACTING OFFICER.
3. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 72 HOURS TO THE
CONTRACTING OFFICER AND ASSOCIATED UTILITY COMPANIES AND
AGENCIES BEFORE PROCEEDING WITH ANY EXCAVATION.
4. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND AND
READY FOR PLACING THEREIN. AS SOON AS POSSIBLE AFTER THE
MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL AND
COMPACT TRENCHES AS SPECIFIED.
5. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE
REQUIRED, SEE GEOTECHNICAL BORING LOGS.
6. STRUCTURES AND UTILITIES TO BE REMOVED SHALL BE BACKFILLED IN
ACCORDANCE WITH THE SPECIFICATIONS.
OTHER SAFETY REQUIREMENTS:
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
REGULATIONS AND USACE SAFETY MANUAL EM 385-1-1.
2. CONTRACTOR SHALL MAINTAIN AT ALL TIMES ONE FIRE LANE FREE
FROM OBSTRUCTION AND MAINTAIN ACCESS TO AND THROUGH THE
SITE, AND SURROUNDING ROADS AND STREETS.
3. CONTRACTOR SHALL OBTAIN A BURN PERMIT FROM THE FIRE
DEPARTMENT PRIOR TO PERFORMING ANY WELDING ON SITE
4. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS DAILY AND
PRIOR TO LEAVING THE SITE EACH DAY TO REMEDY ANY SAFETY
CONCERNS IMMEDIATELY.
5. THERE SHALL BE NO PERMANENT WASTE SITES ON BASE PROPERTY.
ANY TEMPORARY WASTE AREA (10 DAYS OR LESS) SHALL BE APPROVED
BY THE CONTRACTING OFFICER AND SHALL BE KEPT IN AN ORDERLY
CONDITION. REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED
IS SUBJECT TO THE DIRECTION OF THE CONTRACTING OFFICER.
6. CONTRACTOR SHALL COORDINATE THE RELOCATION AND SALVAGE OF
ANY GOVERNMENT OWNED EQUIPMENT WITH THE CONTRACTING
OFFICER.
7. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO
CONTROL/PREVENT DUST CAUSED BY CONSTRUCTION ACTIVITIES TO A
LIMIT ACCEPTABLE TO BASE OPERATIONS. THE CONTRACTOR SHALL
CONTROL/PREVENT BLOWING DUST ON THE PROJECT SITE FROM ANY
HAUL ROUTE OR WORK AREA REGARDLESS OF SOURCE.
8. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING
FROM CONTRACTOR'S OPERATIONS OR ACTIVITIES SHALL BE PROPERLY
DISPOSED OF IN ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL
REGULATORY REQUIREMENTS AND PROPERLY REMOVED FROM THE
PROJECT PROPERTY. IF HAZARDOUS MATERIALS ARE ENCOUNTERED
OR UNCOVERED DURING CONSTRUCTION ACTIVITIES, THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
9. FAILURE TO COMPLY WITH BASE OPERATIONS AND THE CONTRACTING
OFFICER SAFETY REQUIREMENTS SHALL RESULT IN THE SUSPENSION
OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE
ADDRESSED BY THE CONTRACTOR TO THE SATISFACTION OF THE
CONTRACTING OFFICER.
10. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY
PLAN OR BASE OPERATIONS SHALL IMMEDIATELY BE REMOVED FROM
THE WORK AREA AND SHALL NOT BE PERMITTED TO RETURN
THROUGHOUT THE REMAINDER OF THE PROJECT.
11. ALL TEMPORARY CONSTRUCTION LIGHTING SHALL BE COORDINATED
WITH HURLBURT FIELD SECURITY FOR APPROVAL OF LOCATIONS,
HEIGHT, AND DIRECTION.
12. CONTRACTOR SHALL PROVIDE KEY ACCESS TO ALL CONSTRUCTION
GATES TO THE BASE FIRE DEPARTMENT DURING CONSTRUCTION.
COORDINATE ACCESS PADLOCKS AND KEYS WITH THE CONTRACTING
OFFICER.
CONTRACTOR SAFETY PLAN SUBMITTALS:
1. CONTRACTOR SHALL FURNISH A CONSTRUCTION SAFETY
PLAN IN ACCORDANCE WITH THE SPECIFICATIONS AND USACE
H U
R L
B U
R T
F
I E
L D
F
L O
R I D
A
M O
B I L E
D
S
T R
I C
T
M O
B I L E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
U S
A
M
Y
C
O R
P
O
E N
G I N
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
H O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
C
T
Y
M
O
B U
R N
M c D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
B
Y
P L O
T
S
C A
L E
S I Z
E x
F I
N
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
A P
R I L
W
R
F T
E V
M E
F
A P
R I L
M T
F
P R
O J E
F
T E
V
AMENDMENT 0002
GC005
G E
N E
R A
L
C
O N
S T
R U
C T
I O
N
N
O T
E S
C
F
R A
N Z
E N
S
W
I E
D E
L
M T
F G
C
D
W G
R
B
A R
U T
H
A
M
A S
H E
K
A M
E N
D M
E N
T
R
E V
I S
C
E S
S
A
F
E T
Y
N
O T
E
T
E X
T
GENERAL NOTES:
1. ALL DIMENSIONS, ELEVATIONS, AND STATIONS ARE IN FEET UNLESS
INDICATED.
2. ALL PIPE SIZES ARE IN INCHES UNLESS INDICATED OTHERWISE.
3. CALLOUTS, COORDINATES, ELEVATIONS, AND DIMENSIONS ARE
POINTED TO OR MEASURED TO STRUCTURE CENTER, EDGE OF
PAVEMENT, BACK OF CURB, OR OUTSIDE FACE OF FOUNDATION
WALL, UNLESS INDICATED OTHERWISE.
4. SEE DRAWING V-100 FOR SURVEY CONTROL.
EXISTING CONDITION NOTES:
1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS
INDICATED HAVE BEEN OBTAINED FROM EXISTING RECORDS AND
FIELD SURVEYS. UNDERGROUND STRUCTURES AND UTILITIES MAY
BE PRESENT WHICH ARE NOT DOCUMENTED OR LOCATED.
2. THE CONTRACTOR SHALL FIELD-CHECK ALL EXISTING CONDITIONS
AND BE THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK
COMMENCES. ANY DISCREPANCIES IN THE DRAWINGS SHALL BE
IMMEDIATELY REPORTED TO THE COR BEFORE ANY FURTHER
WORK COMMENCES.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY
EXISTING STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND
TO TAKE NECESSARY PRECAUTIONS DURING DEMOLITION AND
CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTENCE AND
MARK LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE
CONNECTIONS TO UNDERGROUND UTILITIES PRIOR TO BEGINNING
WORK. CONTRACTOR SHALL CONTACT THE COR AND ALL
ASSOCIATED UTILITY COMPANIES AND AGENCIES TO IDENTIFY THE
LOCATION OF UTILITIES. THERE IS NO GUARANTEE, EITHER
EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE AND TYPE OF
MATERIAL OF EXISTING UNDERGROUND UTILITIES INDICATED ARE
REPRESENTATIVE OF THOSE TO BE ENCOUNTERED DURING
CONSTRUCTION.
4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE
COR OF OPERATIONAL PLANS. IN THE EVENT AN UNEXPECTED
UTILITY OR STRUCTURE INTERFERENCE OR CONFLICT IS
ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE COR. ANY UTILITY SERVICES OR
STRUCTURES DISTURBED BY THE CONTRACTOR'S OPERATIONS
SHALL BE RESTORED IMMEDIATELY AT CONTRACTOR'S EXPENSE TO
THE SATISFACTION OF THE COR.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT
TO BE DAMAGED DURING DEMOLITION AND CONSTRUCTION. THE
CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED OR
DISTURBED ITEMS TO THE SATISFACTION OF THE COR.
GENERAL DEMOLITION NOTES:
1. ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY
MATERIALS SHALL BE DISPOSED OF OFF BASE IN ACCORDANCE
WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS. DISPOSAL
AREAS FOR RUBBLE, UNSUITABLE EXCESS SOIL MATERIALS OR
OTHER CONSTRUCTION DEBRIS ARE NOT AVAILABLE ON THE BASE
FOR THE CONTRACTORS USE. DISPOSAL IS THE RESPONSIBILITY OF
THE CONTRACTOR AT SITES OFF GOVERNMENT CONTROLLED
LANDS.
2. SEE SHEET GC009 BORROW\MATERIAL NOTE FOR MUCK SOIL
MATERIAL DISPOSAL.
3. LOCATIONS NOTED FOR DEBRIS REMOVAL MAY CONTAIN ANY OF
THE FOLLOWING MATERIALS: AGGREGATE, CONCRETE, ASPHALT,
MASONRY, FOUNDATIONS, REBAR, FENCE MATERIAL, PIPING, AND
MISCELLANEOUS STRUCTURES. LARGE PIECES OF MATERIAL MAY
NEED TO BE CRUSHED AND/OR BROKEN UP FURTHER IN ORDER TO
BE HAULED OFF BASE TO THE WASTE DISPOSAL SITE.
4. CONTRACTOR SHALL COORDINATE LIMITS OF SAWCUT AND
PAVEMENT REMOVAL WITH PROPOSED PAVEMENT LAYOUT AND
JOINTING PLAN. PAVEMENT DESIGNATED FOR SAWCUT SHALL BE
SAWCUT FULL DEPTH AND DOUBLE CUT. EXISTING PAVEMENT
EDGES SHALL BE SAWCUT IN LOCATIONS SHOWN TO PROVIDE
CLEAN EDGE FOR CONSTRUCTION OF PROPOSED PAVEMENT.
5. CONCRETE PAVEMENT REMOVAL LIMITS SHALL BE TO THE NEAREST
EXISTING PAVEMENT JOINT TO THE GREATEST EXTENT POSSIBLE
TO PREVENT PARTIAL PANEL REMOVAL.
6. PAVEMENT REMOVAL SHALL INCLUDE REMOVAL OF PAVEMENT AND
ANY SUBBASE MATERIAL PRESENT.
7. CONTRACTOR SHALL COORDINATE WITH THE COR PRIOR TO
REMOVAL OF EXISTING UTILITIES CURRENTLY IN SERVICE.
RELOCATED UTILITIES SHALL BE CONSTRUCTED BEFORE REMOVAL
OF EXISTING UTILITIES TO ENSURE UNINTERRUPTED SERVICE TO
THE FACILITIES SERVED BY THE UTILITY. ALL RELOCATIONS SHALL
BE COORDINATED WITH THE COR.
8. UTILITY DEMOLITION INCLUDES THE REMOVAL OF THE
PIPE/CONDUIT/STRUCTURE AND ALL PERMEABLE
BACKFILL/ANNULUS MATERIAL AND THEN BACK FILLED WITH LOW
PERMEABILITY MATERIAL.UTILITY CAPPING METHODS SHALL BE IN
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS FOR
SPECIFIC PIPE MATERIAL IN SERVICE. ALL CAPPING SHALL BE
INSPECTED AND APPROVED BY THE COR.
9. STRUCTURES AND UTILITIES TO BE REMOVED SHALL BE REMOVED
IN ACCORDANCE WITH 02 41 00 AND BACKFILLED IN ACCORDANCE
WITH SPECIFICATION 31 00 00.
10. SEE SHEET GC008 FOR ENVIRONMENTAL AND RESOURCE NOTES.
GENERAL SITE NOTES:
1. BUILDING COORDINATES ARE INDICATED TO OR MEASURED AT THE
CENTER OF BUILDING COLUMNS. CONTRACTOR SHALL
COORDINATE BEARINGS OF BUILDING GRID LINES WITH
STRUCTURAL DRAWINGS.
2. CONTRACTOR SHALL COORDINATE BUILDING ENTRANCES,
EGRESSES, WALKWAYS, AND DOORWAY LOCATIONS WITH
ARCHITECTURAL AND STRUCTURAL SHEETS. STOOPS AND
SIDEWALKS SHALL BE CENTERED ON DOORS.
3. SEE MECHANICAL AND ELECTRICAL SHEETS FOR MISCELLANEOUS
SITE EQUIPMENT DETAILS. SEE STRUCTURAL SHEETS FOR
EQUIPMENT PAD DETAILS.
GENERAL UTILITY NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL BUILDING
CONNECTIONS WITH BUILDING CONTRACTOR AND THE
INFORMATION PROVIDED ON MECHANICAL AND ELECTRICAL
SHEETS.
2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING CATHODIC
PROTECTION FOR THE UTILITY SYSTEMS, COMPLYING WITH THE
RECOMMENDATIONS OF A REGISTERED CATHODIC PROTECTION
ENGINEER, BASED ON THE SITE SOIL CONDITIONS.
3. CONTRACTOR SHALL CONTACT AND SUBMIT AF IMT 103 DIG PERMIT
TO THE BASE CE OFFICE TO IDENTIFY THE LOCATION OF UTILITIES
PRIOR TO COMMENCEMENT OF WORK.
4. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 30 DAYS FOR
ALL REQUIRED UTILITY SHUTDOWNS FOR UTILITY CONNECTIONS
WITH THE COR.
5. THE MINIMUM DEPTH OF COVER FOR UTILITIES SHALL BE AS
FOLLOWS UNLESS INDICATED OTHERWISE:
a. WATER AND FIRE PROTECTION: 42 INCHES
b. ELECTRICAL AND COMMUNICATION: 24 INCHES
c. ALL OTHER UTILITIES: 36 INCHES
6. ALL EXTERIOR EQUIPMENT SHALL BE PAINTED BROWN TO MATCH
BASE STANDARD.
7. ANY CHANGES TO PROPOSED UTILITY DESIGN SHALL BE
APPROVED BY THE COR IN WRITING.
WATER UTILITY NOTES:
1. THRUST BLOCKS OR JOINT RESTRAINTS ARE REQUIRED AT ALL
TEES, BENDS, OR ELBOWS OF PRESSURIZED PIPING IN
ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, AND
MANUFACTURER'S RECOMMENDATIONS. SEE SHEET CU501 FOR
TYPICAL THRUST BLOCK DETAIL. MECHANICAL JOINT RESTRAINTS
ARE ALLOWED IN AREAS WHERE PROXIMITY OF ADJACENT UTILITIES
OR STRUCTURES WILL MAKE PLACEMENT OF THRUST BLOCKS
DIFFICULT. USE OF JOINT RESTRAINTS SHALL BE APPROVED BY
THE COR.
2. FIRE HYDRANTS SHALL BE INSTALLED A MINIMUM OF 3.00 FEET AND
A MAXIMUM OF 6.00 FEET FROM EDGE OF PAVEMENT OR FACE OF
CURB AND A MINIMUM OF 1.00 FEET FROM EDGE OF SIDEWALK
UNLESS INDICATED OTHERWISE. A RADIUS OF 3.00 FEET AROUND
THE HYDRANT SHALL BE KEPT CLEAR FOR FIRE DEPARTMENT
ACCESS. AREA BETWEEN CURB AND HYDRANTS SHALL BE KEPT
CLEAR OF OBSTRUCTIONS. FIRE HYDRANTS SHALL BE PAINTED
MEDIUM BRONZE PER SPECIFICATIONS AND FITTED WITH STORTZ
CONNECTIONS.
3. CONTRACTOR CANNOT OPEN OR CLOSE ANY WATER VALVES
WITHOUT PRESENCE OF BASE CE WATER SHOP REPRESENTATIVE.
CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 10 DAYS OF
THIS.
SANITARY UTILITY NOTES:
1. ALL SANITARY SEWER BUILDING CONNECTIONS ARE TO BE MADE
USING 6.00 INCH LINES UNLESS INDICATED OTHERWISE.
2. ALL SANITARY LINES ARE TO BE LAID AT A UNIFORM SLOPE FROM
THE BUILDING CONNECTIONS TO THE CONNECTING SEWER AND
BETWEEN UTILITY STRUCTURES.
3. SEE DETAILS FOR CONCRETE SEWER ENCASEMENT DETAIL WHERE
SANITARY SEWER WILL BE INSTALLED ABOVE WATER LINES. SEE
SPECIFICATIONS FOR ADDITIONAL CLEARANCE REQUIREMENTS FOR
SANITARY PIPING.
4. MANHOLES INDICATED ON SANITARY LINES SHALL HAVE A 2.00 INCH
DROP IN ELEVATION BETWEEN THE INCOMING AND OUTGOING
SEWER SHALL BE PROVIDED IN EACH MANHOLE UNLESS INDICATED
OTHERWISE. INVERT FLOW CHANNELS SHALL BE CONSTRUCTED TO
PROVIDE SMOOTH AND UNIFORM SLOPE WITH GRADUAL
TRANSITION SECTIONS.
UTILITY STRUCTURE NOTES:
1. ALL LANDSIDE UTILITY STRUCTURES ARE TO BE H-20 RATED.
a. CONTRACTOR SHALL SUBMIT STRUCTURAL DRAWINGS, DESIGN
CALCULATIONS, AND WATERPROOFING METHOD, DESIGNED BY
A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF
FLORIDA FOR APPROVAL.
2. MANHOLE RIM ELEVATION SHALL BE FLUSH WITH FINAL GRADE.
3. COVERS AND CASTINGS OF MANHOLES AND STRUCTURES SHALL BE
STAMPED PER THE APPROPRIATE UTILITY TYPE OR PER THE LOCAL
STANDARDS, AND SHALL BE STAMPED PER THE ORIGIN OF
MANUFACTURE.
4. COVERS AND CASTINGS SHALL BE TAMPER-PROOF FOR
STRUCTURES LOCATED IN PEDESTRIAN AREAS, EASEMENT AREAS,
AND AREAS WITH SPECIAL SECURITY RESTRICTIONS.
GENERAL GRADING NOTES:
1. BORROW SITES AVAILABLE FOR USE BY CONTRACTOR AT EGLIN
RANGE. SEE DRAWING GC009 - GC011 FOR DETAILS.
2. PROPOSED ELEVATIONS INDICATED ARE FOR TOP OF FINAL GRADE,
PAVEMENT, OR STRUCTURE UNLESS INDICATED OTHERWISE
3. ELEVATION DENOTED AS “MATCH” ARE INTENDED TO MEET
EXISTING GRADE ELEVATIONS. CONTRACTOR SHALL VERIFY
ELEVATIONS AT TIE-INS AND MATCH POINTS PRIOR TO BEGINNING
CONSTRUCTION.
4. EXTERIOR FINISH GRADES AT BUILDING ENTRANCES AND DOORWAY
THRESHOLDS SHALL BE MAXIMUM 0.25 INCHES BELOW BUILDING
FINISH FLOOR IF A VERTICAL THRESHOLD IS PROVIDED, AND SHALL
BE MAXIMUM 0.5 INCHES BELOW BUILDING FINISH FLOOR IF A
BEVELED THRESHOLD IS PROVIDED, UNLESS INDICATED
OTHERWISE. EXTERIOR GRADE SHALL HAVE A 6 INCH DROP
ELSEWHERE UNLESS INDICATED OTHERWISE.
5. ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING
CONSTRUCTION. ANY DRAINAGE FEATURE OR STRUCTURE
DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO
EXISTING CONDITIONS OR BETTER SUBJECT TO THE APPROVAL OF
THE COR.
6. SURFACES AROUND THE FACILITY SHALL BE GRADED TO PROVIDE
POSITIVE DRAINAGE AWAY FROM BUILDINGS AND PAVEMENTS.
7. THE CONTRACTOR SHALL REMOVE STANDING WATER FROM THE
PROJECT WORK LIMITS AS NECESSARY TO PROTECT SUBGRADE,
SUBBASE, AND/OR BASE COURSE OF NEW PAVEMENT,
SURROUNDING PAVEMENT-TO-REMAIN, OR OTHER COMPLETED
WORKS.
8. TOP ELEVATION OF ALL UTILITY STRUCTURES TO REMAIN SHALL BE
ADJUSTED ACCORDINGLY TO FINISH GRADE ELEVATION.
9. ALL AREAS DISTURBED BY CONSTRUCTION NOT BE DESIGNATED
FOR PAVEMENT OR GRAVEL SURFACING SHALL BE COVERED WITH
A MINIMUM 4 INCHES OF TOPSOIL, SODDED, AND
IRRIGATED/MAINTAINED FOR A MINIMUM OF 12 MONTHS OR UNTIL
95% GROUND COVER HAS BEEN ESTABLISHED IN ACCORDANCE
WITH THE SPECIFICATIONS.
10. INSPECTION REPORTS GENERATED BY THE CONTRACTOR AFTER
INSPECTION OF EROSION CONTROL DEVICES SHALL BE SUBMITTED
TO THE COR.
BYPASS PUMPING NOTES (IF NEEDED BASED
ON CONTRACTORS SCHEDULE/ ACTIVITIES):
1. BYPASS PUMPING PLAN: THE CONTRACTOR SHALL PREPARE
BYPASS PUMPING PLANS FOR WORK PERFORMED ON SANITARY OR
INDUSTRIAL WASTE SYSTEMS. THE BYPASS PUMPING PLANS SHALL
DESCRIBE IN DETAIL THE FOLLOWING MINIMUM REQUIREMENTS
FOR THE PROJECT.
A. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
WASTEWATER FLOWS 24 HOURS PER DAY AT ALL TIMES. THE
BYPASS PUMPING PLANS SHALL IDENTIFY AND DESCRIBE ALL
EQUIPMENT AND METHODOLOGIES THAT WILL BE USED TO
IMPLEMENT THE PLAN TO THE SATISFACTION OF THE
GOVERNMENT.
B. THE CONTRACTOR SHALL PROVIDE PUMPING EQUIPMENT
CAPABLE OF MEETING THE PEAK FLOW RATES ANTICIPATED FOR
EACH BYPASSED SEGMENT. PROVIDE CERTIFICATION FROM
PUMP SUPPLIERS THAT THE PUMPING EQUIPMENT HAS BEEN
TESTED PER ANSI-HI STANDARDS AND PROVIDE THE CERTIFIED
PUMP CURVES FOR EACH FLOW SCENARIO.
C. THE CONTRACTOR SHALL PROVIDE REDUNDANT PUMPING
SYSTEMS INCLUDING PUMPS, POWER SUPPLY AND CONTROL
SYSTEMS ON-SITE AND READY FOR IMMEDIATE DEPLOYMENT
SHOULD A SYSTEM FAILURE OCCUR ON BY-PASS PUMPING
OPERATIONS SUCH AS SEWER LINES ETC. THE REDUNDANT
EQUIPMENT SHALL MEET THE CERTIFICATION REQUIREMENTS OF
THE PRIMARY EQUIPMENT.
D. THE BYPASS PUMPING SYSTEM SHALL UTILIZE A DUPLEX PUMP
ARRANGEMENT WITH A LEVEL-BASED PUMP CONTROL SYSTEM
TO OPERATE WITHIN A DESIRED FLOW LEVEL RANGE IN THE
MANHOLE. THE CONTROL SYSTEM SHALL INCORPORATE VISUAL
AND AUDIBLE ALARMS FOR PUMP FAILURE, PUMP OVERHEAT,
HIGH WATER, HIGH-HIGH WATER, AND LOW WATER ALARM
LEVELS.
E. THE BYPASS PUMPING SYSTEM PIPES AND HOSES SHALL BE
PROTECTED FROM TRAFFIC. VEHICLES SHALL NOT BE
PERMITTED TO RIDE DIRECTLY OVER THE PIPES OR HOSES.
F. THE BYPASS PUMPING SYSTEM SHALL BE MONITORED AND
OPERATED BY CONTRACTOR PERSONNEL 24 HOURS PER DAY
DURING PUMPING OPERATION.
G. THE CONTRACTOR SHALL PREPARE AN ILLUMINATION PLAN AND
PROVIDE LIGHTING SYSTEMS TO ILLUMINATE THE BYPASS
PUMPING SYSTEM COMPONENTS TO A SAFE WORKING LEVEL AT
ALL TIMES.
H. BYPASS PUMPING SYSTEM ([PEAK FLOW RATES):
a. PEAK FLOW IN EXISTING 8-INCH DIAMETER SANITARY GRAVITY
FLOW PIPELINE IS ESTIMATED TO BE 200 GPM.
2. SPILL RESPONSE PLAN: A SPILL IS DEFINED AS AN UNINTENTIONAL
RELEASE OF A CHEMICAL TO THE ENVIRONMENT. THE SPILL
RESPONSE PLAN SHALL BE DEVELOPED BY THE CONTRACTOR AND
SHALL IDENTIFY THE EQUIPMENT, PROCEDURES, NOTIFICATION AND
MANPOWER THAT WILL BE USED TO PREVENT OR MITIGATE A SPILL
EVENT. THE CONTRACTOR MUST DEMONSTRATE THE ABILITY TO
PERFORM EMERGENCY DUTIES INCLUDING PROVIDING A DETAILED
LIST OF EQUIPMENT THAT WILL BE STORED ON SITE DURING
CONSTRUCTION AND A LIST AND CORRESPONDING QUALIFICATION
FOR THE PERSONNEL THAT WILL BE ASSIGNED THE DUTY. THIS
PLAN MUST BE SUBMITTED AND APPROVED BY THE GOVERNMENT
AND HURLBURT FIELD PRIOR TO BEGINNING ANY CONSTRUCTION
OR SITE DISTURBANCE ACTIVITIES.
GAS UTILITY NOTES:
1. NATURAL GAS COMPANY TO PERFORM ALL WORK ON GAS LINES UP
TO AND INCLUDING THE BUILDING METER. CONTRACTOR SHALL
COORDINATE AND PAY ALL FEES AND CONNECTION CHARGES IN
REGARD TO NEW GAS SERVICE, INCLUDING METER, CONNECTION,
AND OTHER ASSOCIATED FEES FOR GAS SERVICE. COORDINATE
WITH NATURAL GAS COMPANY AND BASE CIVIL ENGINEERS OFFICE.
SERVICE LINE RISER WILL TERMINATE WITHIN 18" FROM FACE OF
BUILDING. A 24" SEPARATION IS REQUIRED BETWEEN NATURAL GAS
SERVICE LINE AND BURIED ELECTRICAL LINES BOTH HORIZONTALLY
AND VERTICALLY. NEW GAS SERVICE WILL BE DELIVERED
AT 30 PSI TO THE BUILDING AND REGULATED DOWN TO 2 PSI INTO
THE BUILDING. CONTRACTOR SHALL PURCHASE REGULATORS AND
METERS FROM OKALOOSA GAS. CONTACT MARK CLARK AT
850-974-7019. DEMOLITION/REMOVAL OF EXISTING GAS LINES
INDICATED ON THE DRAWINGS WILL BE BY THE CONTRACTOR
AFTER THE LINES HAVE BEEN ABANDONED AFTER
CUTTING/CAPPING BY OKALOOSA GAS.
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I
S
T R
I C
T
M O
B I L E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
A P
R I L
W
R
F T
E V
M E
F
A P
R I L
M T
F
P R
O J E
F
T E
V
AMENDMENT 0002
GC007
C I V
I L
G
E N
E R
A L
N
O T
E S
C
F
R A
N Z
E N
S
W
I E
D E
L
M T
F G
C
D
W G
R
B
A R
U T
H
A
M
A S
H E
K
A
M E
N D
M E
R
E V
I S
G
A
D I N
G
N
O T
E
T
O
D
E F
I N
E
A
R E
B
E
S
O D
D E
D
W
R
N
V
D
M
I D
M
I
D
N
N
E
C
T
O
R
J
O
K
W
Y
F O
R E
H
W
NICEVILLE
VALPARAISO
E
G
L
W
Y
R
O
G
J
A
Y
EGLIN AFB
LAKE LORRAINE
FORT WALTON BEACH
OCEAN CITY
WRIGHT
HURLBURT FIELD
MARY ESTHER
OKALOOSA ISLAND
M
I R
A
C
R
H I L L
A
V
M
A
T
H
E
R
C
HWY 188
HWY 189
OKALOOSA
CHOCTAWHATCHEE BAY
DESTIN
H
H
H
EGLIN FIELD NR 2
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I
S
T R
I C
T
M O
B I L E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
A P
R I L
W
R
F T
E V
M E
F
A P
R I L
M T
F
P R
O J E
F
T E
V
AMENDMENT 0002
GC009
B O
R R
C A
T I O
N
C
F
R A
N Z
E N
S
W
I E
D E
L
M T
F G
C
D
W G
R
B
A R
U T
H
A
M
A S
H E
K
BORROW PIT B-40
EGLIN/RANGE BORROW PIT NOTES:
1. ESTABLISH BORROW PIT FOR STRUCTURAL FILL MATERIAL AND
EXCAVATION OPERATIONS FOR THE MTF SITE DEVELOPMENT.
2. CONTRACTOR TO TEST MATERIAL FROM THE PROJECT SITE
PER SPECIFICATION SECTION 31 00 00 FOR APPROVAL PRIOR
TO HAULING TO THE EGLIN BORROW PITS FOR DISPOSAL.
3. CONTRACTOR TO PROVIDE ALL EQUIPMENT FOR HAULING AND
EXCAVATING ALL BORROW MATERIAL AND HAULING AND
STABILIZING/SPREADING SOILS DEPOSITED AT THE EGLIN
RANGE BORROW PITS.
4. FORESTRY OFFICE WILL HARVEST THE TIMBER (NOT GRUB) IN
THE AREAS WHERE THE CONTRACTOR CAN EXPAND THE EGLIN
RANGE BORROW PITS.
5. CONTRACTOR TO PERFORM GRADING OF EXISTING BORROW
PIT AREAS TO LEVEL RUTTING IN PREPARATION OF
DEPOSIT/LEVELING AND SEEDING OF ORGANIC SOIL DISPOSAL.
6. COORDINATE FDEP ENVIRONMENTAL RESOURCE PERMIT
REQUIREMENTS AND SWPPP FOR EGLIN BORROW PIT WITH
EGLIN CE ENV AND EGLIN RANGE OFFICES.
PROJECT SITE
BORROW/FILL MATERIAL NOTE:
CONTRACTOR MAY DISPOSE OF ALL EXTRA ORGANIC SOIL
MATERIAL AT THE EGLIN RANGE BORROW PITS. CONTRACTOR
HAS OPTION TO OBTAIN ALL STRUCTURAL FILL MATERIAL AT
EGLIN BORROW PITS OR PURCHASE BORROW MATERIALS FROM
COMMERCIAL BORROW SOURCES. COORDINATE FILL MATERIAL
TESTING AND SOIL REQUIREMENTS WITH SPECIFICATION
SECTION 31 00 00 EARTHWORK.
LEWIS TURNER BLVD
N
A1
BORROW PIT LOCATION
1" = 5000'
0 10000'5000'
A
M E
N D
M E
E
D
N
O T
E
R L
B U
E
L D
F
L O
R I D
A
M O
B I
S
T R
I C
T
M O
B I L E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
A P
R I L
W
R
F T
E V
M E
F
A P
R I L
M T
F
P R
O J E
F
T E
V
AMENDMENT 0002
GC010
B O
R R
C
F
R A
N Z
E N
S
W
I E
D E
L
M T
F G
C
D
W G
R
B
A R
U T
H
A
M
A S
H E
K
H
PIT EXPANSION AREA
EXCAVATED
MATERIAL DISPOSAL /
RECLAMATION AREA
STABILIZE / CLEARING
REQUIRED FOR TRUCK TRAFFIC
EXISTING HWY
MEDIAN CUT
ACCESS
ROUTE
PIT B-40:
1. LOCATION
EAST OF HWY 85 NORTH
PLOT NUM 87N84
30.6 ACRES
· 200K CY AVAILABLE
· REQUIRES TIMBER HARVEST/CLEAR GRUB TO ACCESS SAND
· ACCESS ENTRANCE FOR MUCK DISPOSAL REQUIRES WORK
FOR TRUCK/EQUIPMENT ACCESS.
2. SEE NOTES ON GC009.
EGLIN/RANGE BORROW PIT NOTES:
1. ESTABLISH BORROW PIT FOR STRUCTURAL FILL MATERIAL AND
EXCAVATION OPERATIONS FOR THE MTF SITE DEVELOPMENT.
2. CONTRACTOR TO TEST MATERIAL FROM THE PROJECT SITE
PER SPECIFICATION SECTION 31 00 00 FOR APPROVAL PRIOR
TO HAULING TO THE EGLIN BORROW PITS FOR DISPOSAL.
3. CONTRACTOR TO PROVIDE ALL EQUIPMENT FOR HAULING AND
EXCAVATING ALL BORROW MATERIAL AND HAULING AND
STABILIZING/SPREADING SOILS DEPOSITED AT THE EGLIN
RANGE BORROW PITS.
4. FORESTRY OFFICE WILL HARVEST THE TIMBER (NOT GRUB) IN
THE AREAS WHERE THE CONTRACTOR CAN EXPAND THE EGLIN
RANGE BORROW PITS.
5. CONTRACTOR TO PERFORM GRADING OF EXISTING BORROW
PIT AREAS TO LEVEL RUTTING IN PREPARATION OF
DEPOSIT/LEVELING AND SEEDING OF ORGANIC SOIL DISPOSAL.
6. COORDINATE FDEP ENVIRONMENTAL RESOURCE PERMIT
REQUIREMENTS AND SWPPP FOR EGLIN BORROW PIT WITH
EGLIN CE ENV AND EGLIN RANGE OFFICES.
A
M E
N D
M E
M
O D
I F
I E
D
N
O T
E
A
L L O
U T
90638
E
E E
E
E
E
S S
F M
SSFM
SSFM
SSFM
SSFM
SSFM
SSFM
SSFM
SSFM
S S
F M
S S
F M
S S
F M
S S
F M
S S
F M
ST
ST
W W
W W
W W
W W
W W
W
W W
W W
S
T
S
T
S
T
S
T
ST
ST ST
ST
ST
X X
X
X
X X
X
X
X
X
X
X
BLDG. 90833
FFE: 34.51
X
C
O
N
C
R
E
T
E
S
S
E
E
E
E
E
E
E
E
N 525900.00
N 525975.00
N 526050.00
N 526125.00
N 526200.00
REMOVE EXISTING CURB & GUTTER
REMOVE EXISTING
CURB & GUTTER
CLEAR AND GRUB SITE
DRIVE
EXISTING
BASIN
BASIN
EXISTING LIFT
STATION 6-4
SEE CU104
W
E
T
L
A
N
D
S
F
F
E
R
SAWCUT FULL DEPTH AND
AND REMOVE ASPHALT
SAWCUT FULL DEPTH
AND REMOVE ASPHALT
2" ASPHALT MILLING
WETLANDS
REMOVE AND REPLACE
EXISTING FLUMES AFTER
GRADING WORK
CONNECT TO EXISTING
WATER LINE
SAWCUT FULL DEPTH
REMOVE ASPHALT
EXISTING
STORM WATER
BASIN
DITCH
REMOVE AND REINSTALL
SECTION OF SCREEN
WALL TO ALLOW FOR
ELECTRICAL CONNECTION
(SEE CU101)
APPROXIMATE
LIMITS OF LF18-19
MT-1-18
MT-2-18
MT-4-18
MT-5-18
MT-6-18
MT-3-18
N 525909.05
E 1276249.86
N 525863.31
E 1276253.37
N 525839.05
E 1275891.15
N 525840.34
E 1275915.14
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I
S
T R
I C
T
M O
B I L E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
A P
R I L
W
R
F T
E V
M E
F
A P
R I L
M T
F
P R
O J E
F
T E
V
AMENDMENT 0002
CD101
D E
M O
L I T
I O
N
P
L A
N
C
F
R A
N Z
E N
S
W
I E
D E
L
M T
F C
D
D
W G
R
B
A R
U T
H
A
M
A S
H E
K
A1
DEMOLITION PLAN 1
SCALE: 1" = 20'
DEMOLITION NOTES:
1. SEE SHEETS GC005, GC006, GC007 FOR GENERAL NOTES.
2. SEE CIVIL LEGEND ON GC001.
20' 40'0
N
MATCHLINE - SEE SHEET CD102 FOR CONTINUATION
LEGEND
CLEARING AND GRUBBING
DISTURBANCE LIMITS
ASPHALT DEMOLITION
CONCRETE DEMOLITION
CURB AND GUTTER DEMOLITION
UTILITY DEMOLITION
REMOVE EXISTING TREES
ASPHALT MILLING
MISCELLANEOUS DEMOLITION
FULL DEPTH SAW CUT
A
M E
N D
M E
E
X P
A N
D E
D
C
L E
A R
I N
G
L I M
I T
S
AutoCAD SHX Text
LS 6-4
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text
EB
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
BFP
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
TOP OF LIFT STATION ELEV=34.72
AutoCAD SHX Text Storm Inlet INV=28.50 ALL PIPES UNDER WATER
AutoCAD SHX Text Storm Inlet BOTTOM OF BOX ELEV=27.8 (FULL OF WATER)
AutoCAD SHX Text
12" PVC FL ELEV=33.36
AutoCAD SHX Text
12" PVC FL ELEV=31.2
AutoCAD SHX Text Storm Inlet BOTTOM OF BOX ELEV=29.82 INV=28.87 (FULL OF WATER)
AutoCAD SHX Text Storm Inlet N INV. =29.67
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
4" SOLID
WHITE STRIPE
N
T
E
R
N
T
E
R
45 DEGREES TO PARKING
6" SOLID WHITE OUTLINE STRIPE
NOTES:
1. SEE SITE PLANS FOR LAYOUT OF STRIPING.
SCALE N.T.S
"NO PARKING" AREA STRIPING
C1
MIN
FINISH GRADE
CONCRETE
CONCRETE FILLED, STD WT
STEEL PIPE WITH BROWN PAINT
TO MATCH BASE STANDARD.
18"
EXPANSION
MATERIAL
AROUND
BOLLARDS IN
PAVEMENT
PAVEMENT
NOTES:
1. ALL NEW BOLLARDS SHALL HAVE BOLLARGARD 52" YELLOW
PLASTIC BOLLARD COVER WITH TWO RED REFLECTIVE
STRIPES AS MANUFACTURED BY INNOPLAST, OR APPROVED
EQUAL.
2. EXACT LOCATIONS SHALL BE COORDINATED WITH UTILITIES.
FIELD COORDINATE EXACT LOCATIONS WITH CONTRACTING
OFFICER'S REPRESENTATIVE AS REQUIRED.
INSTALL BOLLARD COVER OVER
STEEL BOLLARD. SEE NOTE 1.
9"
TYPICAL PLACEMENT
AT CORNERS
2'-0" (MIN)
6'-0" (MIN)
ELEVATION
PLAN
END VIEW
NOTE:
1. MINOR DEVIATIONS OF A
MANUFACTURER'S STANDARD
PRODUCT FROM THE CROSS
SECTIONS, HOLES, AND
DRAINAGE OPENINGS SHOWN
ARE ACCEPTABLE.
HOLE FOR 1/2" STD PIPE OR 3/4" DIA.
REINF. ROD (OPTIONAL 1" x 3" HOLE)
(MIN)
2'-6" TO EDGE OF
PARKING STALL
OR FACE OF CURB
OR SIDEWALK
6-1/2"
12"
2'-0" (MIN)
12"12"
7'-0" (MAX)
DRAINAGE
OPENING
M
I N
6-1/2"
8"
4"
2"
2 #3
1/2" STD PIPE OR 3/4" REINF. ROD
SHALL BE PLACED PRIOR TO
ASPHALT PARKING LOT SURFACING
OR IN A HOLE DRILLED IN THE
FINISHED SURFACE WITH TIGHT FIT
OBTAINED BY AN APPROVED
METHOD, OR DRIVEN INTO THE
SURFACE
1/2" MAX.
CLEARANCE
3/8" TOOLED
EDGE (TYP)
C
L
4" SOLID WHITE PAINTED STRIPES
AS SHOWN ON THE DRAWINGS
PARKING STALL
PRECAST CONCRETE OR RECYCLED
RUBBER WHEEL STOP
SCALE N.T.S.
PARKING BLOCKS AND STRIPING
A4
SCALE N.T.S.
BOLLARD
C4
COMPACTED
SUBGRADE
12" GCA BASE COURSE
(SEE SPECIFICATION
SECTION 32 11 23)
FDOT DROP CURB
GRASSPAVE SYSTEM
WITH SAND FILL
SCALE N.T.S
GRASSPAVE
A2
@ BOTTOM OF CURB EL.
TOP OF PAVEMENT
ELEVATION PER
GRADING PLANS
PLAN
GUTTER
CURB
M
I N
2'-0"
6'-0"
TAPER
6'-0"
TAPER
SCALE N.T.S
CONCRETE CURB CUT FLUME WITH RIP RAP
C2
PAVEMENT
NOTE:
1. RIPRAP SHALL BE FDOT RUBBLE
(DITCH LINING) MATERIAL.
RIPRAP
SEE NOTE
TO BOTTOM OF
STORM BASIN
CS500
B1
S E
E
S
I T
E
P
L A
N S
GUTTER
CURB
3'-0"
3 1/2"
7"
14 1/4"
T
Y P
3"
R
14"
NOTE:
1. SYMBOL SHALL BE PAINTED BLUE AT THE END OF THE PARKING
STALL.
SCALE N.T.S
ACCESSIBLE PARKING STALL MARKING
A1
NOTES:
1. DETECTABLE WARNING SURFACE SHALL BE INSTALLED IN A MANNER SUCH THATHE
DOMES ARE PARALLEL TO THE DIRECTION OF PEDESTRIAN TRAVEL.
2. INSTALL THE DETECTABLE WARNING SURFACE BEGINNING AT BACK OF CURB.
3. DETECTABLE WARNING SURFACE SHALL BE FULL WIDTH OF PARKING STALL (5-FEET)
STRIPED LANES.
1.6"-2.4"
M
I N
PLAN
(ENLARGED)
ELEVATION
(ENLARGED)
TOP DIAMETER TO
BE 50%-65% OF THE
BASE DIAMETER
BASE DIAMETER
OF 0.9"-1.4"
SCALE N.T.S
DETECTABLE WARNING SURFACE
D1
CS500
B5
NOTES:
1. GRASSPAVE SYSTEM TO SUPPORT A TYPICAL HS-20 VEHICLE LOADING
(110 PSI) WITH A SUBGRADE CBR VALUE OF 15.
2. GRASSPAVE SYSTEM TO BE INFILLED WITH SAND CONFORMING TO
ASTM C-33.
3. 3. GRASSPAVE SURFACE TO BE SURFACED WITH SOD, SOD SHALL BE
GROWN IN SAND OR SANDY LOAM SOILS ONLY.
SOD
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I
S
T R
I C
T
M O
B I L E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
A P
R I L
W
R
F T
E V
M E
F
A P
R I L
M T
F
P R
O J E
F
T E
V
AMENDMENT 0002
CS501
S I T
E
D
E T
A I
F
R A
N Z
E N
S
W
I E
D E
L
B D
R h e e t d w g
E T
R
B
A R
U T
H
A
M
A S
H E
K
A
M E
N D
M E
E
D
T
A I L
A
S
S
PJC
90638
PROPOSED BASIN 1B
BOTTOM 32.00
PROPOSED BASIN 1A
BOTTOM 32.00
PROPOSED SOUTH
POND (BASIN 3)
EXPANSION
BOTTOM 31.00
EXISTING POND B
BOTTOM ELEV 32.00
EXISTING
WETLANDS
MAINTENANCE
TRAINING FACILITY
FF = 35.33
MATCH
33.48
MATCH
32.95
M
A
T
C
H
M
A
T
C
H
M
A
T
C
H
M
A
T
C
H
MATCH
34.42
MATCH
33.69
34.83
34.73
34.83
33.21
33.19
32.87
TC 32.81
TC 33.38
TC 33.17
EXISTING OUTLET
CONTROL
STRUCTURE TO
REMAIN
INV = 32.20
PROPOSED OUTLET
CONTROL STRUCTURE
12" SD2
6" RD
6" RD
6" RD
S
D
RIM= 33.92±
RIM= 33.83±
RIM= 32.50
INV= 28.50
RIM=34.74
X X
X
X X
X
X
X
X
X
X
BLDG. 90833
FFE: 34.51
X
C
O
N
C
R
E
T
E
S
S
35.32
34.63
34.53
35.32
35.33
35.16
35.32
35.16
35.31
35.21
35.32
35.32
35.21
35.07
34.97
35.16
35.32
35.20
35.32
35.32
35.32
35.16
35.32
35.32
35.32
35.32
35.32
35.32
35.32
34.97
35.07
34.71
34.81
35.06
35.06
34.96
34.96
34.72
34.82
34.96
35.06
34.96
35.06
34.72
34.82
34.72
34.82
34.72
34.82
34.96
35.07
34.97
35.07
34.72
34.82
35.03
35.02
35.00
35.19
34.99
34.97
35.06
35.09
35.05
35.19
34.99
34.98
35.01
34.99
35.01
34.99
34.97
34.95
34.93
34.93
34.63
34.63
34.53
35.07
34.97
35.07
34.97
34.82
34.72
34.82
34.72
35.06
34.96
35.06
34.96
34.82
34.72
MATCH
33.30
MATCH
33.39
MATCH
34.13
M
A
T
C
H
M
A
T
C
H
M
A
T
C
H
MATCH
33.33
M
A
T
C
H
M
A
T
C
H
MATCH
33.13
MATCH
33.28
MATCH
33.77
MATCH
33.28
MATCH
35.63
MATCH
35.41
MATCH
35.06
M
A
T
C
H
MATCH
34.91
TC 34.13
TC 34.60
TC 34.80
TC 34.80
TC 35.00
TC 34.22
TC 34.02
TC 33.93
34.79
M
A
T
C
H
34.73
34.40
34.79
34.83
34.65
34.60
34.60
34.65
32.59
TOP OF BASIN
P
A
D
RIM:34.86
RD2D
FES W/ RIP RAP
INV. OUT: 33.00 RD2F
FES W/ RIP RAP
INV. OUT: 33.00
RD2G
FES W/ RIPRAP
INV. OUT: 33.00
RD2H
FES W/ RIP RAP
INV. OUT: 33.00
RD2B
FES W/ RIP RAP
INV. OUT: 33.00
RD2C
FES W/ RIP RAP
INV. OUT: 33.00
FES WITH RIP RAP
INV = 29.75
LIMITS OF
LF-19 FRP SITE
EXISTING BASIN
BTM: 32.50
(REGRADE AND RESOD AFTER
UTILITY INSTALLATION)
P
A
D
FES WITH RIPRAP
INV = 31.5
SD1
SD1
8" RD
8" RD
N 526198.93
E 1276102.46
N 526194.72
E 1276109.69
N 526155.20
E 1276106.87
N 526160.18
E 1276111.48
N 526151.21
E 1276030.24
N 526160.51
E 1276027.69
N 526015.21
E 1276330.70
N 526012.81
E 1276283.90
N 525964.64
E 1276341.37
N 525926.39
E 1276288.41
N 525940.43
E 1276355.20
N 525915.31
E 1276296.54
N 525917.80
E 1276344.26
N 525924.74
E 1276351.15
N 525952.55
E 1276349.83
N 526051.16
E 1275953.54
N 526040.30
E 1275944.88
N 526017.21
E 1275945.87
N 526006.55
E 1275955.93
N 526082.77
E 1275951.96
N 526061.09
E 1275930.42
N 526032.05
E 1275915.36
N 525929.71
E 1275891.27
N 525944.78
E 1275880.51
N 525940.32
E 1275959.37
N 525931.55
E 1275948.48
E
E
E
E
E
E
E
E
N 525975.00
N 526050.00
N 526125.00
N 526200.00
CULVERT INLET/OUTLET
PROTECTION
SILT FENCE
CURB INLET
PROTECTION
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I
S
T R
I C
T
M O
B I L E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
A P
R I L
W
R
F T
E V
M E
F
A P
R I L
M T
F
P R
O J E
F
T E
V
AMENDMENT 0002
SHEET
IDENTIFICATION
CG101.1
G R
A D
I N
G
P
L A
N
C
F
R A
N Z
E N
S
W
I E
D E
L
M T
F C
G
D
W G
R
B
A R
U T
H
A
M
A S
H E
K
A1
GRADING PLAN
SCALE: 1" = 20'
GRADING NOTES:
1. SEE NOTES ON SHEET GC005, GC006 AND GC007.
2. SEE CIVIL LEGEND ON GC001.
3. SEE SHEET CU101 FOR STORM SEWER LAYOUT AND SHEET
CU202 FOR STORM SEWER PROFILES.
N
20' 40'0
CU505
A1
CU505
A1
CU507
A1
CG502
A3
(TYP)
CU506
A2
CU506
A2
CG502
A1
CG501
A1
CG502
C1
LEGEND:
SILT FENCE
CULVER INLET/OUTLET PROTECTION
A M
E N
D M
E N
T
A
D D
N
L E
T
P
R O
T E
C T
I O
N
AutoCAD SHX Text
LS 6-4
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text
EB
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
BFP
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
TOP OF LIFT STATION ELEV=34.72
AutoCAD SHX Text Storm Inlet INV=28.50 ALL PIPES UNDER WATER
AutoCAD SHX Text Storm Inlet BOTTOM OF BOX ELEV=27.8 (FULL OF WATER)
AutoCAD SHX Text
12" PVC FL ELEV=33.36
AutoCAD SHX Text
12" PVC FL ELEV=31.2
AutoCAD SHX Text Storm Inlet BOTTOM OF BOX ELEV=29.82 INV=28.87 (FULL OF WATER)
Storm Inlet N INV. =29.67
SCALE N.T.S
SILT FENCE
A1
RUNOFF
PONDING HEIGHT
M
I N
WOOD POST
36" HIGH MAX.
FILTER FABRIC ATTACH
SECURELY TO UPSTREAM
SIDE OF POST
4" X 6" TRENCH WITH
COMPACTED BACKFILL
MATERIAL SPECIFICATION:
SILT FENCE FABRIC SHOULD CONFORM TO THE AASHTO M288 96 SILT FENCE
SPECIFICATION. THE POSTS USED TO SUPPORT THE SILT FENCE FABRIC
SHOULD BE A HARDWOOD MATERIAL WITH THE FOLLOWING MINIMUM
DIMENSIONS: 2" SQUARE (NOMINAL) BY 4' LONG. SILT FENCE FABRIC SHOULD
BE ATTACHED TO THE WOODEN POSTS WITH STAPLES, WIRE, ZIP TIES, OR
NAILS.
PLACEMENT:
A SLOPE BARRIER SHOULD BE PLACED AROUND THE CONSTRUCTION
PERIMETER. THE BARRIER IS PLACED AWAY FROM THE TOE OF THE SLOPE
TO PROVIDE ADEQUATE STORAGE FOR SETTLING OUT SEDIMENT. WHEN
PRACTICABLE, SILT FENCE BARRIERS SHOULD BE PLACED ALONG
CONTOURS TO AVOID A CONCENTRATION OF FLOW.
PROPER INSTALLATION METHOD:
EXCAVATE A TRENCH THE LENGTH OF THE PLANNED SLOPE BARRIER THAT
IS 6" DEEP BY 4" WIDE. MAKE SURE THAT THE TRENCH IS EXCAVATED ALONG
A SINGLE CONTOUR. WHEN PRACTICABLE, SLOPE BARRIERS SHOULD BE
PLACED ALONG CONTOURS TO AVOID A CONCENTRATION OF FLOW. PLACE
THE SOIL ON THE UPSLOPE SIDE OF THE TRENCH FOR LATER USE. ROLL
OUT A CONTINUOUS LENGTH OF SILT FENCE FABRIC ON THE DOWNSLOPE
SIDE OF THE TRENCH. PLACE THE EDGE OF THE FABRIC IN THE TRENCH
STARTING AT THE TOP UPSLOPE EDGE. LINE ALL THREE SIDES OF THE
TRENCH WITH THE FABRIC. BACKFILL OVER THE FABRIC IN THE TRENCH
WITH THE EXCAVATED SOIL AND COMPACT. AFTER FILLING THE TRENCH,
APPROXIMATELY 24" TO 36" OF SILT-FENCE FABRIC SHOULD REMAIN
EXPOSED. LAY THE EXPOSED SILT FENCE UPSLOPE OF THE TRENCH TO
CLEAR AN AREA FOR DRIVING IN THE POSTS. JUST DOWNSLOPE OF THE
TRENCH, DRIVE POSTS INTO THE GROUND TO A DEPTH OF AT LEAST 18".
PLACE POSTS NO MORE THAN 4' APART. ATTACH THE SILT FENCE TO THE
ANCHORED POST WITH STAPLES, WIRE, ZIP TIES, OR NAILS.
LIST OF COMMON PLACEMENT/INSTALLATION MISTAKES TO AVOID:
WHEN PRACTICABLE, DO NOT PLACE SILT FENCE SLOPE BARRIERS ACROSS
CONTOURS. SLOPE BARRIERS SHOULD BE PLACED ALONG CONTOURS TO
AVOID A CONCENTRATION OF FLOW. WHEN THE FLOW CONCENTRATES, IT
OVERTOPS THE BARRIER AND THE SILT FENCE SLOPE BARRIER QUICKLY
DETERIORATES. DO NOT PLACE SILT-FENCE POSTS ON THE UPSLOPE SIDE
OF THE SILT FENCE FABRIC. IN THIS CONFIGURATION, THE FORCE OF THE
WATER IS NOT RESTRICTED BY THE POSTS, BUT ONLY BY THE STAPLES
(WIRE, ZIP TIES, NAILS, ETC.). THE SILT FENCE WILL RIP AND FAIL. DO NOT
PLACE SILT FENCE SLOPE BARRIERS IN AREAS WITH SHALLOW SOILS
UNDERLAIN BY ROCK. IF THE BARRIER IS NOT SUFFICIENTLY ANCHORED, IT
WILL WASH OUT. SILT FENCE SLOPE BARRIERS MUST BE DUG INTO THE
GROUND-SILT FENCE AT GROUND LEVEL DOES NOT WORK BECAUSE WATER
WILL FLOW UNDERNEATH.
INSPECTION AND MAINTENANCE:
SILT FENCE SLOPE BARRIERS SHOULD BE INSPECTED EVERY 7 DAYS AND
WITHIN 24 HOURS OF A RAINFALL OF 1/2" OR MORE. THE FOLLOWING IS A
LIST OF QUESTIONS THAT SHOULD BE ADDRESSED DURING EACH
INSPECTION:
ARE THERE ANY POINTS ALONG THE SLOPE BARRIER WHERE WATER IN
CONCENTRATING?
DOES WATER FLOW UNDER THE SLOPE BARRIER?
DO THE SILT FENCES SAG EXCESSIVELY?
HAS THE SILT FENCE TORN OR BECOME DETACHED FROM THE POSTS?
DOES SEDIMENT NEED TO BE REMOVED FROM BEHIND THE SLOPE BARRIER?
MATERIAL SPECIFICATION:
SILT FENCE FABRIC SHOULD CONFORM TO THE AASHTO M288 96 SILT FENCE SPECIFICATION. THE
WIRE OR POLYMERIC MESH BACKING USED TO HELP SUPPORT THE SILT FENCE FABRIC SHOULD
CONFORM TO THE AASHTO M288 96 SILT FENCE SPECIFICATION. THE POSTS USED TO SUPPORT
THE SILT FENCE FABRIC SHOULD BE A HARDWOOD MATERIAL WITH THE FOLLOWING MINIMUM
DIMENSIONS: 2" SQUARE (NOMINAL) BY 4' LONG. THE MATERIAL USED TO FRAME THE TOPS OF
THE POSTS SHOULD BE 1" BY 4" BOARDS. SILT FENCE FABRIC AND SUPPORT BACKING SHOULD BE
ATTACHED TO THE WOODEN POSTS AND FRAME WITH STAPLES, WIRE, ZIP TIES, OR NAILS.
PLACEMENT:
PLACE A SILT FENCE DROP INLET BARRIER IN A LOCATION WHERE IT IS UNLIKELY TO BE
OVERTOPPED. WATER SHOULD FLOW THROUGH SILT FENCE, NOT OVER IT. SILT FENCE BARRIERS
FOR AREA INLETS OFTEN FAIL WHEN REPEATEDLY OVERTOPPED. WHEN USED AS A BARRIER
FOR AREA INLETS, SILT FENCE FABRIC AND POSTS MUST BE SUPPORTED AT THE TOP BY A
WOODEN FRAME. TIMELY REMOVAL OF SEDIMENT MUST OCCUR FOR A BARRIER TO OPERATE
PROPERLY IN THIS LOCATION.
PROPER INSTALLATION METHOD (INLETS IN UNPAVED AREAS):
EXCAVATE A TRENCH AROUND THE PERIMETER OF THE AREA INLET THAT IS AT LEAST 8" DEEP BY
8" WIDE. DRIVE POSTS TO A DEPTH OF AT LEAST 18" AROUND THE PERIMETER OF THE AREA
INLET. THE DISTANCE BETWEEN POSTS SHOULD BE 4' OR LESS. IF THE DISTANCE BETWEEN TWO
ADJACENT CORNER POSTS IS MORE THAN 4', ADD ANOTHER POST(S) BETWEEN THEM. CONNECT
THE TOPS OF ALL THE POSTS WITH A WOODEN FRAME MADE OF 1" BY 4" BOARDS. USE NAILS OR
SCREWS FOR FASTENING. ATTACH THE WIRE OR POLYMERIC-MESH BACKING TO THE OUTSIDE OF
THE POST/FRAME STRUCTURE WITH STAPLES, WIRE, ZIP TIES, OR NAILS. ROLL OUT A
CONTINUO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .