AM03.pdf

PDF 275 KB Posted

Attached to
SOF Maintenance Training Facility, Hurlburt Field, FL
Solicitation number
W9127820R0077
Issued by

About this file

This document is an amendment to a solicitation for the construction of a Maintenance Training Facility at Hurlburt Field, Florida. The amendment revises the specifications and description of work to clarify that the solicitation is for the construction of a 36,800 square foot high bay facility with concrete foundation, auger cast pilings, floor slab, steel frame, masonry walls and sloped metal roof. Functional areas will include space for a dedicated Weapons Load Trainer, a full size C-130 aircraft, small training devices, classrooms, instructors and staff offices, and storage. Supporting facilities will include utilities, pavements, site improvements, communications, and all necessary support to deliver a complete and usable facility. Special site conditions involve removing a large quantity of unsuitable material for disposal and suitable fill. The estimated cost of work is between $10 million and $25 million. The Corps of Engineers Engineering District in Mobile is the issuing agency.

View the file

Other files

File Type Posted
AM05.pdf PDF
AM04.pdf PDF
AM02 DRAWINGS.pdf PDF
AM02.pdf PDF
AM01.pdf PDF
W9127820R0077 VOL2.PDF PDF
W9127820R0077 VOL4.PDF PDF
W9127820R0077 VOL1.PDF PDF
W9127820R0077 VOL3.PDF PDF
W9127820R0077 RTA DRAWINGS VOL2.pdf PDF
W9127820R0077 EM 385-1-1.pdf PDF
W9127820R0077 RTA DRAWINGS VOL 1.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)

W9127820R0077-0003 22 JULY 2020 MEF20006

6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)

CODE

Corps of Engineers 109 St. Joseph St.

Mobile, AL 36602

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION

NO.

W9127820R0077

9B. DATED (SEE ITEM 11)

3 JUNE 2020

10A. MODIFICATION OF

CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The subject solicitation for: SOF MAINTENANCE TRAINING FACILITY, HURLBURT FIELD, FLORIDA

Is modified in the following: REFER TO THE ENCLOSED SPECIFICATION REVISIONS FOR AMENDMENT NO. 0003

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of contracting officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SOF MAINTENANCE TRAINING FACILITY W9127820R0077

HURLBURT FIELD, FLORIDA MEF20006

SF 30 Page 2 Amendment No. W9127820R0077-0003

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.

Corresponding Added or Revised Paragraph SECTION Page, and/or Section

00 12 00 Revised Paragraph 3.2 as indicated herein.

01 00 01 Revised Paragraph 7 as indicated herein.

Encl as stated Replaced pages of the specifications as indicated in Part I.

SECTION 00 12 00

Revised by Amendment No. W9127820R0077-0003

00 12 00

3.2 Evaluation of Factor 1 - Past Performance Information of the Prime Contractor.

(1) An Offeror’s “Relevant Company Effort” information will be evaluated to determine if the construction or repair projects submitted are “recent”, and “relevant”. The Government will give more consideration for design-bid-build construction similar to that described by this solicitation; projects in and around military installations; projects of a dollar value similar to the project anticipated under this solicitation; for projects where the Offeror performed as the prime contractor, as opposed to a subcontractor.

Additionally, more consideration will be given to a project portfolio that reflects successful performance of construction type projects similar to the project described in this solicitation.

The work described in this solicitation is for the construction of a new 36,800 SF high bay facility with concrete foundation, auger cast pilings, floor slab, steel frame, masonry walls and sloped metal roof, environmental control (HVAC), fire detection and protection, and mass notification system.

Functional areas include space for a dedicated Weapons Load Trainer (WLT), a full size C-130 aircraft, small training devices, classrooms, instructors and staff offices, storage, etc. Special site conditions includes the removal of a large quantity of unsuitable material, disposal, and suitable fill. Supporting facilities include utilities, pavements, site improvements, communications, and all necessary support, making a complete and usable facility.

(Note: The remainder of the section is unchanged by this amendment.)

This page was intentionally left blank for duplex printing.

01 00 01 Revised by Amendment No. W9127820R0077-0003

01 00 01

7. DESCRIPTION OF WORK

In general, the work shall consist of the following: Construct a 36,800 SF high bay facility with concrete foundation, auger cast pilings, floor slab, steel frame, masonry walls and sloped metal roof, environmental control (HVAC), fire detection and protection, and mas notification system. Functional areas include space for a dedicated Weapons Load Trainer (WLT), a full size C-130 aircraft, small training devices, classrooms, instructors and staff offices, storage, etc. Supporting facilities include utilities, pavements, site improvements, communications, and all necessary support. Special site conditions include the removal of a large quantity of unsuitable material, disposal, and suitable fill.

NOTE: The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein. The cost of this work is estimated to be between $10,000,000 and $25,000,000.00.

End of Paragraph

(Note: The remainder of the section is unchanged by this amendment.)

This page was intentionally left blank for duplex printing.

File details come from the government source that posted it. Updated .