AM02.pdf
PDF 321 KB Posted
- Solicitation number
- W9127820R0077
About this file
This document package includes a solicitation amendment and related federal contract opportunity. The solicitation amendment modifies an earlier solicitation for construction of a 36,800 square foot maintenance training facility at Hurlburt Field, Florida. Key changes include revisions to specifications sections, replacement drawings, and extending the receipt of proposal date to July 24, 2020 at 2:00 PM local time. The opportunity is to construct the facility with a concrete foundation, steel frame, masonry walls, and sloped metal roof along with HVAC, fire protection, and mass notification systems. Functional spaces include an aircraft hangar, classrooms, offices, and storage to support weapons load training for a C-130 aircraft and small devices. The site work includes removing unsuitable material, disposal, suitable fill, utilities, and pavements. The soliciting agency is the U.S. Army Corps of Engineers Engineering District Mobile.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AM05.pdf | ||
| AM04.pdf | ||
| AM03.pdf | ||
| AM02 DRAWINGS.pdf | ||
| AM01.pdf | ||
| W9127820R0077 RTA DRAWINGS VOL2.pdf | ||
| W9127820R0077 EM 385-1-1.pdf | ||
| W9127820R0077 VOL2.PDF | ||
| W9127820R0077 VOL4.PDF | ||
| W9127820R0077 VOL1.PDF | ||
| W9127820R0077 VOL3.PDF | ||
| W9127820R0077 RTA DRAWINGS VOL 1.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)
W9127820R0077-0002 7 JULY 2020 MEF20006
6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)
CODE
Corps of Engineers 109 St. Joseph St.
Mobile, AL 36602
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION
NO.
W9127820R0077
9B. DATED (SEE ITEM 11)
3 JUNE 2020
10A. MODIFICATION OF
CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers ia extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The subject solicitation for: SOF MAINTENANCE TRAINING FACILITY
HURLBURT FIELD, FLORIDA
Is modified in the following: REFER TO THE ENCLOSED SPECIFICATION REVISIONS FOR AMENDMENT NO. 0002
NOTE: THE RECEIPT OF PROPOSAL DATE IS HEREBY REVISED BY THIS AMENDMENT. REFER TO BLOCK 13.A OF THE ENCLOSED SF1442.
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of contracting officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
SOF MAINTENANCE TRAINING FACILITY W9127820R0077
HURLBURT FIELD, FLORIDA MEF20006
SF 30 Page 2 Amendment No. W9127820R0077-0002
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.
Corresponding Added or Revised Paragraph SECTION Page, and/or Section
SF1442 Revised Block 13.A as indicated herein.
05 30 00 Revised Paragraphs 2.2.7 and 3.3 as indicated herein.
07 42 63 Revised Paragraphs 2.2.1.1 and 2.4.2 as indicated herein.
Deleted Paragraph 2.2.1.2.
26 12 19.10 Revised Paragraph 2.2.1.2 as indicated herein.
26 20 00 Revised Paragraph 2.4 as indicated herein.
26 29 23 Added Paragraph 1.9 as indicated herein.
PART II - REVISIONS MADE BY DELETED PAGES/SECTIONS
The pages and/or sections listed below are to be deleted from the specifications by the bidders and marked "DELETED":
Page/Section
09 84 20 Deleted section and associated submittal registers.
PART III - NOTE: Revised, replacement and added drawings are listed below. These revised, replacement and added drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised or replaced by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.
SHT
REF. TITLE OF DRAWINGS
COVER SHEET
GC005 GENERAL CONSTRUCTION NOTES
GC007 CIVIL GENERAL NOTES
GC009 BORROW PIT LOCATION
GC010 BORROW PIT B-40
SF 30 Page 3 Amendment No. W9127820R0077-0002
CD101 DEMOLITION PLAN 1
CS501 CIVIL DETAILS 1
CG101.1 GRADING PLAN (REPLACED)
CG501 EROSION CONTROL DETAILS
CU102 UTILITY PLAN 2
CU202 STORM PROFILES
CU510 LIFT STATION DETAILS 1
S-002 GENERAL NOTES
S-102 FOUNDATION AND SLAB PLAN – AREA B
S-500 STANDARD CONCRETE DETAILS
A-113 ENLARGED FLOOR PLAN MECHANICAL PLATFORM
A-201 EXTERIOR BUILDING ELEVATIONS
A-510 SECTION DETAILS
A-511 SECTION DETAILS
A-512 SECTION DETAILS
E-002 ELECTRICAL SYMBOLS LEGEND
EG101 GROUNDING PLAN
EP102 POWER PLAN – AREA B
EP504 POWER DETAILS
EP601 ELECTRICAL ONE-LINE DIAGRAM
T-001 TELECOMMUNICATIONS LEGEND
T-101 TELECOMMUNICATIONS PLAN – AREA A
Encl as stated Replaced pages of the specifications as indicated in Part I.
26 Revised drawings as indicated in Part III.
1 Replaced drawing as indicated in Part III.
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9127820R0077
2. TYPE OF
SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
3 JUNE 2020
PAGES OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
MEF20006
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S. ARMY ENGINEER DISTRICT, MOBILE
CONTRACTING DIVISION (CESAM-CT)
(109 ST. JOSEPH ST. 36602) P.O. BOX 2288
MOBILE, AL 36628-0001
SAME AS BLOCK 7
IF HAND CARRIED, DELIVER TO
CONTRACT SPECIALIST IDENTIFIED IN BLOCK 9.
9. FOR INFORMATION
CALL : Lisa Trimble
Kyle Rodgers
A. NAME
Elizabeth.M.Trimble@usace.army.mil Kyle.M.Rodgers@usace.army.mil
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(251) 690-3329 (251)-690-3356
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
SOF MAINTENANCE TRAINING FACILITY, HURLBURT FIELD, FLORIDA
* See Section 01 00 00, Paragraph “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”.
**Block 13A. : Refer to Section 00 11 00 for the number of copies to submit with the original offer.
11. The Contractor shall begin performance within _8________ calendar days and complete it within __*________ calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See _ __.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and ___**____ copies to perform the work required are due at the place specified in Item 8 by__1400___ (hour) local time 10 24 JULY 2020 (date).
If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than ____120_______ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101
STANDARD FORM 1442(REV. 4-85)
Prescribed by GSA FAR(48 CFR) 53.236-1(e)
Revised by Amendment No. W9127820R0077-0002
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within _________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award con-summates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD
DATE
STANDARD FORM 1442 BACK (REV. 4-85)
Revised by Amendment No. W9127820R0077-0002
05 30 00 Revised by Amendment No. W9127820R0077-0002
05 30 00
2.2.7 NOT USED Roof Sump Pans
Sump pans must be provided for roof drains and must be minimum 0.075 inch thick steel, recessed type. Shape sump pans to meet roof slope by the supplier or by a sheet metal specialist. Provide bearing flanges of sump pans to overlap steel deck a minimum of 3 inches. Shape, size, and reinforce the opening in bottom of the sump pan to receive roof drain.
3.3 NOT USED ROOF SUMP PANS
Place sump pans over openings in roof decking and fusion welded to top surface of roof decking. Do not exceed spacing of welds of 12 inches with not less than one weld at each corner. Field cut opening in the bottom of each roof sump pan to receive the roof drain as part of the Work of this Section.
(Note: The remainder of the section is unchanged by this amendment.)
07 42 63 Revised by Amendment No. W9127820R0077-0002
07 42 63
2.2.1.1 MP-1
Corrugated Insulated metal wall panel.
a. Use: Training Bay Hangar bay or high bay exterior wall.
b. Thickness: 3 inch.
c. Metal face: 22 gauge galvanized both sides.
d. Minimum R value: 16.
e. Color: Manufacture standard color close match to SW 2186 Townhouse
Tan.
f. Basis of design: Centria Formawall Dimension Series DS60 Vertical Profile.
2.2.1.2 MP-2
Flush insulated metal panel.
a. Use: Hangar door, SNC bay door and exterior soffit.
b. Thickness: 2 inch.
c. Metal face: 22 gauge galvanized both side.
d. Minimum R value: 14 min.
e. Color: Manufacturer standard color close match to SW 2186 Townhouse Tan from Sherwin-Williams.
2.4.2 Exposed Fasteners
Fasteners for wall panels to be corrosion resistant coated steel, aluminum, stainless steel, or nylon capped steel compatible with the sheet panel or flashing and of a type and size recommended by the manufacturer to meet the performance requirements and design loads. Fasteners for accessories to be the manufacturer's standard. Provide an integral metal washer matching the color of attached material with compressible sealing EPDM gasket approximately 3/32 inches thick.
26 12 19.10 Revised by Amendment No. W9127820R0077-0002
26 12 19.10
2.2.1.2 Low Voltage
Low-voltage compartment contains: Low-voltage bushings with NEMA spade terminals, accessories, metering, stainless steel or laser-etched anodized aluminum diagrammatic transformer nameplate, and ground pad.
a. Include the following accessories: Drain valve with sampler device, fill plug, pressure relief device, liquid level gauge, pressure-vacuum gauge, and dial type thermometer with maximum temperature indicator.
b. Metering: Provide as specified in Section 26 27 14.00 20 ELECTRICITY
METERING. Provide as indicated on drawings.
26 20 00 Revised by Amendment No. W9127820R0077-0002
26 20 00
2.4 CABLE TRAYS
NEMA VE 1. Provide the following:
a. Cable trays: Form a wireway system, with a nominal depth as indicated.
b. Cable trays: Constructed of aluminum or steel.
c. Cable trays: Include splice and end plates, dropouts, and miscellaneous hardware.
d. Edges, fittings, and hardware: Finished free from burrs and sharp edges.
e. Fittings: Ensure not less than load-carrying ability of straight tray sections and have manufacturer's minimum standard radius.
26 29 23 Revised by Amendment No. W9127820R0077-0002
26 29 23
1.9 PROCUREMENT
VFDs shall be sized to match mechanical equipment selected by the Contractor and shall procured with mechanical equipment.
| SF30 |
| LINEUP |
| SF1442_AM02 |
| 05 30 00_AM02 |
| 07 42 63_AM02 |
| 26 12 19.10_AM02 |
| 26 20 00_AM02 |
| 26 29 23_AM02 |
File details come from the government source that posted it. Updated .