AM02.pdf

PDF 321 KB Posted

Attached to
SOF Maintenance Training Facility, Hurlburt Field, FL
Solicitation number
W9127820R0077
Issued by

About this file

This document package includes a solicitation amendment and related federal contract opportunity. The solicitation amendment modifies an earlier solicitation for construction of a 36,800 square foot maintenance training facility at Hurlburt Field, Florida. Key changes include revisions to specifications sections, replacement drawings, and extending the receipt of proposal date to July 24, 2020 at 2:00 PM local time. The opportunity is to construct the facility with a concrete foundation, steel frame, masonry walls, and sloped metal roof along with HVAC, fire protection, and mass notification systems. Functional spaces include an aircraft hangar, classrooms, offices, and storage to support weapons load training for a C-130 aircraft and small devices. The site work includes removing unsuitable material, disposal, suitable fill, utilities, and pavements. The soliciting agency is the U.S. Army Corps of Engineers Engineering District Mobile.

View the file

Other files

File Type Posted
AM05.pdf PDF
AM04.pdf PDF
AM03.pdf PDF
AM02 DRAWINGS.pdf PDF
AM01.pdf PDF
W9127820R0077 RTA DRAWINGS VOL2.pdf PDF
W9127820R0077 EM 385-1-1.pdf PDF
W9127820R0077 VOL2.PDF PDF
W9127820R0077 VOL4.PDF PDF
W9127820R0077 VOL1.PDF PDF
W9127820R0077 VOL3.PDF PDF
W9127820R0077 RTA DRAWINGS VOL 1.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)

W9127820R0077-0002 7 JULY 2020 MEF20006

6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)

CODE

Corps of Engineers 109 St. Joseph St.

Mobile, AL 36602

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION

NO.

W9127820R0077

9B. DATED (SEE ITEM 11)

3 JUNE 2020

10A. MODIFICATION OF

CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers ia extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The subject solicitation for: SOF MAINTENANCE TRAINING FACILITY

HURLBURT FIELD, FLORIDA

Is modified in the following: REFER TO THE ENCLOSED SPECIFICATION REVISIONS FOR AMENDMENT NO. 0002

NOTE: THE RECEIPT OF PROPOSAL DATE IS HEREBY REVISED BY THIS AMENDMENT. REFER TO BLOCK 13.A OF THE ENCLOSED SF1442.

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of contracting officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SOF MAINTENANCE TRAINING FACILITY W9127820R0077

HURLBURT FIELD, FLORIDA MEF20006

SF 30 Page 2 Amendment No. W9127820R0077-0002

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.

Corresponding Added or Revised Paragraph SECTION Page, and/or Section

SF1442 Revised Block 13.A as indicated herein.

05 30 00 Revised Paragraphs 2.2.7 and 3.3 as indicated herein.

07 42 63 Revised Paragraphs 2.2.1.1 and 2.4.2 as indicated herein.

Deleted Paragraph 2.2.1.2.

26 12 19.10 Revised Paragraph 2.2.1.2 as indicated herein.

26 20 00 Revised Paragraph 2.4 as indicated herein.

26 29 23 Added Paragraph 1.9 as indicated herein.

PART II - REVISIONS MADE BY DELETED PAGES/SECTIONS

The pages and/or sections listed below are to be deleted from the specifications by the bidders and marked "DELETED":

Page/Section

09 84 20 Deleted section and associated submittal registers.

PART III - NOTE: Revised, replacement and added drawings are listed below. These revised, replacement and added drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised or replaced by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.

SHT

REF. TITLE OF DRAWINGS

COVER SHEET

GC005 GENERAL CONSTRUCTION NOTES

GC007 CIVIL GENERAL NOTES

GC009 BORROW PIT LOCATION

GC010 BORROW PIT B-40

SF 30 Page 3 Amendment No. W9127820R0077-0002

CD101 DEMOLITION PLAN 1

CS501 CIVIL DETAILS 1

CG101.1 GRADING PLAN (REPLACED)

CG501 EROSION CONTROL DETAILS

CU102 UTILITY PLAN 2

CU202 STORM PROFILES

CU510 LIFT STATION DETAILS 1

S-002 GENERAL NOTES

S-102 FOUNDATION AND SLAB PLAN – AREA B

S-500 STANDARD CONCRETE DETAILS

A-113 ENLARGED FLOOR PLAN MECHANICAL PLATFORM

A-201 EXTERIOR BUILDING ELEVATIONS

A-510 SECTION DETAILS

A-511 SECTION DETAILS

A-512 SECTION DETAILS

E-002 ELECTRICAL SYMBOLS LEGEND

EG101 GROUNDING PLAN

EP102 POWER PLAN – AREA B

EP504 POWER DETAILS

EP601 ELECTRICAL ONE-LINE DIAGRAM

T-001 TELECOMMUNICATIONS LEGEND

T-101 TELECOMMUNICATIONS PLAN – AREA A

Encl as stated Replaced pages of the specifications as indicated in Part I.

26 Revised drawings as indicated in Part III.

1 Replaced drawing as indicated in Part III.

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9127820R0077

2. TYPE OF

SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

3 JUNE 2020

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

MEF20006

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S. ARMY ENGINEER DISTRICT, MOBILE

CONTRACTING DIVISION (CESAM-CT)

(109 ST. JOSEPH ST. 36602) P.O. BOX 2288

MOBILE, AL 36628-0001

SAME AS BLOCK 7

IF HAND CARRIED, DELIVER TO

CONTRACT SPECIALIST IDENTIFIED IN BLOCK 9.

9. FOR INFORMATION

CALL : Lisa Trimble

Kyle Rodgers

A. NAME

Elizabeth.M.Trimble@usace.army.mil Kyle.M.Rodgers@usace.army.mil

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(251) 690-3329 (251)-690-3356

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

SOF MAINTENANCE TRAINING FACILITY, HURLBURT FIELD, FLORIDA

* See Section 01 00 00, Paragraph “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”.

**Block 13A. : Refer to Section 00 11 00 for the number of copies to submit with the original offer.

11. The Contractor shall begin performance within _8________ calendar days and complete it within __*________ calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See _ __.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and ___**____ copies to perform the work required are due at the place specified in Item 8 by__1400___ (hour) local time 10 24 JULY 2020 (date).

If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than ____120_______ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101

STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(e)

Revised by Amendment No. W9127820R0077-0002

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within _________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award con-summates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

STANDARD FORM 1442 BACK (REV. 4-85)

Revised by Amendment No. W9127820R0077-0002

05 30 00 Revised by Amendment No. W9127820R0077-0002

05 30 00

2.2.7 NOT USED Roof Sump Pans

Sump pans must be provided for roof drains and must be minimum 0.075 inch thick steel, recessed type. Shape sump pans to meet roof slope by the supplier or by a sheet metal specialist. Provide bearing flanges of sump pans to overlap steel deck a minimum of 3 inches. Shape, size, and reinforce the opening in bottom of the sump pan to receive roof drain.

3.3 NOT USED ROOF SUMP PANS

Place sump pans over openings in roof decking and fusion welded to top surface of roof decking. Do not exceed spacing of welds of 12 inches with not less than one weld at each corner. Field cut opening in the bottom of each roof sump pan to receive the roof drain as part of the Work of this Section.

(Note: The remainder of the section is unchanged by this amendment.)

07 42 63 Revised by Amendment No. W9127820R0077-0002

07 42 63

2.2.1.1 MP-1

Corrugated Insulated metal wall panel.

a. Use: Training Bay Hangar bay or high bay exterior wall.

b. Thickness: 3 inch.

c. Metal face: 22 gauge galvanized both sides.

d. Minimum R value: 16.

e. Color: Manufacture standard color close match to SW 2186 Townhouse

Tan.

f. Basis of design: Centria Formawall Dimension Series DS60 Vertical Profile.

2.2.1.2 MP-2

Flush insulated metal panel.

a. Use: Hangar door, SNC bay door and exterior soffit.

b. Thickness: 2 inch.

c. Metal face: 22 gauge galvanized both side.

d. Minimum R value: 14 min.

e. Color: Manufacturer standard color close match to SW 2186 Townhouse Tan from Sherwin-Williams.

2.4.2 Exposed Fasteners

Fasteners for wall panels to be corrosion resistant coated steel, aluminum, stainless steel, or nylon capped steel compatible with the sheet panel or flashing and of a type and size recommended by the manufacturer to meet the performance requirements and design loads. Fasteners for accessories to be the manufacturer's standard. Provide an integral metal washer matching the color of attached material with compressible sealing EPDM gasket approximately 3/32 inches thick.

26 12 19.10 Revised by Amendment No. W9127820R0077-0002

26 12 19.10

2.2.1.2 Low Voltage

Low-voltage compartment contains: Low-voltage bushings with NEMA spade terminals, accessories, metering, stainless steel or laser-etched anodized aluminum diagrammatic transformer nameplate, and ground pad.

a. Include the following accessories: Drain valve with sampler device, fill plug, pressure relief device, liquid level gauge, pressure-vacuum gauge, and dial type thermometer with maximum temperature indicator.

b. Metering: Provide as specified in Section 26 27 14.00 20 ELECTRICITY

METERING. Provide as indicated on drawings.

26 20 00 Revised by Amendment No. W9127820R0077-0002

26 20 00

2.4 CABLE TRAYS

NEMA VE 1. Provide the following:

a. Cable trays: Form a wireway system, with a nominal depth as indicated.

b. Cable trays: Constructed of aluminum or steel.

c. Cable trays: Include splice and end plates, dropouts, and miscellaneous hardware.

d. Edges, fittings, and hardware: Finished free from burrs and sharp edges.

e. Fittings: Ensure not less than load-carrying ability of straight tray sections and have manufacturer's minimum standard radius.

26 29 23 Revised by Amendment No. W9127820R0077-0002

26 29 23

1.9 PROCUREMENT

VFDs shall be sized to match mechanical equipment selected by the Contractor and shall procured with mechanical equipment.

SF30
LINEUP
SF1442_AM02
05 30 00_AM02
07 42 63_AM02
26 12 19.10_AM02
26 20 00_AM02
26 29 23_AM02

File details come from the government source that posted it. Updated .