W9127819R0048_Section_01_11_10_Amendment_5.pdf

PDF 37 KB Posted

Attached to
Switchgear At Jones Bluff Powerhouse
Solicitation number
W9127819R0048
Issued by

About this file

This document contains a technical specification and related federal contract opportunity notice. The technical specification outlines work required to install two new government-furnished 15kV generator switchgear lineups at the Jones Bluff Powerhouse in Selma, AL. The scope of work includes removing existing switchgear, installing new switchgear, replacing cables and bus, coordinating plenum ventilation, replacing surge arrestors and capacitors, testing, and removing/reinstalling a condensing pipe section. The related federal contract opportunity is solicitation number W9127819R0048 for switchgear installation services at Jones Bluff Powerhouse. The solicitation will be available on May 22, 2019. This is a 100% small business set-aside for NAICS 335313 issued by the Department of the Army Corps of Engineers Engineering District Mobile. Offerors should check the website for solicitation details and amendments.

Amendment 5 revised specs

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 11 10

SUMMARY OF WORK

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

This section covers the technical specifications to perform all work required to install government furnished 15kV generator switchgear for Jones Bluff powerhouse. This section is a general summary of the required work and is not all-inclusive. The work described within these specifications shall include, but not necessarily be limited to the following:

a. Remove existing 15KV generator switchgear lineups for units 1-2 and station service breaker no. 1, and for units 3-4 and station service breaker no. 2.

b. Install two government furnished new 15KV generator switchgear lineups. One cotaining generator breakers for units 1 and 2 (breakers 710 & 720) and station service breaker no. 1 (breaker 812), and the second containing generator breakers for units 3 and 4 (breakers 730 &

740) and station service no. 2 (breaker 822).

c. Replace all the cables from removed equipment and install new conductors to new equipment.

d. Replace, as necessary, the existing non-segregated bus from the generators and GSU in order to connect to the new 15KV switchgear, to include all connectors and fasteners.

e. Coordinate with the switchgear manufacturer to install balance of the plenum system for each of the new switchgear to vent the exhaust to a safe area.

f. Replace the existing surge arrestors and capacitors in the new government furnished equipment with new surge arrestors and capacitors.

g. Perform necessary commissioning and testing.

h. Remove a section of the synchronous condensing pipe and re-install the pipe with flanges.

1.2 CHANGES IN SPECIFICATIONS AND DRAWINGS

The Government reserves the right to revise or amend the specifications and/or drawings prior to the date set for opening bids. Copies of such amendments will be furnished to all prospective bidders. If the revisions and amendments require material changes in quantities or prices bid, or both, the date set for bid opening may be extended to enable bidders the opportunity to revise their bids. The amendment will include an announcement of the new date for opening bids.

1.3 DEFINITIONS

a. Wherever in the specifications, or upon the drawings, the words "directed", "required", "ordered", "designated", "prescribed", or words of like import are used, it shall be understood that the "direction", "requirement", "order", "designation", or "prescription" of the Contracting Officer is intended, and similarly the words "approved", "acceptable", "satisfactory", or words of like import shall mean "approved by" or "acceptable to" or "satisfactory to" the Contracting Officer unless otherwise expressly stated.

b. Where "as shown", "as indicated", "as detailed", or words of like import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word "provided" as used herein shall be understood to mean "provided complete in place", that is, "furnished and installed". (FAR 52.236.21(b) and (c)).

c. Wherever in these specifications or upon the drawings, the words "Contracting Officer" (CO) or "Contracting Officer's Representative" (COR) are used, it shall be understood to also mean "Government" unless otherwise expressly stated.

d. Wherever in these specifications the acronym "GQAR" is used, it shall be understood to mean "Government Quality Assurance Representative", unless otherwise expressly stated.

e. Wherever in these specifications the word "weekend(s)" is used, it shall be understood to mean "Friday, Saturday, Sunday, and Federal Holidays", unless otherwise expressly stated.

f. Whenever in these specifications the word "Project" is used, it shall be understood to mean Jones Bluff Powerhouse.

PART 2 - PRODUCTS - NOT USED

PART 3 - PRODUCTS - NOT USED

-- End of Section --

File details come from the government source that posted it. Updated .