W9127819R0048_Contract_Drawing_Amendment.pdf

PDF 430 KB Posted

Attached to
Switchgear At Jones Bluff Powerhouse
Solicitation number
W9127819R0048
Issued by

About this file

This package includes drawings and contract amendments for installing new 15kV generator switchgear lineups at the Jones Bluff Powerhouse in Selma, Alabama. The scope of work consists of removing existing switchgear and installing two new government furnished 15kV lineups, one each for generators 1-2 and 3-4. Additional requirements include replacing cables from removed equipment to the new lineups, modifying bus duct and connectors, coordinating exhaust venting, replacing surge arrestors and capacitors, commissioning and testing, modifying synchronous condensing piping, removing and replacing a switchgear room door, and creating as-built drawings. The contractor must field verify existing drawings and conditions. This small business set-aside procurement issued under NAICS 335313 will be posted to the website for download on or around May 22, 2019. The agency is the Department of the Army Corps of Engineers Engineering District Mobile.

Amendment No. 4 Drawings

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUS ENCLOSURE

CONNECTION POINT

PLENUM PLENUM PLENUM PLENUM PLENUM PLENUM

VENT VENTVENT

METERS

RELAYS &

GEN 1

(2) P.T.

METERS

RELAYS &

GEN 2

(2) P.T.

CONTROL

GEN 1

(2) P.T.

CONTROL

GEN 2

(2) P.T.

ADVAC

2000A

GEN 1

52-710

ADVAC

2000A

GEN 2

52-720

ADVAC

2000A

FDR

SERVICE

STATION

52-812

COMP'T

AUX

COMP'T

AUX

SYNC

MAIN BUS

(2) P.T.

PLENUM

CUBICLE 1 CUBICLE 2 CUBICLE 3 CUBICLE 4 CUBICLE 5 CUBICLE 6 CUBICLE 7

PLENUM

VENT

2' 5 1/2 "3' 0"3' 0"3' 0"3' 0"3' 0"3' 0"

6"

1 1/2 "

3' 7 1/16 "

4' 4"

1 1/8 "

ELEVATION - FRONT VIEW

SCALE 1/2" = 1'

EXISTING CONCRETE BLOCKOUTSEXISTING CONCRETE BLOCKOUTS

BUS DUCT 1200A

GENERATOR 1

BUS DUCT 1200A

GENERATOR 2

BUS DUCT 2000A

TRANSFORMER

(CUBICLE 4 SIMILAR)

CUBICLE 1

PLENUM

VENT

CUBICLE 5

1' 8"

4' 4"

10'-0" TO FLOOR

(EL. 104.0)

EL. 120.79

/2

/2

2' 11 1/2 " 3' 0" 2' 11 5/8 " 3' 0" 3' 0"

1' 3"

OPEN

CLOSED

SEE NOTE 6

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

S

IZ

E

®of Engineers

US Army Corps

S T

E V

E N R

M

IL

E S P .E

F

IL

E N

A M

E

P O

W E

R H

O U

E

1 2 3 4 5 6 7 8 9 10

A N

S I

D

K V S

W

IT

C H

G E

A R I

N S

T A

L L

A L

A B

A M

A R

IV

E R

M O

B

IL

E

A L

A B

A M

J O

N E

S B

L U

F F P

R O J E

C T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

M O

B

IL

E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

P O

R T

L A

N D

O R

E G

O N

D R

A W

IN

G N

O

E-301

L

A U

G H

L

IN

D

D

IN

H

J B

P .0

-E -3

X X

X .d g n

REFERENCE DRAWINGS:

NOTES:

E L E

V A

T

IO

N V

IE

W

B K

R

K V S

W

IT

C H

G E

A R

S L

A U

G H

L

IN

4'2'0'

A N

S I

D

/0

/2

13.8KV SWITCHGEAR - FRONT VIEW

13.8KV SWITCHGEAR - SECTION VIEWS

JB - 61/6

JB - 51/44

CABLE TRAYS ARRANGEMENT SH. 1

SERVICE AREA FLOOR - EL. 121.0

JB - 59/3 13.8KV SWITCHGEAR - DETAILS

J B

P -1 .0

-6 -0

E /2

A

SCALE 1/2"=1'

GENERATOR 1 & 2 BUS

ELEVATION - SIDE VIEW

4'2'0' B

SCALE 1/2"=1'

TRANSFORMER BUS

ELEVATION - SIDE VIEW

4'2'0'

13.8KV SWITCHGEAR - FLOOR PLAN

DRAWING NUMBER TITLE

CS01343-C1B4102A

CS01343-C1B4103A

CS01343-C1B4104A

C O

N T

R A

C T A

M E

N D

M E

N T

/1

/1

DIMENSIONS: 95.5"W X 102.5"H

7. DOOR TO SWITCHGEAR ROOM WITH DOOR REMOVED,

TO FABRICATE AND INSTALL THE END PIECE OF THE EXHAUST FLUME.

6. CONTRACTOR TO COORDINATE WITH THE SWITCHGEAR MANUFACTURE

AND INSTALL NEW BRAIDED FLEXIBLE CONNECTORS.

FLEXIBLE LINKS CANNOT BE REUSED, THEN CONTRACTOR TO PROVIDE

5. REUSE FLEXIBLE LINKS, IF POSSIBLE, FOR RECONNECTING THE BUS. IF

OPENINGS.

PROPERLY ALIGN WITH THE DIMENSIONS OF THE GFE SWITCHGEAR

4. CONTRACTOR TO ENSURE THE INCOMING BUS SECTION ENCLOSURES

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION.

3. LOCATION OF EXISTING CONCRETE BLOCKOUTS ARE APPROXIMATE.

2. SWITCHGEAR IS GOVERNMENT FURNISHED EQUIPMENT (GFE).

1. BOLD/RED INDICATES EQUIPMENT TO BE REPLACED AND INSTALLED.

A

B

PLENUMPLENUMPLENUMPLENUMPLENUMPLENUM

VENTVENT VENT

PLENUM

CUBICLE 1 CUBICLE 2 CUBICLE 3 CUBICLE 4 CUBICLE 5 CUBICLE 6 CUBICLE 7

PLENUM

VENT

ELEVATION - FRONT VIEW

SCALE 1/2" = 1'-0"

BUS ENCLOSURE

CONNECTION POINT

METERS

RELAYS &

GEN 3

(2) P.T.

CONTROL

GEN 4

(2) P.T.

CONTROL

GEN 3

(2) P.T.

ADVAC

2000A

GEN 4

52-710

ADVAC

2000A

GEN 2

52-720

ADVAC

2000A

FDR

SERVICE

STATION

52-822

COMP'T

AUX

COMP'T

AUX

SYNC

MAIN BUS

(2) P.T.

METERS

RELAYS &

GEN 4

(2) P.T.

2' 5 1/2 " 3' 0" 3' 0" 3' 0" 3' 0" 3' 0" 3' 0"

6"

OPEN

CLOSED

1 1/8 "

4' 4"

3' 7 1/16 "

1 1/2 "

/2

/2

(CUBICLE 4 SIMILAR)

CUBICLE 7

PLENUM

VENT

CUBICLE 3

BUS DUCT 2000A

TRANSFORMER

BUS DUCT 1200A

GENERATOR 3

BUS DUCT 1200A

GENERATOR 4

1' 3"

EXISTING CONCRETE BLOCKOUTS

11'-0" TO FLOOR

(EL. 104.0)

EL. 120.79

EXISTING CONCRETE BLOCKOUTS

BUS ENCLOSURE

CONNECTION POINT

3' 0"3' 0"3' 0"3' 0"3' 0"

4' 4"

1' 8"

SEE NOTE 6

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

S

IZ

E

T

E V

E N R

M

IL

E S P .E

F

IL

E N

A M

E

P O

W E

R H

O U

E

1 2 3 4 5 6 7 8 9 10

N

S I

D

K V S

W

IT

C H

G E

A R I

N S

T A

L L

A L

A B

A M

A R

IV

E R

M O

B

IL

E

A L

A B

A M

J O

N E

S B

L U

F F P

R O J E

C T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

M O

B

IL

E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

P O

R T

L A

N D

O R

E G

O N

D R

A W

IN

G N

O

E-302

L

A U

G H

L

IN

D

D

IN

H

J B

P .0

-E -3

X X

X .d g n

REFERENCE DRAWINGS:

NOTES:

B K

R

K V S

W

IT

C H

G E

A R

E L E

V A

T

IO

N V

IE

W

A N

S I

D

/0

/2

S L

A U

G H

L

IN

4'2'0'

A

SCALE 1/2"=1'-0"

GENERATOR 3 & 4 BUS

ELEVATION - SIDE VIEW

4'2'0' B

SCALE 1/2"=1'-0"

TRANSFORMER BUS

ELEVATION - SIDE VIEW

4'2'0'

JB - 61/7

JB - 51/45

JB - 59/3

13.8KV SWITCHGEAR - FRONT VIEW

13.8KV SWITCHGEAR - SECTION VIEWS

CABLE TRAYS ARRANGEMENT SH. 2

SERVICE AREA FLOOR - EL. 121.0

13.8KV SWITCHGEAR - DETAILS

J B

P -1 .0

-6 -0

E /3

13.8KV SWITCHGEAR - FLOOR PLAN

DRAWING NUMBER TITLE

CS01343-C2B4102A

CS01343-C2B4103A

CS01343-C2B4104A

C O

N T

R A

C T A

M E

N D

M E

N T

/1

/1

TO FABRICATE AND INSTALL THE END PIECE OF THE EXHAUST FLUME.

6. CONTRACTOR TO COORDINATE WITH THE SWITCHGEAR MANUFACTURE

AND INSTALL NEW BRAIDED FLEXIBLE CONNECTORS.

FLEXIBLE LINKS CANNOT BE REUSED, THEN CONTRACTOR TO PROVIDE

5. REUSE FLEXIBLE LINKS, IF POSSIBLE, FOR RECONNECTING THE BUS. IF

OPENINGS.

PROPERLY ALIGN WITH THE DIMENSIONS OF THE GFE SWITCHGEAR

4. CONTRACTOR TO ENSURE THE INCOMING BUS SECTION ENCLOSURES

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION.

3. LOCATION OF EXISTING CONCRETE BLOCKOUTS ARE APPROXIMATE.

2. SWITCHGEAR IS GOVERNMENT FURNISHED EQUIPMENT (GFE).

1. BOLD/RED INDICATES EQUIPMENT TO BE REPLACED AND INSTALLED.

A

B

JBP1.003-E-301XXX
JBP1.003-E-302XXX

File details come from the government source that posted it. Updated .