W9127819R0048_Contract_Drawing_Amendment_5.pdf

PDF 432 KB Posted

Attached to
Switchgear At Jones Bluff Powerhouse
Solicitation number
W9127819R0048
Issued by

About this file

This package includes drawings and specifications for a federal contract solicitation to replace switchgear equipment at the Jones Bluff Powerhouse in Selma, Alabama. The scope of work consists of removing existing 15kV generator switchgear lineups for units 1-2 and 3-4, and installing new government furnished 15kV switchgear lineups in their place. Additional requirements include replacing cables from the removed equipment to the new equipment, replacing non-segregated bus and connectors to connect the generators and transformer to the new switchgear, coordinating with the manufacturer to design and install plenum ventilation for the new switchgear, replacing surge arrestors and capacitors, performing commissioning and testing, modifying a synchronous condensing pipe, removing and reframing a switchgear room door, and creating as-built drawings. The solicitation will be open to small businesses only with a NAICS code of 335313 and size standard of 500 employees. The work is to be performed at the Jones Bluff Powerhouse and the solicitation package will be available for download on or about May 22, 2019.

Amendment 5 - Contract Drawing

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUS ENCLOSURE

CONNECTION POINT

PLENUM PLENUM PLENUM PLENUM PLENUM PLENUM

VENT VENTVENT

METERS

RELAYS &

GEN 1

(2) P.T.

METERS

RELAYS &

GEN 2

(2) P.T.

CONTROL

GEN 1

(2) P.T.

CONTROL

GEN 2

(2) P.T.

ADVAC

2000A

GEN 1

52-710

ADVAC

2000A

GEN 2

52-720

ADVAC

2000A

FDR

SERVICE

STATION

52-812

COMP'T

AUX

COMP'T

AUX

SYNC

MAIN BUS

(2) P.T.

PLENUM

CUBICLE 1 CUBICLE 2 CUBICLE 3 CUBICLE 4 CUBICLE 5 CUBICLE 6 CUBICLE 7

PLENUM

VENT

2' 5 1/2 "3' 0"3' 0"3' 0"3' 0"3' 0"3' 0"

6"

1 1/2 "

3' 7 1/16 "

4' 4"

1 1/8 "

ELEVATION - FRONT VIEW

SCALE 1/2" = 1'

EXISTING CONCRETE BLOCKOUTSEXISTING CONCRETE BLOCKOUTS

BUS DUCT 1200A

GENERATOR 1

BUS DUCT 1200A

GENERATOR 2

BUS DUCT 2000A

TRANSFORMER

(CUBICLE 4 SIMILAR)

CUBICLE 1

PLENUM

VENT

CUBICLE 5

1' 8"

4' 4"

10'-0" TO FLOOR

(EL. 104.0)

EL. 120.79

/2

/2

2' 11 1/2 " 3' 0" 2' 11 5/8 " 3' 0" 3' 0"

1' 3"

OPEN

CLOSED

SEE NOTE 6

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

S

IZ

E

®of Engineers

US Army Corps

S T

E V

E N R

M

IL

E S P .E

F

IL

E N

A M

E

P O

W E

R H

O U

E

1 2 3 4 5 6 7 8 9 10

A N

S I

D

K V S

W

IT

C H

G E

A R I

N S

T A

L L

A L

A B

A M

A R

IV

E R

M O

B

IL

E

A L

A B

A M

J O

N E

S B

L U

F F P

R O J E

C T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

M O

B

IL

E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

P O

R T

L A

N D

O R

E G

O N

D R

A W

IN

G N

O

E-301

L

A U

G H

L

IN

D

D

IN

H

J B

P .0

-E -3

X X

X .d g n

REFERENCE DRAWINGS:

NOTES:

E L E

V A

T

IO

N V

IE

W

B K

R

K V S

W

IT

C H

G E

A R

S L

A U

G H

L

IN

4'2'0'

A N

S I

D

/0

/2

13.8KV SWITCHGEAR - FRONT VIEW

13.8KV SWITCHGEAR - SECTION VIEWS

JB - 61/6

JB - 51/44

CABLE TRAYS ARRANGEMENT SH. 1

SERVICE AREA FLOOR - EL. 121.0

JB - 59/3 13.8KV SWITCHGEAR - DETAILS

J B

P -1 .0

-6 -0

E /2

A

SCALE 1/2"=1'

GENERATOR 1 & 2 BUS

ELEVATION - SIDE VIEW

4'2'0' B

SCALE 1/2"=1'

TRANSFORMER BUS

ELEVATION - SIDE VIEW

4'2'0'

13.8KV SWITCHGEAR - FLOOR PLAN

DRAWING NUMBER TITLE

CS01343-C1B4102A

CS01343-C1B4103A

CS01343-C1B4104A

C O

N T

R A

C T A

M E

N D

M E

N T

/1

/1

DIMENSIONS: 95.5"W X 102.5"H

7. DOOR TO SWITCHGEAR ROOM WITH DOOR REMOVED,

TO INSTALL THE END PIECE OF THE EXHAUST FLUME (GFE).

6. CONTRACTOR TO COORDINATE WITH THE SWITCHGEAR MANUFACTURE

AND INSTALL NEW BRAIDED FLEXIBLE CONNECTORS.

FLEXIBLE LINKS CANNOT BE REUSED, THEN CONTRACTOR TO PROVIDE

5. REUSE FLEXIBLE LINKS, IF POSSIBLE, FOR RECONNECTING THE BUS. IF

OPENINGS.

PROPERLY ALIGN WITH THE DIMENSIONS OF THE GFE SWITCHGEAR

4. CONTRACTOR TO ENSURE THE INCOMING BUS SECTION ENCLOSURES

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION.

3. LOCATION OF EXISTING CONCRETE BLOCKOUTS ARE APPROXIMATE.

2. SWITCHGEAR IS GOVERNMENT FURNISHED EQUIPMENT (GFE).

1. BOLD/RED INDICATES EQUIPMENT TO BE REPLACED AND INSTALLED.

A

B

PLENUMPLENUMPLENUMPLENUMPLENUMPLENUM

VENTVENT VENT

PLENUM

CUBICLE 1 CUBICLE 2 CUBICLE 3 CUBICLE 4 CUBICLE 5 CUBICLE 6 CUBICLE 7

PLENUM

VENT

ELEVATION - FRONT VIEW

SCALE 1/2" = 1'-0"

BUS ENCLOSURE

CONNECTION POINT

METERS

RELAYS &

GEN 3

(2) P.T.

CONTROL

GEN 4

(2) P.T.

CONTROL

GEN 3

(2) P.T.

ADVAC

2000A

GEN 4

52-710

ADVAC

2000A

GEN 2

52-720

ADVAC

2000A

FDR

SERVICE

STATION

52-822

COMP'T

AUX

COMP'T

AUX

SYNC

MAIN BUS

(2) P.T.

METERS

RELAYS &

GEN 4

(2) P.T.

2' 5 1/2 " 3' 0" 3' 0" 3' 0" 3' 0" 3' 0" 3' 0"

6"

OPEN

CLOSED

1 1/8 "

4' 4"

3' 7 1/16 "

1 1/2 "

/2

/2

(CUBICLE 4 SIMILAR)

CUBICLE 7

PLENUM

VENT

CUBICLE 3

BUS DUCT 2000A

TRANSFORMER

BUS DUCT 1200A

GENERATOR 3

BUS DUCT 1200A

GENERATOR 4

1' 3"

EXISTING CONCRETE BLOCKOUTS

11'-0" TO FLOOR

(EL. 104.0)

EL. 120.79

EXISTING CONCRETE BLOCKOUTS

BUS ENCLOSURE

CONNECTION POINT

3' 0"3' 0"3' 0"3' 0"3' 0"

4' 4"

1' 8"

SEE NOTE 6

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

S

IZ

E

T

E V

E N R

M

IL

E S P .E

F

IL

E N

A M

E

P O

W E

R H

O U

E

1 2 3 4 5 6 7 8 9 10

N

S I

D

K V S

W

IT

C H

G E

A R I

N S

T A

L L

A L

A B

A M

A R

IV

E R

M O

B

IL

E

A L

A B

A M

J O

N E

S B

L U

F F P

R O J E

C T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

M O

B

IL

E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

P O

R T

L A

N D

O R

E G

O N

D R

A W

IN

G N

O

E-302

L

A U

G H

L

IN

D

D

IN

H

J B

P .0

-E -3

X X

X .d g n

REFERENCE DRAWINGS:

NOTES:

B K

R

K V S

W

IT

C H

G E

A R

E L E

V A

T

IO

N V

IE

W

A N

S I

D

/0

/2

S L

A U

G H

L

IN

4'2'0'

A

SCALE 1/2"=1'-0"

GENERATOR 3 & 4 BUS

ELEVATION - SIDE VIEW

4'2'0' B

SCALE 1/2"=1'-0"

TRANSFORMER BUS

ELEVATION - SIDE VIEW

4'2'0'

JB - 61/7

JB - 51/45

JB - 59/3

13.8KV SWITCHGEAR - FRONT VIEW

13.8KV SWITCHGEAR - SECTION VIEWS

CABLE TRAYS ARRANGEMENT SH. 2

SERVICE AREA FLOOR - EL. 121.0

13.8KV SWITCHGEAR - DETAILS

J B

P -1 .0

-6 -0

E /3

13.8KV SWITCHGEAR - FLOOR PLAN

DRAWING NUMBER TITLE

CS01343-C2B4102A

CS01343-C2B4103A

CS01343-C2B4104A

C O

N T

R A

C T A

M E

N D

M E

N T

/1

/1

TO INSTALL THE END PIECE OF THE EXHAUST FLUME (GFE).

6. CONTRACTOR TO COORDINATE WITH THE SWITCHGEAR MANUFACTURE

AND INSTALL NEW BRAIDED FLEXIBLE CONNECTORS.

FLEXIBLE LINKS CANNOT BE REUSED, THEN CONTRACTOR TO PROVIDE

5. REUSE FLEXIBLE LINKS, IF POSSIBLE, FOR RECONNECTING THE BUS. IF

OPENINGS.

PROPERLY ALIGN WITH THE DIMENSIONS OF THE GFE SWITCHGEAR

4. CONTRACTOR TO ENSURE THE INCOMING BUS SECTION ENCLOSURES

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION.

3. LOCATION OF EXISTING CONCRETE BLOCKOUTS ARE APPROXIMATE.

2. SWITCHGEAR IS GOVERNMENT FURNISHED EQUIPMENT (GFE).

1. BOLD/RED INDICATES EQUIPMENT TO BE REPLACED AND INSTALLED.

A

B

JBP1.003-E-301XXX
JBP1.003-E-302XXX