W9127819R0048_Contract_Drawing_Amendment_5.pdf
PDF 432 KB Posted
- Attached to
- Switchgear At Jones Bluff Powerhouse
- Solicitation number
- W9127819R0048
About this file
This package includes drawings and specifications for a federal contract solicitation to replace switchgear equipment at the Jones Bluff Powerhouse in Selma, Alabama. The scope of work consists of removing existing 15kV generator switchgear lineups for units 1-2 and 3-4, and installing new government furnished 15kV switchgear lineups in their place. Additional requirements include replacing cables from the removed equipment to the new equipment, replacing non-segregated bus and connectors to connect the generators and transformer to the new switchgear, coordinating with the manufacturer to design and install plenum ventilation for the new switchgear, replacing surge arrestors and capacitors, performing commissioning and testing, modifying a synchronous condensing pipe, removing and reframing a switchgear room door, and creating as-built drawings. The solicitation will be open to small businesses only with a NAICS code of 335313 and size standard of 500 employees. The work is to be performed at the Jones Bluff Powerhouse and the solicitation package will be available for download on or about May 22, 2019.
Amendment 5 - Contract Drawing
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUS ENCLOSURE
CONNECTION POINT
PLENUM PLENUM PLENUM PLENUM PLENUM PLENUM
VENT VENTVENT
METERS
RELAYS &
GEN 1
(2) P.T.
METERS
RELAYS &
GEN 2
(2) P.T.
CONTROL
GEN 1
(2) P.T.
CONTROL
GEN 2
(2) P.T.
ADVAC
2000A
GEN 1
52-710
ADVAC
2000A
GEN 2
52-720
ADVAC
2000A
FDR
SERVICE
STATION
52-812
COMP'T
AUX
COMP'T
AUX
SYNC
MAIN BUS
(2) P.T.
PLENUM
CUBICLE 1 CUBICLE 2 CUBICLE 3 CUBICLE 4 CUBICLE 5 CUBICLE 6 CUBICLE 7
PLENUM
VENT
2' 5 1/2 "3' 0"3' 0"3' 0"3' 0"3' 0"3' 0"
6"
1 1/2 "
3' 7 1/16 "
4' 4"
1 1/8 "
ELEVATION - FRONT VIEW
SCALE 1/2" = 1'
EXISTING CONCRETE BLOCKOUTSEXISTING CONCRETE BLOCKOUTS
BUS DUCT 1200A
GENERATOR 1
BUS DUCT 1200A
GENERATOR 2
BUS DUCT 2000A
TRANSFORMER
(CUBICLE 4 SIMILAR)
CUBICLE 1
PLENUM
VENT
CUBICLE 5
1' 8"
4' 4"
10'-0" TO FLOOR
(EL. 104.0)
EL. 120.79
/2
/2
2' 11 1/2 " 3' 0" 2' 11 5/8 " 3' 0" 3' 0"
1' 3"
OPEN
CLOSED
SEE NOTE 6
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
S
IZ
E
®of Engineers
US Army Corps
S T
E V
E N R
M
IL
E S P .E
F
IL
E N
A M
E
P O
W E
R H
O U
E
1 2 3 4 5 6 7 8 9 10
A N
S I
D
K V S
W
IT
C H
G E
A R I
N S
T A
L L
A L
A B
A M
A R
IV
E R
M O
B
IL
E
A L
A B
A M
J O
N E
S B
L U
F F P
R O J E
C T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
M O
B
IL
E D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
P O
R T
L A
N D
O R
E G
O N
D R
A W
IN
G N
O
E-301
L
A U
G H
L
IN
D
D
IN
H
J B
P .0
-E -3
X X
X .d g n
REFERENCE DRAWINGS:
NOTES:
E L E
V A
T
IO
N V
IE
W
B K
R
K V S
W
IT
C H
G E
A R
S L
A U
G H
L
IN
4'2'0'
A N
S I
D
/0
/2
13.8KV SWITCHGEAR - FRONT VIEW
13.8KV SWITCHGEAR - SECTION VIEWS
JB - 61/6
JB - 51/44
CABLE TRAYS ARRANGEMENT SH. 1
SERVICE AREA FLOOR - EL. 121.0
JB - 59/3 13.8KV SWITCHGEAR - DETAILS
J B
P -1 .0
-6 -0
E /2
A
SCALE 1/2"=1'
GENERATOR 1 & 2 BUS
ELEVATION - SIDE VIEW
4'2'0' B
SCALE 1/2"=1'
TRANSFORMER BUS
ELEVATION - SIDE VIEW
4'2'0'
13.8KV SWITCHGEAR - FLOOR PLAN
DRAWING NUMBER TITLE
CS01343-C1B4102A
CS01343-C1B4103A
CS01343-C1B4104A
C O
N T
R A
C T A
M E
N D
M E
N T
/1
/1
DIMENSIONS: 95.5"W X 102.5"H
7. DOOR TO SWITCHGEAR ROOM WITH DOOR REMOVED,
TO INSTALL THE END PIECE OF THE EXHAUST FLUME (GFE).
6. CONTRACTOR TO COORDINATE WITH THE SWITCHGEAR MANUFACTURE
AND INSTALL NEW BRAIDED FLEXIBLE CONNECTORS.
FLEXIBLE LINKS CANNOT BE REUSED, THEN CONTRACTOR TO PROVIDE
5. REUSE FLEXIBLE LINKS, IF POSSIBLE, FOR RECONNECTING THE BUS. IF
OPENINGS.
PROPERLY ALIGN WITH THE DIMENSIONS OF THE GFE SWITCHGEAR
4. CONTRACTOR TO ENSURE THE INCOMING BUS SECTION ENCLOSURES
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION.
3. LOCATION OF EXISTING CONCRETE BLOCKOUTS ARE APPROXIMATE.
2. SWITCHGEAR IS GOVERNMENT FURNISHED EQUIPMENT (GFE).
1. BOLD/RED INDICATES EQUIPMENT TO BE REPLACED AND INSTALLED.
A
B
PLENUMPLENUMPLENUMPLENUMPLENUMPLENUM
VENTVENT VENT
PLENUM
CUBICLE 1 CUBICLE 2 CUBICLE 3 CUBICLE 4 CUBICLE 5 CUBICLE 6 CUBICLE 7
PLENUM
VENT
ELEVATION - FRONT VIEW
SCALE 1/2" = 1'-0"
BUS ENCLOSURE
CONNECTION POINT
METERS
RELAYS &
GEN 3
(2) P.T.
CONTROL
GEN 4
(2) P.T.
CONTROL
GEN 3
(2) P.T.
ADVAC
2000A
GEN 4
52-710
ADVAC
2000A
GEN 2
52-720
ADVAC
2000A
FDR
SERVICE
STATION
52-822
COMP'T
AUX
COMP'T
AUX
SYNC
MAIN BUS
(2) P.T.
METERS
RELAYS &
GEN 4
(2) P.T.
2' 5 1/2 " 3' 0" 3' 0" 3' 0" 3' 0" 3' 0" 3' 0"
6"
OPEN
CLOSED
1 1/8 "
4' 4"
3' 7 1/16 "
1 1/2 "
/2
/2
(CUBICLE 4 SIMILAR)
CUBICLE 7
PLENUM
VENT
CUBICLE 3
BUS DUCT 2000A
TRANSFORMER
BUS DUCT 1200A
GENERATOR 3
BUS DUCT 1200A
GENERATOR 4
1' 3"
EXISTING CONCRETE BLOCKOUTS
11'-0" TO FLOOR
(EL. 104.0)
EL. 120.79
EXISTING CONCRETE BLOCKOUTS
BUS ENCLOSURE
CONNECTION POINT
3' 0"3' 0"3' 0"3' 0"3' 0"
4' 4"
1' 8"
SEE NOTE 6
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
S
IZ
E
T
E V
E N R
M
IL
E S P .E
F
IL
E N
A M
E
P O
W E
R H
O U
E
1 2 3 4 5 6 7 8 9 10
N
S I
D
K V S
W
IT
C H
G E
A R I
N S
T A
L L
A L
A B
A M
A R
IV
E R
M O
B
IL
E
A L
A B
A M
J O
N E
S B
L U
F F P
R O J E
C T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
M O
B
IL
E D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
P O
R T
L A
N D
O R
E G
O N
D R
A W
IN
G N
O
E-302
L
A U
G H
L
IN
D
D
IN
H
J B
P .0
-E -3
X X
X .d g n
REFERENCE DRAWINGS:
NOTES:
B K
R
K V S
W
IT
C H
G E
A R
E L E
V A
T
IO
N V
IE
W
A N
S I
D
/0
/2
S L
A U
G H
L
IN
4'2'0'
A
SCALE 1/2"=1'-0"
GENERATOR 3 & 4 BUS
ELEVATION - SIDE VIEW
4'2'0' B
SCALE 1/2"=1'-0"
TRANSFORMER BUS
ELEVATION - SIDE VIEW
4'2'0'
JB - 61/7
JB - 51/45
JB - 59/3
13.8KV SWITCHGEAR - FRONT VIEW
13.8KV SWITCHGEAR - SECTION VIEWS
CABLE TRAYS ARRANGEMENT SH. 2
SERVICE AREA FLOOR - EL. 121.0
13.8KV SWITCHGEAR - DETAILS
J B
P -1 .0
-6 -0
E /3
13.8KV SWITCHGEAR - FLOOR PLAN
DRAWING NUMBER TITLE
CS01343-C2B4102A
CS01343-C2B4103A
CS01343-C2B4104A
C O
N T
R A
C T A
M E
N D
M E
N T
/1
/1
TO INSTALL THE END PIECE OF THE EXHAUST FLUME (GFE).
6. CONTRACTOR TO COORDINATE WITH THE SWITCHGEAR MANUFACTURE
AND INSTALL NEW BRAIDED FLEXIBLE CONNECTORS.
FLEXIBLE LINKS CANNOT BE REUSED, THEN CONTRACTOR TO PROVIDE
5. REUSE FLEXIBLE LINKS, IF POSSIBLE, FOR RECONNECTING THE BUS. IF
OPENINGS.
PROPERLY ALIGN WITH THE DIMENSIONS OF THE GFE SWITCHGEAR
4. CONTRACTOR TO ENSURE THE INCOMING BUS SECTION ENCLOSURES
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION.
3. LOCATION OF EXISTING CONCRETE BLOCKOUTS ARE APPROXIMATE.
2. SWITCHGEAR IS GOVERNMENT FURNISHED EQUIPMENT (GFE).
1. BOLD/RED INDICATES EQUIPMENT TO BE REPLACED AND INSTALLED.
A
B
| JBP1.003-E-301XXX |
| JBP1.003-E-302XXX |
File details come from the government source that posted it. Updated .