DPW - 03051

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. The purpose of this amendment 0001 is to (1) answ er questions, and (2) incorporate the revised Statement of Work in its entirety to include Technical Exhibit 9. Revisions are marked in red.

B. A signed copy of this amendment shall be included in the proposal.

C. All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124N19B0002

X 9B. DATED (SEE ITEM 11)

08-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Aug-2019

CODE

MICC - PRESIDIO OF MONTEREY

ATTN: BRITTNEY WILSON

400 GIGLING RD.

SEASIDE CA 93955-

W9124N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9124N19B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMD 0001 (Q&A)

Project: B620 Retrofit Channel/Infiltration Swale Solicitation: W9124N-19-B-0002 Q&A:

1. Paragraph 5.b of the Statement of Work indicates that the project must comply with all environmental requirements that are provided in the Environmental Assessment for the Presidio of Monterey Integrated Water Sustainability Concept Plan, November 2018. It does not appear that this document has been provided to bidders for review. Please provide a copy of this referenced document.

As per Paragraph 5.b, see Technical Exhibit (TE) 9 in the revised Statement of Work (SOW) for the environmental requirements of the Environmental Assessment for the Presidio of Monterey Integrated Water Sustainability Concept Plan, November 2018. The environmental requirements that are applicable to this project are highlighted in yellow in

TE 9.

2. Paragraph 5.e of the Statement of Work indicates that a professional archaeologist is required to monitor ground disturbance activities. Is the contractor responsible for the cost associated with providing the archaeologist? If so, what are the parameters bidders should assume (onsite at all times during excavation; post excavation observations only;

etc.).

Per Paragraph 5.e, a professional archeologist must be on site at all times during excavation. The contractor is responsible for the cost of procuring and utilizing services of a professional archeologist.

3. Paragraph 5.g of the Statement of Work states that "Staging areas must be on DPW

Environmental-approved hardscape areas." Please provide additional information as to the actual location where contractors will be allowed to stage equipment and materials as there does not appear to be hardscape areas adjacent to the work area with the exception of parking stalls and roadways.

Per Paragraph 5.g, the DPW Environmental-approved hardscape areas will be determined by installation personnel when more details are known as to how large the staging area will be, what type of equipment will need to be staged, and project duration. Assume the staging area will be in an adjacent parking lot.

W9124N19B0002

4. Paragraph 5.g of the Statement of Work indicates that contractor equipment is to be kept on hardscape. Please clarify whether this is specific to storing equipment or if it is expected that all work utilizing equipment is to be completed with the equipment on hardscape.

Per Paragraph 5.g, equipment must be stored on DPW Environmental-approved hardscaped areas, which will be determined by installation personnel. It is expected that equipment will be used on the landscape given the nature of the work. Therefore, utilizing equipment on landscaped areas is permitted.

REVISED SOW

Revised Statement of Work (SOW) is manually attached.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENT DESCRIPTION

The following documents are hereby incorporated into this solicitation:

1. Statement of Work – 03051 (Revised SOW was incorporated by Amendment 0001)

2. Wage Determination – CA 20190018 dated 5/3/2019

(End of Summary of Changes)