About this file

This federal contract opportunity notice describes a planned solicitation for construction services at the Military Ocean Terminal Concord (MOTCO) Access Control Point (ACP) gate 1 in California. Upgrades are required for the ACP gate, including construction of a Visitor Control Center, Gate House, overwatch booths, guard booths, vehicle and truck inspection canopies, roadways, parking, lighting, security and information systems, utilities, and site development. The work also involves demolition, relocation of a mail freight facility and arms storage building, and supporting landscaping and signage. The estimated value is between $10,000 and $25,000. The solicitation is expected to be unrestricted and issued on October 28th, 2020 via beta.SAM.gov, with proposals due December 3rd, 2020. Interested vendors should monitor the site for any changes. The Army Corps of Engineers Engineering District Sacramento will conduct the procurement using NAICS 236220 and PS Code Y1JZ.

View the file

Other files for this federal contract opportunity

Other files attached to MOTCO Access Control Point (ACP) Gate 1, newest first.
File Type Posted
Amendment 5 - Drawings.pdf PDF
Amendment 0005.pdf PDF
Amendment 5 - Narrative of changes.pdf PDF
Amendment 4 - Narrative of Changes.pdf PDF
Amendment 0004 - Posted revised specs and drawings and posted narrative of changes.pdf PDF
Amendment 4-Drawings.pdf PDF
Amendment 4 -Technical Specifications.pdf PDF
Amendment 0003 - Extend Due Date and Questions Period and Posted revised Specs.pdf PDF
W9123821R0005 Amendment 0003.pdf PDF
Amendment 3 -Specs. Section 34 71 13.9 11.24.20.pdf PDF
Amendment 0003.pdf PDF
Amendment 3-Specifications- Section 34 71 13.19 11.24.20.pdf PDF
Site visit pictures 11.17.20.pdf PDF
Site Visit Sign-in Sheet 11.17.20.pdf PDF
Amendment 0002.pdf PDF
Amendment 0002.pdf PDF
Amendment 1 - Drawings Electrical Site - 10.29.20.pdf PDF
Amendment 1 - Drawings - Access Control Point - 10.29.20.pdf PDF
Amendment 0001.pdf PDF
Amendment 1 - Specifications - 10.29.20.pdf PDF
Attachment 2 Drawings-Access Control Point.pdf PDF
Attachment 6 Past Performance Questionnaire.pdf PDF
W9123821R0005.pdf PDF
Attachment 3 Drawings - Electrical Site.pdf PDF
Attachment 4 DB Wage Determination.pdf PDF
Attachment 1 Specifications.pdf PDF
Attachment 5 Pre-Award Survey.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 88 PAGES

Gate 1 ACP, PN 074877, MOTCO, Concord, CA

01 00 00 SD-01 Preconstruction Submittals

1.11.1 GPreconstruction Quantity Survey

Plan 1.11.1.1Preconstruction Access Road

Survey 1.11.1.2Post-construction Access Road

Survey 01 11 00 SD-01 Preconstruction Submittals

1.7 G ROSalvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.4.1.1 GPersonnel List

1.3.1.1 Glist of contact personnel

01 30 00 SD-01 Preconstruction Submittals

1.3 G ROView Location Map

1.18.1 G ROPreconstruction Quantity Survey

Plan 1.18.1.1Preconstruction Access Road

Survey 1.18.1.2Post-construction Access Road

Survey 01 32 01 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.5Bar Chart Schedule

3.1 GProject Schedule

3.5.1 GPreliminary Project Schedule

3.5.2 GInitial Project Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Revised in Accordance with Am #0005

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 88 PAGES

01 32 01 3.6.1Data Optical Discs

3.5.3 GPeriodic Schedule Update

3.7.2 GPeriodic Schedule Update

3.9.1 GJustification of Delay

3.9.3 GTime Impact Analysis

3.9.4 GForensic Schedule Analysis

3.1.1 GSchedule Status Report

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

SD-02 Shop Drawings 1.13Mechanical Room Layout

Drawings 01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 G DOPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G DOSustainability Action Plan

1.5.3.1 G DOPreliminary Sustainability

eNotebook SD-11 Closeout Submittals

1.5.3.1 G DOFinal High Performance and

Sustainable Building Checklist

1.5.3.1 G DOFinal Sustainability eNotebook

1.5.3.1 G DOAmended Final Sustainability

eNotebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 88 PAGES

01 33 29 1.5.3.1 G DOAmended Final High Performance and Sustainable Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.6 G DOAccident Prevention Plan (APP)

3.7 GMunitions and Explosives of

Concern (MEC) Support Plan

1.6.2.11 GHealth Hazard Control Plan

1.6.2.12 GEmergency Action Plan

1.6.2.2 GStandard Lift Plan

1.6.2.3 G DOCritical Lift Plan

1.7Activity Hazard Analysis (AHA)

SD-06 Test Reports 1.11.3Monthly Exposure Reports 1.11Notifications and Reports

1.11.2 G DOAccident Investigation Reports

1.11.4LHE Inspection Reports 1.11.6Regulatory Citations and

Violations SD-07 Certificates

1.5.1.4Crane Operators/Riggers 1.8.1Confined Space Entry Permit 1.8.1Hot Work Permit 1.11.5Certificate of Compliance 3.7Excavation Permit 1.5.1.4Proof of Current Qualification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 88 PAGES

01 45 00 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control Plan

3.7.2.1 GMTC validation

SD-06 Test Reports 3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals 3.1.2Written Practices 3.1.2NDT Procedures and Equipment

Calibration Records SD-06 Test Reports

3.1.2Daily Reports 3.1.1Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1Steel Truss Plant 2.1AC472 Accreditation 2.1Steel Joist Institute Membership 2.1Certificate of Compliance

1.5 GSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals 3.1.2Interim Final Report

3.1.2 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.1.10.1 G DOTraffic Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 88 PAGES

01 50 00 1.4 GTemporary Earthwork Plan

3.1.10.3 GDust Control Methods And

Procedures SD-06 Test Reports

2.4Backflow Preventer Tests SD-07 Certificates

1.7.1Backflow Tester 1.7Backflow Preventers 1.7.2Backflow Prevention Training

Certificate 01 57 20 SD-01 Preconstruction Submittals

1.7 G DOEnvironmental Protection Plan

3.8 G DOEnvironmental Protection Plan

1.7.4 G DOEnvironmental Permit Application

3.5.2 G DOEnvironmental Permit Application

3.5.3 G DOAsbestos Dust Control Plan

SD-06 Test Reports 3.5.1Air Quality Control Plan Reports 3.5.2PERP Data 3.5.9.1PERP Data

01 57 23 SD-01 Preconstruction Submittals

1.6.1 G DOSWPPP

1.6.1 G DOSWPPP

1.6.2 G DOPRDs

1.6.2 G DOPRDs

1.6.2 G DOPRDs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 88 PAGES

01 57 23 SD-03 Product Data 1.6.1.3BMP Product Data 3.1.1BMP Product Data 3.1.1BMP Product Data 3.1.1BMP Product Data

2.1.1.7 G DOGeotextiles And Mats

SD-06 Test Reports 3.1.1SWPPP Amendment 3.2.1SWPPP Amendment 3.2.1SWPPP Amendment 3.2.1SWPPP Amendment 3.2.1SWPPP Amendment 3.2.1SWPPP Amendment 1.6.2Sampling Results 3.2.5Sampling Results 3.2.6.1Sampling Results 3.2.2REAPs and Inspection Reports 3.2.3REAPs and Inspection Reports 3.2.3REAPs and Inspection Reports 3.2.1Exceedance Reports 1.6.2Annual Report 3.1.2Annual Report 3.1.2Annual Report

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 88 PAGES

01 57 23 3.1.2 G DOPost-Construction Storm Water Management Plan

3.1.2 G DOPost-Construction Storm Water

Management Plan

SD-11 Closeout Submittals

3.1.2 G DOFinal SWPPP

3.2.1 G DOFinal SWPPP

3.1.2 G DONOT Application

3.1.2 G DONOT Application

3.1.2 G DONOT Application

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals 1.7Records

01 78 00 SD-03 Product Data 1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.5Spare Parts Data

SD-06 Test Reports

3.1.4 Gworking as-built drawings

3.2 G DOfinal as-built record drawings

SD-08 Manufacturer’s Instructions 1.7.1Instructions

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 88 PAGES

01 78 00 3.9Operation and Maintenance Manuals

SD-11 Closeout Submittals

1.3.4 G DORecord Drawings

2.3 GCertification of EPA Designated

Items

3.11 GInterim DD FORM 1354

3.11 GChecklist for DD FORM 1354

3.6 GFinal Approved Shop Drawings

3.7 GConstruction Contract

Specifications 3.8As-Built Record Of Equipment

And Materials 02 41 00 SD-01 Preconstruction Submittals

1.2.1 G RODemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.6 G RONotification

SD-11 Closeout Submittals 3.3.2Receipts

02 82 00 SD-03 Product Data

1.2.2 G ROAmended Water

1.3.9 G ROSafety Data Sheets (SDS) for All

Materials

2.1 G ROEncapsulants

3.1.2.1 G RORespirators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 88 PAGES

02 82 00 3.1.7 G ROLocal Exhaust Equipment

3.1.7 GPressure Differential Automatic

Recording Instrument

3.1.8 G ROVacuums

SD-06 Test Reports

1.5.5 G ROAir Sampling Results

1.5.6 G ROPressure Differential Recordings

for Local Exhaust System

3.3.3.2 G ROAsbestos Disposal Quantity

Report SD-07 Certificates

1.3.4 G ROEmployee Training

1.3.5 G RONotifications

1.3.7 G RORespiratory Protection Program

1.3.10 G ROAsbestos Hazard Abatement

Plan

1.3.11 G ROTesting Laboratory

1.3.12 G ROLandfill Approval

1.3.12 G RODelivery Tickets

1.3.12 G ROWaste Shipment Records

1.3.13 G ROTransporter Certification

1.3.14 G ROMedical Certification

1.5.1 G ROPrivate Qualified Person

Documentation

1.5.2 G ROCompetent Person

1.5.3 G ROWorker's License

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 88 PAGES

02 82 00 1.5.4 G ROContractor's License

1.5.9 G ROFederal, State or Local Citations

on Previous Projects

2.1 G ROEncapsulants

3.1 G ROEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 G ROWater Filtration Equipment

3.1.8 G ROVacuums

3.1.8 G ROVentilation Systems

SD-11 Closeout Submittals

1.3.5 G ROPermits and Licenses

1.3.5 G RONotifications

1.3.7.1 G RORespirator Program Records

1.5.7 G ROProtective Clothing

Decontamination Quality Control Records

1.5.8 G ROProtective Clothing

Decontamination Facility Notification

1.7.1 G RORental Equipment

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 G ROCompetent Person

1.5.1.2 G ROTraining Certification

1.5.2.4 G ROMedical Examinations

1.5.2.8 G ROLead Waste Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 88 PAGES

02 83 00 1.5.3 G ROLicenses, Permits and Notifications

1.5.2.2 G ROLead Compliance Plan

3.5.2.1 G ROWritten Evidence of TSD

Approval SD-03 Product Data

1.6.1 G RORespirators

1.6.4 G ROVacuum Filters

2.1 G ROMaterials and Equipment

2.1.1 G ROExpendable Supplies

SD-06 Test Reports

1.3.3 G ROSampling and Analysis

1.5.2.3 G ROOccupational and Environmental

Assessment Data Report

1.5.2.3 G ROSampling Results

SD-07 Certificates

1.5.1.3 G ROTesting Laboratory

SD-11 Closeout Submittals

3.5.2.1 G ROHazardous Waste Manifest

3.5.2.1 G ROTurn-In Documents or Weight

Tickets 03 30 53 SD-02 Shop Drawings

1.4Installation Drawings

1.4.1 GReinforcing Steel

SD-03 Product Data 2.2.3.1Air-Entraining Admixture

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 88 PAGES

03 30 53 2.2.3.2 GAccelerating Admixture 2.2.3.3Water-Reducing or Retarding

Admixture 2.2.11Curing Materials 2.2.6Expansion Joint Filler Strips, Premolded 2.2.7Joint Sealants - Field Molded

Sealants 3.2Conveying and Placing Concrete 2.2.8Formwork

2.3 GMix Design Data

2.3Ready-Mix Concrete 2.4.1Curing Compound 2.2.5Mechanical Reinforcing Bar

Connectors SD-06 Test Reports

2.2.2Aggregates

2.1.3 GConcrete Mixture Proportions

3.9.3 GCompressive Strength Testing

3.9.3Slump 3.9.3Air Content 2.2.4Water

SD-07 Certificates 2.2.1Cementitious Materials 2.2.1.2Pozzolan 2.2.2Aggregates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 88 PAGES

03 30 53 2.3Delivery Tickets SD-08 Manufacturer’s Instructions

2.4.1Curing Compound 03 42 13.00 10 SD-01 Preconstruction Submittals

1.3.2.2Quality Control Procedures SD-02 Shop Drawings

2.1.1 G ROStandard Precast Units

2.1.2 G ROCustom-Made Precast Units

3.2.4.3Special Finishes

SD-03 Product Data 2.1.1Standard Precast Units 2.1.3Proprietary Precast Units 3.1.3Embedded Items 2.2.6Accessories

SD-05 Design Data

2.1.2 G RODesign Calculations

2.1.5.1Concrete Mix Proportions

SD-06 Test Reports 1.3.2.4Test Reports

SD-07 Certificates 1.3.2.2Quality Control Procedures

SD-11 Closeout Submittals

2.2.1 SRecycled content for fly ash and

pozzolan

2.2.1 SRecycled content for Ground Iron

Blast-Furnace Slag

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 88 PAGES

03 42 13.00 10 2.2.1 SRecycled content for Silica Fume

2.2.1 SRecycled content for Synthetic

Fiber Reinforcement

2.2.1 SRecycled content for steel

04 20 00 SD-02 Shop Drawings

3.3.4.1 G OMACut CMU

3.4.1.1 G OMADetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2.2.1 GCement

2.4.1.1 GCementitious Materials

2.6.7 GInsulation

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2.2 GConcrete Masonry Units (CMU)

2.4.1.3 GAdmixtures for Masonry Mortar

2.6.2 G OMAAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

2.6.7 GInsulation

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

2.2.2.4Fire-Rated Concrete Masonry

Units

3.2.5 GBracing Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 88 PAGES

04 20 00 SD-06 Test Reports 2.2.2.4Fire-Rated Concrete Masonry

Units 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 3.6.1.3Prism Tests 3.6.1.4Single-Wythe Masonry Wall

Water Penetration Test SD-07 Certificates

1.3.2Special Masonry Inspector Qualifications

2.2.2.2Concrete Masonry Units (CMU) 2.2.3Precast Concrete Units 2.4.1.1Cementitious Materials 2.4.1.3Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar

Positioners 2.6.3Joint Reinforcement 2.6.7Insulation

SD-08 Manufacturer’s Instructions 2.4.1.3Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance Data

3.8Take-Back Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 88 PAGES

04 20 00 SD-11 Closeout Submittals

2.2.2.2.2 SRecycled Content

05 05 23.16 SD-01 Preconstruction Submittals 3.2Welding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.5Welder, Welding Operator, and

Tacker Qualification 1.3.6Inspector Qualification 1.3.2Previous Qualifications 1.3.3Pre-Qualified Procedures 2.2Welding Electrodes and Rods

SD-06 Test Reports 3.3Nondestructive Testing

SD-07 Certificates 1.3.1Certified Welding Procedure

Specifications (WPS) 1.3.1Certified Brazing Procedure

Specifications (BPS) 1.3.1Certified Procedure Qualification

Records (PQR) 1.3.1Certified Welder Performance

Qualifications (WPQ) 1.3.1Certified Brazer Performance

Qualifications (BPQ) 05 12 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 88 PAGES

05 12 00 1.4.1.1 GErection Drawings SD-02 Shop Drawings

1.4.2 G OMAFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer 2.4.1Welding Electrodes and Rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.3Tension Control Bolts

SD-06 Test Reports 2.6.2Class B Coating 2.3Bolts, Nuts, and Washers 3.7.1.2Weld Inspection Reports 3.7.2.1Direct Tension Indicator Washer

Inspection Reports 3.7.3.1Bolt Testing Reports 3.7.4Embrittlement Test Reports

SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.4.3.1Welding Procedures and

Qualifications 05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 88 PAGES

05 30 00 2.2Accessories 2.1Deck Units 2.1.4Galvanizing Repair Paint 2.2.17Mechanical Fasteners 2.1.4Touch-Up Paint 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-04 Samples 2.1.1Metal Roof Deck Units 2.2.4Flexible Closure Strips

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates 1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.1Manufacturer's Certificate 2.2.12Stud Manufacture's Certification 2.2.12Stud Manufacture's Test Reports

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products 05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 88 PAGES

05 40 00 2.1Studs, Joists SD-05 Design Data

1.6.2 GMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal Framing

3.2.1Welds 05 50 13 SD-02 Shop Drawings

2.3 GAccess Doors and Panels

2.7 GAngles and Plates

SD-03 Product Data 2.4Control-Joint Covers

SD-04 Samples 2.4Control-Joint Covers

05 50 14 SD-02 Shop Drawings

1.3.1 GDetail Drawings

2.1.2.1Welding of Structural Steel 2.2.4Structural Steel Welding Repairs 2.1.6Castings

SD-03 Product Data 2.1.2.1.3.1Filler Metal 2.1.8.3Lubricant

SD-06 Test Reports 2.2Tests, Inspections, and

Verifications SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 88 PAGES

05 50 14 1.3.2Welding Qualifications

2.1.2.3.1 GApplication Qualification for Steel

Studs 2.1.2.4Welding of Aluminum

06 10 00 SD-03 Product Data 1.8Fire-retardant Treatment 2.3.2Adhesives

SD-06 Test Reports 1.4.3Preservative-treated 1.7Preservative Treatment

2.3.2 SIndoor Air Quality for Aerosol

Adhesives

2.3.2 SIndoor Air Quality for Non-aerosol

Adhesives SD-10 Operation and Maintenance Data

3.4Take-back Program 06 41 16.00 10 SD-02 Shop Drawings

1.5.2Shop Drawings 2.9Shop Drawings 3.1Installation

SD-03 Product Data 2.1Wood Materials 1.5.3Certification

SD-04 Samples 2.3Plastic Laminates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 88 PAGES

06 41 16.00 10 2.5Cabinet Hardware SD-07 Certificates

1.5Quality Assurance 3.1Laminate Clad Casework

SD-11 Closeout Submittals 1.3LEED Documentation

06 61 16 SD-02 Shop Drawings

3.1 G DOInstallation

SD-03 Product Data 2.1Solid Polymer Material 1.5.1Qualifications 2.3Fabrications

2.2.4 SIndoor air quality for solid surface

seam and sealant products SD-04 Samples

2.1 G DOMaterial

2.3.5 G DOCounter and Vanity Tops

SD-06 Test Reports 2.1Solid Polymer Material

SD-07 Certificates 2.3Fabrications 1.5.1Qualifications

2.1 SIndoor Air Quality for solid

surface fabrication products SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 88 PAGES

06 61 16 3.2Clean-up 07 11 13 SD-07 Certificates

1.3Materials 07 21 13 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.1 G DOBlock or Board Insulation

2.2 GPressure Sensitive Tape

1.4 GProtection Board or Coatings

2.4 GAccessories

2.1.5 SRecycled Content for Block or

Board Insulation SD-07 Certificates

2.1 G ROBlock or Board Insulation

2.3 GProtection Board or Coating

3.4.5 GProtection Board or Coating

1.8 G ROSpecial Warranties

1.8 G ROSpecial Warranties

2.1.6 SIndoor Air Quality For Block Or

Board Insulation SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation 2.4.1Adhesive

07 21 16 SD-03 Product Data 2.1Blanket Insulation

2.1.2 SRecycled Content for Insulation

Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 88 PAGES

07 21 16 2.2Sill Sealer Insulation 2.4Pressure Sensitive Tape 2.5Accessories

SD-07 Certificates

2.1.4 SIndoor Air Quality for Insulation

Materials

2.5.1 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions 3.3.1Insulation

07 22 00 SD-02 Shop Drawings

1.3 G DOInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.1 G DOInsulation

1.4 GCover Board

2.3 GFasteners

2.2 GMoisture Control

2.1.2 SRecycled Content For Insulation

SD-07 Certificates

1.6 G ROInstaller Qualifications

1.6 GCertificates Of Compliance For

Felt Materials

2.1.3 SIndoor Air Quality For Insulation

SD-08 Manufacturer’s Instructions

2.3 GFasteners

2.1 G ROInsulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 88 PAGES

07 24 00 SD-02 Shop Drawings

3.3 G DOShop Drawings

SD-03 Product Data 2.5Thermal Insulation 2.2Adhesive 2.4Mechanical Fasteners 2.11Accessories 2.6Base Coat 2.7Portland Cement 2.8Reinforcing Fabric 2.9Finish Coat 2.12Joint Sealant 2.10Sealant Primer 2.13Bond Breaker 2.14Backer Rod 1.4.5Insulation Board

2.5.2 SRecycled Content for Insulation

Materials 1.7Warranty

SD-04 Samples

1.2.3.7 GSample Boards

1.2.4Moisture Analysis

SD-06 Test Reports 1.2.3.1Abrasion Resistance 1.2.3.2Accelerated Weathering 1.2.2.3Impact Resistance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 88 PAGES

07 24 00 1.2.3.3Mildew Resistance 1.2.3.4Salt Spray Resistance 1.2.4Vapor Transmission 1.2.3.6Absorption-Freeze-Thaw 1.2.1.1Water Penetration 1.2.3.5Water Resistance 1.2.2.1Surface Burning Characteristics 1.2.2.2Radiant Heat 3.1Substrate 1.2.1.2Wind Load

SD-07 Certificates 1.4.1Qualifications of EIFS

Manufacturer 1.4.2Qualification of EIFS Installer 1.4.3Qualification of Sealant

Applicator 1.4.4Qualifications of Third Party

Inspector

3.5.2 G ROInspection Check List

SD-08 Manufacturer’s Instructions 3.3Installation

SD-10 Operation and Maintenance Data

1.7EIFS

07 27 10.00 10 SD-06 Test Reports

3.2 G ROInspection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 88 PAGES

07 27 19.01 SD-01 Preconstruction Submittals

1.7.1 G ROQualifications of Manufacturer

1.7.2 G ROQualifications of Installer

SD-02 Shop Drawings

1.4 G DOSelf-adhering Air Barrier

SD-03 Product Data

1.4 G DOSelf-adhering Air Barrier

2.2 G DOPrimers, Adhesives, and Mastics

1.4.2 G ROSafety Data Sheets

SD-04 Samples

1.4 G DOSelf-adhering Air Barrier

SD-06 Test Reports

1.6 G ROField Peel Adhesion Test

SD-07 Certificates

1.4 G ROSelf-adhering Air Barrier

1.7.1 G ROQualifications of Manufacturer

1.7.2 G ROQualifications of Installer

SD-08 Manufacturer’s Instructions

1.4 G ROSelf-adhering Air Barrier

2.2 G ROPrimers, Adhesives, and Mastics

07 27 26 SD-08 Manufacturer’s Instructions 3.3.1Manufacturer's Installation

Instructions 1.6Manufacturer's Instructions

07 60 00 SD-02 Shop Drawings

2.2.1 G DOExposed Sheet Metal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 88 PAGES

07 60 00 3.1.14 G DOGutters

3.1.15 G DODownspouts

3.1.11 G DOBase Flashing

3.1.12 G DOCounterflashing

3.1.19 G DOFlashing at Roof Penetrations

and Equipment Supports

2.2.15 GReglets

3.1.13 GDrip Edges

3.1.16 G DOOpen Valley Flashing

3.1.17 G DOEave Flashing

2.1 SRecycled Content

SD-03 Product Data

2.2.12 GCool Roof

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 G ROQuality Control Plan

SD-10 Operation and Maintenance Data

1.4.3 G ROCleaning and Maintenance

07 61 14.00 20 SD-02 Shop Drawings

1.2.5 G DORoofing

SD-03 Product Data

2.1 G DORoofing Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 88 PAGES

07 61 14.00 20 2.1 SEnergy Star Label for Steel Roofing Product

2.1.1 SRecycled Content for Steel

Roofing Product

2.3Attachment Clips 2.4.1Closures 2.4Accessories 2.4.2Fasteners 2.4.3Sealants 2.5Insulation

1.7 G DOWarranty

SD-04 Samples 2.1Panel 2.4Accessories 2.4.3Sealants 2.2Intermediate Support

SD-05 Design Data 1.5Design Calculations

SD-06 Test Reports 3.6Field Inspection 1.3.3Structural Performance 1.6.6Finish

SD-07 Certificates 1.6.3Manufacturer's Technical

Representative 1.6.4Installer's Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 88 PAGES

07 61 14.00 20 2.1 G ROCoil Stock SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-11 Closeout Submittals

3.8Information Card 1.7Warranty

07 92 00 SD-03 Product Data

2.1 G ROSealants

2.2 G ROPrimers

2.3 G ROBond Breakers

2.4 G ROBackstops

3.1 G ROField Adhesion

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 SIndoor Air Quality For Interior

Acoustical Sealants

2.5 SIndoor Air Quality For Interior

Caulking 08 11 13 SD-02 Shop Drawings

2.1 G DODoors

2.1 G DODoors

2.1 SRecycled Content for Steel Door

Product

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 88 PAGES

08 11 13 2.6 G DOFrames

2.6 G DOFrames

2.6 SRecycled Content for Steel

Frame Product 2.4Accessories 2.7Weatherstripping

SD-03 Product Data

2.1 G DODoors

2.6 G DOFrames

2.4Accessories 2.7Weatherstripping

SD-04 Samples

2.9.3 G DOFactory-applied enamel finish

08 11 16 SD-02 Shop Drawings

1.5.1 G DODoor and Frame Assembly

SD-03 Product Data

1.5.1 G DODoor and Frame Assembly

2.2.3 SRecycled Content of Aluminum

Material SD-04 Samples

1.5.2 G ROFinish Samples

SD-05 Design Data

1.2.1 GCalculations

1.2.2 GAir Infiltration

1.2.3 GWater Penetration

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 88 PAGES

08 11 16 1.2.4 G RONFRC Project Label Certificates for Fenestration

SD-08 Manufacturer’s Instructions

1.5.1 G RODoor and Frame Assembly

1.5.3 G ROAdjustments, Cleaning, and

Maintenance

1.2.4 G RONFRC Project Label Certificates

for Fenestration 08 33 13 SD-02 Shop Drawings

1.3 G DODetail Drawings

SD-03 Product Data

1.5Warranty 2.1Rolling Counter Doors 3.1Installation 3.3Cleaning

SD-11 Closeout Submittals 2.3Rolling Counter Door

(Non-Rated) 08 33 23 SD-02 Shop Drawings

2.2.1 G DOOverhead Coiling Doors

2.2.3Counterbalancing Mechanism

2.2.4 G DOElectric Door Operators

2.2.1.3 G DOBottom Bars

2.1.1.1Guides 2.2.3.1Mounting Brackets 2.2.1.9Overhead Drum

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 88 PAGES

08 33 23 3.3.2Hood 2.1.1.1Installation Drawings

SD-03 Product Data

2.2.1 G DOOverhead Coiling Doors

2.2.2Hardware 2.2.3Counterbalancing Mechanism

2.2.4 G DOElectric Door Operators

SD-05 Design Data 2.2.1Overhead Coiling Doors 2.2.2Hardware 2.2.3Counterbalancing Mechanism

2.2.4 G DOElectric Door Operators

SD-10 Operation and Maintenance Data

3.3.2 G ROOperation and Maintenance

Manuals

3.3.2Materials 3.3.2Devices 3.3.2Procedures 3.3.2Manufacture's Brochures 3.3.2Parts Lists

SD-11 Closeout Submittals 3.3.1Warranty

08 34 01 SD-02 Shop Drawings

3.5 G DOInstallation

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 88 PAGES

08 34 01 1.3Forced Entry Resistant Components

3.5Installation 1.4Components

SD-07 Certificates

1.3 G ROForced Entry Resistant

Components 08 34 02 SD-02 Shop Drawings

3.3 G DOInstallation

SD-03 Product Data

1.4Bullet Resistant Components SD-07 Certificates

1.4Bullet Resistant Components SD-10 Operation and Maintenance Data

1.4 G DOBullet Resistant Components

08 41 13 SD-01 Preconstruction Submittals

1.2.1 G ROSample Warranty

1.2.1 GList of Product Installations

SD-02 Shop Drawings

3.3 GInstallation Drawings

2.2 G DOFabrication Drawings

SD-03 Product Data

1.2.1 GManufacturer's Catalog Data

2.2.3 GFinish

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 88 PAGES

08 41 13 2.1.1.2Recycled Content of Aluminum Material

SD-04 Samples

1.2.1 G DOFinish and Color Samples

SD-06 Test Reports

1.2.1 G ROCertified Test Reports

3.4.3Deflection 3.4.1Air Infiltration 3.4.4Condensation Resistance and

Thermal Transmittance 3.4.5Water Infiltration

SD-08 Manufacturer’s Instructions 3.3Manufacturer's Instructions

SD-11 Closeout Submittals 3.6Manufacturer's Product Warranty

08 51 13 SD-02 Shop Drawings

2.1 G DOWindows

1.10Fabrication Drawings

SD-03 Product Data

2.1 G DOWindows

2.2.2 GFasteners

1.11 G DOWindow Performance

2.3 G DOThermal-Barrier Windows

2.2.5 G DOAccessories

1.11.4 G DOThermal Performance

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 88 PAGES

08 51 13 1.4.2.1Finish Sample SD-05 Design Data

2.1 GStructural Calculations for

Deflection

SD-06 Test Reports 1.4.4Minimum Condensation

Resistance Factor SD-10 Operation and Maintenance Data

2.1 G ROWindows

1.7Plastic Identification

08 71 00 SD-02 Shop Drawings

1.3 G DOManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 G DOHardware Schedule

2.3.6 G ROKeying System

SD-03 Product Data

2.3 G DOHardware Items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.5 G ROHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting 08 81 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 88 PAGES

08 81 00 3.3.1Installation SD-03 Product Data

1.6.1Insulating Glass 1.3Glazing Accessories

SD-04 Samples 1.6.1Insulating Glass 2.3.2Glazing Compound 2.3.5Tape 2.3.3.1Sealant

SD-07 Certificates 1.6.1Insulating Glass

SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting

08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

SD-04 Samples

1.4 GWall louvers

1.5 GWall louvers

1.5 GDoor louvers

09 22 00 SD-02 Shop Drawings

2.1 G DOMetal Support Systems

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 88 PAGES

09 22 00 2.1Metal Support Systems

2.1 SRecycled Content for Metal

Support Systems 09 29 00 SD-03 Product Data

2.1.3Glass Mat Water-Resistant Gypsum Tile Backing Board

2.1.2Water-Resistant Gypsum Backing Board

2.1.4Glass Mat Covered or Reinforced Gypsum Sheathing

2.1.4.1Glass Mat Covered or Reinforced Gypsum Sheathing Sealant

2.1.8Accessories 2.1.1Gypsum Board

2.1.5 SVOC Content of Joint Compound

SD-07 Certificates

2.1 G ROAsbestos Free Materials

2.1.1 SIndoor Air Quality for Gypsum

Board

2.1.7 SIndoor Air Quality for Non-aerosol

Adhesives

2.1.7 SIndoor Air Quality for Aerosol

Adhesives 09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 88 PAGES

09 30 10 2.1.1 G DOCeramic Tile

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

SD-04 Samples

2.1 G DOTile

2.1 GAccessories

2.1 GTransition Strips

2.6 GTransition Strips

2.4.3 G DOGrout

SD-08 Manufacturer’s Instructions 3.6Maintenance Instructions

SD-10 Operation and Maintenance Data

3.2 GInstallation

09 51 00 SD-02 Shop Drawings

2.1 G DOApproved Detail Drawings

SD-03 Product Data

1.9 GAcoustical Ceiling Systems

SD-04 Samples

2.2 GAcoustical Units

2.2.1.1Acoustical Ceiling Tiles

09 65 00 SD-02 Shop Drawings

2.5 G DOResilient Flooring and

Accessories SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 88 PAGES

09 65 00 2.5 G DOResilient Flooring and Accessories

2.2Adhesives SD-04 Samples

2.5 G DOResilient Flooring and

Accessories

SD-07 Certificates 2.1Indoor Air Quality for Wall Base 2.2Indoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

2.5Resilient Flooring and Accessories

09 67 23.13 SD-02 Shop Drawings 2.1Installation Drawings

SD-03 Product Data 1.2.1Manufacturer's Catalog Data

SD-04 Samples 1.5.2Hardboard Mounted Epoxy

Flooring 3.1.4Floor Topping

SD-05 Design Data 1.2.2Design Mix Data

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 88 PAGES

09 67 23.13 1.5.1Listing of Product Installations 1.5Referenced Standards

Certificates SD-11 Closeout Submittals

1.6Warranty 09 90 00 SD-02 Shop Drawings

3.10Piping Identification SD-03 Product Data

2.1 G DOCoating

SD-04 Samples

1.10 G ROColor

1.5.2 G ROTextured Wall Coating System

1.5.3 G ROSample Textured Wall Coating

System Mock-Up SD-07 Certificates

1.4Applicator's Qualifications

1.5.1.2 G ROQualification Testing

2.1Indoor Air Quality for Paints and

Primers SD-08 Manufacturer’s Instructions

3.6.2Mixing 1.8.2Manufacturer's Safety Data

Sheets SD-10 Operation and Maintenance Data

2.1 G ROCoatings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 88 PAGES

09 96 59 SD-03 Product Data 2.1.4High-build glaze coatings

SD-04 Samples

2.1.4 G ROHigh-build glaze coatings

2.1.4 G ROCoating system

SD-06 Test Reports 2.1.1Filler material 2.1.2Primers 2.1.3Top coating

SD-07 Certificates 1.5Qualifications of installer

SD-08 Manufacturer’s Instructions 2.1Wall coating system

10 14 00.10 SD-02 Shop Drawings

3.1 G DOApproved Detail Drawings

SD-03 Product Data 2.1Modular Exterior Signage System 3.1Installation

1.2 G DOExterior Signage

1.2.1Wind Load Requirements

SD-04 Samples

1.2 GExterior Signage

SD-10 Operation and Maintenance Data

3.1.2 G ROProtection and Cleaning

10 14 00.20 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 88 PAGES

10 14 00.20 1.4.2 G DODetail Drawings SD-03 Product Data

3.1 G DOInstallation

1.6Warranty

SD-04 Samples

1.4.1 G DOInterior Signage

1.3 G ROSoftware

SD-10 Operation and Maintenance Data

3.1Approved Manufacturer's Instructions

3.1.2Protection and Cleaning 10 14 53 SD-03 Product Data

2.1Traffic Sign Posts 2.3Traffic Sign Retroreflective

Sheeting 10 26 00 SD-02 Shop Drawings

2.2 G DOCorner Guards

2.3 G DOWall Covering

SD-03 Product Data

2.2 G DOCorner Guards

2.3 G DOWall Covering

SD-04 Samples

2.5 G DOFinish

SD-06 Test Reports 2.2Corner Guards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 88 PAGES

10 26 00 2.3Wall Covering SD-07 Certificates

2.2Corner Guards…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .