Amendment 0002.pdf

PDF 378 KB Posted

Attached to
MOTCO Access Control Point (ACP) Gate 1 Federal contract opportunity
Solicitation number
W9123821R0005
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document provides an amendment to a solicitation for construction services at the Military Ocean Terminal Concord Access Control Point gate 1. The amendment changes the site visit date from 12 November 2020 to 17 November 2020 at 10:00am Pacific Standard Time and provides instructions for contractors to obtain required forms to access the base for the site visit. The solicitation will be issued on or about 28 October 2020 as unrestricted with proposals due on 3 December 2020. The project involves upgrading the Access Control Point gate 1 and includes construction of a Visitor Control Center, gate house, overwatch and guard booths, vehicle and truck inspection canopies, roadways, parking, lighting, traffic control signals, vehicle barriers and control systems, electronic security systems, information systems, intrusion detection and uninterrupted power supply installations. Supporting work consists of site development, demolition, utilities, telecommunications, lighting, paving, drainage, landscaping and signage. The estimated value is between $10,000 and $25,000 using NAICS code 236220 and size standard of $39.5 million. The agency is the Department of the Army Corps of Engineers Engineering District Sacramento.

View the file

Other files for this federal contract opportunity

Other files attached to MOTCO Access Control Point (ACP) Gate 1, newest first.
File Type Posted
Amendment 5 - Drawings.pdf PDF
Amendment 0005.pdf PDF
Amendment 5 - Technical Specifications.pdf PDF
Amendment 5 - Narrative of changes.pdf PDF
Amendment 4 - Narrative of Changes.pdf PDF
Amendment 4 -Technical Specifications.pdf PDF
Amendment 0004 - Posted revised specs and drawings and posted narrative of changes.pdf PDF
Amendment 4-Drawings.pdf PDF
Amendment 0003 - Extend Due Date and Questions Period and Posted revised Specs.pdf PDF
W9123821R0005 Amendment 0003.pdf PDF
Amendment 3 -Specs. Section 34 71 13.9 11.24.20.pdf PDF
Amendment 3-Specifications- Section 34 71 13.19 11.24.20.pdf PDF
Amendment 0003.pdf PDF
Site visit pictures 11.17.20.pdf PDF
Site Visit Sign-in Sheet 11.17.20.pdf PDF
Amendment 0002.pdf PDF
Amendment 1 - Drawings Electrical Site - 10.29.20.pdf PDF
Amendment 0001.pdf PDF
Amendment 1 - Specifications - 10.29.20.pdf PDF
Amendment 1 - Drawings - Access Control Point - 10.29.20.pdf PDF
Attachment 2 Drawings-Access Control Point.pdf PDF
Attachment 6 Past Performance Questionnaire.pdf PDF
Attachment 1 Specifications.pdf PDF
Attachment 5 Pre-Award Survey.pdf PDF
W9123821R0005.pdf PDF
Attachment 3 Drawings - Electrical Site.pdf PDF
Attachment 4 DB Wage Determination.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Purpose of this amendment is to change the site visit date.

No other changes are made or implied.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Nov-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123821R0005

X 9B. DATED (SEE ITEM 11)

28-Oct-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Nov-2020

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123821R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- 12 November 2020

Date: 17 November 2020

Time: 10:00am Pacific Standard Time

(c) Participants will meet at-- 5110 Port Chicago Hwy Concord, CA 94520

*** Please contact Contract Specialist for the required forms in order to get on base.

The last day to request forms will be 12noon 6 November 2020.

All information must be submitted to Contract Specialist by 12noon 9 November 2020.***

(End of provision)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .