Attachment 5 Pre-Award Survey.pdf

PDF 98 KB Posted

Attached to
MOTCO Access Control Point (ACP) Gate 1 Federal contract opportunity
Solicitation number
W9123821R0005
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document contains a pre-award survey for a construction contractor and details of a related federal contract opportunity for upgrades to an Access Control Point gate at a military facility. The pre-award survey requests information on the contractor's organization, personnel, equipment, financial data, experience on past construction projects, and type of work specializing in. The related federal contract opportunity is a solicitation for a firm-fixed price construction contract between $10,000 and $25,000 to upgrade Gate 1 at the Military Ocean Terminal Concord, including a visitor control center, gate house, overwatch and guard booths, vehicle inspection areas, roadways, parking, lighting, security systems, backup power, and site development. The solicitation is expected to be issued on October 28th, 2020 with proposals due December 3rd, 2020. The work will be conducted under NAICS code 236220 and PS Code Y1JZ and awarded by the Department of the Army Corps of Engineers Sacramento District.

View the file

Other files for this federal contract opportunity

Other files attached to MOTCO Access Control Point (ACP) Gate 1, newest first.
File Type Posted
Amendment 0005.pdf PDF
Amendment 5 - Technical Specifications.pdf PDF
Amendment 5 - Narrative of changes.pdf PDF
Amendment 5 - Drawings.pdf PDF
Amendment 4 - Narrative of Changes.pdf PDF
Amendment 4 -Technical Specifications.pdf PDF
Amendment 4-Drawings.pdf PDF
Amendment 0004 - Posted revised specs and drawings and posted narrative of changes.pdf PDF
Amendment 0003 - Extend Due Date and Questions Period and Posted revised Specs.pdf PDF
W9123821R0005 Amendment 0003.pdf PDF
Amendment 3 -Specs. Section 34 71 13.9 11.24.20.pdf PDF
Amendment 3-Specifications- Section 34 71 13.19 11.24.20.pdf PDF
Amendment 0003.pdf PDF
Site visit pictures 11.17.20.pdf PDF
Site Visit Sign-in Sheet 11.17.20.pdf PDF
Amendment 0002.pdf PDF
Amendment 0002.pdf PDF
Amendment 1 - Drawings Electrical Site - 10.29.20.pdf PDF
Amendment 0001.pdf PDF
Amendment 1 - Specifications - 10.29.20.pdf PDF
Amendment 1 - Drawings - Access Control Point - 10.29.20.pdf PDF
Attachment 2 Drawings-Access Control Point.pdf PDF
Attachment 6 Past Performance Questionnaire.pdf PDF
Attachment 1 Specifications.pdf PDF
Attachment 3 Drawings - Electrical Site.pdf PDF
Attachment 4 DB Wage Determination.pdf PDF
W9123821R0005.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The Government will treat the pre-award survey information submitted by the offeror as proprietary.

CONSTRUCTION CONTRACTOR DATA DATE:

Firm Name and Telephone Number

Tel:

Main Office Address (Street, City, and State)

Branch Offices Services Rendered

Construction

Design

Consultant

Organization

Individual Joint Venture

Partnership Corporation

Date Organized Date Incorporated:

State:

Names of Officers and Other Key Personnel

I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below)

Partners:

Officers:

Other Key:

Remainder: Subtotal Permanent:

Maximum Personnel at Any Time:

Date:

Total:

II—EQUIPMENT OWNED III—FINANCIAL DATA AS OF

(DATE): Present Value ($)

Current Assets:

Acquisition Cost ($) Current Liabilities:

Net Worth:

IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION WORK IN

PAST 6 YRS EXCLUSIVE OF JOINT VENTURE (LIST MOST RECENT

FIRST)

V—LARGEST JOB EVER

CONTRACTED

(If Other Than in Past Six Years)

$ LARGEST JOB IN PAST 6 YRS Contract Amount:

Date: Description:

Owner:

$ Contract Amount:

Date: Description:

Owner:

Avg. Annual Income

VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES

NAME AND POSITION/TITLE OF PERSON SIGNING SIGNATURE

See attachment for explanations or detailed description of item(s) reported above.

CONSTRUCTION CONTRACTOR DATA – SCHEDULE A – EXISTING COMMITMENTS

List below the construction projects your firm currently has under way, including recent awards. Also list construction projects for which your firm is the apparent successful offeror/bidder, but for which a contract has not yet been awarded.

CONTRACT

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

COMPLETE

CONSTRUCTION CONTRACTOR DATA – SCHEDULE B – COMPLETED PROJECTS

List below the principal construction projects your firm has completed within the past five years, including all DoD contracts with a total value exceeding $500,000.00

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

SUBLET

CONSTRUCTION CONTRACTOR DATA – SCHEDULE C –

CONSTRUCTION AND/OR TECHNICAL EQUIPMENT

List total equipment and facilities owned for performing the prospective contract and present status as to whether or not it is currently committed to existing contracts.

QUANTITY

DESCRIPTION

CONDITION

YEARS OF

SERVICE

PRESENT

STATUS

File details come from the government source that posted it. Updated .