Amendment 4 -Technical Specifications.pdf
PDF 822 KB Posted
- Attached to
- MOTCO Access Control Point (ACP) Gate 1 Federal contract opportunity
- Solicitation number
- W9123821R0005
About this file
This document provides details of a federal construction contract opportunity for the Military Ocean Terminal Concord Access Control Point Gate 1 project. The project scope includes construction of a visitor control center, gate house, overwatch booths, guard booths, vehicle and truck inspection canopies, roadways, parking, lighting, traffic control signals, passive and active vehicle barriers with control systems, electronic security systems, information systems, intrusion detection system installation, uninterrupted power supply, backup generator, and energy monitoring control system connections. Additional work comprises a mail freight facility with loading dock and arms storage building relocation, as well as supporting work such as site development, demolition, utilities, telecommunications, paving, walks, landscaping, and signage. The estimated magnitude of construction is between $10-25 million. The solicitation is anticipated to be issued on or around October 28, 2020 with proposals due by December 3, 2020. The contract will be awarded as a firm-fixed-price and conducted under NAICS code 236220 by the Department of the Army Corps of Engineers Engineering District Sacramento.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 01 00 - 1 PROJECT TABLE OF CONTENTS
TECHNICAL SPECIFICATIONS FOR CONSTRUCTION OF
ACCESS CONTROL POINT (GATE 1)
PN 074877
MILITARY OCEAN TERMINAL CONCORD, CALIFORNIA
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS*
00 01 00 PROJECT TABLE OF CONTENTS
* - DIVISON 00 SECTIONS ARE UNDER SEPARATE COVER
TECHNICAL SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
REGISTER SUBMITTAL REGISTER
01 33 29 SUSTAINABILITY REPORTING
01 33 29AT MOTCO GATE #1 GUIDING PRINCIPLES ASSESSMENT CHECKLIST
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
SPKFORMS SAMPLE FORMS
SPK415-1-2 CONTRUCTION CONTROL MANUAL
01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
BLDG1A-2 ASBESTORS AND LEAD PANT SURVERY REPORT-BLDG-1A-2
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION
Revised in Accordance with Am #0004
00 01 00 - 2 PROJECT TABLE OF CONTENTS
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 50 14 STRUCTURAL METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 BITUMINOUS DAMPPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 SPRAY FOAM INSULATION
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 01 FORCED ENTRY RESISTANT COMPONENTS
08 34 02 BULLET-RESISTANT COMPONENTS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 90 COLOR SCHEDULE
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
00 01 00 - 3 PROJECT TABLE OF CONTENTS
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 90 00 PAINTS AND COATINGS
09 96 59 HIGH-BUILD GLAZE COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 14.00 20AT SIGNAGE ATTACHMENTS *Am-4
10 14 53 TRAFFIC SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 13 - SPECIAL CONSTRUCTION
13 12 50 PRE-ENGINEERED METAL CANOPY
13 34 19.02 METAL MAIL FACILITY BUILDING SYSTEMS*Am-4
13 34 19.03 METAL COMMUNICATIONS HUT SYSTEMS
13 34 23 PREENGINEERED GUARD BOOTH AND OVERWATCH STRUCTURES
13 34 23.01 MODULAR BUILDING SYSTEM – MAIL FACILITY *Am-4
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS CRASH RATED
ACTIVE VEHICLE BARRIERS AND CONTROLS
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FIRE ALARM AND
MASS NOTIFICATION
25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS CONFIGURABLE
SYSTEMS
00 01 00 - 4 PROJECT TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION WITH ARC FLASH
26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY APPLICATIONS
26 32 33.00 10 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS)
26 36 00.00 10 AUTOMATIC TRANSFER SWITCHES
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING *Am-4
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.17 COLD MILLING ASPHALT PAVING
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
00 01 00 - 5 PROJECT TABLE OF CONTENTS
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 - TRANSPORTATION
34 11 00 RAILROAD TRACK AND ACCESSORIES
34 71 13.19 CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS
34 72 00.00 CABLE-BASED PASSIVE VEHICLE BARRIERS
-- End of Project Table of Contents --
Gate 1 ACP, PN 074877, MOTCO, Concord, CA CA44
SECTION TABLE OF CONTENTS
DIVISION 05 - METALS
SECTION 05 05 23.16
STRUCTURAL WELDING
05/14
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 General Requirements
1.3.2 Previous Qualifications
1.3.3 Pre-qualified Procedures
1.3.4 Retests
1.3.5 Welder, Welding Operator, and Tacker Qualification
1.3.5.1 Previous Personnel Qualifications
1.3.5.2 Certificates
1.3.5.3 Renewal of Qualification
1.3.6 Inspector Qualification
1.3.7 Symbols and Safety
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Pre-erection Conference
2.2 WELDING EQUIPMENT AND MATERIALS
PART 3 EXECUTION
3.1 WELDING OPERATIONS
3.1.1 Requirements
3.1.2 Identification
3.2 QUALITY CONTROL
3.3 STANDARDS OF ACCEPTANCE
3.3.1 Nondestructive Testing
3.3.2 Destructive Tests
3.4 GOVERNMENT INSPECTION AND TESTING
3.5 CORRECTIONS AND REPAIRS
-- End of Section Table of Contents --
SECTION 05 05 23.16 Page 1
SECTION 05 05 23.16
STRUCTURAL WELDING
05/14
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 360 (2016) Specification for Structural Steel Buildings
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
ANSI/ASNT CP-189 (2016) ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel (ANSI/ASNT CP-105-2006)
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
AWS D1.3/D1.3M (2018) Structural Welding Code - Sheet Steel
AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel
AWS D1.8/D1.8M (2016) Structural Welding Code—Seismic Supplement
AWS D14.4/D14.4M (2012) Specification for Welded Joints for Machinery and Equipment
AWS Z49.1 (2012) Safety in Welding and Cutting and Allied Processes
ASTM INTERNATIONAL (ASTM)
ASTM E165/E165M (2018) Standard Practice for Liquid Penetrant Examination for General Industry
ASTM E709 (2015) Standard Guide for Magnetic Particle Examination
SECTION 05 05 23.16 Page 2
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Welding Quality Assurance Plan
SD-03 Product Data
Welding Procedure Qualifications; G Welder, Welding Operator, and Tacker Qualification Inspector Qualification Previous Qualifications Pre-Qualified Procedures Welding Electrodes and Rods
SD-06 Test Reports
Nondestructive Testing
SD-07 Certificates
Certified Welding Procedure Specifications (WPS) Certified Brazing Procedure Specifications (BPS) Certified Procedure Qualification Records (PQR) Certified Welder Performance Qualifications (WPQ) Certified Brazer Performance Qualifications (BPQ)
1.3 QUALITY ASSURANCE
Except for pre-qualified (in accordance with AWS D1.1/D1.1M) and previously qualified procedures, each Contractor performing welding must record in detail and qualify the welding procedure specification for any welding procedure followed in the fabrication of weldments. Conform welding procedure qualifications to AWS D1.1/D1.1M AWS D1.8/D1.8M and to the specifications in this section. Submit for approval copies of the welding procedure specification and the results of the procedure qualification test records for each type of welding which requires procedure qualification and the welder, welding operator, or tacker qualification test records..
Approval of any procedure, however, does not relieve the Contractor of the sole responsibility for producing a finished structure meeting all the specified requirements. Submit this information on the forms in Annex M of AWS D1.1/D1.1M. Individually identify and clearly reference on the detail drawings and erection drawings all welding procedure specifications, or suitably key them to the contract drawings. In case of conflict between this specification and AWS D1.1/D1.1M, this specification governs.
1.3.1 General Requirements
*Am-4 Fabricate work in an AISC Certified Fabrication Plant, Category I. Work must be erected by an AISC Certified Erector.
SECTION 05 05 23.16 Page 3
a. For Structural Projects, provide documentation of the following:
(1) Component Thickness 1/8 inch and greater: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.1/D1.1Mand
AWS D1.8/D1.8M.
(2) Component Thickness Less than 1/8 inch: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.3/D1.3M.
(3) Reinforcing Steel: Qualification documents (WPS, PWR, and WPQ) in accordance with AWS D1.4/D1.4M.
b. For other applications, provide documentation of the following:
(1) Submit two copies of the Certified Welding Procedure Specifications (WPS), Certified Brazing Procedure Specifications (BPS) and Certified Procedure Qualification Records (PQR) to the Contracting Officer for approval .
(2) Submit two copies of the Certified Welder Performance Qualifications (WPQ)and Certified Brazer Performance Qualifications (BPQ) to the Contracting Officer for approval within fifteen calendar days prior to any employee welding on the project material.
(3) Machinery: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D14.4/D14.4M.
1.3.2 Previous Qualifications
Welding procedures previously qualified by test may be accepted for this contract without re-qualification, upon receipt of the test results, if the following conditions are met:
a. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.
b. The qualified welding procedure conforms to the requirements of this specification and is applicable to welding conditions encountered under this contract.
c. The welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.
1.3.3 Pre-qualified Procedures
Welding procedures which are considered pre-qualified as specified in AWS D1.1/D1.1M will be accepted without further qualification. Submit for approval a listing or an annotated drawing to indicate the joints not pre-qualified. Procedure qualification is mandatory for these joints.
1.3.4 Retests
If welding procedure fails to meet the requirements of AWS D1.1/D1.1M, revise and re-qualify the procedure specification, or at the Contractor's option, welding procedure may be retested in accordance with AWS D1.1/D1.1M.
If the welding procedure is qualified through retesting, submit all test results, including those of test welds that failed to meet the
SECTION 05 05 23.16 Page 4 requirements, with the welding procedure.
1.3.5 Welder, Welding Operator, and Tacker Qualification
Each welder, welding operator, and tacker assigned to work on this contract must be qualified in accordance with the applicable requirements of AWS D1.1/D1.1M, AWS D1.8/D1.8M and as specified in this section. Welders, welding operators, and tackers who make acceptable procedure qualification test welds will be considered qualified for the welding procedure used.
1.3.5.1 Previous Personnel Qualifications
At the discretion of the Contracting Officer, welders, welding operators, and tackers qualified by test within the previous 6 months may be accepted for this contract without re-qualification if all the following conditions are met:
a. Copies of the welding procedure specifications, the procedure qualification test records, and the welder, welding operator, and tacker qualification test records are submitted and approved in accordance with the specified requirements for detail drawings.
b. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.
c. The previously qualified welding procedure conforms to the requirements of this specification and is applicable to welding conditions encountered under this contract.
d. The welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.
1.3.5.2 Certificates
Before assigning any welder, welding operator, or tacker to work under this contract, submit the names of the welders, welding operators, and tackers to be employed, and certification that each individual is qualified as specified. State in the certification the type of welding and positions for which the welder, welding operator, or tacker is qualified, the code and procedure under which the individual is qualified, the date qualified, and the name of the firm and person certifying the qualification tests.
Keep the certification current, on file, and furnish 3 copies.
1.3.5.3 Renewal of Qualification
Re-qualification of a welder or welding operator is required under any of the following conditions:
a. It has been more than 6 months since the welder or welding operator has used the specific welding process for which he is qualified.
b. There is specific reason to question the welder or welding operator's ability to make welds that meet the requirements of these specifications.
c. The welder or welding operator was qualified by an employer other than those firms performing work under this contract, and a qualification test has not been taken within the past 12 months. Submit as evidence
SECTION 05 05 23.16 Page 5 of conformance all records showing periods of employment, name of employer where welder, or welding operator, was last employed, and the process for which qualified.
d. A tacker who passes the qualification test is considered eligible to perform tack welding indefinitely in the positions and with the processes for which he/she is qualified, unless there is some specific reason to question the tacker's ability. In such a case, the tacker is required to pass the prescribed tack welding test.
1.3.6 Inspector Qualification
Submit inspector qualifications that are in accordance with AWS D1.1/D1.1M and AWS D1.8/D1.8M. Qualify all nondestructive testing personnel in accordance with the requirements of ANSI/ASNT CP-189 for Levels I or II in the applicable nondestructive testing method. The inspector may be supported by assistant welding inspectors who are not qualified to AWS D1.1/D1.1M, and assistant inspectors may perform specific inspection functions under the supervision of the qualified inspector, as allowed by
AWS D1.1/D1.1M.
1.3.7 Symbols and Safety
Use symbols in accordance with AWS A2.4, unless otherwise indicated.
Follow safe welding practices and safety precautions during welding in conformance with AWS Z49.1.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Conform the design of welded connections to AISC 360, unless otherwise indicated or specified. Material with welds will not be accepted unless the welding is specified or indicated on the drawings or otherwise approved. Perform welding as specified in this section, except where additional requirements are shown on the drawings or are specified in other sections. Do not commence welding until welding procedures, inspectors, nondestructive testing personnel, welders, welding operators, and tackers have been qualified and the submittals approved by the Contracting Officer. Perform all testing at or near the work site. Maintain records of the test results obtained in welding procedure, welder, welding operator, and tacker performance qualifications.
2.1.1 Pre-erection Conference
Hold a pre-erection conference prior to the start of the field welding, to bring all affected parties together and to gain a naturally clear understanding of the project and the Welding Procedure Specifications (WPS) (submitted for all welding, including welding done using pre-qualified procedures). Mandatory attendance is required by all Contractor's welding production and inspection personnel and appropriate Government personnel.
Include as items for discussion: responsibilities of various parties;
welding procedures and processes to be followed; welding sequence (both within a joint and joint sequence within the building); inspection requirements and procedures, both visual and nondestructive testing;
welding schedule; and other items deemed necessary by the attendees.
SECTION 05 05 23.16 Page 6
2.2 WELDING EQUIPMENT AND MATERIALS
Provide all welding equipment, welding electrodes and rods, welding wire, and fluxes capable of producing satisfactory welds when used by a qualified welder or welding operator performing qualified welding procedures.
Provide welding equipment and materials that comply with the applicable requirements of AWS D1.1/D1.1M and AWS D1.8/D1.8M. Submit product data on welding electrodes and rods.
PART 3 EXECUTION
3.1 WELDING OPERATIONS
3.1.1 Requirements
Conform workmanship and techniques for welded construction to the requirements of AWS D1.1/D1.1M, AWS D1.8/D1.8M and AISC 360. When AWS D1.1/D1.1M, AWS D1.8/D1.8M and the AISC 360 specification conflict, the requirements of AWS D1.1/D1.1M, AWS D1.8/D1.8M govern.
3.1.2 Identification
Identify all welds in one of the following ways:
a. Submit written records to indicate the location of welds made by each welder, welding operator, or tacker.
b. Identify all work performed by each welder, welding operator, or tacker with an assigned number, letter, or symbol to identify welds made by that individual. The Contracting Officer may require welders, welding operators, and tackers to apply their symbol next to the weld by means of rubber stamp, felt-tipped marker with waterproof ink, or other methods that do not cause an indentation in the metal. Place the identification mark for seam welds adjacent to the weld at 3 foot intervals. Identification with die stamps or electric etchers is not allowed.
3.2 QUALITY CONTROL
Perform testing using an approved inspection or testing laboratory or technical consultant; or if approved, the Contractor's inspection and testing personnel may be used instead of the commercial inspection or testing laboratory or technical consultant. Perform visual inspections to determine conformance with paragraph STANDARDS OF ACCEPTANCE. Conform procedures and techniques for inspection with applicable requirements of AWS D1.1/D1.1M, AWS D1.8/D1.8M, ASTM E165/E165M, and ASTM E709. Submit a Welding Quality Assurance Plan and records of tests and inspections.
3.3 STANDARDS OF ACCEPTANCE
Conform dimensional tolerances for welded construction, details of welds, and quality of welds with the applicable requirements of AWS D1.1/D1.1M, AWS D1.8/D1.8M and the contract drawings. Perform nondestructive testing by visual inspection methods. The minimum extent of nondestructive testing must be random 15 percent of welds or joints, as indicated on the drawings. Submit all records of nondestructive testing.
SECTION 05 05 23.16 Page 7
3.3.1 Nondestructive Testing
The welding is subject to inspection and tests in the mill, shop, and field. Inspection and tests in the mill or shop do not relieve the Contractor of the responsibility to furnish weldments of satisfactory quality. When materials or workmanship do not conform to the specification requirements, the Government reserves the right to reject material or workmanship or both at any time before final acceptance of the structure containing the weldment. Any indication of a defect is regarded as a defect, unless re-evaluation by nondestructive methods or by surface conditioning shows that no unacceptable defect is present. Submit all records of nondestructive testing in accordance with paragraph STANDARDS OF
ACCEPTANCE.
3.3.2 Destructive Tests
Make all repairs when metallographic specimens are removed from any part of a structure. Employ only qualified welders or welding operators, and use the proper joints and welding procedures, including peening or heat treatment if required, to develop the full strength of the members and joints cut and to relieve residual stress.
3.4 GOVERNMENT INSPECTION AND TESTING
In addition to the inspection and tests performed by the Contractor for quality control, the Government will perform inspection and testing for acceptance to the extent determined by the Contracting Officer. The costs of such inspection and testing will be borne by the Contractor if unsatisfactory welds are discovered, or by the Government if the welds are satisfactory. The work may be performed by the Government's own forces or under a separate contract for inspection and testing. The Government reserves the right to perform supplemental nondestructive and destructive tests to determine compliance with paragraph STANDARDS OF ACCEPTANCE.
3.5 CORRECTIONS AND REPAIRS
If inspection or testing indicates defects in the weld joints, repair defective welds using a qualified welder or welding operator as applicable. Conduct corrections in accordance with the requirements of AWS D1.1/D1.1M, AWS D1.8/D1.8M and the specifications. Repair all defects in accordance with the approved procedures. Repair defects discovered between passes before additional weld material is deposited. Wherever a defect is removed and repair by welding is not required, blend the affected area into the surrounding surface to eliminate sharp notches, crevices, or corners. After a defect is thought to have been removed, and before re-welding, examine the area by suitable methods to ensure that the defect has been eliminated. Repaired welds must meet the inspection requirements for the original welds.
-- End of Section --
SECTION 05 05 23.16 Page 8
DIVISION 08 - OPENINGS
SECTION 08 71 00
DOOR HARDWARE
02/16
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SHOP DRAWINGS
1.4 PRODUCT DATA
1.5 HARDWARE SCHEDULE
1.6 KEY BITTING CHART REQUIREMENTS
1.6.1 Requirements
1.7 QUALITY ASSURANCE
1.7.1 Hardware Manufacturers and Modifications
1.7.2 Key Shop Drawings Coordination Meeting
1.8 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 TEMPLATE HARDWARE
2.2 HARDWARE FOR FIRE DOORS AND EXIT DOORS
2.3 HARDWARE ITEMS
2.3.1 Hinges
2.3.2 Pivots
2.3.3 Locks and Latches
2.3.3.1 Mortise Locks and Latches
2.3.3.2 Bored Locks and Latches
2.3.3.3 Auxiliary Locks
2.3.4 Cylinders and Cores
2.3.5 Electrified Hardware
2.3.5.1 Electric Strikes and Frame Mounted Actuators (N.I.C)
2.3.5.1.1 Tamper Resistance
2.3.5.1.2 Mounting Method
2.3.6 Keying System
2.3.7 Lock Trim
2.3.7.1 Lever Handles
2.3.8 Keys
2.3.9 Closers
2.3.9.1 Identification Marking
2.3.10 Overhead Holders
2.3.11 Door Protection Plates
2.3.11.1 Sizes of Mop and Kick Plates
2.3.12 Door Stops and Silencers
2.3.13 Padlocks
2.3.14 Thresholds
2.3.15 Weatherstripping Gasketing
2.3.15.1 Extruded Aluminum Retainers
2.3.15.2 Interlocking Type
2.3.15.3 Spring Tension Type
SECTION 08 71 00 Page 1
2.3.16 Rain Drips
2.3.16.1 Door Rain Drips
2.3.16.2 Overhead Rain Drips
2.3.17 Auxiliary Hardware (Other than locks)
2.3.18 Special Tools
2.4 FASTENERS
2.5 FINISHES
2.6 KEY CABINET AND CONTROL SYSTEM
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Weatherstripping Installation
3.1.1.1 Stop Applied Weatherstripping
3.1.1.2 Interlocking Type Weatherstripping
3.1.1.3 Spring Tension Type Weatherstripping
3.1.2 Threshold Installation
3.2 HARDWARE LOCATIONS
3.3 KEY CABINET AND CONTROL SYSTEM
3.4 FIELD QUALITY CONTROL
3.5 HARDWARE SETS
-- End of Section Table of Contents --
SECTION 08 71 00 Page 2
SECTION 08 71 00
DOOR HARDWARE
02/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E283 (2019) Standard Test Method for Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
ASTM F883 (2013) Padlocks
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.1 (2016) Butts and Hinges
ANSI/BHMA A156.13 (2017) Mortise Locks & Latches Series 1000
ANSI/BHMA A156.16 (2018) Auxiliary Hardware
ANSI/BHMA A156.17 (2014) Self Closing Hinges & Pivots
ANSI/BHMA A156.18 (2016) Materials and Finishes
ANSI/BHMA A156.2 (2017) Bored and Preassembled Locks and Latches
ANSI/BHMA A156.21 (2014) Thresholds
ANSI/BHMA A156.22 (2017) Door Gasketing and Edge Seal Systems
ANSI/BHMA A156.3 (2014) Exit Devices
ANSI/BHMA A156.36 (2010) Auxiliary Locks
ANSI/BHMA A156.4 (2019) Door Controls - Closers
ANSI/BHMA A156.5 (2014) Cylinder and Input Devices for Locks
ANSI/BHMA A156.6 (2016) Architectural Door Trim
ANSI/BHMA A156.7 (2016) Template Hinge Dimensions
ANSI/BHMA A156.8 (2015) Door Controls - Overhead Stops and Holders
SECTION 08 71 00 Page 3
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 101 (2018; TIA 18-1; TIA 18-2; TIA 18-3) Life Safety Code
NFPA 252 (2017) Standard Methods of Fire Tests of Door Assemblies
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
NFPA 72 (2016; Errata 1 2018) National Fire Alarm and Signaling Code
NFPA 80 (2016; TIA 16-1) Standard for Fire Doors and Other Opening Protectives
STEEL DOOR INSTITUTE (SDI/DOOR)
SDI/DOOR A250.8 (2017) Specifications for Standard Steel Doors and Frames
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines
UNDERWRITERS LABORATORIES (UL)
UL Bld Mat Dir (updated continuously online) Building Materials Directory
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Manufacturer's Detail Drawings; G, DO
Verification of Existing Conditions; G
Hardware Schedule; G, DO
Keying System; G, RO
SECTION 08 71 00 Page 4
SD-03 Product Data
Hardware Items; G, DO
SD-08 Manufacturer's Instructions
Installation
SD-10 Operation and Maintenance Data
Hardware Schedule Items, Data Package 1; G, RO
SD-11 Closeout Submittals
Key Bitting
1.3 SHOP DRAWINGS
Submit manufacturer's detail drawings indicating all hardware assembly components and interface with adjacent construction. Indicate power components and wiring coordination for electrified hardware. Base shop drawings on verified field measurements and include verification of existing conditions.
1.4 PRODUCT DATA
Indicate fire-ratings at applicable components. Provide documentation of ABA/ADA accessibility compliance of applicable components, as required by 36 CFR 1191 Appendix D - Technical.
1.5 HARDWARE SCHEDULE
Prepare and submit hardware schedule in the following form:
Hardware Item
Quantity Size Reference Publi-cation Type No.
Finish Mfr Name and Catalog No.
Key Control Symbols
UL
Mark (If fire-rated and listed)
BHMA
Finish Desig-nation
In addition, submit hardware schedule data package 1 in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.
1.6 KEY BITTING CHART REQUIREMENTS
1.6.1 Requirements
Submit key bitting charts to the Contracting Officer prior to completion of the work. Include:
a. Complete listing of all keys (e.g. AA1 and AA2).
b. Complete listing of all key cuts (AA1-123456, AA2-123458).
c. Tabulation showing which key fits which door.
SECTION 08 71 00 Page 5
d. Copy of floor plan showing doors and door numbers.
e. Listing of 20 percent more key cuts than are presently required in each master system.
1.7 QUALITY ASSURANCE
1.7.1 Hardware Manufacturers and Modifications
Provide, as far as feasible, locks, hinges, pivots, and closers of one lock, hinge, pivot, or closer manufacturer's make. Modify hardware as necessary to provide features indicated or specified.
1.7.2 Key Shop Drawings Coordination Meeting
Prior to the submission of the key shop drawing, the Contracting Officer, Contractor, Door Hardware Subcontractor, using Activity and Base Locksmith must meet to discuss and coordinate key requirements for the facility.
1.8 DELIVERY, STORAGE, AND HANDLING
Deliver hardware in original individual containers, complete with necessary appurtenances including fasteners and instructions. Mark each individual container with item number as shown on hardware schedule. Deliver permanent keys and removable cores to the Contracting Officer, either directly or by certified mail. Deliver construction master keys with the locks.
PART 2 PRODUCTS
2.1 TEMPLATE HARDWARE
Hardware applied to metal or to prefinished doors must be manufactured using a template. Provide templates to door and frame manufacturers in accordance with ANSI/BHMA A156.7 for template hinges. Coordinate hardware items to prevent interference with other hardware.
2.2 HARDWARE FOR FIRE DOORS AND EXIT DOORS
Provide all hardware necessary to meet the requirements of NFPA 72 for door alarms, NFPA 80 for fire doors, NFPA 101 for exit doors, NFPA 252 for fire tests of door assemblies, ABA/ADA accessibility requirements, and all other requirements indicated, even if such hardware is not specifically mentioned in paragraph HARDWARE SCHEDULE. Provide Underwriters Laboratories, Inc. labels for such hardware in accordance with UL Bld Mat Dir or equivalent labels in accordance with another testing laboratory approved in writing by the Contracting Officer.
2.3 HARDWARE ITEMS
Clearly and permanently mark with the manufacturer's name or trademark, hinges, pivots, locks, latches, exit devices, bolts and closers where the identifying mark is visible after the item is installed. For closers with covers, the name or trademark may be beneath the cover. Coordinate electrified door hardware components with corresponding components specified in Division 28 ELECTRONIC SECURITY SYSTEMS (ESS).
SECTION 08 71 00 Page 6
2.3.1 Hinges
Provide in accordance with ANSI/BHMA A156.1. Provide hinges that are 4-1/2 by 4-1/2 inch unless otherwise indicated. Construct loose pin hinges for interior doors and reverse-bevel exterior doors so that pins are non-removable when door is closed. Other anti-friction bearing hinges may be provided in lieu of ball bearing hinges.
2.3.2 Pivots
Provide in accordance with ANSI/BHMA A156.17.
2.3.3 Locks and Latches
2.3.3.1 Mortise Locks and Latches
Provide in accordance with ANSI/BHMA A156.13, Series 1000, Operational Grade 1, Security Grade 2. Provide knobs and roses of mortise locks with screwless shanks and no exposed screws.
2.3.3.2 Bored Locks and Latches
Provide in accordance with ANSI/BHMA A156.2, Series 4000, Grade 1.
2.3.3.3 Auxiliary Locks
Provide in accordance with ANSI/BHMA A156.36, Grade 1.
2.3.4 Cylinders and Cores
Provide cylinders and cores for new locks, including locks provided under other sections of this specification. Provide cylinders and cores with six pin tumblers. Provide cylinders from the products of one manufacturer, and provide cores from the products of one manufacturer.
Provide cylinders for new locks, including locks provided under other sections of this specification. Provide fully compatible cylinders with products of the BEST Lock Corporation with interchangeable cores that are removable by a special control key. Factory set the cores with six pin tumblers using the A4 system and F keyway. Submit a core code sheet with the cores. Provide master keyed cores in one system for this project.
Provide construction interchangeable cores.
2.3.5 Electrified Hardware
Comply with the requirements of NFPA 70 for wiring of electrified hardware.
2.3.5.1 Electric Strikes and Frame Mounted Actuators (N.I.C)
Coordinate electric strikes and actuators of a size, weight and profile compatible with each specified door frame. Field verify installation clearances prior to procurement.
2.3.5.1.1 Tamper Resistance
Provide strike guards that prevent tampering with the latch bolt of the locking hardware or the latch bolt keeper of the electric strike. Strike guards to bolt through the door using tamper resistant screws. Provide strike guards made of 1/8 inch thick brass and that are 11-1/14 inch high by
SECTION 08 71 00 Page 7
1-5/8 inch wide, with a minimum 5/32 inch wide offset.
2.3.5.1.2 Mounting Method
Electric strikes and actuators shall be suitable for use with single and double doors, with mortise or rim type hardware specified, and for right or left hand mounting as specified. In double door installations, locate the lock in the active leaf and monitor the fixed leaf.
2.3.6 Keying System
Provide a master keying system to match existing MOTCO keying system.
2.3.7 Lock Trim
Provide cast, forged, or heavy wrought construction and commercial plain design for lock trim.
2.3.7.1 Lever Handles
Provide lever handles in lieu of knobs. Provide in accordance with ANSI/BHMA A156.3 for mortise locks of lever handles for exit devices.
Provide lever handle locks with a breakaway feature (such as a weakened spindle or a shear key) to prevent irreparable damage to the lock when force in excess of that specified in ANSI/BHMA A156.13 is applied to the lever handle. Provide lever handles return to within 1/2 inch of the door face.
2.3.8 Keys
Provide one file key, one duplicate key, and one working key for each key change and for each master keying system. Provide one additional working key for each lock of each keyed-alike group. Furnish a quantity of key blanks equal to 20 percent of the total number of file keys. Stamp each key with appropriate key control symbol and "U.S. property - do not duplicate." Do not place room number on keys.
2.3.9 Closers
Provide in accordance with ANSI/BHMA A156.4, Series C02000, Grade 1, with PT 4C. Provide with brackets, arms, mounting devices, fasteners, full size covers, except at storefront mounting, and other features necessary for the particular application. Size closers in accordance with manufacturer's printed recommendations, or provide multi-size closers, Sizes 1 through 6, and list sizes in the Hardware Schedule. Provide manufacturer's 10 year warranty.
2.3.9.1 Identification Marking
Engrave each closer with manufacturer's name or trademark, date of manufacture, and manufacturer's size designation in locations that will be visible after installation.
2.3.10 Overhead Holders
Provide in accordance with ANSI/BHMA A156.8.
SECTION 08 71 00 Page 8
2.3.11 Door Protection Plates
Provide in accordance with ANSI/BHMA A156.6.
2.3.11.1 Sizes of Mop and Kick Plates
Provide 10 inch kick plates for flush doors and 1 inch less than height of bottom rail for panel doors. Provide 6 inch mop plates.
2.3.12 Door Stops and Silencers
Provide in accordance with ANSI/BHMA A156.16. Silencers Type L03011.
Provide three silencers for each single door, two for each pair.
2.3.13 Padlocks
Provide in accordance with ASTM F883.
2.3.14 Thresholds
Provide in accordance with ANSI/BHMA A156.21. Use J35100, with vinyl or silicone rubber insert in face of stop, for exterior doors opening out, unless specified otherwise.
2.3.15 Weatherstripping Gasketing
Provide in accordance with ANSI/BHMA A156.22. Provide the type and function designation where specified in paragraph HARDWARE SCHEDULE.
Provide a set to include head and jamb seals, sweep strips, . Air leakage of weatherstripped doors not to exceed 0.5 cubic feet per minute of air per square foot of door area when tested in accordance with ASTM E283. Provide weatherstripping with one of the following:
2.3.15.1 Extruded Aluminum Retainers
Extruded aluminum retainers not less than 0.050 inch wall thickness with vinyl, neoprene, silicone rubber, or polyurethane inserts. Provide clear (natural) anodized aluminum.
2.3.15.2 Interlocking Type
Zinc or bronze not less than 0.018 inch thick.
2.3.15.3 Spring Tension Type
Spring bronze or stainless steel not less than 0.008 inch thick.
2.3.16 Rain Drips
Provide in accordance with ANSI/BHMA A156.22. Provide extruded aluminum rain drips, not less than 0.08 inch thick, clear anodized finish. Provide the manufacturer's full range of color choices to the Contracting Officer for color selection Provide rain drips with a 4 inch overlap on each side of each exterior door that is not protected by an awning, roof, eave or other horizontal projection. Set drips in sealant and fasten with stainless steel screws.
SECTION 08 71 00 Page 9
2.3.16.1 Door Rain Drips
Approximately 1-1/2 inch high by 5/8 inch projection. Align bottom with bottom edge of door.
2.3.16.2 Overhead Rain Drips
Approximately 1-1/2 inch high by 2-1/2 inch projection. Align bottom with door frame rabbet.
2.3.17 Auxiliary Hardware (Other than locks)
Provide in accordance with ANSI/BHMA A156.16, Grade 1.
2.3.18 Special Tools
Provide special tools, such as spanner and socket wrenches and dogging keys, as required to service and adjust hardware items.
2.4 FASTENERS
Provide fasteners of type, quality, size, and quantity appropriate to the specific application. Fastener finish to match hardware. Provide stainless steel or nonferrous metal fasteners in locations exposed to weather. Verify metals in contact with one another are compatible and will avoid galvanic corrosion when exposed to weather.
2.5 FINISHES
Provide in accordance with ANSI/BHMA A156.18. Provide hardware in BHMA 630 finish (satin stainless steel), unless specified otherwise. Provide items not manufactured in stainless steel in BHMA 626 finish (satin chromium plated) over brass or bronze, except prime coat finish for surface door closers, and except BHMA 600 finish (primed for painting) for steel hinges. Provide hinges for exterior doors in stainless steel with BHMA 630 finish or chromium plated brass or bronze with BHMA 626 finish. Furnish exit devices in BHMA 626 finish in lieu of BHMA 630 finish except where BHMA 630 is specified under paragraph HARDWARE SETS. Match exposed parts of concealed closers to lock and door trim. Match hardware finish for aluminum doors to the doors.
2.6 KEY CABINET AND CONTROL SYSTEM
Provide in accordance with ANSI/BHMA A156.5, Type required to yield a capacity (number of hooks) 50 percent greater than the number of key changes used for door locks.
PART 3 EXECUTION
3.1 INSTALLATION
Provide hardware in accordance with manufacturers' printed installation instructions. Fasten hardware to wood surfaces with full-threaded wood screws or sheet metal screws. Provide machine screws set in expansion shields for fastening hardware to solid concrete and masonry surfaces.
Provide toggle bolts where required for fastening to hollow core construction. Provide through bolts where necessary for satisfactory installation.
SECTION 08 71 00 Page 10
3.1.1 Weatherstripping Installation
Provide full contact, weathertight seals that allow operation of doors without binding the weatherstripping.
3.1.1.1 Stop Applied Weatherstripping
Fasten in place with color matched sheet metal screws not more than 9 inch on center after doors and frames have been finish painted.
3.1.1.2 Interlocking Type Weatherstripping
Provide interlocking, self adjusting type on heads and jambs and flexible hook type at sills. Nail weatherstripping to door 1 inch on center and to heads and jambs at 4 inch on center.
3.1.1.3 Spring Tension Type Weatherstripping
Provide spring tension type on heads and jambs. Provide bronze nails with bronze. Provide stainless steel nails with stainless steel. Space nails not more than 1-1/2 inch on center.
3.1.2 Threshold Installation
Extend thresholds the full width of the opening and notch end for jamb stops. Set thresholds in a full bed of sealant and anchor to floor with cadmium-plated, countersunk, steel screws .
3.2 HARDWARE LOCATIONS
Provide in accordance with SDI/DOOR A250.8, unless indicated or specified otherwise.
a. Kick and Armor Plates: Push side of single-acting doors. Both sides of double-acting doors.
b. Mop Plates: Bottom flush with bottom of door.
3.3 KEY CABINET AND CONTROL SYSTEM
Locate where directed . Tag one set of file keys and one set of duplicate keys. Place other keys in appropriately marked envelopes, or tag each key. Provide complete instructions for setup and use of key control system. On tags and envelopes, indicate door and room numbers or master or grand master key.
3.4 FIELD QUALITY CONTROL
After installation, protect hardware from paint, stains, blemishes, and other damage until acceptance of work. Submit notice of testing 15 days before scheduled, so that testing can be witnessed by the Contracting Officer. Adjust hinges, locks, latches, bolts, holders, closers, and other items to operate properly. Demonstrate that permanent keys operate respective locks, and give keys to the Contracting Officer. Correct, repair, and finish, errors in cutting and fitting and damage to adjoining work.
SECTION 08 71 00 Page 11
3.5 HARDWARE SETS
SECTION 08 71 00 Page 12
*Am-4
HDWR SET 01:
1 Ea Lever handle both sides, ANSI Function 32 3 Ea Pivots by Alum Door Manufacturer 1 Ea Closer, spring-cushioned C02021 1 Ea Door Stop L02251 1 Set Weatherstrip
HDWR SET 02:
1 Ea Lever handle both sides, ANSI Function 032 3 Ea Hinge - Full Mortise A5111 1 Ea Closer, spring-cushioned C02011 1 Ea Door Stop L02251 1 Ea Weatherstripping 1 Ea Threshold 1 Ea Kickplate
HDWR SET 03:
1 Ea Lever handle both sides, ANSI Function 02 3 Ea Hinge - Full Mortise A5111 1 Ea Closer, spring-cushioned C02011 1 Ea Door Stop L02251 1 Ea Mop Plate
HDWR SET 04:
1 Ea Lever handle both sides, ANSI Function 32 3 Ea Hinge - Full Mortise A5111 1 Ea Door Stop L02251 1 Ea Closer, spring-cushioned C02021 1 Ea Kick Plate
HDWR SET 05:
1 Ea Lever handle both sides, ANSI Function 01 3 Ea Hinge - Full Mortise A5111 1 Ea Door Stop L02251 1 Ea Closer, spring-cushioned C02021 1 Ea Silencer L03011
HDWR SET 06 :
1 Ea Lever handle both sides, ANSI Function 07 3 Ea Hinge - Full Mortise A5111, NRP 1 Ea Closer, spring-cushioned C02011 2 Ea Door Stop L02251 1 Set Weatherstrip R3E164 x DS
HDWR SET 07:
3 Ea Hinge - Full Mortise A5111, NRP 1 Ea Lever handle both sides, ANSI Function 07 2 Ea Door Stop L02251 1 Set Threshold
HDWR SET 08:
1 Ea Overhead Rain Drip ROY936 x Opening Width See Specification 08 34 02 BULLET-RESISTANT COMPONENTS
HDWR SET 09:
1 Ea Lever handle both sides, ANSI Function 07 3 Ea Hinge - Full Mortise A5111, NRP
SECTION 08 71 00 Page 13
1 Ea Closer, spring-cushioned C02011 2 Ea Door Stop L02251 1 Set Weatherstrip R3E164 x DS 1 Ea Overhead Rain Drip ROY936 x Opening Width 1 Ea Door Bottom with Drip ROY536
HDWR SET 10:
1 Ea Lever handle both sides, ANSI Function 04 3 Ea Hinge - Full Mortise A5111, NRP 1 Ea Closer, spring-cushioned C02011 2 Ea Door Stop L02251 1 Set Weatherstrip R3E164 x DS 1 Ea Overhead Rain Drip ROY936 x Opening Width 1 Ea Door Bottom with Drip ROY536
HDWR SET 11:
1 Ea Overhead Rain Drip ROY936 x Opening Width See Specification Section 08 33 23
Provide hardware for aluminum doors under this section. Deliver Hardware templates and hardware, except field applied hardware, to the aluminum door and frame manufacturer for use in fabricating doors and frames.
HIGH SECURITY KEY BOX (KNOX BOX)
Provide High security key box(es) that shall be provided and installed by the Contractor as located on the drawings. Key box shall be similar to Model 3200, Surface Mount style, manufactured by the Knox Company (www.knoxbox.com) or an approved equal. Key box shall be dark bronze color and shall have the following manufacturer's options: Corrosion protection pretreatment application. Mount key box at 4 foot 6 inches above finished surface to center of key box. Locate key box at exterior wall of entrances.
-- End of Section --
SECTION 08 71 00 Page 14
DIVISION 10 - SPECIALTIES
SECTION 10 14 00.20
INTERIOR SIGNAGE
08/17
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 EXTRA MATERIALS
1.4 QUALITY ASSURANCE
1.4.1 Samples
1.4.2 Detail Drawings
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 WARRANTY
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
2.2 ROOM IDENTIFICATION/DIRECTIONAL SIGNAGE SYSTEM
2.2.1 Standard Room Signs
2.2.2 Changeable Message Strip Signs
2.2.2.1 Exterior No Smoking Sign
2.2.3 Type of Mounting For Signs
2.2.4 Graphics
2.2.4.1 Subsurface Copy
2.2.4.2 First Surface Copy Direct Print or Silkscreened
(Non-Tactile)
2.2.4.3 Surface Applied Photopolymer
2.2.4.4 Engraved Copy
2.2.4.5 Graphic Blast Raised Copy
2.2.4.6 Embossed
2.2.5 Character Proportions and Heights
2.2.6 Tactile Letters, Symbols and Braille
2.3 EXTERIOR SIGNAGE FOR SIGN TYPE "M"
2.4 LETTERS AND GRAPHICS
2.4.1 Fabrication
2.4.2 Size
2.5 ORGANIC COATING
2.6 FABRICATION AND MANUFACTURE
2.6.1 Factory Workmanship
2.6.2 Dissimilar Materials
2.7 COLOR, FINISH, AND CONTRAST
2.8 TYPEFACE
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Anchorage
3.1.2 Protection and Cleaning
SECTION 10 14 00.20 Page 1
ATTACHMENTS:
Attachment for sign types
-- End of Section Table of Contents --
SECTION 10 14 00.20 Page 2
SECTION 10 14 00.20
INTERIOR SIGNAGE
08/17
PART 1 GENERAL
Attachment: Signage Placement Schedule
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA 2604 (2017a) Voluntary Specification, Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z97.1 (2015) Safety Glazing Materials Used in Buildings - Safety Performance Specifications and Methods of Test
ASTM INTERNATIONAL (ASTM)
ASTM D635 (2018) Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Plastics in a Horizontal Position
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Detail Drawings; G, DO
SD-03 Product Data
SECTION 10 14 00.20 Page 3
Installation; G, DO
Warranty
SD-04 Samples
Interior Signage; G, DO
Software; G, RO
SD-10 Operation and Maintenance Data
Approved Manufacturer's Instructions
Protection and Cleaning
1.3 EXTRA MATERIALS
Provide twenty-five paper inserts and one copy of the software for user produced signs and inserts after project completion and equipment necessary for removal of signage parts and pieces.
1.4 QUALITY ASSURANCE
1.4.1 Samples
Submit interior signage samples of each of the following sign types showing typical quality, workmanship and color: A, B, DWM and M. The samples may be installed in the work, provided each sample is identified and location recorded.
1.4.2 Detail Drawings
Submit detail drawings showing elevations of each type of sign, dimensions, details and methods of mounting or anchoring, mounting height, shape and thickness of materials, and details of construction. Include a schedule showing the location, each sign type, and message.
1.5 DELIVERY, STORAGE, AND HANDLING
Materials must be packaged to prevent damage and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .