This solicitation is for design and construction services for a new East Gate canopy and inspection facility at Hill Air Force Base in Utah. Key requirements include designing and constructing a new canopy in the access control and approach zones, providing a shelter in the inspection zone, modifying the geometry of inbound and outbound lanes to ensure nine seconds of response time for security forces, situating passive vehicle barriers around the perimeter according to the DoD Anti-RAM list, constructing a generator pad, connecting to an automatic transfer switch, installing IDS and CCTV infrastructure, replacing traffic and security lighting, and performing demolition and precise grading to integrate the new features with existing infrastructure and terrain. The project will be conducted in two phases to maintain one open lane at all times.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SF-30 Continuation
AM03
CONSTRUCT EAST GATE CANOPY & INSPECTION FACILITY, HILL AFB
AMENDMENT 0003
Summary of Changes:
A) SPECIFICATIONS REVISED
1. 01 33 00 SUBMITTAL PROCEDURE –Replaced submittal register only
2. 34 71 13.16 VEHICLE CRASH BARRIERS – Replaced entire section.
B) DRAWINGS REVISED
1. C‐103 DEMOLITION PLAN
2. C‐104 SITE PLAN WITH GEOMETRIC INFORMATION (1)
3. C‐105 SITE PLAN WITH GEOMETRIC INFORMATION (2)
4. C‐515 M50 PVB DETAILS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 38 PAGES
Construct East Gate Canopy & Inspection Facility, Hill AFB
01 11 00 SD-01 Preconstruction Submittals
1.6 GSalvage Plan
01 32 01 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.5Bar Chart Schedule
3.1 GProject Schedule
3.5.1 GPreliminary Project Schedule
3.5.2 GInitial Project Schedule
3.6.1Data Optical Discs
3.5.3 GPeriodic Schedule Update
3.7.2 GPeriodic Schedule Update
3.9.1 GJustification of Delay
3.9.3 GTime Impact Analysis
3.9.4 GForensic Schedule Analysis
3.1.1 GSchedule Status Report
01 33 00 SD-01 Preconstruction Submittals
1.9 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.1 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.3.1 GFinal High Performance and
Sustainable Building Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 38 PAGES
01 33 29 1.5.3.1 GFinal Sustainability eNotebook
1.5.3.1 GAmended Final Sustainability
eNotebook
1.5.3.1 GAmended Final High
Performance and Sustainable
Building Checklist
01 35 26 SD-01 Preconstruction Submittals
1.6 G DOAccident Prevention Plan (APP)
1.6.2.10 GHealth Hazard Control Plan
1.6.2.11 GEmergency Action Plan
1.6.2.3 GStandard Lift Plan
1.6.2.4 G DOCritical Lift Plan
1.7Activity Hazard Analysis (AHA)
SD-06 Test Reports
1.11.3Monthly Exposure Reports
1.11Notifications and Reports
1.11.2 G DOAccident Investigation Reports
1.11.4LHE Inspection Reports
1.11.6Regulatory Citations and
Violations
SD-07 Certificates
1.5.1.4Crane Operators/Riggers
1.8.1Confined Space Entry Permit
1.8.1Hot Work Permit
1.11.5Certificate of Compliance
1.5.1.4Proof of Current Qualification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 38 PAGES
01 45 00 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control Plan
3.7.2.1 GMTC validation
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.2Written Practices
3.1.2NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1Certificate of Compliance
1.5 GSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals
3.1.2Interim Final Report
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.1.10.1 GTraffic Control Plan
3.5 GSafety Plan
1.4 GTemporary Earthwork Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 38 PAGES
01 50 00 3.1.10.3 GDust Control Methods And
Procedures
2.2 GHaul Road Plan
3.1.1 GTemporary Power Plan
SD-06 Test Reports
2.4Backflow Preventer Tests
SD-07 Certificates
1.7.1Backflow Tester
1.7Backflow Preventers
1.7.2Backflow Prevention Training
Certificate
01 57 19 SD-01 Preconstruction Submittals
1.8.1Preconstruction Survey
1.10.2 GSolid Waste Management Permit
3.6.2 GSolid Waste Management Plan
1.8.2 GRegulatory Notifications
1.9 GEnvironmental Protection Plan
1.8.4 GEnvironmental Manager
Qualifications
3.2.1.2 GStormwater Notice of Intent
1.9.7 GNon-Hazardous Solid Waste
Disposal Plan
1.9.11.3 GDirt and Dust Control Plan
1.9.8 GSpill Control Plan
1.9.12 GWaste Water Management Plan
1.9.1.1 GAir Pollution Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 38 PAGES
01 57 19 1.9.1.1 GContaminant Prevention Plan
1.9.13 GCultural Resources Protection
Plan
1.9.2.3 GTraffic Control Plan
1.9.2.3 GHaul Route Plan
SD-06 Test Reports
3.2.1.3Inspection Reports
3.7.2.1 GSolid Waste Management Report
1.9.7Non-Hazardous Solid Waste
Diversion Report
SD-07 Certificates
1.8.5 GEmployee Training Records
1.8.5Erosion and Sediment Control
Inspector Qualifications
SD-11 Closeout Submittals
3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.7.1 GWaste Determination
Documentation
3.2.1.5 GStormwater Notice of Termination
3.7.3.1 GHazardous Waste/Debris
Management
3.7.3.1 GHazardous Waste/Debris
Management
3.7.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 38 PAGES
01 57 19 1.8.5 GAssembled Employee Training
Records
1.10.2 GSolid Waste Management Permit
3.7.2.1 GSolid Waste Management Report
1.8.2 GRegulatory Notifications
3.7.2.1 GSales Documentation
01 57 23 SD-01 Preconstruction Submittals
1.6.1 G DOSWPPP
1.6.1 G DOSWPPP
1.6.2 G DOPRDs
1.6.2 G DOPRDs
SD-03 Product Data
1.6.1.1BMP Product Data
3.1.1BMP Product Data
3.1.1BMP Product Data
3.1.1BMP Product Data
SD-06 Test Reports
3.1.1SWPPP Amendment
SD-11 Closeout Submittals
3.1.2 G DOFinal SWPPP
3.2.1 G DOFinal SWPPP
3.1.2 G DONOT Application
3.1.2 G DONOT Application
01 74 19 SD-01 Preconstruction Submittals
1.5 GWaste Management Plan
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 38 PAGES
01 74 19 1.6 SRecords
01 78 00 SD-03 Product Data
1.7.1Warranty Management Plan
1.7.5Warranty Tags
1.5Spare Parts Data
SD-06 Test Reports
3.1.4 Gworking as-built drawings
3.2 G DOfinal as-built record drawings
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.9Operation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.4 G DORecord Drawings
2.3 GCertification of EPA Designated
Items
3.11 GInterim DD FORM 1354
3.11 GChecklist for DD FORM 1354
3.6 GFinal Approved Shop Drawings
3.7 GConstruction Contract
Specifications
3.8As-Built Record of Equipment and Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 38 PAGES
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 78 24 SD-01 Preconstruction Submittals
1.5.1Facility Data Project Execution
Plan
3.1 GFacility Data Workbook, Construction Progress
3.1 GFacility Document Set, Construction Progress
SD-11 Closeout Submittals
3.2 GFacility Data Workbook, Construction Final
1.5.3 GFacility Document Set, Construction Final
3.2 GFacility Document Set, Construction Final
01 91 00.15 SD-01 Preconstruction Submittals
1.7 G DOCommissioning Firm
1.7.1 G DOLead Commissioning Specialist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 38 PAGES
01 91 00.15 1.7.2 G DOTechnical Commissioning
Specialists
1.7 G DOCommissioning Firm's Contract
SD-06 Test Reports
3.1.3.1 G DOInterim Construction Phase
Commissioning Plan
3.1.3.1 G DOInterim Construction Phase
Commissioning Plan
3.1.3.2 G DOFinal Construction Phase
Commissioning Plan
3.1.3.1.2 G DOTemplate Building Envelope
Inspection Checklists
3.1.5.2 G DOBuilding Envelope Inspection
Checklists
3.1.5.3 G DOPre-Functional Checklists
1.8Issues Log
3.2 G DOCommissioning Report
3.3.1 G DOPost-Construction Trend Log
Report
SD-07 Certificates
1.9 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.6 G ROTraining Plan
3.1.6 G ROTraining Attendance Rosters
3.1.7 G DOSystems Manual
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 38 PAGES
01 91 00.15 3.1.8 G DOMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.2 S DOFinal Commissioning Report
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
3.3.4Receipts
03 30 53 SD-02 Shop Drawings
1.4Installation Drawings
SD-03 Product Data
2.2.3.1Air-Entraining Admixture
2.2.3.2 GAccelerating Admixture
2.2.3.3Water-Reducing or Retarding
Admixture
2.2.11Curing Materials
2.2.6Expansion Joint Filler Strips, Premolded
2.2.7Joint Sealants - Field Molded
Sealants
3.2Conveying and Placing Concrete
2.2.8Formwork
2.3 GMix Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 38 PAGES
03 30 53 2.3Ready-Mix Concrete
2.4.1Curing Compound
2.2.5Mechanical Reinforcing Bar
Connectors
SD-06 Test Reports
2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
3.9.3 GCompressive Strength Testing
3.9.3Slump
3.9.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
2.2.1.2Pozzolan
2.2.2Aggregates
2.3Delivery Tickets
SD-08 Manufacturer’s Instructions
2.4.1Curing Compound
03 42 13 SD-01 Preconstruction Submittals
1.3.2.2Quality Control Procedures
SD-02 Shop Drawings
2.1.1 GStandard Precast Units
2.1.2 GCustom-Made Precast Units
3.2.4.3Special Finishes
SD-03 Product Data
2.1.1Standard Precast Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 38 PAGES
03 42 13 2.1.3Proprietary Precast Units
3.1.3Embedded Items
2.2.4Accessories
SD-05 Design Data
2.1.2 GDesign Calculations
2.1.5.1Concrete Mix Proportions
SD-06 Test Reports
1.3.2.4Test Reports
SD-07 Certificates
1.3.2.2Quality Control Procedures
04 20 00 SD-02 Shop Drawings
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay or Shale Brick
2.4.1.1 GCement
2.4.1.1 GCementitious Materials
SD-04 Samples
2.2.2 GClay or Shale Brick
2.4.1.3 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 38 PAGES
04 20 00 SD-06 Test Reports
2.2.2.1.3Efflorescence Test
3.6.1.1Field Testing of Mortar
3.6.1.3Prism Tests
3.6.1.4Single-Wythe Masonry Wall
Water Penetration Test
SD-07 Certificates
1.3.1Special Masonry Inspector
Qualifications
2.2.2Clay or Shale Brick
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures For Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
05 12 00 SD-01 Preconstruction Submittals
1.3.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.3.2 GFabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 38 PAGES
05 12 00 SD-03 Product Data
2.5.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
2.2.3 SRecycled Content for Steel Pipe
SD-06 Test Reports
2.5.2Class B Coating
2.3Bolts, Nuts, and Washers
3.6.1.1Visual Weld Inspection Log
3.6.2.1Direct Tension Indicator Washer
Inspection Reports
3.6.3.1Bolt Testing Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
1.3.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.6.1.1Certified Welding Inspector
3.4Welding Procedure Specifications
(WPS)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 38 PAGES
05 30 00 SD-02 Shop Drawings
1.3.4 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.2.12Mechanical Fasteners
2.1 SRecycled Content of Steel
Products
SD-04 Samples
2.1.1Metal Roof Deck Units
2.2.3Flexible Closure Strips
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3.1Fire Safety
1.3.3.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.6.2 GMetal Truss Framing Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 38 PAGES
05 40 00 1.6.2 GMetal Truss Anchorage
Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.2.1Welds
07 24 00 SD-02 Shop Drawings
3.3 GShop Drawings
SD-03 Product Data
2.3Sheathing Board
2.5Thermal Insulation
2.4Mechanical Fasteners
2.11Accessories
2.6Base Coat
2.7Portland Cement
2.8Reinforcing Fabric
2.9Finish Coat
2.12Joint Sealant
2.10Sealant Primer
2.13Bond Breaker
2.14Backer Rod
1.4.5Insulation Board
1.7Warranty
SD-04 Samples
1.2.3.7 GSample Boards
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 38 PAGES
07 24 00 1.2.1.2Wind Load
SD-06 Test Reports
1.2.3.1Abrasion Resistance
1.2.3.2Accelerated Weathering
1.2.2.3Impact Resistance
1.2.3.3Mildew Resistance
1.2.3.4Salt Spray Resistance
1.2.3.6Absorption-Freeze-Thaw
1.2.1.3Wall Fire Test
1.2.1.1Water Penetration
1.2.3.5Water Resistance
1.2.1.3Full Scale or Intermediate Scale
Fire Test
1.2.2.1Surface Burning Characteristics
1.2.2.2Radiant Heat
3.1Substrate
1.2.1.2Wind Load
SD-07 Certificates
1.4.1Qualifications of EIFS
Manufacturer
1.4.2Qualification of EIFS Installer
1.4.3Qualification of Sealant Applicator
1.4.4Qualifications of Third Party
Inspector
3.5.2 GInspection Check List
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 38 PAGES
07 24 00 3.3Installation
SD-10 Operation and Maintenance
Data
1.7EIFS
07 41 13 SD-02 Shop Drawings
1.4.5 GRoofing Panels
1.4.5 GFlashing and Accessories
SD-03 Product Data
2.1 GRoof Panels
1.4.5 GFactory-Applied Color Finish
2.4 GAccessories
1.4.5 GFasteners
1.4.5 GPressure Sensitive Tape
2.7 GUnderlayments
2.8 GGaskets and Sealing/Insulating
Compounds
1.4.5 GCoil Stock
1.4.5 GEnamel Repair Paint
SD-04 Samples
2.1 GRoof Panels
1.4.5 GFactory-applied Color Finish
2.4 GAccessories
1.4.5 GFasteners
1.4.5 GGaskets and Sealant/Insulating
Compounds
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 38 PAGES
07 41 13 1.2.1.2 GWind Uplift Resistance
SD-06 Test Reports
1.2.1.1 GLeakage Test Report
1.2.1.2 GWind Uplift Test Report
2.2 GFactory Finish and Color
Performance Requirements
SD-07 Certificates
2.1 GRoof Panels
1.4.5 GCoil Stock Compatibility
2.7.2 GSelf-Adhering Modified Bitumen
Underlayment
1.4.1 GQualification of Manufacturer
1.4.2 GQualification of Applicator
SD-08 Manufacturer’s Instructions
2.6 GInsulation
1.4.5 GInstallation Manual
SD-11 Closeout Submittals
1.8 GWarranties
3.9 GInformation Card
09 90 00 SD-03 Product Data
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets
2.1Materials
SD-04 Samples
1.9 GColor
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 38 PAGES
09 90 00 SD-07 Certificates
1.3Applicator's qualifications
SD-08 Manufacturer’s Instructions
3.2.1Application instructions
3.5.2Mixing
1.7.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings:
13 34 19 SD-01 Preconstruction Submittals
1.4.4 GManufacturer's Qualifications
SD-02 Shop Drawings
1.4.2 GDetail Drawings
SD-03 Product Data
1.4.2 GManufacturer's Catalog Data
SD-05 Design Data
1.4.1 GDesign calculations
1.4.2 GManufacturer's Descriptive and
Technical Literature
1.4.2 GManufacturer's Building Design
Analysis
1.4.3Installation of Roof and Wall
Panels
SD-06 Test Reports
1.4.2 GTest Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 38 PAGES
13 34 19 1.4.2 GCoatings and Base Metals
1.4.2 GFactory Color Finish Performance
Requirements
SD-07 Certificates
1.4.2 GSystem Components
1.4.2 GQualification of Manufacturer
1.4.2 GQualification of Erector
1.4.2Coil Stock
SD-08 Manufacturer’s Instructions
1.5 GShipping, Handling, and Storage
13 48 00 SD-02 Shop Drawings
3.1 GBracing
2.1 GEquipment Requirements
SD-03 Product Data
3.1 GBracing
2.1 GEquipment Requirements
3.3 GAnchor Bolts
2.1.2 GVibration Isolators
SD-05 Design Data
1.2.3 GDesign Calculations
SD-06 Test Reports
3.3 GAnchor Bolts
23 00 00 SD-02 Shop Drawings
1.4.4 GDetail Drawings
SD-03 Product Data
2.9.1.1Centrifugal Fans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 38 PAGES
23 00 00 2.9.1.2In-Line Centrifugal Fans
2.9.1.3Axial Flow Fans
2.9.1.4Centrifugal Type Power Roof
Ventilators
2.9.1.5Propeller Type Power Roof
Ventilators
2.10 GAir Handling Units
2.11.1 GRoom Fan-Coil Units
2.11.2Unit Ventilators
2.14.1 GPrefabricated Radiant-Heating
Electric Panels
1.4.5Test Procedures
1.2.1.2 GDiagrams
SD-06 Test Reports
3.12 GPerformance Tests
3.10 GDamper Acceptance Test
SD-07 Certificates
1.4.1Bolts
1.4.3Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.14.2Operation and Maintenance
Training
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 38 PAGES
23 00 00 SD-10 Operation and Maintenance
Data
3.14.1 GOperation and Maintenance
Manuals
2.9.1.1 GCentrifugal Fans
2.9.1.2 GIn-Line Centrifugal Fans
2.9.1.3 GAxial Flow Fans
2.9.1.4 GCentrifugal Type Power Roof
Ventilators
2.9.1.5 GPropeller Type Power Roof
Ventilators
2.10 GAir Handling Units
2.11.1 GRoom Fan-Coil Units
2.11.2 GUnit Ventilators
2.14.1 GPrefabricated Radiant-Heating
Electric Panels
SD-11 Closeout Submittals
3.13 SIndoor Air Quality During
Construction
23 05 48.19 SD-02 Shop Drawings
3.1Coupling and Bracing
3.3Flexible Couplings or Joints
2.2Equipment Restraint
1.2.4 GContractor Designed Bracing
SD-03 Product Data
3.1 GCoupling and Bracing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 38 PAGES
23 05 48.19 3.3 GFlexible Couplings Or Joints
2.2 GEquipment Restraint
1.2.4 GContractor Designed Bracing
2.6Snubbers
3.9Anchor Bolts
2.2.2Vibration Isolators
SD-05 Design Data
1.2.4Design Calculations
SD-06 Test Reports
3.9 GAnchor Bolts
23 81 00 SD-03 Product Data
3.7.1Spare Parts
3.4Posted Instructions
2.6.1Coil Corrosion Protection
3.6System Performance Tests
3.4 GTraining
1.4Inventory
2.2.2.5Environmental Data
2.1Supplied Products
2.2Manufacturer's Standard Catalog
Data
SD-06 Test Reports
3.5 GRefrigerant Tests, Charging, and
Start-Up
3.6 GSystem Performance Tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 38 PAGES
23 81 00 3.7.2Service Organizations
SD-10 Operation and Maintenance
Data
3.4 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
2.2.2.3 SOzone Depleting Substances
23 82 00 SD-03 Product Data
2.1Unit Heaters
2.2Infrared Heaters
SD-10 Operation and Maintenance
Data
2.1Unit Heaters
2.2Infrared Heaters
26 05 48 SD-02 Shop Drawings
3.2Lighting Fixtures in Buildings
1.3Equipment Requirements
SD-03 Product Data
3.2 GLighting Fixtures in Buildings
1.3 GEquipment Requirements
1.2.4 GContractor Designed Bracing
26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
2.4Busway
2.25Wireways
3.1.7.1 GMarking strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 38 PAGES
26 20 00 SD-03 Product Data
2.11Receptacles
2.12.3Circuit breakers
2.10Switches
2.13Enclosed circuit breakers
2.16Motor controllers
2.17Manual motor starters
2.27Surge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.5 GGrounding system test
3.5.3 GTransformer tests
3.5.4Ground-fault receptacle test
SD-09 Manufacturer’s Field
Reports
2.29.1Transformer factory tests
SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
26 27 13.10 SD-03 Product Data
2.1 GPower Meters
2.1.3Current
2.1.2Potential Transformer
2.2.2Communications Module
1.6.1Protocol Modules
1.6.2Data Recorder
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 38 PAGES
26 27 13.10 1.6.2Modem
SD-06 Test Reports
3.2.1 GAcceptance Checks and Tests
SD-10 Operation and Maintenance
Data
2.1 GPower Meters
2.2.2Communications Module
1.6.1Protocol Modules
1.6.2Data Recorder
1.6.2Modem
SD-11 Closeout Submittals
3.2.2 GSystem Function Verification
26 41 00 SD-02 Shop Drawings
1.4.1.1 GOverall lightning protection
system
1.4.1.2 GEach major component
SD-06 Test Reports
1.4.3 GLightning Protection and
Grounding System Test Plan
3.4.1 GLightning Protection and
Grounding System Test
SD-07 Certificates
1.2.3 GLightning Protection System
Installers Documentation
1.4.2 GComponent UL Listed and
Labeled
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 38 PAGES
26 41 00 1.4.4 GLightning protection system inspection certificate
3.1.1 GRoof manufacturer's warranty
26 56 00 SD-01 Preconstruction Submittals
1.5.2 GPhotometric Plan
1.7.1LED Luminaire Warranty
SD-02 Shop Drawings
1.5.1.1Luminaire drawings
1.5.1.2Poles
SD-03 Product Data
2.2 GLED Luminaires
2.2.2Luminaire Light Sources
2.2.3Luminaire Power Supply Units
(Drivers)
2.3.2Lighting Control Relay Panel
2.3.1Photocell
2.4.1 GAluminum poles
2.5Brackets
SD-05 Design Data
1.5.3Design Data for luminaires
SD-06 Test Reports
1.5.4LED Luminaire - IES LM-79 Test
Report
1.5.5LED Light Source - IES LM-80
Test Report
3.2Operating test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 38 PAGES
26 56 00 SD-07 Certificates
1.7.1Luminaire Useful Life Certificate
SD-10 Operation and Maintenance
Data
1.8Operational Service
27 10 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications drawings
SD-03 Product Data
2.3 GTelecommunications cabling
2.5 GTelecommunications
outlet/connector assemblies
1.10.3 GSpare Parts
SD-06 Test Reports
3.5.1 GTelecommunications cabling
testing
SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.2.2Key Personnel
1.6.2.3Manufacturer Qualifications
1.6.3Test plan
SD-09 Manufacturer’s Field
Reports
2.9.1Factory reel tests
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 38 PAGES
27 10 00 1.10.1 GTelecommunications cabling and pathway system
SD-11 Closeout Submittals
1.10.2 GRecord Documentation
28 08 10 SD-05 Design Data
3.1 GTest Plan
SD-06 Test Reports
3.2.2Draft Test Report
3.4 GFinal Test Report
SD-07 Certificates
1.4.1Qualifications
28 10 05 SD-02 Shop Drawings
1.3.3.1 GESS Components
1.3.3.2 GOverall System Schematic
SD-05 Design Data
1.5.1 GBackup Battery Capacity
Calculations
1.5.2CCTV Storage Calculations
SD-07 Certificates
1.3.4.1 GContractor Qualifications
1.3.4.2 GInstructor Qualifications
SD-10 Operation and Maintenance
Data
3.6.1 GTraining Plan
3.6 GTraining Content
1.6 GESS Software
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 38 PAGES
28 10 05 SD-11 Closeout Submittals
1.7 GAs-Built Drawings
31 00 00 SD-01 Preconstruction Submittals
3.3 GShoring
1.4.3 GDewatering Work Plan
SD-03 Product Data
3.6 GUtilization of Excavated Materials
SD-06 Test Reports
3.14Testing
2.1Borrow Site Testing
SD-07 Certificates
3.14Testing
31 11 00 SD-01 Preconstruction Submittals
3.1.1Herbicide Application Plan
SD-03 Product Data
3.4.1 GNonsaleable Materials
1.3.2 GHerbicides
SD-04 Samples
2.1.1Tree Wound Paint
SD-07 Certificates
1.3.2 GQualifications
SD-11 Closeout Submittals
3.5.1Pest Management Report
31 31 16.13 SD-01 Preconstruction Submittals
3.1.4 G IMPCTermiticide Application Plan
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 38 PAGES
31 31 16.13 2.2.1Termiticides
SD-05 Design Data
3.2.2Mixing Formulation
SD-06 Test Reports
1.6.1Soil Moisture
3.2.1Calibration Test
SD-07 Certificates
1.4.2 GQualifications
3.1.2Foundation Exterior
3.1.3Utilities and Vents
3.2.1List of Equipment
SD-08 Manufacturer’s Instructions
2.2.1Termiticides
SD-11 Closeout Submittals
3.3.1Verification of Measurement
1.7Warranty
3.4Pest Management Report
32 11 23 SD-03 Product Data
1.5Plant, Equipment, and Tools
SD-06 Test Reports
2.4.1 GInitial Tests
3.12.1 GIn-Place Tests
32 12 13 SD-06 Test Reports
3.7Sampling and Testing
32 12 16 SD-03 Product Data
2.5 GMix Design
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 38 PAGES
32 12 16 3.9 GQuality Control
3.10 GMaterial Acceptance
SD-04 Samples
2.4Asphalt Cement Binder
2.2Aggregates
SD-06 Test Reports
2.2 GAggregates
3.9.3.10QC Monitoring
SD-07 Certificates
2.4 GAsphalt Cement Binder
3.5Testing Laboratory
32 17 23 SD-03 Product Data
2.1.1.1 GSurface Preparation Equipment
List
2.1.2 GApplication Equipment List
3.2Exterior Surface Preparation
1.3.1 GSafety Data Sheets
2.2.6.1 GReflective media for roads
2.2.1 GWaterborne Paint
2.2.2 GThermoplastic compound
3.3.2 GThermoplastic compound
2.2.5 GRaised Pavement Markers
Primers and Adhesives
SD-06 Test Reports
2.2.6.1 GReflective Media for Roads
2.2.1 GWaterborne Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 38 PAGES
32 17 23 2.2.3 GHigh Build Acrylic Coating
(HBAC)
2.2.2 GThermoplastic Compound
3.3.2 GThermoplastic Compound
2.2.5 GRaised Pavement Markers
Primers and Adhesives
3.4.1Test Reports
SD-07 Certificates
1.3.2 GQualifications
2.2.6.1Reflective Media for Roads
2.2.1Waterborne Paint
1.3.1 GVolatile Organic Compound
2.2.3 GVolatile Organic Compound
2.2.2Thermoplastic Compound
3.3.2Thermoplastic Compound
SD-08 Manufacturer’s Instructions
2.2.1 GWaterborne Paint
2.2.2 GThermoplastic Compound
3.3.2 GThermoplastic Compound
32 31 13 SD-02 Shop Drawings
2.1Fence Assembly
3.2.2.1Location of Gate, Corner, End, and Pull Posts
2.1Gate Assembly
2.2.11Gate Hardware and Accessories
Part 3 GErection/Installation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 38 PAGES
32 31 13 SD-03 Product Data
2.1Fence Assembly
2.1Gate Assembly
2.2.11Gate Hardware and Accessories
2.3.1Zinc Coating
2.2.1Fabric
2.2.6Stretcher Bars
2.3.3Concrete
SD-04 Samples
2.2.1Fabric
2.2.10Braces
2.2.2Line Posts
2.2.4Sleeves
2.3.2Tension Wire
2.2.6Stretcher Bars
2.2.9Gate Posts
2.2.11Gate Hardware and Accessories
2.2.14Padlocks
2.2.13Wire Ties
SD-07 Certificates
1.3.1Certificates of Compliance
SD-08 Manufacturer’s Instructions
2.1Fence Assembly
2.1Gate Assembly
2.1Hardware Assembly
2.1Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 38 PAGES
33 40 00 SD-04 Samples
2.1Pipe for Culverts and Storm
Drains
SD-07 Certificates
2.4.6.1Oil Resistant Gasket
3.8.1.2Leakage Test
3.8.1.1Hydrostatic Test on Watertight
Joints
3.8.1.3Determination of Density
2.4.5Frame and Cover for Gratings
3.8.2.1.2Post-Installation Inspection
Report
3.3Placing Pipe
33 71 02 SD-02 Shop Drawings
1.5.1 GPrecast underground structures
SD-03 Product Data
2.10.2.1 GPrecast concrete structures
2.10.2.4Sealing Material
3.4.3Pulling-In Irons
2.10.3 GHandhole frames and covers
2.10.4 GComposite/fiberglass handholes
2.11Cable supports
SD-06 Test Reports
3.15.1Field Acceptance Checks and
Tests
1.5.2Cable Installer Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 38 PAGES
34 41 26 SD-02 Shop Drawings
1.6.1 GGroup I Technical Data Package
1.6.4 GGroup IV Technical Data
Package
1.6.5 GGroup V Technical Data Package
SD-03 Product Data
1.6.1 GGroup I Technical Data Package
1.6.2 GGroup II Technical Data Package
1.6.4 GGroup IV Technical Data
Package
1.6.5 GGroup V Technical Data Package
SD-05 Design Data
1.6.1 GGroup I Technical Data Package
SD-06 Test Reports
1.6.3Group III Technical Data Package
1.6.4Group IV Technical Data
Package
SD-07 Certificates
1.6.1Group I Technical Data Package
1.5.4Technical Specialists
SD-08 Manufacturer’s Instructions
1.6.1 GGroup I Technical Data Package
34 71 13.16 SD-03 Product Data
2.1.2 GM50 P1 Or P2 Passive Vehicle
Barrier (PVB)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 38 PAGES
34 71 13.16 2.1.1 GM30 P1 Or P2 Passive Vehicle
Barriers (PVBs)
SD-08 Manufacturer’s Instructions
3.5End Anchorage
2.1.2 GM50 P1 Or P2 Passive Vehicle
Barrier (PVB)
2.1.1 GM30 P1 Or P2 Passive Vehicle
Barriers (PVBs)
3.7Crash Cushion
34 71 13.19 SD-02 Shop Drawings
3.1 GInstallation
3.1 GEquipment
2.3 GElectrical Work
SD-03 Product Data
1.2Barrier Systems
1.5Spare Parts
SD-06 Test Reports
3.6Field Testing
SD-10 Operation and Maintenance
Data
1.2 GBarrier Systems
3.5 GOperating and Maintenance
Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
Construct East Gate Canopy & Inspection Facility, Hill AFB 2242
SECTION TABLE OF CONTENTS
DIVISION 34 - TRANSPORTATION
SECTION 34 71 13.16
VEHICLE CRASH BARRIERS
PART 1 GENERAL
1.1 SUBMITTALS
PART 2 PRODUCTS
2.1 PASSIVE VEHICLE BARRIERS (PVBs)
2.1.1 M30 P1 or P2 Passive Vehicle Barriers (PVBs)
2.1.2 M50 P1 or P2 Passive Vehicle Barrier (PVB)
2.2 GUARDRAIL POSTS
2.3 W-BEAM GUARDRAIL
2.4 "W' BEAM END SECTION
2.5 GUARDRAIL HARDWARE
2.6 TERMINAL FOR W-BEAM GUARDRAIL
PART 3 EXECUTION
3.1 M30 and M50 PASSIVE VEHILCE BARRIERS (PVBs)
3.2 M30 and M50 POSTS
3.3 M30 and M50 GUARDRAIL BEAM ELEMENTS
3.4 M30 and M50 GUARDRAIL DELINEATOR REFLECTOR TABS
3.5 M30 and M50 GUARDRAIL END ANCHORAGE
3.6 M30 and M50 THREE CABLE GUARDRAIL
3.6.1 Posts
3.6.2 Cable Splices, Compensating Devices and Turnbuckle Cable End
Assemblies
3.6.3 Pretension of Cable
3.7 CRASH CUSHION
-- End of Section Table of Contents --
34 71 13.16 - 1 Amendment 0003
SECTION 34 71 13.16
VEHICLE CRASH BARRIERS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
M50 P1 Or P2 Passive Vehicle Barrier (PVB); G
M30 P1 Or P2 Passive Vehicle Barriers (PVBs); G
SD-08 Manufacturer's Instructions
End Anchorage
Submit at least 14 days prior to installation.
M50 P1 Or P2 Passive Vehicle Barrier (PVB); G
M50 P1 Passive Vehicle Barrier M30 P1 Or P2 Passive Vehicle Barriers (PVBs); G
Crash Cushion
Provide M30 P1 Passive Vehicle Barrier list of materials with receipts and proof of adequate material specification. Also, provide manufacturer's M50 P1 Passive Vehicl Barrier recommendation for installation. "G"
PART 2 PRODUCTS
2.1 PASSIVE VEHICLE BARRIERS (PVBs)
Passive Vehicle Barriers (PVBs) are identified as Passive Cable or Passive Bollards in this specifications. And they follow the categorization DoD Anti-Ram Vehicle Barrier Lists.
This project only includes M30 P1/P2 and M50 P1/P2 PVBs under the Passive Cable listing of the DoD Anti-Ram Vehicle Barrier List except when turning plus/minus 90 degrees towards the existing Active Vehicle Barrier (AVB) and near the perimeter fence (within 5 ft from the fence). The Contractor must use a Passive Bollard (M30 P1 or P2) to not allow a 3.3 ft break near the AVB and 4.1 ft near perimeter fence. See subsection 3.1 for permissible breaks.
Pick one M30 P1 or P2 PVB and use it throghout the project except when
34 71 13.16 - 2 Amendment 0003 turning plus/minus 90 degrees towards the existing AVB. Also, the Contractor must pick one M50 P1 or P2 PVB and use it throughout the project. In other words, the Contractor must not use two or more M30 P1 or P2 PVBs except near the AVB as aforementioned. Likewise, the Contractors must not use two or more M50 P1 or P2 PVBs.
The M30 P1 or P2 and M50 P1 or P2 PVBs must be included in the June 2020 DoD Anti-Ram Vehicle Barrier List by the Protective Design Center (USACE).
The June 2020 is provided at the end of this section. The Contractor must request and get approval from the Contracting Office if an updated DoD Anti-Ram Vehcile Barrier list is available. The engineering sheet C-515 and C-516 provide an example of an M50 Passive Vehicle Barrier and must be used only as reference.
Pick a PVB that must follow the curves of the project outside the clear zone (7 ft) within the PVBs limitation (e.g., tested length).
2.1.1 M30 P1 or P2 Passive Vehicle Barriers (PVBs)
List the materials with receipts and proof of adequate material specification of the Passive Cable and Passive Bollards. Also, provide manufacturer's M30 P1 or P2 PVB recommendation for installation.
2.1.2 M50 P1 or P2 Passive Vehicle Barrier (PVB)
List the materials with receipts and proof of adequate material specification of the Passive Cable. Also, provide manufacturer's M50 P1 or P2 Passive Vehicle Barrier recommendation for installation.
2.2 GUARDRAIL POSTS
Guardrail posts must be according to the attachment provided at the end of this section, Modified Midwest Guardrail System (MMGS) M30 P1 Passive Barrier System the manufacturer's instructions.
2.3 W-BEAM GUARDRAIL
W-Beam Guardrail must be according to the attachment provided at the end of this section, Modified Midwest Guardrail System (MMGS) M30 P1 Passive Barrier System. the manufacturer's instructions .
2.4 "W' BEAM END SECTION
Provide "W" beam end sections according to the attachment provided at the end of this section, Modified Midwest Guardrail System (MMGS) M30 P1 Passive Barrier System the manufacturer's instructions.
2.5 GUARDRAIL HARDWARE
Guardrail hardware must be according to the attachment provided at the end of this section, Modified Midwest Guardrail System (MMGS) M30 P1 Passive Barrier System the manufacturer's instructions.
2.6 TERMINAL FOR W-BEAM GUARDRAIL
Terminal for W-Beam guardrail must be according to the attachment provided at the end of this section, Modified Midwest Guardrail System (MMGS) M30 P1 Passive Barrier System. For the M50 P1 Passive Barrier System it must be according to the manufacturer's specifications. the manufacturer's
34 71 13.16…