This solicitation is for design and construction services for a new East Gate canopy and inspection facility at Hill Air Force Base in Utah. Key requirements include designing and constructing a new canopy in the access control and approach zones, providing a shelter in the inspection zone, modifying the geometry of inbound and outbound lanes to ensure nine seconds of response time for security forces, situating passive vehicle barriers around the perimeter according to the DoD Anti-RAM list, constructing a generator pad, connecting to an automatic transfer switch, installing IDS and CCTV infrastructure, replacing traffic and security lighting, and performing demolition and precise grading to integrate the new features with existing infrastructure and terrain. The project will be conducted in two phases to maintain one open lane at all times.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SF-30 Continuation

AM03

CONSTRUCT EAST GATE CANOPY & INSPECTION FACILITY, HILL AFB

AMENDMENT 0003

Summary of Changes:

A) SPECIFICATIONS REVISED

1. 01 33 00 SUBMITTAL PROCEDURE –Replaced submittal register only

2. 34 71 13.16 VEHICLE CRASH BARRIERS – Replaced entire section.

B) DRAWINGS REVISED

1. C‐103 DEMOLITION PLAN

2. C‐104 SITE PLAN WITH GEOMETRIC INFORMATION (1)

3. C‐105 SITE PLAN WITH GEOMETRIC INFORMATION (2)

4. C‐515 M50 PVB DETAILS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 38 PAGES

Construct East Gate Canopy & Inspection Facility, Hill AFB

01 11 00 SD-01 Preconstruction Submittals

1.6 GSalvage Plan

01 32 01 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.5Bar Chart Schedule

3.1 GProject Schedule

3.5.1 GPreliminary Project Schedule

3.5.2 GInitial Project Schedule

3.6.1Data Optical Discs

3.5.3 GPeriodic Schedule Update

3.7.2 GPeriodic Schedule Update

3.9.1 GJustification of Delay

3.9.3 GTime Impact Analysis

3.9.4 GForensic Schedule Analysis

3.1.1 GSchedule Status Report

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 GPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GSustainability Action Plan

1.5.3.1 GPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

1.5.3.1 GFinal High Performance and

Sustainable Building Checklist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 38 PAGES

01 33 29 1.5.3.1 GFinal Sustainability eNotebook

1.5.3.1 GAmended Final Sustainability

eNotebook

1.5.3.1 GAmended Final High

Performance and Sustainable

Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.6 G DOAccident Prevention Plan (APP)

1.6.2.10 GHealth Hazard Control Plan

1.6.2.11 GEmergency Action Plan

1.6.2.3 GStandard Lift Plan

1.6.2.4 G DOCritical Lift Plan

1.7Activity Hazard Analysis (AHA)

SD-06 Test Reports

1.11.3Monthly Exposure Reports

1.11Notifications and Reports

1.11.2 G DOAccident Investigation Reports

1.11.4LHE Inspection Reports

1.11.6Regulatory Citations and

Violations

SD-07 Certificates

1.5.1.4Crane Operators/Riggers

1.8.1Confined Space Entry Permit

1.8.1Hot Work Permit

1.11.5Certificate of Compliance

1.5.1.4Proof of Current Qualification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 38 PAGES

01 45 00 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control Plan

3.7.2.1 GMTC validation

SD-06 Test Reports

3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals

3.1.2Written Practices

3.1.2NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1Certificate of Compliance

1.5 GSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals

3.1.2Interim Final Report

3.1.2 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.1.10.1 GTraffic Control Plan

3.5 GSafety Plan

1.4 GTemporary Earthwork Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 38 PAGES

01 50 00 3.1.10.3 GDust Control Methods And

Procedures

2.2 GHaul Road Plan

3.1.1 GTemporary Power Plan

SD-06 Test Reports

2.4Backflow Preventer Tests

SD-07 Certificates

1.7.1Backflow Tester

1.7Backflow Preventers

1.7.2Backflow Prevention Training

Certificate

01 57 19 SD-01 Preconstruction Submittals

1.8.1Preconstruction Survey

1.10.2 GSolid Waste Management Permit

3.6.2 GSolid Waste Management Plan

1.8.2 GRegulatory Notifications

1.9 GEnvironmental Protection Plan

1.8.4 GEnvironmental Manager

Qualifications

3.2.1.2 GStormwater Notice of Intent

1.9.7 GNon-Hazardous Solid Waste

Disposal Plan

1.9.11.3 GDirt and Dust Control Plan

1.9.8 GSpill Control Plan

1.9.12 GWaste Water Management Plan

1.9.1.1 GAir Pollution Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 38 PAGES

01 57 19 1.9.1.1 GContaminant Prevention Plan

1.9.13 GCultural Resources Protection

Plan

1.9.2.3 GTraffic Control Plan

1.9.2.3 GHaul Route Plan

SD-06 Test Reports

3.2.1.3Inspection Reports

3.7.2.1 GSolid Waste Management Report

1.9.7Non-Hazardous Solid Waste

Diversion Report

SD-07 Certificates

1.8.5 GEmployee Training Records

1.8.5Erosion and Sediment Control

Inspector Qualifications

SD-11 Closeout Submittals

3.2.1.4 GStormwater Pollution Prevention

Plan Compliance Notebook

3.7.1 GWaste Determination

Documentation

3.2.1.5 GStormwater Notice of Termination

3.7.3.1 GHazardous Waste/Debris

Management

3.7.3.1 GHazardous Waste/Debris

Management

3.7.3.6 GDisposal Documentation for

Hazardous and Regulated Waste

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 38 PAGES

01 57 19 1.8.5 GAssembled Employee Training

Records

1.10.2 GSolid Waste Management Permit

3.7.2.1 GSolid Waste Management Report

1.8.2 GRegulatory Notifications

3.7.2.1 GSales Documentation

01 57 23 SD-01 Preconstruction Submittals

1.6.1 G DOSWPPP

1.6.1 G DOSWPPP

1.6.2 G DOPRDs

1.6.2 G DOPRDs

SD-03 Product Data

1.6.1.1BMP Product Data

3.1.1BMP Product Data

3.1.1BMP Product Data

3.1.1BMP Product Data

SD-06 Test Reports

3.1.1SWPPP Amendment

SD-11 Closeout Submittals

3.1.2 G DOFinal SWPPP

3.2.1 G DOFinal SWPPP

3.1.2 G DONOT Application

3.1.2 G DONOT Application

01 74 19 SD-01 Preconstruction Submittals

1.5 GWaste Management Plan

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 38 PAGES

01 74 19 1.6 SRecords

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

1.7.5Warranty Tags

1.5Spare Parts Data

SD-06 Test Reports

3.1.4 Gworking as-built drawings

3.2 G DOfinal as-built record drawings

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.9Operation and Maintenance

Manuals

SD-11 Closeout Submittals

1.3.4 G DORecord Drawings

2.3 GCertification of EPA Designated

Items

3.11 GInterim DD FORM 1354

3.11 GChecklist for DD FORM 1354

3.6 GFinal Approved Shop Drawings

3.7 GConstruction Contract

Specifications

3.8As-Built Record of Equipment and Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 38 PAGES

01 78 23 SD-10 Operation and Maintenance

Data

1.4 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 78 24 SD-01 Preconstruction Submittals

1.5.1Facility Data Project Execution

Plan

3.1 GFacility Data Workbook, Construction Progress

3.1 GFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.2 GFacility Data Workbook, Construction Final

1.5.3 GFacility Document Set, Construction Final

3.2 GFacility Document Set, Construction Final

01 91 00.15 SD-01 Preconstruction Submittals

1.7 G DOCommissioning Firm

1.7.1 G DOLead Commissioning Specialist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 38 PAGES

01 91 00.15 1.7.2 G DOTechnical Commissioning

Specialists

1.7 G DOCommissioning Firm's Contract

SD-06 Test Reports

3.1.3.1 G DOInterim Construction Phase

Commissioning Plan

3.1.3.1 G DOInterim Construction Phase

Commissioning Plan

3.1.3.2 G DOFinal Construction Phase

Commissioning Plan

3.1.3.1.2 G DOTemplate Building Envelope

Inspection Checklists

3.1.5.2 G DOBuilding Envelope Inspection

Checklists

3.1.5.3 G DOPre-Functional Checklists

1.8Issues Log

3.2 G DOCommissioning Report

3.3.1 G DOPost-Construction Trend Log

Report

SD-07 Certificates

1.9 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.6 G ROTraining Plan

3.1.6 G ROTraining Attendance Rosters

3.1.7 G DOSystems Manual

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 38 PAGES

01 91 00.15 3.1.8 G DOMaintenance and Service Life

Plans

SD-11 Closeout Submittals

3.2 S DOFinal Commissioning Report

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.9Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

3.3.4Receipts

03 30 53 SD-02 Shop Drawings

1.4Installation Drawings

SD-03 Product Data

2.2.3.1Air-Entraining Admixture

2.2.3.2 GAccelerating Admixture

2.2.3.3Water-Reducing or Retarding

Admixture

2.2.11Curing Materials

2.2.6Expansion Joint Filler Strips, Premolded

2.2.7Joint Sealants - Field Molded

Sealants

3.2Conveying and Placing Concrete

2.2.8Formwork

2.3 GMix Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 38 PAGES

03 30 53 2.3Ready-Mix Concrete

2.4.1Curing Compound

2.2.5Mechanical Reinforcing Bar

Connectors

SD-06 Test Reports

2.2.2Aggregates

2.1.3 GConcrete Mixture Proportions

3.9.3 GCompressive Strength Testing

3.9.3Slump

3.9.3Air Content

2.2.4Water

SD-07 Certificates

2.2.1Cementitious Materials

2.2.1.2Pozzolan

2.2.2Aggregates

2.3Delivery Tickets

SD-08 Manufacturer’s Instructions

2.4.1Curing Compound

03 42 13 SD-01 Preconstruction Submittals

1.3.2.2Quality Control Procedures

SD-02 Shop Drawings

2.1.1 GStandard Precast Units

2.1.2 GCustom-Made Precast Units

3.2.4.3Special Finishes

SD-03 Product Data

2.1.1Standard Precast Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 38 PAGES

03 42 13 2.1.3Proprietary Precast Units

3.1.3Embedded Items

2.2.4Accessories

SD-05 Design Data

2.1.2 GDesign Calculations

2.1.5.1Concrete Mix Proportions

SD-06 Test Reports

1.3.2.4Test Reports

SD-07 Certificates

1.3.2.2Quality Control Procedures

04 20 00 SD-02 Shop Drawings

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2 GClay or Shale Brick

2.4.1.1 GCement

2.4.1.1 GCementitious Materials

SD-04 Samples

2.2.2 GClay or Shale Brick

2.4.1.3 GAdmixtures for Masonry Mortar

2.6.2 GAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 38 PAGES

04 20 00 SD-06 Test Reports

2.2.2.1.3Efflorescence Test

3.6.1.1Field Testing of Mortar

3.6.1.3Prism Tests

3.6.1.4Single-Wythe Masonry Wall

Water Penetration Test

SD-07 Certificates

1.3.1Special Masonry Inspector

Qualifications

2.2.2Clay or Shale Brick

2.4.1.1Cementitious Materials

2.4.1.3Admixtures for Masonry Mortar

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures For Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

05 12 00 SD-01 Preconstruction Submittals

1.3.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.3.2 GFabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 38 PAGES

05 12 00 SD-03 Product Data

2.5.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SD-06 Test Reports

2.5.2Class B Coating

2.3Bolts, Nuts, and Washers

3.6.1.1Visual Weld Inspection Log

3.6.2.1Direct Tension Indicator Washer

Inspection Reports

3.6.3.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

1.3.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.6.1.1Certified Welding Inspector

3.4Welding Procedure Specifications

(WPS)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 38 PAGES

05 30 00 SD-02 Shop Drawings

1.3.4 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.2.12Mechanical Fasteners

2.1 SRecycled Content of Steel

Products

SD-04 Samples

2.1.1Metal Roof Deck Units

2.2.3Flexible Closure Strips

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3.1Fire Safety

1.3.3.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1 SRecycled Content of Steel

Products

SD-05 Design Data

1.6.2 GMetal Truss Framing Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 38 PAGES

05 40 00 1.6.2 GMetal Truss Anchorage

Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.2.1Welds

07 24 00 SD-02 Shop Drawings

3.3 GShop Drawings

SD-03 Product Data

2.3Sheathing Board

2.5Thermal Insulation

2.4Mechanical Fasteners

2.11Accessories

2.6Base Coat

2.7Portland Cement

2.8Reinforcing Fabric

2.9Finish Coat

2.12Joint Sealant

2.10Sealant Primer

2.13Bond Breaker

2.14Backer Rod

1.4.5Insulation Board

1.7Warranty

SD-04 Samples

1.2.3.7 GSample Boards

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 38 PAGES

07 24 00 1.2.1.2Wind Load

SD-06 Test Reports

1.2.3.1Abrasion Resistance

1.2.3.2Accelerated Weathering

1.2.2.3Impact Resistance

1.2.3.3Mildew Resistance

1.2.3.4Salt Spray Resistance

1.2.3.6Absorption-Freeze-Thaw

1.2.1.3Wall Fire Test

1.2.1.1Water Penetration

1.2.3.5Water Resistance

1.2.1.3Full Scale or Intermediate Scale

Fire Test

1.2.2.1Surface Burning Characteristics

1.2.2.2Radiant Heat

3.1Substrate

1.2.1.2Wind Load

SD-07 Certificates

1.4.1Qualifications of EIFS

Manufacturer

1.4.2Qualification of EIFS Installer

1.4.3Qualification of Sealant Applicator

1.4.4Qualifications of Third Party

Inspector

3.5.2 GInspection Check List

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 38 PAGES

07 24 00 3.3Installation

SD-10 Operation and Maintenance

Data

1.7EIFS

07 41 13 SD-02 Shop Drawings

1.4.5 GRoofing Panels

1.4.5 GFlashing and Accessories

SD-03 Product Data

2.1 GRoof Panels

1.4.5 GFactory-Applied Color Finish

2.4 GAccessories

1.4.5 GFasteners

1.4.5 GPressure Sensitive Tape

2.7 GUnderlayments

2.8 GGaskets and Sealing/Insulating

Compounds

1.4.5 GCoil Stock

1.4.5 GEnamel Repair Paint

SD-04 Samples

2.1 GRoof Panels

1.4.5 GFactory-applied Color Finish

2.4 GAccessories

1.4.5 GFasteners

1.4.5 GGaskets and Sealant/Insulating

Compounds

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 38 PAGES

07 41 13 1.2.1.2 GWind Uplift Resistance

SD-06 Test Reports

1.2.1.1 GLeakage Test Report

1.2.1.2 GWind Uplift Test Report

2.2 GFactory Finish and Color

Performance Requirements

SD-07 Certificates

2.1 GRoof Panels

1.4.5 GCoil Stock Compatibility

2.7.2 GSelf-Adhering Modified Bitumen

Underlayment

1.4.1 GQualification of Manufacturer

1.4.2 GQualification of Applicator

SD-08 Manufacturer’s Instructions

2.6 GInsulation

1.4.5 GInstallation Manual

SD-11 Closeout Submittals

1.8 GWarranties

3.9 GInformation Card

09 90 00 SD-03 Product Data

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets

2.1Materials

SD-04 Samples

1.9 GColor

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 38 PAGES

09 90 00 SD-07 Certificates

1.3Applicator's qualifications

SD-08 Manufacturer’s Instructions

3.2.1Application instructions

3.5.2Mixing

1.7.2Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings:

13 34 19 SD-01 Preconstruction Submittals

1.4.4 GManufacturer's Qualifications

SD-02 Shop Drawings

1.4.2 GDetail Drawings

SD-03 Product Data

1.4.2 GManufacturer's Catalog Data

SD-05 Design Data

1.4.1 GDesign calculations

1.4.2 GManufacturer's Descriptive and

Technical Literature

1.4.2 GManufacturer's Building Design

Analysis

1.4.3Installation of Roof and Wall

Panels

SD-06 Test Reports

1.4.2 GTest Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 38 PAGES

13 34 19 1.4.2 GCoatings and Base Metals

1.4.2 GFactory Color Finish Performance

Requirements

SD-07 Certificates

1.4.2 GSystem Components

1.4.2 GQualification of Manufacturer

1.4.2 GQualification of Erector

1.4.2Coil Stock

SD-08 Manufacturer’s Instructions

1.5 GShipping, Handling, and Storage

13 48 00 SD-02 Shop Drawings

3.1 GBracing

2.1 GEquipment Requirements

SD-03 Product Data

3.1 GBracing

2.1 GEquipment Requirements

3.3 GAnchor Bolts

2.1.2 GVibration Isolators

SD-05 Design Data

1.2.3 GDesign Calculations

SD-06 Test Reports

3.3 GAnchor Bolts

23 00 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

SD-03 Product Data

2.9.1.1Centrifugal Fans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 38 PAGES

23 00 00 2.9.1.2In-Line Centrifugal Fans

2.9.1.3Axial Flow Fans

2.9.1.4Centrifugal Type Power Roof

Ventilators

2.9.1.5Propeller Type Power Roof

Ventilators

2.10 GAir Handling Units

2.11.1 GRoom Fan-Coil Units

2.11.2Unit Ventilators

2.14.1 GPrefabricated Radiant-Heating

Electric Panels

1.4.5Test Procedures

1.2.1.2 GDiagrams

SD-06 Test Reports

3.12 GPerformance Tests

3.10 GDamper Acceptance Test

SD-07 Certificates

1.4.1Bolts

1.4.3Ozone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

3.14.2Operation and Maintenance

Training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 38 PAGES

23 00 00 SD-10 Operation and Maintenance

Data

3.14.1 GOperation and Maintenance

Manuals

2.9.1.1 GCentrifugal Fans

2.9.1.2 GIn-Line Centrifugal Fans

2.9.1.3 GAxial Flow Fans

2.9.1.4 GCentrifugal Type Power Roof

Ventilators

2.9.1.5 GPropeller Type Power Roof

Ventilators

2.10 GAir Handling Units

2.11.1 GRoom Fan-Coil Units

2.11.2 GUnit Ventilators

2.14.1 GPrefabricated Radiant-Heating

Electric Panels

SD-11 Closeout Submittals

3.13 SIndoor Air Quality During

Construction

23 05 48.19 SD-02 Shop Drawings

3.1Coupling and Bracing

3.3Flexible Couplings or Joints

2.2Equipment Restraint

1.2.4 GContractor Designed Bracing

SD-03 Product Data

3.1 GCoupling and Bracing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 38 PAGES

23 05 48.19 3.3 GFlexible Couplings Or Joints

2.2 GEquipment Restraint

1.2.4 GContractor Designed Bracing

2.6Snubbers

3.9Anchor Bolts

2.2.2Vibration Isolators

SD-05 Design Data

1.2.4Design Calculations

SD-06 Test Reports

3.9 GAnchor Bolts

23 81 00 SD-03 Product Data

3.7.1Spare Parts

3.4Posted Instructions

2.6.1Coil Corrosion Protection

3.6System Performance Tests

3.4 GTraining

1.4Inventory

2.2.2.5Environmental Data

2.1Supplied Products

2.2Manufacturer's Standard Catalog

Data

SD-06 Test Reports

3.5 GRefrigerant Tests, Charging, and

Start-Up

3.6 GSystem Performance Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 38 PAGES

23 81 00 3.7.2Service Organizations

SD-10 Operation and Maintenance

Data

3.4 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

2.2.2.3 SOzone Depleting Substances

23 82 00 SD-03 Product Data

2.1Unit Heaters

2.2Infrared Heaters

SD-10 Operation and Maintenance

Data

2.1Unit Heaters

2.2Infrared Heaters

26 05 48 SD-02 Shop Drawings

3.2Lighting Fixtures in Buildings

1.3Equipment Requirements

SD-03 Product Data

3.2 GLighting Fixtures in Buildings

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

26 20 00 SD-02 Shop Drawings

2.12 GPanelboards

2.4Busway

2.25Wireways

3.1.7.1 GMarking strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 38 PAGES

26 20 00 SD-03 Product Data

2.11Receptacles

2.12.3Circuit breakers

2.10Switches

2.13Enclosed circuit breakers

2.16Motor controllers

2.17Manual motor starters

2.27Surge protective devices

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.5 GGrounding system test

3.5.3 GTransformer tests

3.5.4Ground-fault receptacle test

SD-09 Manufacturer’s Field

Reports

2.29.1Transformer factory tests

SD-10 Operation and Maintenance

Data

1.5.1 GElectrical Systems

26 27 13.10 SD-03 Product Data

2.1 GPower Meters

2.1.3Current

2.1.2Potential Transformer

2.2.2Communications Module

1.6.1Protocol Modules

1.6.2Data Recorder

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 38 PAGES

26 27 13.10 1.6.2Modem

SD-06 Test Reports

3.2.1 GAcceptance Checks and Tests

SD-10 Operation and Maintenance

Data

2.1 GPower Meters

2.2.2Communications Module

1.6.1Protocol Modules

1.6.2Data Recorder

1.6.2Modem

SD-11 Closeout Submittals

3.2.2 GSystem Function Verification

26 41 00 SD-02 Shop Drawings

1.4.1.1 GOverall lightning protection

system

1.4.1.2 GEach major component

SD-06 Test Reports

1.4.3 GLightning Protection and

Grounding System Test Plan

3.4.1 GLightning Protection and

Grounding System Test

SD-07 Certificates

1.2.3 GLightning Protection System

Installers Documentation

1.4.2 GComponent UL Listed and

Labeled

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 38 PAGES

26 41 00 1.4.4 GLightning protection system inspection certificate

3.1.1 GRoof manufacturer's warranty

26 56 00 SD-01 Preconstruction Submittals

1.5.2 GPhotometric Plan

1.7.1LED Luminaire Warranty

SD-02 Shop Drawings

1.5.1.1Luminaire drawings

1.5.1.2Poles

SD-03 Product Data

2.2 GLED Luminaires

2.2.2Luminaire Light Sources

2.2.3Luminaire Power Supply Units

(Drivers)

2.3.2Lighting Control Relay Panel

2.3.1Photocell

2.4.1 GAluminum poles

2.5Brackets

SD-05 Design Data

1.5.3Design Data for luminaires

SD-06 Test Reports

1.5.4LED Luminaire - IES LM-79 Test

Report

1.5.5LED Light Source - IES LM-80

Test Report

3.2Operating test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 38 PAGES

26 56 00 SD-07 Certificates

1.7.1Luminaire Useful Life Certificate

SD-10 Operation and Maintenance

Data

1.8Operational Service

27 10 00 SD-02 Shop Drawings

1.6.1.1 GTelecommunications drawings

SD-03 Product Data

2.3 GTelecommunications cabling

2.5 GTelecommunications

outlet/connector assemblies

1.10.3 GSpare Parts

SD-06 Test Reports

3.5.1 GTelecommunications cabling

testing

SD-07 Certificates

1.6.2.1 GTelecommunications Contractor

1.6.2.2Key Personnel

1.6.2.3Manufacturer Qualifications

1.6.3Test plan

SD-09 Manufacturer’s Field

Reports

2.9.1Factory reel tests

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 38 PAGES

27 10 00 1.10.1 GTelecommunications cabling and pathway system

SD-11 Closeout Submittals

1.10.2 GRecord Documentation

28 08 10 SD-05 Design Data

3.1 GTest Plan

SD-06 Test Reports

3.2.2Draft Test Report

3.4 GFinal Test Report

SD-07 Certificates

1.4.1Qualifications

28 10 05 SD-02 Shop Drawings

1.3.3.1 GESS Components

1.3.3.2 GOverall System Schematic

SD-05 Design Data

1.5.1 GBackup Battery Capacity

Calculations

1.5.2CCTV Storage Calculations

SD-07 Certificates

1.3.4.1 GContractor Qualifications

1.3.4.2 GInstructor Qualifications

SD-10 Operation and Maintenance

Data

3.6.1 GTraining Plan

3.6 GTraining Content

1.6 GESS Software

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 38 PAGES

28 10 05 SD-11 Closeout Submittals

1.7 GAs-Built Drawings

31 00 00 SD-01 Preconstruction Submittals

3.3 GShoring

1.4.3 GDewatering Work Plan

SD-03 Product Data

3.6 GUtilization of Excavated Materials

SD-06 Test Reports

3.14Testing

2.1Borrow Site Testing

SD-07 Certificates

3.14Testing

31 11 00 SD-01 Preconstruction Submittals

3.1.1Herbicide Application Plan

SD-03 Product Data

3.4.1 GNonsaleable Materials

1.3.2 GHerbicides

SD-04 Samples

2.1.1Tree Wound Paint

SD-07 Certificates

1.3.2 GQualifications

SD-11 Closeout Submittals

3.5.1Pest Management Report

31 31 16.13 SD-01 Preconstruction Submittals

3.1.4 G IMPCTermiticide Application Plan

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 38 PAGES

31 31 16.13 2.2.1Termiticides

SD-05 Design Data

3.2.2Mixing Formulation

SD-06 Test Reports

1.6.1Soil Moisture

3.2.1Calibration Test

SD-07 Certificates

1.4.2 GQualifications

3.1.2Foundation Exterior

3.1.3Utilities and Vents

3.2.1List of Equipment

SD-08 Manufacturer’s Instructions

2.2.1Termiticides

SD-11 Closeout Submittals

3.3.1Verification of Measurement

1.7Warranty

3.4Pest Management Report

32 11 23 SD-03 Product Data

1.5Plant, Equipment, and Tools

SD-06 Test Reports

2.4.1 GInitial Tests

3.12.1 GIn-Place Tests

32 12 13 SD-06 Test Reports

3.7Sampling and Testing

32 12 16 SD-03 Product Data

2.5 GMix Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 38 PAGES

32 12 16 3.9 GQuality Control

3.10 GMaterial Acceptance

SD-04 Samples

2.4Asphalt Cement Binder

2.2Aggregates

SD-06 Test Reports

2.2 GAggregates

3.9.3.10QC Monitoring

SD-07 Certificates

2.4 GAsphalt Cement Binder

3.5Testing Laboratory

32 17 23 SD-03 Product Data

2.1.1.1 GSurface Preparation Equipment

List

2.1.2 GApplication Equipment List

3.2Exterior Surface Preparation

1.3.1 GSafety Data Sheets

2.2.6.1 GReflective media for roads

2.2.1 GWaterborne Paint

2.2.2 GThermoplastic compound

3.3.2 GThermoplastic compound

2.2.5 GRaised Pavement Markers

Primers and Adhesives

SD-06 Test Reports

2.2.6.1 GReflective Media for Roads

2.2.1 GWaterborne Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 38 PAGES

32 17 23 2.2.3 GHigh Build Acrylic Coating

(HBAC)

2.2.2 GThermoplastic Compound

3.3.2 GThermoplastic Compound

2.2.5 GRaised Pavement Markers

Primers and Adhesives

3.4.1Test Reports

SD-07 Certificates

1.3.2 GQualifications

2.2.6.1Reflective Media for Roads

2.2.1Waterborne Paint

1.3.1 GVolatile Organic Compound

2.2.3 GVolatile Organic Compound

2.2.2Thermoplastic Compound

3.3.2Thermoplastic Compound

SD-08 Manufacturer’s Instructions

2.2.1 GWaterborne Paint

2.2.2 GThermoplastic Compound

3.3.2 GThermoplastic Compound

32 31 13 SD-02 Shop Drawings

2.1Fence Assembly

3.2.2.1Location of Gate, Corner, End, and Pull Posts

2.1Gate Assembly

2.2.11Gate Hardware and Accessories

Part 3 GErection/Installation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 38 PAGES

32 31 13 SD-03 Product Data

2.1Fence Assembly

2.1Gate Assembly

2.2.11Gate Hardware and Accessories

2.3.1Zinc Coating

2.2.1Fabric

2.2.6Stretcher Bars

2.3.3Concrete

SD-04 Samples

2.2.1Fabric

2.2.10Braces

2.2.2Line Posts

2.2.4Sleeves

2.3.2Tension Wire

2.2.6Stretcher Bars

2.2.9Gate Posts

2.2.11Gate Hardware and Accessories

2.2.14Padlocks

2.2.13Wire Ties

SD-07 Certificates

1.3.1Certificates of Compliance

SD-08 Manufacturer’s Instructions

2.1Fence Assembly

2.1Gate Assembly

2.1Hardware Assembly

2.1Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 38 PAGES

33 40 00 SD-04 Samples

2.1Pipe for Culverts and Storm

Drains

SD-07 Certificates

2.4.6.1Oil Resistant Gasket

3.8.1.2Leakage Test

3.8.1.1Hydrostatic Test on Watertight

Joints

3.8.1.3Determination of Density

2.4.5Frame and Cover for Gratings

3.8.2.1.2Post-Installation Inspection

Report

3.3Placing Pipe

33 71 02 SD-02 Shop Drawings

1.5.1 GPrecast underground structures

SD-03 Product Data

2.10.2.1 GPrecast concrete structures

2.10.2.4Sealing Material

3.4.3Pulling-In Irons

2.10.3 GHandhole frames and covers

2.10.4 GComposite/fiberglass handholes

2.11Cable supports

SD-06 Test Reports

3.15.1Field Acceptance Checks and

Tests

1.5.2Cable Installer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 38 PAGES

34 41 26 SD-02 Shop Drawings

1.6.1 GGroup I Technical Data Package

1.6.4 GGroup IV Technical Data

Package

1.6.5 GGroup V Technical Data Package

SD-03 Product Data

1.6.1 GGroup I Technical Data Package

1.6.2 GGroup II Technical Data Package

1.6.4 GGroup IV Technical Data

Package

1.6.5 GGroup V Technical Data Package

SD-05 Design Data

1.6.1 GGroup I Technical Data Package

SD-06 Test Reports

1.6.3Group III Technical Data Package

1.6.4Group IV Technical Data

Package

SD-07 Certificates

1.6.1Group I Technical Data Package

1.5.4Technical Specialists

SD-08 Manufacturer’s Instructions

1.6.1 GGroup I Technical Data Package

34 71 13.16 SD-03 Product Data

2.1.2 GM50 P1 Or P2 Passive Vehicle

Barrier (PVB)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 38 PAGES

34 71 13.16 2.1.1 GM30 P1 Or P2 Passive Vehicle

Barriers (PVBs)

SD-08 Manufacturer’s Instructions

3.5End Anchorage

2.1.2 GM50 P1 Or P2 Passive Vehicle

Barrier (PVB)

2.1.1 GM30 P1 Or P2 Passive Vehicle

Barriers (PVBs)

3.7Crash Cushion

34 71 13.19 SD-02 Shop Drawings

3.1 GInstallation

3.1 GEquipment

2.3 GElectrical Work

SD-03 Product Data

1.2Barrier Systems

1.5Spare Parts

SD-06 Test Reports

3.6Field Testing

SD-10 Operation and Maintenance

Data

1.2 GBarrier Systems

3.5 GOperating and Maintenance

Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

Construct East Gate Canopy & Inspection Facility, Hill AFB 2242

SECTION TABLE OF CONTENTS

DIVISION 34 - TRANSPORTATION

SECTION 34 71 13.16

VEHICLE CRASH BARRIERS

PART 1 GENERAL

1.1 SUBMITTALS

PART 2 PRODUCTS

2.1 PASSIVE VEHICLE BARRIERS (PVBs)

2.1.1 M30 P1 or P2 Passive Vehicle Barriers (PVBs)

2.1.2 M50 P1 or P2 Passive Vehicle Barrier (PVB)

2.2 GUARDRAIL POSTS

2.3 W-BEAM GUARDRAIL

2.4 "W' BEAM END SECTION

2.5 GUARDRAIL HARDWARE

2.6 TERMINAL FOR W-BEAM GUARDRAIL

PART 3 EXECUTION

3.1 M30 and M50 PASSIVE VEHILCE BARRIERS (PVBs)

3.2 M30 and M50 POSTS

3.3 M30 and M50 GUARDRAIL BEAM ELEMENTS

3.4 M30 and M50 GUARDRAIL DELINEATOR REFLECTOR TABS

3.5 M30 and M50 GUARDRAIL END ANCHORAGE

3.6 M30 and M50 THREE CABLE GUARDRAIL

3.6.1 Posts

3.6.2 Cable Splices, Compensating Devices and Turnbuckle Cable End

Assemblies

3.6.3 Pretension of Cable

3.7 CRASH CUSHION

-- End of Section Table of Contents --

34 71 13.16 - 1 Amendment 0003

SECTION 34 71 13.16

VEHICLE CRASH BARRIERS

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

M50 P1 Or P2 Passive Vehicle Barrier (PVB); G

M30 P1 Or P2 Passive Vehicle Barriers (PVBs); G

SD-08 Manufacturer's Instructions

End Anchorage

Submit at least 14 days prior to installation.

M50 P1 Or P2 Passive Vehicle Barrier (PVB); G

M50 P1 Passive Vehicle Barrier M30 P1 Or P2 Passive Vehicle Barriers (PVBs); G

Crash Cushion

Provide M30 P1 Passive Vehicle Barrier list of materials with receipts and proof of adequate material specification. Also, provide manufacturer's M50 P1 Passive Vehicl Barrier recommendation for installation. "G"

PART 2 PRODUCTS

2.1 PASSIVE VEHICLE BARRIERS (PVBs)

Passive Vehicle Barriers (PVBs) are identified as Passive Cable or Passive Bollards in this specifications. And they follow the categorization DoD Anti-Ram Vehicle Barrier Lists.

This project only includes M30 P1/P2 and M50 P1/P2 PVBs under the Passive Cable listing of the DoD Anti-Ram Vehicle Barrier List except when turning plus/minus 90 degrees towards the existing Active Vehicle Barrier (AVB) and near the perimeter fence (within 5 ft from the fence). The Contractor must use a Passive Bollard (M30 P1 or P2) to not allow a 3.3 ft break near the AVB and 4.1 ft near perimeter fence. See subsection 3.1 for permissible breaks.

Pick one M30 P1 or P2 PVB and use it throghout the project except when

34 71 13.16 - 2 Amendment 0003 turning plus/minus 90 degrees towards the existing AVB. Also, the Contractor must pick one M50 P1 or P2 PVB and use it throughout the project. In other words, the Contractor must not use two or more M30 P1 or P2 PVBs except near the AVB as aforementioned. Likewise, the Contractors must not use two or more M50 P1 or P2 PVBs.

The M30 P1 or P2 and M50 P1 or P2 PVBs must be included in the June 2020 DoD Anti-Ram Vehicle Barrier List by the Protective Design Center (USACE).

The June 2020 is provided at the end of this section. The Contractor must request and get approval from the Contracting Office if an updated DoD Anti-Ram Vehcile Barrier list is available. The engineering sheet C-515 and C-516 provide an example of an M50 Passive Vehicle Barrier and must be used only as reference.

Pick a PVB that must follow the curves of the project outside the clear zone (7 ft) within the PVBs limitation (e.g., tested length).

2.1.1 M30 P1 or P2 Passive Vehicle Barriers (PVBs)

List the materials with receipts and proof of adequate material specification of the Passive Cable and Passive Bollards. Also, provide manufacturer's M30 P1 or P2 PVB recommendation for installation.

2.1.2 M50 P1 or P2 Passive Vehicle Barrier (PVB)

List the materials with receipts and proof of adequate material specification of the Passive Cable. Also, provide manufacturer's M50 P1 or P2 Passive Vehicle Barrier recommendation for installation.

2.2 GUARDRAIL POSTS

Guardrail posts must be according to the attachment provided at the end of this section, Modified Midwest Guardrail System (MMGS) M30 P1 Passive Barrier System the manufacturer's instructions.

2.3 W-BEAM GUARDRAIL

W-Beam Guardrail must be according to the attachment provided at the end of this section, Modified Midwest Guardrail System (MMGS) M30 P1 Passive Barrier System. the manufacturer's instructions .

2.4 "W' BEAM END SECTION

Provide "W" beam end sections according to the attachment provided at the end of this section, Modified Midwest Guardrail System (MMGS) M30 P1 Passive Barrier System the manufacturer's instructions.

2.5 GUARDRAIL HARDWARE

Guardrail hardware must be according to the attachment provided at the end of this section, Modified Midwest Guardrail System (MMGS) M30 P1 Passive Barrier System the manufacturer's instructions.

2.6 TERMINAL FOR W-BEAM GUARDRAIL

Terminal for W-Beam guardrail must be according to the attachment provided at the end of this section, Modified Midwest Guardrail System (MMGS) M30 P1 Passive Barrier System. For the M50 P1 Passive Barrier System it must be according to the manufacturer's specifications. the manufacturer's

34 71 13.16…