Attachment 5 - Pre-Award Survey.pdf
PDF 220 KB Posted
- Attached to
- HILL AFB EAST GATE CANOPY & INSPECTION FACILITY
- Solicitation number
- W91238-20-R-0023
About this file
This document contains a pre-award survey of a prospective construction contractor and details of a federal contract opportunity for construction of an East Gate canopy and inspection facility at Hill Air Force Base.
The pre-award survey requests information on the contractor's organization structure, personnel, equipment, financial data, experience on past construction projects valued over $6 million, largest single project completed, type of work specialized in, and existing project commitments. It seeks details on completed projects within the last six years, owned construction equipment and its availability.
The federal contract opportunity is for design and construction of a new canopy and shelter at the East Gate of Hill Air Force Base, along with associated site work, utilities, signage and lighting. It involves phased construction to maintain one open traffic lane. The project includes a generator pad, connection to an automatic transfer switch, uninterruptible power supply and infrastructure for intrusion detection and CCTV systems. Precise grading is required to integrate the new work into the existing terrain. Demolition of existing structures and reconstruction is needed to incorporate the Access Control Zone features. The solicitation number is W91238-20-R-0023 and was issued by the Department of the Army Corps of Engineers Engineering District Sacramento. The response due date and award date are not specified.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Award Survey of Prospective Contractors
CONSTRUCTION CONTRACTOR DATA DATE:
Firm Name and Telephone Number Main Office Address (Street, City, and State)
Branch Offices Services Rendered Construction Design Consultant
Organization Individual Joint Venture Partnership Corporation
Date Organized Date Incorporated:
State:
Names of Officers and Other Key Personnel
I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below) Partners:
Officers:
Other Key:
Remainder: Subtotal Permanent:
Maximum Personnel at Any Time:
Date:
Total:
II—EQUIPMENT OWNED III—FINANCIAL DATA AS OF
(DATE): Present Value ($)
Current Assets:
Acquisition Cost ($) Current Liabilities:
Net Worth:
IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION
WORK IN PAST 6 YRS EXCLUSIVE OF JOINT VENTURE
(LIST MOST RECENT FIRST)
V—LARGEST JOB EVER
CONTRACTED
(If Other Than in Past Six Years)
$ LARGEST JOB IN PAST 6 YRS Contract Amount:
Date:
Description:
Owner:
$ Contract Amount:
Date:
Description:
Owner:
Avg. Annual Income
VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES
NAME AND POSITION/TITLE OF PERSON SIGNING
SIGNATURE
See attachment for explanations or detailed description of item(s) reported above.
CONSTRUCTION CONTRACTOR DATA – SCHEDULE A – EXISTING COMMITMENTS
List below the construction projects your firm currently has under way, including recent awards. Also list construction projects for which your firm is the apparent successful offeror/bidder, but for which a contract has not yet been awarded.
CONTRACT
NUMBER
AMOUNT
DESCRIPTION/
LOCATION
ORGANIZATION/
CONTACT PERSON/
PHONE NUMBER
PERCENT
COMPLETE
CONSTRUCTION CONTRACTOR DATA – SCHEDULE B – COMPLETED PROJECTS
List below the principal construction projects your firm has completed within the past six years, including all DoD contracts.
NUMBER
AMOUNT
DESCRIPTION/
LOCATION
ORGANIZATION/
CONTACT PERSON/
PHONE NUMBER
PERCENT
SUBLET
CONSTRUCTION CONTRACTOR DATA – SCHEDULE C –
CONSTRUCTION AND/OR TECHNICAL EQUIPMENT
List total equipment and facilities owned for performing the prospective contract and present status as to whether or not it is currently committed to existing contracts.
QUANTITY
DESCRIPTION
CONDITION
YEARS OF
SERVICE
PRESENT
STATUS
File details come from the government source that posted it. Updated .