Atch_4_CLIN_Breakout_Schedule_Acknowledgement_Statement_28FEB18.pdf
PDF 35 KB Posted
- Attached to
- Live Fire Exercise Shoothouse at Camp W. G. Williams, Utah Federal contract opportunity
- Solicitation number
- W91238-17-S-0679
About this file
CLIN Breakout Schedule Acknowledgement Statement
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91238-18-R-0034 Attachment 4 – Acknowledgement Statement Live Fire Exercise Shoothouse Camp Williams, UT February 28, 2018
CLIN Breakout Schedule
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS
SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
UNIT OF TOTAL
CLIN DESCRIPTION QUANTITY MEASURE PRICE
BASE BID
0001 Provide all labor, management, 1 JOB $ supervision, tools, materials, equipment and transportation for CONSTRUCTION of the Live Fire Exercise Shoothouse at Camp Williams UT to include demolition, erosion and sediment control;
site improvements of paved roads;
range; sniper and observation platform;
range operations control building; with all utilities, power, HVAC and communications for buildings. Work shall be in strict accordance with all contract documents, RFP drawings and specifications.
0002 Contractor Manpower Reporting 1 JOB $ This CLIN is used for pricing the collection And reporting of Contractor Manpower Reporting data. Reporting period will be the period of Performance not to exceed twelve months ending 30 September of each Government Fiscal Year and must be reported by 31 October of each calendar year.
TOTAL PRICE (ITEM 0001-0002) $
OPTIONS SCHEDULE
1001 Construct Latrine 1 JOB LUMP SUM $ for Shoothouse in accordance with this contract and its attachments, complete
Live Fire Exercise Shoothouse and usable
1002 Construct After Action Review Building for Shoothouse 1 JOB LUMP SUM $ in accordance with this contract and
1003 Construct Ammo Breakdown Building for Shoothouse project 1 JOB LUMP SUM $ in accordance with this contract and
1004 Construct Bleacher for Shoothouse project 1 JOB LUMP SUM $ in accordance with this contract and
1005 Construct Covered Mess for Shoothouse project 1 JOB LUMP SUM $ in accordance with this contract and
TOTAL BASE BID and Options (0001- 1005) $
END OF CLIN SCHEDULE
1. Prices must be submitted on all individual items of this CLIN Schedule. Failure to do so may cause the proposal to be determined "unacceptable".
2. If a modification to a price is submitted which provides for a job adjustment to the total price, the application of the job adjustment to each item in the CLIN Schedule must be stated. If it is not stated, the offeror agrees that the job adjustment shall be applied on a pro rata basis to every item in the CLIN Schedule.
Live Fire Exercise Shoothouse
3. The offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted CLIN Schedule determined to be unbalanced may cause the proposal to be determined "unacceptable".
4. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
UAI 52.214-5000 ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
(5) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
| BASE BID |
| TOTAL BASE BID and Options (0001- 1005) $ |
File details come from the government source that posted it.