Atch_4_Acknowledgement_Statement.pdf

PDF 139 KB Posted

Attached to
Live Fire Exercise Shoothouse at Camp W. G. Williams, Utah Federal contract opportunity
Solicitation number
W91238-17-S-0679
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

Atch 4 Acknowledgement Statement

View the file

Other files for this federal contract opportunity

Other files attached to Live Fire Exercise Shoothouse at Camp W. G. Williams, Utah, newest first.
File Type Posted
DGN_files.zip ZIP file
W91238-18-R-0034_Amendment__2_12MAR18.pdf PDF
Utah_2017StandardDrawings.pdf PDF
CWSH_CG503.dgn —
CWSH_CG112.dgn —
CWSH_CG421.dgn —
CWSH_CG111.dgn —
CWSH_CG101.dgn —
CWSH_CG501.dgn —
Appendix_1_Division_01-General_Requirements_&_Specifications.pdf PDF
CWSH_CG001.dgn —
ES001r.pdf PDF
Atch_4_CLIN_Breakout_Schedule_Acknowledgement_Statement_28FEB18.pdf PDF
CWSH_CG504.dgn —
CWSH_CG423.dgn —
CWSH_CG422.dgn —
CWSH_CG421a.dgn —
CWSH_CG502.dgn —
Atch_3_Wage_Rate_Determination_9FEB18.pdf PDF
Atch_2_Supplemental_Contract_Requirements_27FEB18.pdf PDF
W91238-18-R-0034_Amendment_1_2MAR18.pdf PDF
Site_Visit_Sign-in_Sheet_21FEB18.pdf PDF
A7.1_W91238-18-R-0034.pdf PDF
A7.1_Camp_Williams_Shoothouse_RTA_Submital.pdf PDF
Atch_3_Wage_Rate_Determination.pdf PDF
Atch_2_Supplemental_Contract_Requirements.pdf PDF
Atch_1_SOW_29JAN18.pdf PDF
Atch_5_Pre-Award_Survey_25APR2017.pdf PDF
Division_01_-_General_Requirements.pdf PDF
Sol___W91238-18-R-0034.pdf PDF
Atch_6PPQ_Form_25APR17.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91238-18-R-0034 Attachment 4 – Acknowledgement Statement Live Fire Exercise Shoothouse Camp Williams, UT June 9, 2017

ACKNOWLEDGEMENT STATEMENT

The offeror agrees to perform the work required at the prices specified and in strict accordance with the terms of the contract.

1. Name, Address, and DUNS Number of Contractor

2. Telephone Number

3. Contract No.:

4. Title of Project: Live Fire Exercise Shoothouse, Camp Williams UT

5. Name and Title of Person Authorized to Sign Offer:

Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

6. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation:

7. Signature:

8. Offer Date:

9. Amendments (Number & Date of Acknowledgement):

10. Offers providing less than ___90___ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

11. Proposed Period of Performance for completion Base Bid (CLIN 0001-0002) is:

540 calendar days after NTP date.

Period of Performance for Options (CLIN 1001-1005) is:

540 calendar days after NTP date of Base Bid.

12. Total Amount $_________________________

13. The offeror’s proposal is valid for __________________ calendar days

(a)-Note that your statement must include your acknowledgment of all amendments; and (b)-Include the completed pricing schedule. This is a Job pricing. Provide price breakout as follows:

Live Fire Exercise Shoothouse

CLIN Breakout Schedule

CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY

TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS

SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

UNIT OF TOTAL

CLIN DESCRIPTION QUANTITY MEASURE PRICE

BASE BID

0001 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation for CONSTRUCTION of the Live Fire Exercise Shoothouse at Camp Williams UT in strict accordance with all contract documents, RFP drawings and specifications.

0002 Contractor Manpower Reporting 1 JOB $_______________

This CLIN is used for pricing the collection And reporting of Contractor Manpower Reporting data. Reporting period will be the period of Performance not to exceed twelve months ending 30 September of each Government Fiscal Year and must be reported by 31 October of each calendar year.

TOTAL PRICE (ITEM 0001-0002) $__________________

OPTIONS SCHEDULE

1001 Construct Latrine 1 JOB LUMP SUM $__________ for Shoothouse in accordance with this contract and its attachments, complete and usable

1002 Construct After Action Review Building for Shoothouse 1 JOB LUMP SUM $__________ in accordance with this contract and

Live Fire Exercise Shoothouse

1003 Construct Ammo Breakdown Building for Shoothouse project 1 JOB LUMP SUM $__________ in accordance with this contract and

1004 Construct Bleacher for Shoothouse project 1 JOB LUMP SUM $__________ in accordance with this contract and

1005 Construct Covered Mess for Shoothouse project 1 JOB LUMP SUM $__________ in accordance with this contract and

TOTAL BASE BID and Options (0001- 1005) $________________

END OF CLIN SCHEDULE

1. Prices must be submitted on all individual items of this CLIN Schedule. Failure to do so may cause the proposal to be determined "unacceptable".

2. If a modification to a price is submitted which provides for a job adjustment to the total price, the application of the job adjustment to each item in the CLIN Schedule must be stated. If it is not stated, the offeror agrees that the job adjustment shall be applied on a pro rata basis to every item in the CLIN Schedule.

3. The offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted CLIN Schedule determined to be unbalanced may cause the proposal to be determined "unacceptable".

4. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

UAI 52.214-5000 ARITHMETIC DISCREPANCIES

Live Fire Exercise Shoothouse

(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:

(1) Obviously misplaced decimal points will be corrected;

(2) Discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

(5) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

File details come from the government source that posted it.