Appendix 1 Division 01 General Requirements and Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Live Fire Exercise Shoothouse at Camp W. G. Williams, Utah, newest first.
File Type Posted
DGN_files.zip ZIP file
W91238-18-R-0034_Amendment__2_12MAR18.pdf PDF
Utah_2017StandardDrawings.pdf PDF
CWSH_CG503.dgn —
CWSH_CG112.dgn —
CWSH_CG421.dgn —
CWSH_CG111.dgn —
CWSH_CG101.dgn —
CWSH_CG501.dgn —
CWSH_CG001.dgn —
ES001r.pdf PDF
Atch_4_CLIN_Breakout_Schedule_Acknowledgement_Statement_28FEB18.pdf PDF
CWSH_CG504.dgn —
CWSH_CG423.dgn —
CWSH_CG422.dgn —
CWSH_CG421a.dgn —
CWSH_CG502.dgn —
Atch_3_Wage_Rate_Determination_9FEB18.pdf PDF
Atch_2_Supplemental_Contract_Requirements_27FEB18.pdf PDF
W91238-18-R-0034_Amendment_1_2MAR18.pdf PDF
Site_Visit_Sign-in_Sheet_21FEB18.pdf PDF
A7.1_W91238-18-R-0034.pdf PDF
A7.1_Camp_Williams_Shoothouse_RTA_Submital.pdf PDF
Atch_3_Wage_Rate_Determination.pdf PDF
Atch_2_Supplemental_Contract_Requirements.pdf PDF
Atch_1_SOW_29JAN18.pdf PDF
Atch_5_Pre-Award_Survey_25APR2017.pdf PDF
Division_01_-_General_Requirements.pdf PDF
Sol___W91238-18-R-0034.pdf PDF
Atch_6PPQ_Form_25APR17.pdf PDF
Atch_4_Acknowledgement_Statement.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix 1

Camp Williams Shoot House 2108

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 01 14 00 01 32 01 01 33 00 01 35 26 01 45 00 01 45 00.10 01 45 35 01 50 02 01 57 19 01 62 35 01 74 19 01 78 00 01 78 23 01 78 24 01 91 00.15

SUMMARY OF WORK

WORK RESTRICTIONS

PROJECT SCHEDULE

SUBMITTAL PROCEDURES

GOVERNMENTAL SAFETY REQUIREMENTS

RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) QUALITY CONTROL

QUALITY CONTROL SYSTEM (QCS)

SPECIAL INSPECTIONS

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

TEMPORARY ENVIRONMENTAL CONTROLS

RECYCLED/RECOVERED/BIOBASED MATERIALS

CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

CLOSEOUT SUBMITTALS

OPERATION AND MAINTENANCE DATA

OPERATIONS AND MAINTENANCE FACILITY DATA REQUIREMENTS

TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

2 41 00 DEMOLITION

DIVISION 03 - CONCRETE

3 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00 CONCRETE ACCESSORIES

03 20 00 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

03 35 00 CONCRETE FINISHING

3 39 00 CONCRETE CURING

DIVISION 04 - MASONRY

4 20 00 UNIT MASONRY

DIVISION 05 - METALS

5 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 10 METAL BLEACHER

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

5 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

6 10 00 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

7 18 00 TRAFFIC-BEARING DECK COATING SYSTEM

07 19 00 WATER REPELLENTS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

PROJECT TABLE OF CONTENTS Page 1

Camp Wi l l i ams Shoot House 2108

07 27 10 BUI LDI NG AI R BARRI ER SYSTEM

07 42 13 METAL WALL AND SOFFI T PANELS

07 60 00 FLASHI NG AND SHEET METAL

07 61 14 STEEL STANDI NG SEAM ROOFI NG

07 92 00 JOI NT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 23 OVERHEAD COI LI NG DOORS

08 34 02 BULLET- RESI STANT COMPONENTS

08 51 13 ALUMI NUM WI NDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 65 00 RESI LI ENT FLOORI NG

09 90 00 PAI NTS AND COATI NGS

09 96 56 EPOXY COATI NGS

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 VI SUAL DI SPLAY UNI TS

10 14 00. 10 EXTERI OR SI GNAGE

10 14 00. 20 I NTERI OR SI GNAGE

10 21 13 TOI LET COMPARTMENTS

10 22 39 FOLDI NG PANEL PARTI TI ONS

10 28 13 TOI LET ACCESSORI ES

10 44 16 FI RE EXTI NGUI SHER BRACKETS

DI VI SI ON 11 - EQUI PMENT

11 67 23 LI VE FI RE SHOOTHOUSE EQUI PMENT

DI VI SI ON 12 - FURNI SHI NGS

12 21 00 WI NDOW BLI NDS

12 36 00 COUNTERTOPS

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 48 00 SEI SMI C PROTECTI ON FOR MECHANI CAL EQUI PMENT

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBI NG, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS

23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 82 00 TERMI NAL HEATI NG UNI TS

23 82 02 UNI TARY HEATI NG AND COOLI NG EQUI PMENT

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 26 - ELECTRI CAL

26 05 48 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT

26 08 00 APPARATUS I NSPECTI ON AND TESTI NG

26 12 19. 10 THREE- PHASE PAD- MOUNTED TRANSFORMERS

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

26 41 00 LI GHTNI NG PROTECTI ON SYSTEM

26 51 00 I NTERI OR LI GHTI NG

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 76 I NTERI OR MASS NOTI FI CATI ON SYSTEM

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARI NG AND GRUBBI NG

31 32 11 SOI L SURFACE EROSI ON CONTROL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 05 33 LANDSCAPE ESTABLI SHMENT

32 11 23 AGGREGATE BASE COURSE

32 15 00 AGGREGATE SURFACE COURSE

32 92 19 SEEDING

DI VI SI ON 33 - UTI LI TI ES

33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON

33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 3

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Ut i l i t y Out age Request s

Ut i l i t y Connect i on Request s

Bor r ow Per mi t s

Excavat i on Per mi t s

Wel di ng Per mi t s

Sal vage Pl an; G, RO

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes t he const r uct i on of a Li ve Fi r e Shoot house, Sni per Tower , 100m Fl at Range and associ at ed suppor t i ng f aci l i t i es at Camp Wi l l i ams, UT and i nci dent al r el at ed wor k.

1. 2. 2 Location

The wor k i s l ocat ed at t he Camp Wi l l ai ms, UT, appr oxi mat el y as i ndi cat ed.

The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .

1. 3 EXI STI NG WORK

I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

SECTI ON 01 11 00 Page 1

1. 4 ON- SI TE PERMI TS

1. 4. 1 Ut i l i t y Out age Request s and Ut i l i t y Connect i on Request s

Schedul e wor k t o mi ni mi ze out ages. For ut i l i t y out ages and connect i ons r equi r ed dur i ng t he execut i on of wor k t hat af f ect exi st i ng syst ems, schedul e out s i de t he r egul ar wor k i ng hour s or on weekends, as appr oved by t he Cont r act i ng Of f i cer . Schedul e ut i l i t y out ages and connect i ons t o mi ni mi ze di sr upt i ons t ot he Gover nment . No addi t i onal payment wi l l be pr ovi ded f or ut i l i t y out ages and connect i ons r equi r ed t o be per f or med out s i de t he r egul ar wor k hour s.

Submi t r equest s f or ut i l i t y out ages and connect i ons i n wr i t i ng t o t he Cont r act i ng Of f i cer f or appr oval at l east 15 cal endar days i n advance of t he t i me r equi r ed. I n each r equest , st at e t he syst em i nvol ved, ar ea i nvol ved, appr oxi mat e dur at i on of out age, and t he nat ur e of wor k i nvol ved.

1. 4. 2 Bor r ow, Excavat i on, and Wel di ng Per mi t s

ACTIVITY SUBMI SSI ON DATE SUBMI SSI ON FORM

Bor r ow Per mi t s 15 cal endar days pr i or t o wor k

Excavat i on Per mi t s 15 cal endar days pr i or t o wor k

Wel di ng Per mi t s 3 cal endar days pr i or t o wor k

Post per mi t s at a conspi cuous l ocat i on i n t he const r uct i on ar ea.

Bur ni ng of t r ash or r ubbi sh i s not per mi t t ed at Camp Wi l l i ams.

1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES

Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.

Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 48 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.

I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed.

Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.

1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.

SECTI ON 01 11 00 Page 2

1. 6 SALVAGE MATERI AL AND EQUI PMENT

I t ems desi gnat ed by t he Cont r act i ng Of f i cer t o be sal vaged r emai n t he pr oper t y of t he Gover nment . Segr egat e, i t emi ze, del i ver and of f - l oad t he sal vaged pr oper t y at t he Gover nment desi gnat ed st or age ar ea l ocat ed wi t hi n 5 mi l es of t he const r uct i on s i t e.

Pr ovi de a sal vage pl an, l i s t i ng mat er i al and equi pment t o be sal vaged, and t hei r st or age l ocat i on. Mai nt ai n pr oper t y cont r ol r ecor ds f or mat er i al or equi pment desi gnat ed as sal vage. Use a syst em of pr oper t y cont r ol t hat i s appr oved by t he Cont r act i ng Of f i cer . St or e and pr ot ect sal vaged mat er i al s and equi pment unt i l di sposi t i on by t he Cont r act i ng Of f i cer .

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00 Page 3

SECTI ON 01 14 00

WORK RESTRI CTI ONS

11/11

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Li st of Cont act Per sonnel

Vehi c l e Li st

1. 2 CONTRACTOR ACCESS AND USE OF PREMI SES

1. 2. 1 Act i v i t y Regul at i ons

Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear har d hat s i n desi gnat ed ar eas. Do not ent er any r est r i c t ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Mar k Cont r act or equi pment f or i dent i f i cat i on.

1. 2. 1. 1 Subcont r act or s and Per sonnel Cont act s

Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.

1. 2. 1. 2 No Smoki ng Pol i cy

Smoki ng i s pr ohi bi t ed wi t hi n and out s i de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.

1. 2. 2 Wor ki ng Hour s

Regul ar wor ki ng hour s must consi st of an 8 1/ 2 hour per i od est abl i shed by t he Cont r act or Of f i cer , bet ween Monday t hr ough Fr i day, excl udi ng Gover nment holidays.

1. 2. 3 Wor k Out si de Regul ar Hour s

Wor k out s i de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .

Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s

SECTI ON 01 14 00 Page 1 t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out s i de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer . Make ut i l i t y cut over s af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days unl ess di r ect ed ot her wi se.

1. 2. 4 Ut i l i t y Cut over s and I nt er r upt i ons

a. Make ut i l i t y cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days. Conf or m t o pr ocedur es r equi r ed par agr aph WORK OUTSI DE REGULAR HOURS.

b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser v i ce.

c. I nt er r upt i on t o wat er , sani t ar y sewer , st or m sewer , t el ephone ser vi ce, el ect r i c ser vi ce, ai r condi t i oni ng, heat i ng, f i r e al ar m, compr essed ai r , and communi cat i ons ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph WORK OUTSI DE REGULAR HOURS.

1. 3 SECURI TY REQUI REMENTS

Cont r act Cl ause " FAR 52. 204- 2, Secur i t y Requi r ement s and Al t er nat e I I , " " FAC 5252. 236- 9301, Speci al Wor ki ng Condi t i ons and Ent r y t o Wor k Ar ea, " ar e appl i cabl e t o t hi s pr oj ect

1. 3. 1 Vehi c l e Li st

Submi t an or i gi nal l i s t of vehi c l es t o be ut i l i zed at t he wor k s i t e wi t h t he f ol l owi ng i nf or mat i on f or each vehi c l e:

a. Make

b. Year

c. Model

d. Li cense number

e. Regi st er ed owner f . Cur r ent NAVBASE Pear l Har bor pass expi r at i on dat e.

1. 3. 2 Passes

Submi t r equest f or per sonnel and vehi c l e passes t oget her . I ncl ude t he Cer t i f i cat e of I nsur ance f or Cont r act or and Subcont r act or ( s) and t he St at ement of Acknowl edgement For m SF 1413 wi t h t he submi t t al . Passes wi l l nor mal l y be i ssued wi t hi n 21 days.

1. 3. 2. 1 Control

Mai nt ai n st r i c t account abi l i t y over passes. I mmedi at el y r epor t t o t he sour ce of i ssue, passes mi ssi ng or l ost and t he c i r cumst ances. I f t he Cont r act or has anot her act i ve cont r act or one commenci ng i mmedi at el y, empl oyees' names may be t r ansf er r ed f r om one cont r act t o t he ot her . Fi nal

SECTI ON 01 14 00 Page 2 payment wi l l not be ef f ect ed unt i l empl oyees ar e t r ansf er r ed t o anot her cont r act or t he r ecor ds ar e c l ear ed. Fur ni sh a s i gned l et t er , count er si gned by t he sour ce of i ssue, st at i ng t hat passes have been t ur ned in.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 14 00 Page 3

SECTI ON 01 32 01

PROJECT SCHEDULE

02/15

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AACE I NTERNATI ONAL ( AACE)

AACE 29R- 03 ( 2011) For ensi c Schedul e Anal ysi s

AACE 52R- 06 ( 2006) Ti me I mpact Anal ysi s - As Appl i ed i n Const r uct i on

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

ER 1- 1- 11 ( 1995) Admi ni st r at i on - - Pr ogr ess, Schedul es, and Net wor k Anal ysi s Syst ems

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr oj ect Schedul er Qual i f i cat i ons Pr el i mi nar y Pr oj ect Schedul e I ni t i al Pr oj ect Schedul e Per i odi c Schedul e Updat e

1. 3 PROJECT SCHEDULER QUALI FI CATI ONS

Desi gnat e an aut hor i zed r epr esent at i ve t o be r esponsi bl e f or t he pr epar at i on of t he schedul e and al l r equi r ed updat i ng and pr oduct i on of r epor t s. The aut hor i zed r epr esent at i ve must have a mi ni mum of 2- year s exper i ence schedul i ng const r uct i on pr oj ect s s i mi l ar i n s i ze and nat ur e t o t hi s pr oj ect wi t h schedul i ng sof t war e t hat meet s t he r equi r ement s of t hi s speci f i cat i on. Repr esent at i ve must have a compr ehensi ve knowl edge of CPM schedul i ng pr i nc i pl es and appl i cat i on.

PART 2 PRODUCTS

2. 1 SOFTWARE

The schedul i ng sof t war e ut i l i zed t o pr oduce and updat e t he schedul es r equi r ed her ei n must be capabl e of meet i ng al l r equi r ement s of t hi s specification.

SECTI ON 01 32 01 Page 1

2. 1. 1 Gover nment Def aul t Sof t war e

The Gover nment i nt ends t o use Pr i maver a P6.

2. 1. 2 Cont r act or Sof t war e

Schedul i ng sof t war e used by t he cont r act or must be commer ci al l y avai l abl e f r om t he sof t war e vendor f or pur chase wi t h vendor sof t war e suppor t agr eement s avai l abl e. The sof t war e r out i ne used t o cr eat e t he r equi r ed sdef f i l e must be cr eat ed and suppor t ed by t he sof t war e manuf act ur er .

2. 1. 2. 1 Primavera

I f Pr i maver a P6 i s sel ect ed f or use, pr ovi de t he " xer " expor t f i l e i n a ver si on of P6 i mpor t abl e by t he Gover nment syst em.

2. 1. 2. 2 Ot her Than Pr i maver a

I f t he cont r act or chooses sof t war e ot her t han Pr i maver a P6, t hat i s compl i ant wi t h t hi s speci f i cat i on, pr ovi de f or t he Gover nment ' s use t wo l i censes, t wo comput er s, and t r ai ni ng f or t wo Gover nment empl oyees i n t he use of t he sof t war e. These comput er s wi l l be st and- al one and not connect ed t o Gover nment net wor k. Comput er s and l i censes wi l l be r et ur ned at pr oj ect completion.

PART 3 EXECUTI ON

3. 1 GENERAL REQUI REMENTS

Pr epar e f or appr oval a Pr oj ect Schedul e, as speci f i ed her ei n, pur suant t o FAR Cl ause 52. 236- 15, SCHEDULE FOR CONSTRUCTI ON CONTRACTS. Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed. The schedul i ng of const r uct i on desi gn and const r uct i on i s t he r esponsi bi l i t y of t he Cont r act or . Cont r act or management per sonnel must act i vel y par t i c i pat e i n i t s devel opment .

Subcont r act or s and suppl i er s Desi gner s, Subcont r act or s and suppl i er s wor ki ng on t he pr oj ect must al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e Pr oj ect Schedul e. Pr ovi de a schedul e t hat i s a f or war d pl anni ng as wel l as a pr oj ect moni t or i ng t ool . Use t he Cr i t i cal Pat h Met hod ( CPM) of net wor k cal cul at i on t o gener at e al l Pr oj ect Schedul es.

Pr epar e each Pr oj ect Schedul e usi ng t he Pr ecedence Di agr am Met hod ( PDM) .

3. 2 BASI S FOR PAYMENT AND COST LOADI NG

The schedul e i s t he basi s f or det er mi ni ng cont r act ear ni ngs dur i ng each updat e per i od and t her ef or e t he amount of each pr ogr ess payment . The aggr egat e val ue of al l act i v i t i es coded t o a cont r act CLI N must equal t he val ue of t he CLI N.

3. 2. 1 Act i v i t y Cost Loadi ng

Act i v i t y cost l oadi ng must be r easonabl e and wi t hout f r ont - end l oadi ng.

Pr ovi de addi t i onal document at i on t o demonst r at e r easonabl eness i f r equest ed by t he Cont r act i ng Of f i cer .

SECTI ON 01 32 01 Page 2

3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on

Fai l ur e t o meet t he r equi r ement s of t hi s speci f i cat i on may r esul t i n t he di sappr oval of t he pr el i mi nar y, i ni t i al or per i odi c schedul e updat es and subsequent r ej ect i on of payment r equest s unt i l compl i ance i s met .

I n t he event t hat t he Cont r act i ng Of f i cer di r ect s schedul e r evi s i ons and t hose r evi s i ons have not been i nc l uded i n subsequent Pr oj ect Schedul e r evi s i ons or updat es, t he Cont r act i ng Of f i cer may wi t hhol d 10 per cent of pay r equest amount f r om each payment per i od unt i l such r evi s i ons t o t he pr oj ect schedul e have been made.

3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS

3. 3. 1 Level of Det ai l Requi r ed

Devel op t he Pr oj ect Schedul e t o t he appr opr i at e l evel of det ai l t o addr ess maj or mi l est ones and t o al l ow f or sat i sf act or y pr oj ect pl anni ng and execut i on. Fai l ur e t o devel op t he Pr oj ect Schedul e t o an appr opr i at e l evel of det ai l wi l l r esul t i n i t s di sappr oval . The Cont r act i ng Of f i cer wi l l consi der , but i s not l i mi t ed t o, t he f ol l owi ng char act er i st i cs and r equi r ement s t o det er mi ne appr opr i at e l evel of det ai l :

3. 3. 2 Act i v i t y Dur at i ons

Reasonabl e act i v i t y dur at i ons ar e t hose t hat al l ow t he pr ogr ess of ongoi ng act i v i t i es t o be accur at el y det er mi ned bet ween updat e per i ods.

Less t han 2 per cent of al l non- pr ocur ement act i v i t i es may have Or i gi nal Dur at i ons ( OD) gr eat er t han 20 wor k days or 30 cal endar days.

3. 3. 3 Pr ocur ement Act i v i t i es

I ncl ude act i v i t i es associ at ed wi t h t he cr i t i cal submi t t al s and t hei r appr oval s, pr ocur ement , f abr i cat i on, and del i ver y of l ong l ead mat er i al s, equi pment , f abr i cat ed assembl i es, and suppl i es. Long l ead pr ocur ement act i v i t i es ar e t hose wi t h an ant i c i pat ed pr ocur ement sequence of over 90 cal endar days.

3. 3. 4 Mandat or y Tasks

I ncl ude t he f ol l owi ng act i v i t i es/ t asks i n t he i ni t i al pr oj ect schedul e and al l updat es.

a. Submi ssi on, r evi ew and accept ance of SD- 01 Pr econst r uct i on Submi t t al s ( i ndi v i dual act i v i t y f or each) .

b. Submi ssi on of mechani cal / el ect r i cal / i nf or mat i on syst ems l ayout dr awi ngs.

c. Long pr ocur ement act i v i t i es

d. Submi ssi on and appr oval of O & M manual s.

e. Submi ssi on and appr oval of as- bui l t dr awi ngs.

f . Submi ssi on and appr oval of DD1354 dat a and i nst al l ed equi pment l i s t s.

g. Submi ssi on and appr oval of t est i ng and ai r bal ance ( TAB) .

SECTI ON 01 32 01 Page 3

h. Submi ssi on of TAB speci al i s t desi gn r evi ew r epor t .

i . Submi ssi on and appr oval of f i r e pr ot ect i on speci al i s t .

j . Submi ssi on and appr oval of Bui l di ng Commi ssi oni ng Pl an, t est dat a, and r epor t s: Devel op t he schedul e l ogi c associ at ed wi t h t est i ng and commi ssi oni ng of mechani cal syst ems t o a l evel of det ai l consi st ent wi t h t he cont r act commi ssi oni ng r equi r ement s. Al l t asks associ at ed wi t h al l bui l di ng t est i ng and commi ssi oni ng wi l l be compl et ed pr i or t o submi ssi on of bui l di ng commi ssi oni ng r epor t and subsequent cont r act completion.

k. Ai r and wat er bal anci ng.

l . Bui l di ng commi ssi oni ng - Funct i onal Per f or mance Test i ng.

m. Cont r ol s t est i ng pl an submi ssi on.

n. Cont r ol s t est i ng.

o. Per f or mance Ver i f i cat i on t est i ng.

p. Ot her syst ems t est i ng, i f r equi r ed.

q. Cont r act or ' s pr e- f i nal i nspect i on.

r . Cor r ect i on of punch l i s t f r om Cont r act or ' s pr e- f i nal i nspect i on.

s. Gover nment ' s pr e- f i nal i nspect i on.

t . Cor r ect i on of punch l i s t f r om Gover nment ' s pr e- f i nal i nspect i on.

u. Fi nal i nspect i on.

3. 3. 5 Gover nment Act i v i t i es

Show Gover nment and ot her agency act i v i t i es t hat coul d i mpact pr ogr ess.

These act i v i t i es i ncl ude, but ar e not l i mi t ed t o: appr oval s, accept ance, desi gn r evi ews, envi r onment al per mi t appr oval s by St at e r egul at or s, i nspect i ons, ut i l i t y t i e- i n, Gover nment Fur ni shed Equi pment ( GFE) and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.

3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y

Use t he act i v i t y codi ng st r uct ur e def i ned i n t he St andar d Dat a Exchange For mat ( SDEF) i n ER 1- 1- 11. Thi s exact st r uct ur e i s mandat or y. Devel op and assi gn al l Act i v i t y Codes t o act i v i t i es as det ai l ed her ei n. A t empl at e SDEF compat i bl e schedul e backup f i l e i s avai l abl e on t he QCS web si t e:

http://rms.usace.army.mil .

The SDEF f or mat i s as f ol l ows:

Field Act i v i t y Code Length Description

1 WRKP 3 Wor ker s per day

SECTI ON 01 32 01 Page 4

Field Act i v i t y Code Length Description

2 RESP 4 Responsi bl e par t y

3 AREA 4 Ar ea of wor k

4 MODF 6 Modi f i cat i on Number

5 BIDI 6 Bi d I t em ( CLI N)

6 PHAS 2 Phase of wor k

7 CATW 1 Cat egor y of wor k

8 FOW 20 Feat ur e of wor k*

* Some syst ems r equi r e t hat FEATURE OF WORK val ues be pl aced i n sever al act i v i t y code f i el ds. The not at i on shown i s f or Pr i maver a P6. Ref er t o t he speci f i c sof t war e gui del i nes wi t h r espect t o t he FEATURE OF WORK f i el d r equi r ement s.

3. 3. 6. 1 Wor ker s Per Day ( WRKP)

Assi gn Wor ker s per Day f or al l f i el d const r uct i on or di r ect wor k act i v i t i es, i f di r ect ed by t he Cont r act i ng Of f i cer . Wor ker s per day i s based on t he aver age number of wor ker s expect ed each day t o per f or m a t ask f or t he dur at i on of t hat act i v i t y .

3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)

Assi gn r esponsi bi l i t y code f or al l act i v i t i es t o t he Pr i me Cont r act or , Subcont r act or ( s) or Gover nment agency( i es) r esponsi bl e f or per f or mi ng t he activity.

a. Act i v i t i es coded wi t h a Gover nment Responsi bi l i t y code i ncl ude, but ar e not l i mi t ed t o: Gover nment appr oval s, Gover nment desi gn r evi ews, envi r onment al per mi t appr oval s by St at e r egul at or s, Gover nment Fur ni shed Pr oper t y/ Equi pment ( GFP) and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.

b. Act i v i t i es cannot have mor e t han one Responsi bi l i t y Code. Exampl es of accept abl e act i v i t y code val ues ar e: DOR ( f or t he desi gner of r ecor d) ;

ELEC ( f or t he el ect r i cal subcont r act or ) ; MECH ( f or t he mechani cal subcont r act or ) ; and GOVT ( f or USACE) .

3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)

Assi gn Wor k Ar ea code t o act i v i t i es based upon t he wor k ar ea i n whi ch t he act i v i t y occur s. Def i ne wor k ar eas based on r esour ce const r ai nt s or space const r ai nt s t hat woul d pr ecl ude a r esour ce, such as a par t i cul ar t r ade or cr af t wor k cr ew f r om wor ki ng i n mor e t han one wor k ar ea at a t i me due t o r est r ai nt s on r esour ces or space. Exampl es of Wor k Ar ea Codi ng i nc l ude di f f er ent ar eas wi t hi n a f l oor of a bui l di ng, di f f er ent f l oor s wi t hi n a bui l di ng, and di f f er ent bui l di ngs wi t hi n a compl ex of bui l di ngs.

Act i v i t i es cannot have mor e t han one Wor k Ar ea Code.

SECTI ON 01 32 01 Page 5

Not al l act i v i t i es ar e r equi r ed t o be Wor k Ar ea coded. A l ack of Wor k Ar ea codi ng i ndi cat es t he act i v i t y i s not r esour ce or space const r ai ned.

3. 3. 6. 4 Modi f i cat i on Number ( MODF)

Assi gn a Modi f i cat i on Number Code t o any act i v i t y or sequence of act i v i t i es added t o t he schedul e as a r esul t of a Cont r act Modi f i cat i on, when appr oved by Cont r act i ng Of f i cer . Key al l Code val ues t o t he Gover nment ' s modi f i cat i on number i ng syst em. An act i v i t y can have onl y one Modi f i cat i on Number Code.

3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )

Assi gn a Bi d I t em Code t o al l act i v i t i es usi ng t he Cont r act Li ne I t em Schedul e ( CLI N) t o whi ch t he act i v i t y bel ongs, even when an act i v i t y i s not cost l oaded. An act i v i t y can have onl y one BI DI Code.

3. 3. 6. 6 Phase of Wor k Codi ng ( PHAS)

Assi gn Phase of Wor k Code t o al l act i v i t i es. Exampl es of phase of wor k ar e pr ocur ement phase, and const r uct i on phase. Each act i v i t y can have onl y one Phase of Wor k code.

a. Code pr oposed f ast t r ack desi gn and const r uct i on phases pr oposed t o al l ow f i l t er i ng and or gani z i ng t he schedul e by f ast t r ack desi gn and const r uct i on packages.

b. I f t he cont r act speci f i es phasi ng wi t h separ at el y def i ned per f or mance per i ods, i dent i f y a Phase Code t o al l ow f i l t er i ng and or gani z i ng t he schedul e accor di ngl y.

3. 3. 6. 7 Cat egor y of Wor k Codi ng ( CATW)

Assi gn a Cat egor y of Wor k Code t o al l act i v i t i es. Cat egor y of Wor k Codes i ncl ude, but ar e not l i mi t ed t o per mi t s, const r uct i on submi t t al s, const r uct i on submi t t al , pr ocur ement , f abr i cat i on, weat her sensi t i ve i nst al l at i on, non- weat her sensi t i ve i nst al l at i on, st ar t - up, and t est i ng act i v i t i es. Each act i v i t y can have no mor e t han one Cat egor y of Wor k Code.

3. 3. 6. 8 Feat ur e of Wor k Codi ng ( FOW)

Assi gn a Feat ur e of Wor k Code t o appr opr i at e act i v i t i es based on t he Def i nabl e Feat ur e of Wor k t o whi ch t he act i v i t y bel ongs based on t he appr oved QC pl an.

An act i v i t y can have onl y one Feat ur e of Wor k Code.

3. 3. 7 Cont r act Mi l est ones and Const r ai nt s

Mi l est one act i v i t i es ar e t o be used f or s i gni f i cant pr oj ect event s i ncl udi ng, but not l i mi t ed t o, pr oj ect phasi ng, pr oj ect st ar t and end act i v i t i es, or i nt er i m compl et i on dat es. The use of ar t i f i c i al f l oat const r ai nt s such as " zer o f r ee f l oat " or " zer o t ot al f l oat " ar e pr ohi bi t ed.

Mandat or y const r ai nt s t hat i gnor e or ef f ect net wor k l ogi c ar e pr ohi bi t ed.

No const r ai ned dat es ar e al l owed i n t he schedul e ot her t han t hose speci f i ed her ei n. Submi t addi t i onal const r ai nt s t o t he Cont r act i ng Of f i cer f or

SECTI ON 01 32 01 Page 6 appr oval on a case by case basi s.

3. 3. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt

The f i r st act i v i t y i n t he pr oj ect schedul e must be a st ar t mi l est one t i t l ed " NTP Acknowl edged, " whi ch must have a " St ar t On" const r ai nt dat e equal t o t he dat e t hat t he NTP i s acknowl edged.

3. 3. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt

The l ast act i v i t y i n t he schedul e must be a f i ni sh mi l est one t i t l ed " End Project."

Const r ai n t he pr oj ect schedul e t o t he Cont r act Compl et i on Dat e i n such a way t hat i f t he schedul e cal cul at es an ear l y f i ni sh, t hen t he f l oat cal cul at i on f or " End Pr oj ect " mi l est one r ef l ect s posi t i ve f l oat on t he l ongest pat h. I f t he pr oj ect schedul e cal cul at es a l at e f i ni sh, t hen t he " End Pr oj ect " mi l est one f l oat cal cul at i on r ef l ect s negat i ve f l oat on t he l ongest pat h. The Gover nment i s under no obl i gat i on t o accel er at e Gover nment act i v i t i es t o suppor t a Cont r act or ' s ear l y compl et i on.

3. 3. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s

Const r ai n cont r act ual l y speci f i ed i nt er i m compl et i on dat es t o show negat i ve f l oat when t he cal cul at ed l at e f i ni sh dat e of t he l ast act i v i t y i n t hat phase i s l at er t han t he speci f i ed i nt er i m compl et i on dat e.

3. 3. 7. 3. 1 St ar t Phase

Use a st ar t mi l est one as t he f i r s t act i v i t y f or a pr oj ect phase. Cal l t he st ar t mi l est one " St ar t Phase X" wher e " X" r ef er s t o t he phase of wor k.

3. 3. 7. 3. 2 End Phase

Use a f i ni sh mi l est one as t he l ast act i v i t y f or a pr oj ect phase. Cal l t he f i ni sh mi l est one " End Phase X" wher e " X" r ef er s t o t he phase of wor k.

3. 3. 8 Calendars

Schedul e act i v i t i es on a Cal endar t o whi ch t he act i v i t y l ogi cal l y bel ongs.

Devel op cal endar s t o accommodat e any cont r act def i ned wor k per i od such as a 7- day cal endar f or Gover nment Accept ance act i v i t i es, concr et e cur e t i mes, et c. Devel op t he def aul t Cal endar t o mat ch t he physi cal wor k pl an wi t h non- wor k per i ods i dent i f i ed i ncl udi ng weekends and hol i days. Devel op sSeasonal Cal endar ( s) and assi gn t o seasonal l y af f ect ed act i v i t i es as applicable.

I f an act i v i t y i s weat her sensi t i ve i t shoul d be assi gned t o a cal endar showi ng non- wor k days on a mont hl y basi s, wi t h t he non- wor k days sel ect ed at r andom acr oss t he weeks of t he cal endar , usi ng t he ant i c i pat ed days pr ovi ded i n t he cont r act c l ause TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER. Assi gn non- wor k days over a seven- day week as weat her r ecor ds ar e compi l ed on seven- day weeks, whi ch may cause some of t he weat her r el at ed non- wor k days t o f al l on weekends.

3. 3. 9 Open Ended Logi c

Onl y t wo open ended act i v i t i es ar e al l owed: t he f i r st act i v i t y " NTP Acknowl edged" may have no pr edecessor l ogi c, and t he l ast act i v i t y - " End

SECTI ON 01 32 01 Page 7

Pr oj ect " may have no successor l ogi c.

Pr edecessor open ended l ogi c may be al l owed i n a t i me i mpact anal yses upon t he Cont r act i ng Of f i cer ' s appr oval .

3. 3. 10 Def aul t Pr ogr ess Dat a Di sal l owed

Act ual St ar t and Fi ni sh dat es must not aut omat i cal l y updat e wi t h def aul t mechani sms i ncl uded i n t he schedul i ng sof t war e. Updat i ng of t he per cent compl et e and t he r emai ni ng dur at i on of any act i v i t y must be i ndependent f unct i ons. Di sabl e pr ogr am f eat ur es t hat cal cul at e one of t hese par amet er s f r om t he ot her . Act i v i t y Act ual St ar t ( AS) and Act ual Fi ni sh ( AF) dat es assi gned dur i ng t he updat i ng pr ocess must mat ch t hose dat es pr ovi ded i n t he Cont r act or Qual i t y Cont r ol Repor t s. Fai l ur e t o document t he AS and AF dat es i n t he Dai l y Qual i t y Cont r ol r epor t wi l l r esul t i n di sappr oval of t he Cont r act or ' s schedul e.

3. 3. 11 Out - of - Sequence Pr ogr ess

Act i v i t i es t hat have pr ogr essed bef or e al l pr ecedi ng l ogi c has been sat i sf i ed ( Out - of - Sequence Pr ogr ess) wi l l be al l owed onl y on a case- by- case basi s subj ect t o appr oval by t he Cont r act i ng Of f i cer . Pr opose l ogi c cor r ect i ons t o el i mi nat e out of sequence pr ogr ess or j ust i f y not changi ng t he sequenci ng f or appr oval pr i or t o submi t t i ng an updat ed pr oj ect schedul e. Addr ess out of sequence pr ogr ess or l ogi c changes i n t he Nar r at i ve Repor t and i n t he per i odi c schedul e updat e meet i ngs.

3. 3. 12 Added and Del et ed Act i v i t i es

Do not del et e act i v i t i es f r om t he pr oj ect schedul e or add new act i v i t i es t o t he schedul e wi t hout appr oval f r om t he Cont r act i ng Of f i cer . Act i v i t y I D and descr i pt i on changes ar e consi der ed new act i v i t i es and cannot be changed wi t hout Cont r act i ng Of f i cer appr oval .

3. 3. 13 Or i gi nal Dur at i ons

Act i v i t y Or i gi nal Dur at i ons ( OD) must be r easonabl e t o per f or m t he wor k i t em. OD changes ar e pr ohi bi t ed unl ess j ust i f i cat i on i s pr ovi ded and appr oved by t he Cont r act i ng Of f i cer .

3. 3. 14 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps

Lags must be r easonabl e as det er mi ned by t he Gover nment and not used i n pl ace of r eal i st i c or i gi nal dur at i ons, must not be i n pl ace t o ar t i f i c i al l y absor b f l oat , or t o r epl ace pr oper schedul e l ogi c.

a. Leads ( negat i ve l ags) ar e pr ohi bi t ed.

b. St ar t t o Fi ni sh ( SF) r el at i onshi ps ar e pr ohi bi t ed.

3. 3. 15 Ret ai ned Logi c

Schedul e cal cul at i ons must r et ai n t he l ogi c bet ween pr edecessor s and successor s ( " r et ai ned l ogi c" mode) even when t he successor act i v i t y( s) st ar t s and t he pr edecessor act i v i t y( s) has not f i ni shed ( out - of - sequence pr ogr ess) . Sof t war e f eat ur es t hat i n ef f ect sever t he t i e bet ween pr edecessor and successor act i v i t i es when t he successor has st ar t ed and t he pr edecessor l ogi c i s not sat i sf i ed ( " pr ogr ess over r i de" ) ar e not be al l owed.

SECTI ON 01 32 01 Page 8

3. 3. 16 Per cent Compl et e

Updat e t he per cent compl et e f or each act i v i t y st ar t ed, based on t he r eal i st i c assessment of ear ned val ue. Act i v i t i es whi ch ar e compl et e but f or r emai ni ng mi nor punch l i s t wor k and whi ch do not r est r ai n t he i ni t i at i on of successor act i v i t i es may be decl ar ed 100 per cent compl et e t o al l ow f or pr oper schedul e management .

3. 3. 17 Remai ni ng Dur at i on

Updat e t he r emai ni ng dur at i on f or each act i v i t y based on t he number of est i mat ed wor k days i t wi l l t ake t o compl et e t he act i v i t y. Remai ni ng dur at i on may not mat hemat i cal l y cor r el at e wi t h per cent age f ound under par agr aph ent i t l ed Per cent Compl et e.

3. 3. 18 Cost Loadi ng of Cl oseout Act i v i t i es

Cost l oad t he " Cor r ect i on of punch l i s t f r om Gover nment pr e- f i nal i nspect i on" act i v i t y( i es) not l ess t han 1 per cent of t he pr esent cont r act val ue. Act i v i t y( i es) may be decl ar ed 100 per cent compl et e upon t he Gover nment ' s ver i f i cat i on of compl et i on and cor r ect i on of al l punch l i s t wor k i dent i f i ed dur i ng Gover nment pr e- f i nal i nspect i on( s) .

3. 3. 18. 1 As- Bui l t Dr awi ngs

I f t her e i s no separ at e cont r act l i ne i t em ( CLI N) f or as- bui l t dr awi ngs, cost l oad t he " Submi ssi on and appr oval of as- bui l t dr awi ngs" act i v i t y not l ess t han $35, 000 or 1 per cent of t he pr esent cont r act val ue, whi ch ever i s gr eat er , up t o $200, 000. Act i v i t y wi l l be decl ar ed 100 per cent compl et e upon t he Gover nment ' s appr oval .

3. 3. 18. 2 O & M Manual s

Cost l oad t he " Submi ssi on and appr oval of O & M manual s" act i v i t y not l ess t han $20, 000. Act i v i t y wi l l be decl ar ed 100 per cent compl et e upon t he Gover nment ' s appr oval of al l O & M manual s.

3. 3. 19 Ant i c i pat ed Adver se Weat her

Par agr aph appl i cabl e t o cont r act s wi t h c l ause ent i t l ed TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER. Ref l ect t he number of ant i c i pat ed adver se weat her del ays al l ocat ed t o a weat her sensi t i ve act i v i t y i n t he act i v i t y ' s calendar.

3. 3. 20 Ear l y Compl et i on Schedul e and t he Ri ght t o Fi ni sh Ear l y

An Ear l y Compl et i on Schedul e i s an I ni t i al Pr oj ect Schedul e ( I PS) t hat i ndi cat es al l scope of t he r equi r ed cont r act wor k wi l l be compl et ed bef or e t he cont r act ual l y r equi r ed compl et i on dat e.

a. No I PS i ndi cat i ng an Ear l y Compl et i on wi l l be accept ed wi t hout bei ng f ul l y r esour ce- l oaded ( i ncl udi ng cr ew si zes and manhour s) and t he Gover nment agr eei ng t hat t he schedul e i s r easonabl e and achi evabl e.

b. The Gover nment i s under no obl i gat i on t o accel er at e wor k i t ems i t i s r esponsi bl e f or t o ensur e t hat t he ear l y compl et i on i s met nor i s i t r esponsi bl e t o modi f y i ncr ement al f undi ng ( i f appl i cabl e) f or t he pr oj ect t o meet t he cont r act or ' s accel er at ed wor k.

SECTI ON 01 32 01 Page 9

3. 4 PROJECT SCHEDULE SUBMI SSI ONS

Pr ovi de t he submi ssi ons as descr i bed bel ow. The dat a CD/ DVD, r epor t s, and net wor k di agr ams r equi r ed f or each submi ssi on ar e cont ai ned i n par agr aph SUBMI SSI ON REQUI REMENTS. I f t he Cont r act or f ai l s or r ef uses t o f ur ni sh t he i nf or mat i on and schedul e updat es as set f or t h her ei n, t hen t he Cont r act or wi l l be deemed not t o have pr ovi ded an est i mat e upon whi ch a pr ogr ess payment can be made.

Revi ew comment s made by t he Gover nment on t he schedul e( s) do not r el i eve t he Cont r act or f r om compl i ance wi t h r equi r ement s of t he Cont r act Document s.

3. 4. 1 Pr el i mi nar y Pr oj ect Schedul e Submi ssi on

Wi t hi n 15 cal endar days af t er t he NTP i s acknowl edged submi t t he Pr el i mi nar y Pr oj ect Schedul e def i ni ng t he pl anned oper at i ons det ai l ed f or t he f i r st 90 cal endar days f or appr oval . The appr oved Pr el i mi nar y Pr oj ect Schedul e wi l l be used f or payment pur poses not t o exceed 90 cal endar days af t er NTP. Compl et el y cost l oad t he Pr el i mi nar y Pr oj ect Schedul e t o bal ance t he cont r act awar d CLI NS shown on t he Pr i ce Schedul e. The Pr el i mi nar y Pr oj ect Schedul e may be summar y i n nat ur e f or t he r emai ni ng per f or mance per i od. I t must be ear l y st ar t and l at e f i ni sh const r ai ned and l ogi cal l y t i ed as speci f i ed. The Pr el i mi nar y Pr oj ect Schedul e f or ms t he basi s f or t he I ni t i al Pr oj ect Schedul e speci f i ed her ei n and must i ncl ude al l of t he r equi r ed pl an and pr ogr am pr epar at i ons, submi ssi ons and appr oval s i dent i f i ed i n t he cont r act ( f or exampl e, Qual i t y Cont r ol Pl an, Saf et y Pl an, and Envi r onment al Pr ot ect i on Pl an) as wel l as desi gn act i v i t i es, pl anned submi ssi ons of al l ear l y desi gn packages, per mi t t i ng act i v i t i es, desi gn r evi ew conf er ence act i v i t i es, and ot her non- const r uct i on act i v i t i es i nt ended t o occur wi t hi n t he f i r st 90 cal endar days. Gover nment accept ance of t he associ at ed desi gn package( s) and al l ot her speci f i ed Pr ogr am and Pl an appr oval s must occur pr i or t o any pl anned const r uct i on act i v i t i es. Act i v i t y code any act i v i t i es t hat ar e summar y i n nat ur e af t er t he f i r st 90 cal endar days wi t h Bi d I t em ( CLI N) code ( BI DI ) , Responsi bi l i t y Code ( RESP) and Feat ur e of Wor k code ( FOW) .

3. 4. 2 I ni t i al Pr oj ect Schedul e Submi ssi on

Submi t t he I ni t i al Pr oj ect Schedul e f or appr oval wi t hi n 42 cal endar days af t er not i ce t o pr oceed i s i ssued. The schedul e must demonst r at e a r easonabl e and r eal i st i c sequence of act i v i t i es whi ch r epr esent al l wor k t hr ough t he ent i r e cont r act per f or mance per i od. No payment wi l l be made f or wor k i t ems not f ul l y det ai l ed i n t he Pr oj ect Schedul e.

3. 4. 2. 1 Desi gn Package Schedul e Submi ssi on

Wi t h each desi gn package submi t t ed t o t he Gover nment , submi t a f r agnet schedul e ext r act ed f r om t he t hen cur r ent Pr el i mi nar y, I ni t i al or Updat ed schedul e whi ch cover s t he act i v i t i es associ at ed wi t h t hat Desi gn Package i ncl udi ng const r uct i on, pr ocur ement and per mi t t i ng act i v i t i es.

3. 4. 3 Per i odi c Schedul e Updat es

Updat e t he Pr oj ect Schedul e on a r egul ar basi s, mont hl y at a mi ni mum.

Pr ovi de a dr af t Per i odi c Schedul e Updat e f or r evi ew at t he schedul e updat e meet i ngs as pr escr i bed i n t he par agr aph PERI ODI C SCHEDULE UPDATE MEETI NGS.

These updat es wi l l enabl e t he Gover nment t o assess Cont r act or ' s pr ogr ess.

a. Updat e i nf or mat i on i ncl udi ng Act ual St ar t Dat es ( AS) , Act ual Fi ni sh

SECTI ON 01 32 01 Page 10

Dat es ( AF) , Remai ni ng Dur at i ons ( RD) , and Per cent Compl et e i s subj ect t o t he appr oval of t he Gover nment at t he meet i ng.

b. AS and AF dat es must mat ch t he dat e( s) r epor t ed on t he Cont r act or ' s Qual i t y Cont r ol Repor t f or an act i v i t y st ar t or f i ni sh.

3. 5 SUBMI SSI ON REQUI REMENTS

Submi t t he f ol l owi ng i t ems f or t he Pr el i mi nar y Schedul e, I ni t i al Schedul e, and ever y Per i odi c Schedul e Updat e t hr oughout t he l i f e of t he pr oj ect :

3. 5. 1 Dat a CD/ DVDs

Pr ovi de t wo set s of dat a CD/ DVDs cont ai ni ng t he cur r ent pr oj ect schedul e and al l pr evi ousl y submi t t ed schedul es i n t he f or mat of t he schedul i ng sof t war e ( e. g. . xer ) . Al so i ncl ude on t he dat a CD/ DVDs t he Nar r at i ve Repor t and al l r equi r ed Schedul e Repor t s. Label each CD/ DVD i ndi cat i ng t he t ype of schedul e ( Pr el i mi nar y, I ni t i al , Updat e) , f ul l cont r act number , Dat a Dat e and f i l e name. Each schedul e must have a uni que f i l e name and use pr oj ect speci f i c set t i ngs.

3. 5. 2 Nar r at i ve Repor t

Pr ovi de a Nar r at i ve Repor t wi t h each schedul e submi ssi on. The Nar r at i ve Repor t i s expect ed t o communi cat e t o t he Gover nment t he t hor ough anal ysi s of t he schedul e out put and t he pl ans t o compensat e f or any pr obl ems, ei t her cur r ent or pot ent i al , whi ch ar e r eveal ed t hr ough t hat anal ysi s. I ncl ude t he f ol l owi ng i nf or mat i on as mi ni mum i n t he Nar r at i ve Repor t :

a. I dent i f y and di scuss t he wor k schedul ed t o st ar t i n t he next updat e period.

b. A descr i pt i on of act i v i t i es al ong t he t wo most cr i t i cal pat hs wher e t he t ot al f l oat i s l ess t han or equal t o 20 wor k days.

c. A descr i pt i on of cur r ent and ant i c i pat ed pr obl em ar eas or del ayi ng f act or s and t hei r i mpact and an expl anat i on of cor r ect i ve act i ons t aken or r equi r ed t o be t aken.

d. I dent i f y and expl ai n why act i v i t i es based on t hei r cal cul at ed l at e dat es shoul d have ei t her st ar t ed or f i ni shed dur i ng t he updat e per i od but di d not .

e. I dent i f y and di scuss al l schedul e changes by act i v i t y I D and act i v i t y name i ncl udi ng what speci f i cal l y was changed and why t he change was needed. I ncl ude at a mi ni mum new and del et ed act i v i t i es, l ogi c changes, dur at i on changes, cal endar changes, l ag changes, r esour ce changes, and act ual st ar t and f i ni sh dat e changes.

f . I dent i f y and di scuss out - of - sequence wor k.

3. 5. 3 Schedul e Repor t s

The f or mat , f i l t er i ng, or gani z i ng and sor t i ng f or each schedul e r epor t wi l l be as di r ect ed by t he Cont r act i ng Of f i cer . Typi cal l y , r epor t s cont ai n Act i v i t y Number s, Act i v i t y Descr i pt i on, Or i gi nal Dur at i on, Remai ni ng Dur at i on, Ear l y St ar t Dat e, Ear l y Fi ni sh Dat e, Lat e St ar t Dat e, Lat e Fi ni sh Dat e, Tot al Fl oat , Act ual St ar t Dat e, Act ual Fi ni sh Dat e, and Per cent Compl et e. Pr ovi de t he r epor t s el ect r oni cal l y i n . pdf f or mat . Pr ovi de 3

SECTI ON 01 32 01 Page 11 set ( s) of har dcopy r epor t s. The f ol l owi ng l i s t s t ypi cal r epor t s t hat wi l l be r equest ed:

3. 5. 3. 1 Act i v i t y Repor t

Li st of al l act i v i t i es sor t ed accor di ng t o act i v i t y number .

3. 5. 3. 2 Logi c Repor t

Li st of det ai l ed pr edecessor and successor act i v i t i es f or ever y act i v i t y i n ascendi ng or der by act i v i t y number .

3. 5. 3. 3 Tot al Fl oat Repor t

A l i s t of al l i ncompl et e act i v i t i es sor t ed i n ascendi ng or der of t ot al f l oat . Li st act i v i t i es whi ch have t he same amount of t ot al f l oat i n ascendi ng or der of Ear l y St ar t Dat es. Do not show compl et ed act i v i t i es on t hi s r epor t .

3. 5. 3. 4 Ear ni ngs Repor t by CLI N

A compi l at i on of t he Tot al Ear ni ngs on t he pr oj ect f r om t he NTP t o t he dat a dat e, whi ch r ef l ect s t he ear ni ngs of act i v i t i es based on t he agr eement s made i n t he schedul e updat e meet i ng def i ned her ei n. Pr ovi ded a compl et e schedul e updat e has been f ur ni shed, t hi s r epor t ser ves as t he basi s of det er mi ni ng pr ogr ess payment s. Gr oup act i v i t i es by CLI N number and sor t by act i v i t y number . Pr ovi de a t ot al CLI N per cent ear ned val ue, CLI N per cent compl et e, and pr oj ect per cent compl et e. The pr i nt ed r epor t must cont ai n t he f ol l owi ng f or each act i v i t y: t he Act i v i t y Number , Act i v i t y Descr i pt i on, Or i gi nal Budget ed Amount , Ear ni ngs t o Dat e, Ear ni ngs t hi s per i od, Tot al Quant i t y, Quant i t y t o Dat e, and Per cent Compl et e ( based on cost ) .

3. 5. 3. 5 Schedul e Log

Pr ovi de a Schedul i ng/ Level i ng Repor t gener at ed f r om t he cur r ent pr oj ect schedul e bei ng submi t t ed.

3. 5. 4 Net wor k Di agr am

The Net wor k Di agr am i s r equi r ed f or t he Pr el i mi nar y, I ni t i al and Per i odi c Updat es. Depi ct and di spl ay t he or der and i nt er dependence of act i v i t i es and t he sequence i n whi ch t he wor k i s t o be accompl i shed. The Cont r act i ng Of f i cer wi l l use, but i s not l i mi t ed t o, t he f ol l owi ng condi t i ons t o r evi ew compl i ance wi t h t hi s par agr aph:

3. 5. 4. 1 Cont i nuous Fl ow

Show a cont i nuous f l ow f r om l ef t t o r i ght wi t h no ar r ows f r om r i ght t o l ef t . Show t he act i v i t y number , descr i pt i on, dur at i on, and est i mat ed ear ned val ue on t he di agr am.

3. 5. 4. 2 Pr oj ect Mi l est one Dat es

Show dat es on t he di agr am f or st ar…