Attachment K Pricing Schedule
PRICING SCHEDULE
Hamilton City Phase 1 Revegetation
Qty UoM Unit Price Extended Price Title Task 1 Pre Work Submittals
1 Schedule 1 Job 1 Job 1 Job 1 Job 1 Job 1 Job
2 Contractor Quality Control Plan 3 Environmental Protection Plan 4 Accident Prevention Plan 5 Performance Work Plan 6 Irrigation System Design 7 SWPPP And Associated Documentation 1 Job
Task 2 Planting Development 8 Collect Propagules 1 Job
1 Job 1 Job
1 Job 1 Job 1 Job
1 Job 1 Job 1 Job 1 Job 1 Job 1 Job
1 Job
9 Plant Propagation 10 Nursery Growing Task 3 Pre-Installation Weed Control 11 Pre Installation Weed Control Spraying 12 Pre-Installation Mowing 13 Pre-Installation Road Maintenance Task 4 Planting Supplies 14 Irrigation Drip Line Procurement 15 Plant Location Flag Procurement 16 Browse Guard Procurement 17 Bamboo Stake Procurement 18 Native Grass Seed procurement 19 Nursery Growing 2017 Option Task 1 Site Prep 20 Facility Set Up 21 BMP Installation 1 Job
NPDES Monitoring And Reporting And BMP Maintenance 1 Job
1 Job 23 Pre Installation Weed Control Spraying 24 Orchard Removal 1 Job
Orchard Removal, Soil Disturbance Avoidance Area 1 Job
1 Job 26 Soil Prep 27 Road Maintenance 1 Job
Water Elderberry Transplants 1 Job 1 Job Weed Elderberry Transplants
Option Task 2 Installation 28 Develop Irrigation Water Source 1 Job
Installing Underground Irrigation Infrastructure 1 Job
1 Job 1 Job 1 Job 1 Job
30 Planting Zone Layout 31 Installing Flexible Irrigation Lines 32 Planting Tile Layout 33 Planting Location Layout 34 Plant Delivery 1 Job
Qty UoM Unit Price Extended Price 1 Job 1 Job 1 Job 1 Job 1 Job
Title 35 Plant Deepot 40 Container Plants 36 Plant Treepot 4 Container Plants 37 Plant Treebands 38 Irrigation During The Installation Period 39 As Built Plans Option Task 3 Establishment Season 1
Watering In The First Year Of Establishment 1 Job
Weeding Of Plant Locations In The First Year Of Establishment 1 Job
1 Job 1 Job 1 Job
42 1st Herbicide Application, Rows, 43 2nd Herbicide Application, Rows, 44 3rd Herbicide Application, Rows 45 4th Herbicide Application, Rows 1 Job
1st Herbicide Application, Middles, Grasslands 1 Job
2nd Herbicide Application, Middles, Grasslands 1 Job
Road Maintenance During First Establishment Year 1 Job
49 Infrastructure Maintenance 1 Job
NPDES Monitoring And Reporting And BMP Maintenance 1 Job
1 Job 1 Job 1 Job
51 Records And Reports 52 Water Elderberry Transplants 53 Weed Elderberry Transplants 54 Native Grass Seed Procurement, 2017 Option Task 4 Establishment Season 2
Watering In The Second Year Of Establishment 1 Job
Weeding Of Plant Locations In The Second Year Of Establishment 1 Job
Spot Spraying In The Second Year Of Establishment 1 Job
1 Job 1 Job
58 1st Herbicide Application, Rows 59 2nd Herbicide Application, Rows 60 3rd Herbicide Application, Rows 1 Job
1st Herbicide Application, Middles, Grasslands 1 Job
2nd Herbicide Application, Middles, Grasslands 1 Job
Road Maintenance During The Second Establishment Year 1 Job
Infrastructure Maintenance During The Second Year Of Establishment 1 Job
NPDES Monitoring And Reporting And BMP Maintenance 1 Job
Qty UoM Unit Price Extended Price Title 66 Records And Reports 1 Job
Water Elderberry Transplants 1 Job 1 Job 1 Job
1 Job 1 Job 1 Job
Weed Elderberry Transplants 67 Native Grass Seed Procurement, 2018 Option Task 5 Native Grass Installation 68 Pre-Seeding Herbicide Application
2nd Pre-Seeding Herbicide Application 70 Drill Seeding Native Grass Seed Option Task 6 Establishment Season 3
Watering In The Third Year Of Establishment 1 Job
Spot Spraying In The Third Year Of Establishment 1 Job
1 Job 73 1st Herbicide Application, , Rows 74 Optional 1st Mowing, Middles, Grasslands 1 Job
1st Herbicide Application, Middles, Grasslands 1 Job
2nd Herbicide Application, Middles, Grasslands 1 Job
77 Reseeding 1 Job
Road Maintenance During The Third Establishment Year 1 Job
Infrastructure Maintenance During The Third Establishment Year 1 Job
NPDES Monitoring And Reporting And BMP Maintenance 1 Job
1 Job 1 Job 1 Job
81 Well Abandonment Staging Area Removal 83 Site Clean Up 84 Records And Reports 1 Job
| Table of Contents |
| Part 1 – GENERAL |
| Part 2 – PRODUCTS |
| Part 3 – EXECUTION |
| Part 1 - GENERAL |
| Part 2 – PRODUCTS |
| Part 3 – EXECUTION |
| TEMPORARY STORM WATER POLLUTION CONTROL RISK LEVEL 2 |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 GENERAL REQUIREMENTS |
| 1.4.1 Required Stormwater Meetings |
| 1.3.1 TRAINING REQUIREMENTS |
| 1.3.1.1 Qualified SWPPP Developer (QSD) |
| 1.3.1.2 Qualified SWPPP Practitioner (QSP) |
1.3.2 Additional Requirements
| 1.4 DEVELOPMENT AND DESIGN |
| 1.4.1 SWPPP Development |
| 1.4.1.1 Construction Site Management Plan (CSMP) |
| 1.4.1.2 Non-Visible Pollutants |
| 1.4.1.3 Best Management Practices (BMPs) |
1.4.2 Permit Registration Documents (PRDs)
| PART 2 PRODUCTS |
| 2.1 REQUIRED BEST MANAGEMENT PRACTICES |
| 2.1.1 Erosion Control BMPs |
| 2.1.1.1 Scheduling |
| 2.1.1.2 Preservation Of Existing Vegetation |
| 2.1.1.3 Hydraulic Mulch |
| 2.1.1.4 Hydroseeding |
| 2.1.1.5 Soil Binders |
| 2.1.1.6 Straw Mulch |
| 2.1.1.7 Geotextiles And Mats |
| 2.1.2 Sediment Control BMPs |
| 2.1.2.1 Silt Fence |
| 2.1.2.2 Sediment Basin |
| 2.1.2.2 Fiber Rolls |
| 2.1.2.3 Street Sweeping And Vacuuming |
| 2.1.2.4 Storm Drain Inlet Protection |
| 2.1.3 Wind Erosion Control BMP |
| 2.1.4 Tracking Control BMPs |
| 2.1.4.1 Stabilized Construction Entrance/Exit |
| 2.1.5 Non-Stormwater Management BMPs |
| 2.1.5.1 Illicit Connection/Illegal Discharge Detection And Reporting |
| 2.1.5.2 Vehicle And Equipment Cleaning |
| 2.1.5.3 Vehicle And Equipment Fueling |
| 2.1.5.4 Vehicle And Equipment Maintenance |
| 2.1.6 Waste Management And Materials Pollution Control BMPs |
| 2.1.6.1 Material Delivery And Storage |
| 2.1.6.2 Material Use |
| 2.1.6.3 Stockpile Management |
| 2.1.6.4 Spill Prevention And Control |
| 2.1.6.5 Sanitary/Septic Waste Management |
| 2.2 AVAILABLE BEST MANAGEMENT PRACTICES |
| 2.3 ON-SITE RAIN GAUGE |
| PART 3 EXECUTION |
| 3.1 MOBILIZATION AND DEMOBILIZATION |
| 3.1.1 BMP Installation And Removal |
| 3.1.2 Termination Of SWPPP And CSMP Responsibilities |
| 3.1.3 Records |
| 3.2 MAINTENANCE, MONITORING AND INSPECTIONS |
| 3.2.1 SWPPP And Amendments |
| 3.2.2 Rain Event Action Plans (REAPs) |
| 3.2.3 Monitoring And Inspections |
| 3.2.3.1 Inactive Construction Inspections |
| 3.2.4 Correcting Deficiencies |
| 3.2.5 Non-Storm Water Discharge Sampling |
| 3.2.6 Rain Event Sampling |
| 3.2.6.2 Exceedance Report |
GRASS SEEDING AND EROSION CONTROL
| Table of Contents |
| Part 1 – GENERAL |
| Part 2 – PRODUCTS |
| Part 3 – EXECUTION |
| GRASS SEEDING AND EROSION CONTROL |
| Part 1 – GENERAL |
| Part 2 – PRODUCTS |
| Part 3 – EXECUTION |
| Section 32 07 07 |
| RECORDS AND REPORTS |
| Table of Contents |
| Part 1 – GENERAL |
| Part 2 – PRODUCTS (Not Applicable) |
| Part 3 – EXECUTION |
| Section 32 07 07 |
| Part 1 – GENERAL |
| Part 2 – PRODUCTS (Not Applicable) |
| Part 3 – EXECUTION |
| OUTLINE |
| plant sched 6.pdf |
| plant schedule |
| 03 Attachment I HC ph1 reveg Submittal Register.pdf |
| Submittal Register |