attachment_K_PRICING_SCHEDULE.pdf

PDF 190 KB Posted

Attached to
Hamilton City Re-Vegitation
Solicitation number
W91238-16-R-0065
Issued by

About this file

Attachment K

View the file

Other files

File Type Posted
attachment_G_grass_seeding_32_93_33.pdf PDF
attachment_F_Temp_Storm_Water_01_57_23_02.pdf PDF
attachment_J_TARGET_PROJECT_SCHEDULE.pdf PDF
attachment_E_plant_acquisition_32_93_15.pdf PDF
Exhibit_A-Ph1_revegetation_plans.pdf PDF
attachment_C_plant_list.pdf PDF
attachment_D_plant_schedule_08-8-16.pdf PDF
attachment_H_Records_and_Reports_32_07_07.pdf PDF
attachment_A_PWRS.pdf PDF
attachment_B_QASP.pdf PDF
QA_W91238-16-R-0065_Hamilton_City_Reveg.pdf PDF
W91238-16-R-0065_Amendment_0004.pdf PDF
attachment_I_SUBMITTAL_REGISTER.pdf PDF
A07.6_W91238-16-R-0065-0003_Amendment_to_Solicitation.pdf PDF
50-04-6260HC_Ph1_revegetation_plans_75ppi_complete.pdf PDF
A07.6_W91238-16-R-0065-0002_Amendment_to_Solicitation.pdf PDF
A07.6_W91238-16-R-0065-0002_Amendment_to_Solicitation.pdf PDF
A07.6_W91238-16-R-0065-0001_Amendment_to_Solicitation.pdf PDF
03_Exhibit_A_Plans.pdf PDF
A07.6_Attachment_C_PLANT_LIST.pdf PDF
A07.6_Attachment_D_PLANTING_SCHEDULE.pdf PDF
A07.6_Attachment_A_PERFORMANCE_OF_WORK_REQUIREMENTS_SUMMARY.pdf PDF
A07.6_Attachment_G_GRASS_SEEDING_AND_EROSION_CONTROL.pdf PDF
A07.6_Attachment_H_RECORDS_AND_REPORTS.pdf PDF
A07.6_Attachment_E_PLANT_ACQUISITION.pdf PDF
A07.6_Attachment_I_SUBMITTAL_REGISTER.pdf PDF
A07.6_Attachment_J_TARGET_PROJECT_SCHEDULE.pdf PDF
A07.6_Attachment_B_QASP.pdf PDF
A07.6_Attachment_F_TEMPORARY_STORM_WATER_POLLUTION_CONTROL.pdf PDF
A07.6_Attachment_K_PRICING_SCHEDULE.pdf PDF
A07.6_W91238-16-R-0065_Final_Solicitation.pdf PDF
A01.16_-_Synopsis.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment K Pricing Schedule

PRICING SCHEDULE

Hamilton City Phase 1 Revegetation

Qty UoM Unit Price Extended Price Title Task 1 Pre Work Submittals

1 Schedule 1 Job 1 Job 1 Job 1 Job 1 Job 1 Job

2 Contractor Quality Control Plan 3 Environmental Protection Plan 4 Accident Prevention Plan 5 Performance Work Plan 6 Irrigation System Design 7 SWPPP And Associated Documentation 1 Job

Task 2 Planting Development 8 Collect Propagules 1 Job

1 Job 1 Job

1 Job 1 Job 1 Job

1 Job 1 Job 1 Job 1 Job 1 Job 1 Job

1 Job

9 Plant Propagation 10 Nursery Growing Task 3 Pre-Installation Weed Control 11 Pre Installation Weed Control Spraying 12 Pre-Installation Mowing 13 Pre-Installation Road Maintenance Task 4 Planting Supplies 14 Irrigation Drip Line Procurement 15 Plant Location Flag Procurement 16 Browse Guard Procurement 17 Bamboo Stake Procurement 18 Native Grass Seed procurement 19 Nursery Growing 2017 Option Task 1 Site Prep 20 Facility Set Up 21 BMP Installation 1 Job

NPDES Monitoring And Reporting And BMP Maintenance 1 Job

1 Job 23 Pre Installation Weed Control Spraying 24 Orchard Removal 1 Job

Orchard Removal, Soil Disturbance Avoidance Area 1 Job

1 Job 26 Soil Prep 27 Road Maintenance 1 Job

Water Elderberry Transplants 1 Job 1 Job Weed Elderberry Transplants

Option Task 2 Installation 28 Develop Irrigation Water Source 1 Job

Installing Underground Irrigation Infrastructure 1 Job

1 Job 1 Job 1 Job 1 Job

30 Planting Zone Layout 31 Installing Flexible Irrigation Lines 32 Planting Tile Layout 33 Planting Location Layout 34 Plant Delivery 1 Job

Qty UoM Unit Price Extended Price 1 Job 1 Job 1 Job 1 Job 1 Job

Title 35 Plant Deepot 40 Container Plants 36 Plant Treepot 4 Container Plants 37 Plant Treebands 38 Irrigation During The Installation Period 39 As Built Plans Option Task 3 Establishment Season 1

Watering In The First Year Of Establishment 1 Job

Weeding Of Plant Locations In The First Year Of Establishment 1 Job

1 Job 1 Job 1 Job

42 1st Herbicide Application, Rows, 43 2nd Herbicide Application, Rows, 44 3rd Herbicide Application, Rows 45 4th Herbicide Application, Rows 1 Job

1st Herbicide Application, Middles, Grasslands 1 Job

2nd Herbicide Application, Middles, Grasslands 1 Job

Road Maintenance During First Establishment Year 1 Job

49 Infrastructure Maintenance 1 Job

NPDES Monitoring And Reporting And BMP Maintenance 1 Job

1 Job 1 Job 1 Job

51 Records And Reports 52 Water Elderberry Transplants 53 Weed Elderberry Transplants 54 Native Grass Seed Procurement, 2017 Option Task 4 Establishment Season 2

Watering In The Second Year Of Establishment 1 Job

Weeding Of Plant Locations In The Second Year Of Establishment 1 Job

Spot Spraying In The Second Year Of Establishment 1 Job

1 Job 1 Job

58 1st Herbicide Application, Rows 59 2nd Herbicide Application, Rows 60 3rd Herbicide Application, Rows 1 Job

1st Herbicide Application, Middles, Grasslands 1 Job

2nd Herbicide Application, Middles, Grasslands 1 Job

Road Maintenance During The Second Establishment Year 1 Job

Infrastructure Maintenance During The Second Year Of Establishment 1 Job

NPDES Monitoring And Reporting And BMP Maintenance 1 Job

Qty UoM Unit Price Extended Price Title 66 Records And Reports 1 Job

Water Elderberry Transplants 1 Job 1 Job 1 Job

1 Job 1 Job 1 Job

Weed Elderberry Transplants 67 Native Grass Seed Procurement, 2018 Option Task 5 Native Grass Installation 68 Pre-Seeding Herbicide Application

2nd Pre-Seeding Herbicide Application 70 Drill Seeding Native Grass Seed Option Task 6 Establishment Season 3

Watering In The Third Year Of Establishment 1 Job

Spot Spraying In The Third Year Of Establishment 1 Job

1 Job 73 1st Herbicide Application, , Rows 74 Optional 1st Mowing, Middles, Grasslands 1 Job

1st Herbicide Application, Middles, Grasslands 1 Job

2nd Herbicide Application, Middles, Grasslands 1 Job

77 Reseeding 1 Job

Road Maintenance During The Third Establishment Year 1 Job

Infrastructure Maintenance During The Third Establishment Year 1 Job

NPDES Monitoring And Reporting And BMP Maintenance 1 Job

1 Job 1 Job 1 Job

81 Well Abandonment Staging Area Removal 83 Site Clean Up 84 Records And Reports 1 Job

Table of Contents
Part 1 – GENERAL
Part 2 – PRODUCTS
Part 3 – EXECUTION
Part 1 - GENERAL
Part 2 – PRODUCTS
Part 3 – EXECUTION
TEMPORARY STORM WATER POLLUTION CONTROL RISK LEVEL 2
PART 1 GENERAL
1.1 SUMMARY
1.1 REFERENCES
1.2 SUBMITTALS
1.3 GENERAL REQUIREMENTS
1.4.1 Required Stormwater Meetings
1.3.1 TRAINING REQUIREMENTS
1.3.1.1 Qualified SWPPP Developer (QSD)
1.3.1.2 Qualified SWPPP Practitioner (QSP)

1.3.2 Additional Requirements

1.4 DEVELOPMENT AND DESIGN
1.4.1 SWPPP Development
1.4.1.1 Construction Site Management Plan (CSMP)
1.4.1.2 Non-Visible Pollutants
1.4.1.3 Best Management Practices (BMPs)

1.4.2 Permit Registration Documents (PRDs)

PART 2 PRODUCTS
2.1 REQUIRED BEST MANAGEMENT PRACTICES
2.1.1 Erosion Control BMPs
2.1.1.1 Scheduling
2.1.1.2 Preservation Of Existing Vegetation
2.1.1.3 Hydraulic Mulch
2.1.1.4 Hydroseeding
2.1.1.5 Soil Binders
2.1.1.6 Straw Mulch
2.1.1.7 Geotextiles And Mats
2.1.2 Sediment Control BMPs
2.1.2.1 Silt Fence
2.1.2.2 Sediment Basin
2.1.2.2 Fiber Rolls
2.1.2.3 Street Sweeping And Vacuuming
2.1.2.4 Storm Drain Inlet Protection
2.1.3 Wind Erosion Control BMP
2.1.4 Tracking Control BMPs
2.1.4.1 Stabilized Construction Entrance/Exit
2.1.5 Non-Stormwater Management BMPs
2.1.5.1 Illicit Connection/Illegal Discharge Detection And Reporting
2.1.5.2 Vehicle And Equipment Cleaning
2.1.5.3 Vehicle And Equipment Fueling
2.1.5.4 Vehicle And Equipment Maintenance
2.1.6 Waste Management And Materials Pollution Control BMPs
2.1.6.1 Material Delivery And Storage
2.1.6.2 Material Use
2.1.6.3 Stockpile Management
2.1.6.4 Spill Prevention And Control
2.1.6.5 Sanitary/Septic Waste Management
2.2 AVAILABLE BEST MANAGEMENT PRACTICES
2.3 ON-SITE RAIN GAUGE
PART 3 EXECUTION
3.1 MOBILIZATION AND DEMOBILIZATION
3.1.1 BMP Installation And Removal
3.1.2 Termination Of SWPPP And CSMP Responsibilities
3.1.3 Records
3.2 MAINTENANCE, MONITORING AND INSPECTIONS
3.2.1 SWPPP And Amendments
3.2.2 Rain Event Action Plans (REAPs)
3.2.3 Monitoring And Inspections
3.2.3.1 Inactive Construction Inspections
3.2.4 Correcting Deficiencies
3.2.5 Non-Storm Water Discharge Sampling
3.2.6 Rain Event Sampling
3.2.6.2 Exceedance Report

GRASS SEEDING AND EROSION CONTROL

Table of Contents
Part 1 – GENERAL
Part 2 – PRODUCTS
Part 3 – EXECUTION
GRASS SEEDING AND EROSION CONTROL
Part 1 – GENERAL
Part 2 – PRODUCTS
Part 3 – EXECUTION
Section 32 07 07
RECORDS AND REPORTS
Table of Contents
Part 1 – GENERAL
Part 2 – PRODUCTS (Not Applicable)
Part 3 – EXECUTION
Section 32 07 07
Part 1 – GENERAL
Part 2 – PRODUCTS (Not Applicable)
Part 3 – EXECUTION
OUTLINE
plant sched 6.pdf
plant schedule
03 Attachment I HC ph1 reveg Submittal Register.pdf
Submittal Register

File details come from the government source that posted it. Updated .