Conformed_Copy_-_Sol_Amd_0002_16May18.pdf
PDF 1 MB Posted
- Attached to
- DLA DSCR Job Order Contract Federal contract opportunity
- Solicitation number
- W91236-18-R-0011
About this file
Conformed Copy of the Solicitation to include changes up to Amendment 0002 dated 16 May 2018.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91236-18-R-0011
This is a requirement for a single aw ard Indefinite-Delivery, Indefinite-Quantity Job Order Contract to be administered by the U.S. Army Corps of Engineers-Norfolk District in support of DLA/DSCR Richmond VA for the maintenance, repair, upgrade and minor construction of real property facilities at DSCR and related services as specif ied in accordance w ith the terms, conditions, special contract requirements, specif ications, draw ings, attachments, and exhibits in the solicitation.
Contract Period of Performance is a Five (5) Year Ordering Period.
This is an 8(a) competitive small business set aside limited to 8(a) f irms w hose principal place of business is located w ithin SBA Region III (Delaw are, Maryland, Pennsylvania, Virginia, Washington DC, and West Virginia) and other 8(a) construction f irms under the assigned NAICS code w ith a bona fide off ice w ithin SBA Region III (Delaw are, Maryland, Pennsylvania, Virginia, Washington DC, and West Virginia).
The assigned NAICS for this effort is 238990, All Other Specialty Trade Contractors; Business Size Standard is $15M.
Proposals shall be submitted electroncially via AMRDEC Safe Access File Exchange (SAFE) w ebsite at htps://safe.amrdec.army.mil/safe.
Proposals are due on Wednesday, 30 May 2018 at 10:00 am EST.
DANITA A YOUNG 757-201-7136
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
27-Apr-2018
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days af ter receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
757-201-7183FAX:TEL: TEL: FAX:
W91236-18-R-0011 57
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 11 00 - SF 1442 and CLIN Schedule
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Job Job Order Contract: Ordering Periods 1-5
FFP
The contractor shall provide personnel, supplies, materials, tools, and equipment to support the maintenance, repair, upgrade, and minor construction of real property facilities at DLA/DSCR in Richmond, VA. This work shall be accomplished IAW the SOW and Specifications in individual task orders and the basic contract on an as ordered basis. Task order prices will be determined by application of the appropriate coefficient against RSMeans Unit Price Book in effect at the time the Government issues the RFP for orders to be issued under this contract. The value of non-prepriced work will not exceed 10% of the total value of pre-priced items.
Offerors shall insert the proposed coefficients:
Coefficient for Normal Work Hours __________ Coefficient for Other Than Normal Work Hours ________ Non-Pre-priced Coefficient __________ The total of all task orders issued for each ordering period shall not exceed $5,000,000. The contract maximum total value is $25,000,000.
FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
FFP
CLIN DELETED UNDER SOLICITATION AMENDMENT 0002
QUANTITY
Section 00 21 00 - Instructions, Conditions & Notices to Offerors
INFORMATION TO OFFERORS
A. PROJECT OVERVIEW:
This is a requirement for a single award Indefinite-Delivery, Indefinite-Quantity (IDIQ) Job Order Contract (JOC) with firm-fixed-price task orders resulting from the solicitation. This IDIQ contract will be administered by the U.S.
Army Corps of Engineers-Norfolk District in support of the Defense Logistics Agency (DLA)/Defense Supply Center-Richmond (DSCR) for the maintenance, repair, upgrade, and construction of real property facilities at DSCR and related services as specified in accordance with the terms, conditions, special contract requirements, specifications, drawings, attachments, and exhibits in the solicitation.
Contract Period of Performance is a Five (5) Year Ordering Period Ordering Period 1: 2018 – 2019 Ordering Period 2: 2019 – 2020 Ordering Period 3: 2020 – 2021 Ordering Period 4: 2021 – 2022 Ordering Period 5: 2022 - 2023
Contract Value: The contract minimum is $2,500.00 and the contract maximum is $25,000,000.00.
This is an 8(a) competitive small business set aside limited to 8(a) firms whose principal place of business is located within SBA Region III (Delaware, Maryland, Pennsylvania, Virginia, Washington DC, and West Virginia) and other 8(a) construction firms under the assigned NAICS code with a bona fide office within SBA Region III (Delaware, Maryland, Pennsylvania, Virginia, Washington DC, and West Virginia).
NAICS: 238990, All Other Specialty Trade Contractors; Small Business Size Standard: $15M
B. OFFEROR QUESTIONS AND COMMENTS:
All questions, clarifications, verifications, and/or concerns regarding the solicitation package shall be submitted in writing and uploaded to ProjNet. ProjNet will close on Friday, 18 May 2018 at 10:00am EST to allow the Government sufficient time to respond to questions, clarifications, verifications, and/or comments. The Government will consolidated the responses and will be uploaded to FedBizOpps (FBO) as a separate attachment.
ProjNet Instructions:
1. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.
2. To submit and review inquiry items, offerors will need to be a current registered user or self-register in the system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click <continue>. From this page you may view all inquiries or add inquiry. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
3. The Solicitation Number is : W91236-18-R-0011
4. The Bidder Inquiry Key is: SNGQUZ-P49447
5. The Bidder Inquiry System will be unavailable for new inquires 10 days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
6. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
7. The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
C. WAGE DETERMINATION:
The Wage Rate Requirements (Construction), formerly known as the Davis-Bacon Act is applicable to this solicitation.
D. SMALL BUSINESS ADMINISTRATION (SBA):
The assigned SBA Requirement Number is 0304/16/608101
E. EVIDENCE OF AUTHORITY TO SIGN OFFERS:
Evidence of the authority of individuals signing offers to submit firm offers on behalf of the offeror is required except where the offer is signed, and shows that it is so signed, by: the President, Vice-President, or Secretary of an incorporated offeror; a partner in the case of a partnership; or the owner in the case of a sole proprietorship.
Failure to submit with the offer satisfactory evidence of the authority of all other persons may be cause for rejection of the offer as invalid or nonresponsive.
H. AGENTS:
Offers signed by an Agent must be made in the name of the Principal and must be accompanied by evidence of said Agent’s authority to act on behalf of its Principal.
F. INSPECTION OF THE SITE:
Prospective offerors are invited to attend a site visit Wednesday, 9 May 2018, 8:30am EST. Arrangements for inspection of the site shall be made in accordance with the guidance as provided in FAR clause 52.236-27, entitled
"SITE VISIT (CONSTRUCTION)."
G. INCURRING COSTS:
The Government is not liable for any costs incurred by the offeror submitting an offer in response to this solicitation.
H. UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL:
The contractor shall not accept instructions issued by any person, employed by the U.S. Government or otherwise, other than the Contracting Officer or the Authorized Representative of the Contracting Officer acting within the limits of his/her authority as defined in the Designation of Authority letter. A copy of the Designation of Authority letter will be furnished to the contractor at time of contract award.
I. PRICING/COEFFICIENT/UNIT PRICE BOOK:
This requirement will require the contractor to obtain and maintain, at their own expense, the most recent version (as applicable throughout contract performance, including during successive optional ordering periods) of the approved estimating software, RSMeans Online for the life of this contract with as many licensed copies as required for the efficient operation of this contract.
J. REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF BIDDERS
The offeror shall ensure their business has completed their FAR and DFARS Online Representations and Certifications at the System for Award Management (SAM) website at https://www.sam.gov/portal/public/SAM/. It is the offeror’s responsibility to ensure the information provided in each certification/representation is accurate and complete.
Provide a complete copy of all Offeror Representations and Certifications from the System for Award Management (SAM) and all additional certifications found within the solicitation.
K. BID GUARANTEE
A Bid Guarantee is required and shall be provided in the amount of twenty percent (20%) of the estimated annual maximum value of $5,000,000 for the first ordering period. (Bidders must use the Standard Form (SF) 24 if providing a bid bond as the bid guarantee).
L. COMPLETE PROPOSAL PACKAGE:
Signed and completed SF1442 with signed copies of all amendments (SF30) Complete copies of: Volume I – Technical, Volume II – Past Performance, and Volume III –
Price (Coefficient) Bid Guarantee
Offerors shall be currently registered in SAM (https://www.sam.gov/portal/public/SAM/) Offerors shall ensure the NAICS 238990, applicable to this requirement is listed on the offeror’s SAM record
FAR and DFARS Representations and Certifications within SAM record need to be accurate and complete.
Any additional verification/requested documents or information.
M. ATTACHMENTS TO THE RFP:
Document Type Number Description Pages Date
Attachment 1 Specialized Experience for JOC Contracts 1
Attachment 1a Detail Sheet – Specialized Experience for JOC Contracts 1
Attachment 2 Specialized Experience for Non-JOC Contracts 1
Attachment 2a Detail Sheet – Specialized Experience for Non-JOC Contracts 1
Attachment 3 Self-Assessment – Past Performance Worksheet 1
Attachment 4 Bid Schedule - Coefficient Spreadsheet 1
Attachment 5 Division 01 - General Requirements 280 5-Mar-18
Attachment 6 SOW - DLA/DSCR JOC 25 3-Apr-18
Attachment 7 Site Visit Map 1
N. MINIMUM GUARANTEE:
The minimum guarantee for this effort is $25,000 for the first ordering period.
O. CONTRACT MANPOWER REPORTING:
The office of the Assistant Secretary of the Army (Manpower and Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for the performance of this contract. The web address for the data collection site is:
https://www.ecmra.mil/Default.aspx
P. POINT OF CONTACT:
The point of contact for this action is Kevin Comegys, Contract Specialist, kevin.e.comegys@usace.army.mil and Danita Young, Contracting Officer, danita.a.young@usace.army.mil. Please note, all questions and comments shall be submitted via Projnet (refer to paragraph B. Offeror Questions and Comments) by the provided due date and time. The Government will not respond to questions and comments submitted via email or via telephone.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.203-11 Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions
SEP 2007
52.204-7 System for Award Management OCT 2016 52.222-38 Compliance With Veterans' Employment Reporting
Requirements
FEB 2016
52.232-13 Notice Of Progress Payments APR 1984 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.236-7008 Contract Prices-Bidding Schedules DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm-fixed-price contract resulting from this solicitation.
(End of provision)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)
The offeror represents that --
(a) ( ) It has, ( ) has not participated in a previous contract or subcontract subject to the Equal Opportunity clause of this solicitation;
(b) ( ) It has, ( ) has not, filed all required compliance reports; and
(c) Representations indicating submission of required compliance reports, signed by proposed subcontractors, will be obtained before subcontract awards.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
24.9% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is DLA/ DSCR Richmond, VA.
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from U.S. Army Corps of Engineers-Norfolk District, ATTN: Danita Young, Contracting Officer, 803 Front Street, Norfolk, Virginia 23510.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
A site visit will be held on Wednesday, 9 May 2018, 8:30am EST The site visit will be held at DLA/DSCR-Richmond, VA.
Attendees must possess a valid Government issued photo identification to gain access to the DLA
Installation.
Location: Meet at the large parking lot just south of Bldg 80 (refer to attached facility map)
DLA POC:
o Name: Mike O’Connor, DLA Installation Management o Office Phone: 804-279-4799 Cell Phone: 804-306-5273
DLA Base Access: Contact the DLA POC above Pass Office: Only located at the NORTH GATE of DLA/DSCR (there is NO pass office at the EAST
GATE)
Directions: Access Chippenham Parkway; take the Strathmore Road exitm, labeled “DSCR DLA” and follow the signs to the base’s NORTH GAE; the pass ofice is just to the right of the gate; stay to the right and park in front of the Pass Office to obtain your passes
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, Basis of Award One-Step-Best Value, Design-Build (Single Award)
PROPOSAL SUBMISSION RQMNTS
1. OVERVIEW
1.1 The purpose of these instructions is to establish a uniform evaluation procedure for the proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value decision by the Source Selection Authority (SSA) using the Tradeoff Process. In as much as the proposal shall describe the capability of the Offeror to perform the resulting contract, the proposal shall be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.
1.2 The Government will conduct a Best Value Tradeoff of three evaluation factors. The factors are as follows:
Factor 1 – Specialized Experience Factor 2 – Past Performance Factor 3 – Price (Coefficient)
All evaluation factors when combined are significantly more important than price (coefficient).
2. GENERAL INSTRUCTIONS
2.1 Any legally organized Offeror who agrees to follow the conditions of the RFP may submit a proposal.
2.2 Offerors shall not submit any materials not required by this solicitation (such as company brochures, etc.).
2.3 Offerors shall submit their proposal packages electronically via the AMRDEC Safe Access File Exchange (SAFE) website at https://safe.amrdec.army.mil/safe. Proposals must be uploaded to the AMRDEC website with a date/time stamped not later than the time and date specified in Block 10 of Standard Form 1442.
2.4 The Government is not liable for any costs Offerors incur in the preparation and submission of a proposal in response to this solicitation.
2.5 Offerors are cautioned that “parroting” of the requirements with a statement of intent to perform or the use of phrases such as, “standard procedures will be employed” or “well known techniques will be used” does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of their proposal. Failure to provide sufficient detail may result in an unacceptable rating.
2.6 Proposal Submission Requirements
2.6.1 The Offeror’s proposal shall be submitted electronically and shall consist of three volumes, Volume I – Technical, Volume II – Past Performance, and Volume III – Price (Coefficient) and
Pro Forma Information. The proposal shall not contain classified data. The use of hyperlinks in proposals is prohibited.
2.6.2 Each volume of the proposal shall be submitted as a separate electronic volume and shall be clearly identified as such when uploaded to the AMRDEC website. The uploaded documents shall be in Microsoft Office 2013 (.docx) or Portable Document Format (PDF) using Adobe Acrobat 9.0. Offerors shall not submit any documents in PDF that cannot be electronically searched. Offerors may use JPEG images for charts or screen shots. Price (coefficient) shall be submitted in Microsoft Excel 2013 (.xlsx) format to aide in the evaluation of the coefficient.
Offerors shall name documents using standard naming conventions (e.g. Offeror Name-Volume Name.docx). Each volume shall be in a single searchable file with copy/paste capability, and stored in a folder that corresponds to the proposal volume it represents. Offerors shall insert the file name in the header of each document.
2.6.3 The proposal type size for text shall not be smaller than Microsoft Word Times New Roman 12 point font. The text shall be single column, normal proportional spacing and one inch (1”) margins (top, bottom, left, and right). The text for charts, tables, graphs, and figures shall be no smaller than Microsoft Word, Times New Roman or Arial Narrow, 8 point font. Text lines and table lines of text shall be single-spaced. Page color for each page of the proposal shall be white. Information submitted shall not exceed the page limits for each volume. Proposals shall be prepared using 8-½ inch x 11 inch paper format. Fold-outs shall not exceed 11 inch x 17 inch and shall count as one (1) page. Fold-outs shall be kept to a minimum and shall be used only where a table or other graphic cannot be accommodated by a single 8-½ inch x 11 inch page. All material shall be contained within the page limit identified for each volume. All appendices, charts, graphs, diagrams, tables, photographs, drawings, etc., are included in the page count.
The Government will not include the following in the page limitation: Cover page for volumes, tables of contents, indices, section dividers/tables, title pages, cross reference matrix, organizational chart, technical definition page(s), and acronym list will not be included in the page count. They will be counted if they contain any other information e.g., diagrams, extraneous data, etc. Pages marked “This page intentionally left blank” and without any additional information will not be counted.
Information submitted shall not exceed the page limits stated below for each volume and tab.
Evaluators will only read up to the maximum number of pages specified. If the page limit is exceeded, the pages in excess of the limit will be removed from the applicable volume or tab and will not be considered as part of the evaluation. Data submitted prior to the proposal submission due date will not be considered in the Government’s evaluation; therefore such data shall not be relied upon or incorporated in the proposal by reference.
Page limitations are as provided in the table below:
Volume Title Printed Copies Electronic Copies Maximum Pages
I Technical None 1
Specialized Experience None 1 40
II Past Performance None 1 30
III Price (Coefficient) None 1 No Limit
2.6.4 Any information that is changed as a result of negotiations or proposal revisions shall be clearly marked as a revision and dated.
2.6.5 All information shall be confined to the appropriate volume. The Offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner and to permit a complete and accurate evaluation.
3. BASIS OF AWARD
It is intended that this RFP will result in a Firm-Fixed-Price contract. The Contracting Officer will award this contract to that responsible Offeror whose proposal conforms with all the terms and conditions of the solicitation and the proposal is determined to represent the best overall value to the Government, considering non-price factors described herein, and the coefficient. All evaluation factors, when combined, are significantly more important than price (coefficient). After the Government individually evaluates and rates each proposal, the Contracting Officer/Source Selection Authority will compare proposals to determine which proposal represents the best value. The Government reserves the right to accept other than the lowest priced offer or reject all offers. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR 15.001.
4. PROPOSAL CONTENT AND EVALUATION RATING DEFINITIONS
4.1 Evaluation Factors Table
Factor Location Description Relative Importance
Volume I Technical
1 Specialized Experience Most Important Factor
2 Volume II Past Performance 2ndMost Important Factor
3 Volume III Price (Coefficient) and Pro Forma Information 3rd Most Important Factor
Tab A Signed Solicitation & Amendments Not Rated Tab B Bid Guarantee Not Rated Tab C Required Pre-Award Information Not Rated
Tab D Contractor Team Arrangements (e.g., JV Agreement/LLC) Not Rated
4.2 Evaluation Rating Definitions
4.2.1 The Source Selection Authority (SSA) will ensure the evaluation of all Factors has been conducted in accordance with the solicitation and all applicable acquisition laws and regulations.
4.2.2 Technical Factor 1 will be adjectivally evaluated using the combined technical/risk rating in the below table.
Combined Technical/Risk Rating
Color Rating Adjectival Rating Description Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.
Proposal is unawardable.
4.2.3 Risk ratings for Technical Factor 1 will use the descriptions in the following table.
Technical Risk Rating
Adjectival Rating Description Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule and degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule and degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule and degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
4.2.5 The overarching evaluation approach for all factors is as follows:
Adequacy of Response. The proposal will be evaluated to determine the extent to which the Offeror’s methods and approach have adequately and completely considered, defined and satisfied the requirements specified in the solicitation. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission requirements of the solicitation.
Feasibility of Approach. The proposal will be evaluated to determine the extent to which the proposed approach is workable and the end results achievable. The proposal will be evaluated to determine the extent to which successful performance is contingent upon proven practices/processes and techniques. The proposal will be evaluated to determine the extent to which the Offeror is expected to be able to successfully complete the proposed tasks and technical requirements within the required schedule.
4.2.6 The Government will evaluate the proposals and rate the quality of each technical evaluation factor. The SSEB will rate each proposal against the specified evaluation criteria in the solicitation requirements. Proposals will not be compared at this time. After all proposals are rated, the Government’s Source Selection Authority will compare the ratings and relative advantages and disadvantages of proposals against one another in order to determine which Offerors are the most highly qualified.
4.2.7 Rating Definition for Volume II - Past Performance.
4.2.7.1 Recency. The Government will first evaluate the recency of the Offeror’s past performance.
4.2.7.2 Relevance. The Government will next rate the relevancy of recent projects submitted under Factor 1, Specialized Experience in accordance with the definitions in the below table.
The relevancy rating is not a separate proposal rating but is only used in developing overall past performance confidence assessment rating.
Past Performance Relevancy Rating
Adjectival Rating Description Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
4.2.7.3 The Government will next consider how well the Offeror performed on the submitted projects. The Government will consider the recency and relevancy of the information, source of the information, context of the data, and general trends in contractor performance. With respect to relevancy, past performance on projects with more relevance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment rating than past performance on projects of lesser relevance.
4.2.7.4 The Government will target areas covered in the requirement of this solicitation including quality, schedule, cost control, problem resolution for design or construction errors, warranty work and safety. The Government will place a higher value on projects, which document successful outcomes and are supported by outside source confirmation, for example, information found in the Contractor Performance Appraisal Reporting System (CPARS) or other agency performance databases, or personal knowledge. The Government also places a higher value on projects, which provided particularly difficult or unique challenges and the innovative methods the contractor used to resolve problems successfully.
4.2.7.5 The rating for Volume II - Past Performance will be expressed as a degree of confidence in the Offeror’s ability to successfully perform the contract. The rating system used for the performance confidence assessment is provided in the below table.
Performance Confidence Assessments Rating
Adjectival Rating Description Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
4.3 Volume III – Price (Coefficient) will be evaluated by the Cost/Price Evaluation Team.
Proposals will be evaluated using price analysis techniques and will be evaluated for price fair and reasonableness. Price will not be rated or scored.
5. VOLUME I - TECHNICAL
5.1 TAB A – SPECIALIZED EXPERIENCE
5.1.1 Submission Requirements:
The Offeror shall demonstrate recent and relevant JOC experience on the applicable combination of attachment(s) to document their Specialized Experience. Offerors must use the formats in the below attachments when submitting Specialized Experience.
Attachment 1: Specialized Experience for JOC Contracts Attachment 1a: Detail Sheet-Specialized Experience for JOC Projects Attachment 2: Specialized Experience for Non-JOC Contracts Attachment 2a: Detail Sheet-Specialized Experience for Non-JOC Projects
A project is defined as a construction project, a JOC, or a multiple or single award task order contract. A JOC and/or multiple or single award task order contract will count as one (1) project.
Projects submitted for specialized experience shall demonstrate experience in managing multiple projects performed simultaneously. Previous experience may include, but is not limited to JOC experience; however, additional consideration will be given to offerors with previous JOC experience.
Offerors may provide a supplemental narrative (exclusive of the submitted projects/contracts) for additional consideration. The supplemental narrative shall not exceed two (2) pages and should explain how the offeror’s experience, not directly related to managing multiple projects simultaneously, is applicable to this project and how the Government will benefit.
Attachment 1: Specialized Experience for JOC Contracts Offerors shall complete the Attachment 1 Spreadsheet – the format must be followed for an
Offeror’s submission to be evaluated.
Offerors may list up to five (5) JOC contracts that best represent the Offeror’s work experience required on this solicitation; if more than five contracts are submitted, only the first five contracts on the list will be evaluated. (NOTE: Only a total of five (5) examples of specialized experience in total on Attachment 1 and 2 will be considered; i.e., for example, an Offeror may present two (2) JOC contracts plus three (3) Non-JOC projects for a total of five (5) items of specialized experience; or an Offeror may present five (5) JOC contracts plus 0 (zero) NON-JOC projects for a total of five (5) items of specialized experience.)
Each contract listed must have been performed within the last six (6) years from the date of this solicitation; if a project is submitted that was performed more than six (6) years ago, it will not be evaluated.
If the contract listed is currently being performed, it must be at least 50% complete, as of the date of this solicitation.
Attachment 1a: Detail Sheet – Specialized Experience for JOC Contracts Offerors shall complete a Detail Sheet for each JOC Contract listed on Attachment 1 – this format must be followed for an Offeror’s submission to be evaluated.
Each item on the Detail Sheet shall be addressed by the Offeror (ie, name and location of the contract; day, month and year contract was completed; final cost of this contract; is the contract more than 50% complete; provide detailed information for construction work per discipline listed on the Attachment 1a form; provide documentation for and explain any Prime, Key Subcontractor, Joint Venture or Mentor-Protégé arrangement).
Attachment 2: Specialized Experience for Non-JOC Projects Offerors shall complete the Attachment 2 Spreadsheet – this format must be followed for an
Offeror’s submission to be evaluated.
Projects listed on this attachment must have a value between $2,500 and $5,000,000.
Offerors may list up to five (5) Non-JOC projects that best represent the Offeror’s work experience required on this solicitation; if more than five projects are submitted, only the first five projects on the list will be evaluated. (NOTE: Only a total of five (5) examples of specialized experience in total on Attachment 1 and 2 will be considered; i.e., for example, an Offeror may present two (2) JOC contracts plus three (3) Non-JOC projects for a total of 5 items of specialized experience; or an Offeror may present five (5) JOC contracts plus 0 (zero) NON-JOC projects for a total of five (5) items of specialized experience.)
Each project listed must have been performed within the last six (6) years from the date of this solicitation; if a project is submitted that was performed more than six (6) years ago, it will not be evaluated.
If the contract listed is currently being performed, it must be at least 50% complete, as of the date of this solicitation.
Attachment 2a: Detail Sheet — Specialized Experience for Non-JOC Projects Offerors shall complete a Detail Sheet for each Non-JOC Contract listed on Attachment 2 – this format must be followed for an Offeror’s submission to be evaluated.
Each item on the Detail Sheet shall be addressed by the Offeror (i.e., name and location of the contract; day, month and year contract was completed; final cost of this contract; is the contract more than 50% complete; provide detailed information for construction work per discipline listed on the Attachment 2a form; provide documentation for and explain any Prime, Key Subcontractor, Joint Venture or Mentor-Protégé arrangement).
5.1.1.1 Additional Submission Requirements
Five (5) Projects or Contract Examples Offerors may present a maximum total of five (5) examples of specialized experience on Attachments 1 and 2; i.e., for example, an Offeror may present two (2) JOC contracts plus three
(3) Non-JOC projects for a total of five (5) items of specialized experience; or an Offeror may present one (1) JOC contract plus four (4) Non-JOC projects for a total of five (5) examples of specialized experience.
Specialized Experience Presented as Prime, Joint Venture or Mentor-Protégé The offeror may submit up to 5 projects. The government may rate the offeror higher if the offeror has performed as the prime contractor on at least 3 of the 5 projects submitted for specialized experience. In case of a Joint Venture (JV)/Mentor-Protégé (MP), the work as the prime must have been performed by at least one of the JV/MP partners.
Experience in Managing Multiple Projects Simultaneously Projects or contracts submitted for specialized experience should demonstrate experience in managing multiple projects performed simultaneously. Previous experience may include, but is not limited to JOC experience. However, extra consideration will be given to Offerors with previous JOC experience.
Difficult Challenges and Resulting Solutions For any project or contract submitted as specialized experience, describe, in narrative form on the appropriate detail sheet, any difficult challenges encountered and the resulting solution.
Elaborate on instances where a large number of task orders or projects were simultaneously managed and delivered successfully and on time. Explain how your management process will facilitate a successful, on-time delivery.
Presenting the Experience of Another Company Other Than the Offeror If an offeror presents experience of another company, the submission should include a description of the company(s) and what roles they perform in the project, do the companies comprise a Joint Venture, Mentor-Protégé or Prime-Key Subcontractor role? If a Key Subcontractor’s experience is submitted for evaluation purposes, clearly address the experience of the Prime with those particular Key Subcontractors. If a Joint Venture, the offeror shall clearly address the experience of each of the Joint Venture Partners and the relationship of the JV partners on any ongoing or previous projects. If in a Mentor-Protégé relationship, explain the relationship and the experience of each partner.